Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
LA CROSSE BOILING WATER REACTOR
LICENSE TERMINATION PLAN
CHAPTER 1
GENERAL INFORMATION
La CrossLicense TRevision
1. Gen1.1. 1.2. 1.3.
1.3.1.3.1.3.1.3.41.3.1.3.1.3.
1.4. 1.5.
1.5.1.5.1.5.1.5.41.5.1.5.1.5.1.5.
1.6. 1.7.
Figure 1-Figure 1-Figure 1-Figure 1-
se Boiling WTermination
n 0
neral InformaPurpose .....DecommissFacility ......1. Site De2. Current3. Meteor4. Geolog5. Surface6. Ground7. EnvironOperationalPlan Summ1. Genera2. Site Ch3. Identifi4. Remed5. Final R6. Compli7. Update8. SupplemRegulatory References
-1 Site Re-2 Site Ov-3 LACBW-4 Topogr
Water ReactorPlan
ation ..............................
sioning Obje...................escription ....t/Future Lanrology and Cgy and Seisme Water Hydd Water Hydns and Naturl Backgroundary .............
al Informatioharacterizatioication of Re
diation Plans Radiation Suriance with th
e of the Site-ment to the ENotification...................
egional Locaverview .......WR Buildingraphical Map
r
TABLE O
....................
....................ective ...................................................
nd Use .........Climatology .mology .........drology ........drology ........ral Resourced .....................................
on .................on ................emaining Sit...................
rvey Plan ....he RadiologiSpecific DecEnvironmen
ns of Change....................
LIST O
ation .................................gs ................p ..................
1-i
OF CONTE
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................es .................................................................................................te Dismantle........................................ical Criteria commission
ntal Report ...es .....................................
OF FIGURE
....................
....................
....................
....................
ENTS
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................ement Activi........................................for License
ning Costs ................................................................
RES
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................ities .....................................................Termination
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................n ..................................................................................................
....................
....................
....................
....................
... 1-1
... 1-1
... 1-1
... 1-2
... 1-2
... 1-3
... 1-3
... 1-3
... 1-4
... 1-5
... 1-5
... 1-6
... 1-7
... 1-7
... 1-7
... 1-8
... 1-8
... 1-9
... 1-9
... 1-9
... 1-9
. 1-10
. 1-11
. 1-13
. 1-14
. 1-15
. 1-16
La CrossLicense TRevision
ALARA
AMCG
AMSL
BGS
DCGL
DQO
DSAR
FSS
FRS
GWH
ISFSI
LACBW
LSA
LTP
MARSSI
MYBP
NRC
ODCM
PSDAR
RESRAD
STS
USACE
se Boiling WTermination
n 0
As Lo
Avera
Above
Below
Deriv
Data Q
Defue
Final
Final
Gigaw
Indep
WR La Cr
Low S
Licen
IM Multi-
Millio
Nucle
Off-S
Post-S
D RESid
Sourc
US Ar
Water ReactorPlan
LIST OF
ow As Reaso
age Member
e Mean Sea
w Ground Su
ed Concentr
Quality Obje
eled Safety A
Status Surve
Radiation Su
watt-Hours
endent Spen
rosse Boiling
Specific Act
se Terminati
-Agency Rad
on Years Bef
ear Regulator
ite Dose Cal
Shutdown D
dual RADioa
e Term Surv
rmy Corp of
r
ACRONYM
onably Achie
of the Critic
Level
urface
ration Guide
ectives
Analysis Rep
ey
urvey
nt Fuel Stora
g Water Reac
ivity
ion Plan
diation Surv
fore Present
ry Commiss
lculation Ma
ecommissio
active Mater
vey
f Engineers
1-ii
MS AND AB
evable
cal Group
line Level
port
age Installatio
ctor
vey and Site
ion
anual
ning Activit
rials
BBREVIAT
on
Investigatio
ties Report
TIONS
n Manual
La CrossLicense TRevision
1. G
The La Cthat is owlocated oVillage o
LACBWS4601 StGenoa, W
The site ifor LACB
LACBWspent nuclicense.
In a lettrequestedmaintenafrom DaiSolutions
1.1. P
The objepermit th50 licensgeneral li
This Licewas writtfor LicenReview Paccompathe LTP r
1.2. D
The decoLACBWremaininthe requidocumenthat is dAverage
se Boiling WTermination
n 0
General In
Crosse Boiliwned by Dairon the Dairyof Genoa, Ve
WR tate Road 35WI. 54632-88
is licensed uBWR and 72
WR has been clear fuel st
ter dated Od Nuclear Rance and deiryland to Sos.
Purpose
ctive of decohe release of se except foicense provi
ense Terminten followin
nse TerminaPlan for Evaanied by a prrequire NRC
Decommissio
ommissioninWR can submng ISFSI liceirements of
nts the procedistinguishab
Member of
Water ReactorPlan
nformation
ing Water Rryland Poweyland Genoaernon Count
5 846
under Posses2-046 for the
shut down ored in the L
October 8, 2Regulatory Cecommissionolutions. In
ommissioninthe site for ur the area suisions of 10 C
nation Plan (Lng the guidantion Plans foluating Nuclroposed licenC prior appro
oning Objec
ng objectivemit a requestensed facility
10 CFR 20ess that will ble from bathe Critical
r
n
Reactor (LACer Cooperatia site on thty, Wisconsin
ssion Only Le Independen
since 1987 LACBWR I
2015 (1), DCommission ning authoritn May 2016,
ng LACBWRunrestricted urrounding tCFR 72 Sub
LTP) satisfience in Regu
for Nuclear Plear Power Rnse amendmoval.
ctive
e is to condt to the NRCy) in accorda0.1402, Radbe used to dckground raGroup (AM
1-1
CBWR) wave (Dairylan
he east shoren with an ad
License No. Dnt Spent Fue
and is curreISFSI will b
Dairyland an(NRC) con
ties, under the NRC pr
R is to reducuse and allothe ISFSI.
bpart K.
es the requirulatory GuidPower ReacReactor Lice
ment that est
duct remediC for unrestance with Su
diological Crdemonstrate adioactivity
MCG) from a
as a 50 Megnd). This une of the Mi
ddress of:
DPR-45 withel Storage In
ently undergbe maintaine
nd LaCrossensent to tranPossession rovided cons
ce the residuow for the terThe ISFSI f
rement of 10de 1.179, Stactors (2) andense Terminablishes the
iation and stricted releasubpart E of 1riteria for Uthat the dosdoes not e
all applicable
gawatt Electrnit, also knowississippi Ri
h Docket Nunstallation (I
going decomed under an
eSolutions, nsfer Dairyla
Only Licensent to trans
ual radioactivrmination offacility is li
0 CFR 50.82andard Formd in NUREGnation Plans
criteria for
survey operse of the sit10 CFR PartUnrestrictedse from residexceed 25 me pathways o
ric (MWe) Bwn as Genoaiver south o
umbers of 50SFSI).
mmissioningamended Pa
LLC (Solutand’s possesnse No. DPRsfer the licen
vity to levelf the 10 CFRcensed unde
2(a)(9). Thismat and ConG-1700, Stan
(3). This Lwhen chang
rations suchte (other that 20 after med Use. The dual radioacmrem/year toover a 1,000
BWR a 2, is of the
0-409
. The art 50
tions) ssion, R-45, nse to
s that R Part er the
s LTP ntents ndard
LTP is ges to
h that an the eeting
LTP ctivity o the
0 year
La CrossLicense TRevisionperiod anAchievab
1.3. F
1.3.1. LACBWMississipsouth of nearby pLACBWmile 678approximrail road(AMSL) Boiling W
The licenLACBWplant, offand inclu
the
the coa
an a(Ge
an a
a pa
The site iMississipmiles upThe site i35. A Bcommercthis rail National LACBWand sturgLACBW
se Boiling WTermination
n 0 nd that residuble” (ALAR
Facility
Site Desc
WR is locatedppi River, abthe city of Lprominent f
WR are longit8.6 on the mately 300 fe. The reactoper NURE
Water Reacto
nsed site coWR comprisin
f of Highwaude:
LACBWR p
land north oal (and later o
area directlyenoa Station
area south o
arcel of land
is bordered oppi River anstream, manis bordered o
Burlington Ncial freight aline. The sWildlife &
WR, is the Gegeon. On th
WR plant, is a
Water ReactorPlan
ual radioactiA).
cription
d in southwbout 1 mile
La Crosse, Wfeatures suchtude 91o, 13’Mississippi
feet from theor stands onG-0191, Enor (4).
omprises a ng only 1.5 ay 35. The p
plant,
of LACBWRoil) fueled p
y south of LA #3) approxi
f Genoa #3 w
d to the east o
on the northnd Highway naged by theon the west b
Northern-Santalong the eassite is borde
& Fish Refugenoa Nationhe southwes
a public boat
r
ivity has bee
western Wiscsouth of the
WI. See Figuh as highw’, 53.35” WeRiver abov
e Mississippin filled land nvironmental
total of 163acres. The
prominent fe
R, including power plant (
ACBWR witimately 175
where the IS
of Highway
h by the Miss35. The U.
e U.S. Armyby the Missita Fe rail linstern portionered to the sge Pool 9 a
nal Fish Hatcstern corner t launching r
1-2
en reduced to
consin, in Ve Village of ure 1-1 for a
ways, rivers est and latituve the mouti River and at an elevat
l Statement
3.5 acres (5site is acce
eatures on th
the site swit(removed in
th an operatifeet from th
SFSI is locat
35, across fr
sissippi Rive.S. Lock & D
y Corp of Enissippi Riverne, located bn of the site;south by a sarea. Furthechery whichof the site,
ramp with a p
o levels that
Vernon Counf Genoa, WI
map showinand lakes.
ude 43o, 33’,th of the O475 feet wetion of 639 related to
5) which is essed by a rhe site are sh
tchyard and 1989),
ional 350-Mhe LACBWR
ted, and
from LACBW
er and a narrDam No. 8 ngineers (USr and is bordbetween the ; there are nsegment of ter south, ap
h raises enda, approximaparking lot.
are “As Low
nty, on the eand approx
ng the site lo The map
, 36.22” NorOhio River. est of the car
feet Above Operation o
owned by road on the hown in Fig
the site of th
Mwe fossil geR plant,
WR.
row strip of is located a
SACE), Rocdered on the
site and Higno passenger the Upper M
pproximatelyangered musately 0.75 m
w As Reason
east shore oximately 19 mocation, inclu coordinaterth. The site
The reactrgo-carryingMean Sea L
of the La C
Dairyland, south side o
gures 1-2 an
he former G-
enerating stat
land betweeapproximatelck Island Dis
east by Highghway 35 ca
r trains whicMississippi Ry 2.4 miles ssels, brook
miles south o
nably
of the miles uding
es for e is at tor is
g-only Level
Crosse
with of the nd 1-3
-1
tion
en the ly 0.6 strict. hway arries h use River from trout
of the
La CrossLicense TRevision1.3.2. The site the Genothe presecontinue future lanThe speinterim establish
1.3.3. The La Cin Genoaweather rdata inclu
Temperathe extreAverage summer and 1995
Monthly spring an
The bluffshows prwinds foLACBWaverage w
1.3.4. LACBWphysiogrPleistoceearly Palwhich haarea. Ma
Bedrock WisconsiPresent compositdolomiteboth side
se Boiling WTermination
n 0 Current/
has been cooa 3 facility ence of the a
as an indusnd use, otherent nuclear storage faced and ready
Meteorol
Crosse Munia maintain related inforudes: wind s
atures in the emes being temperatureseason. A r
5. The recor
precipitationd summer s
ffs of the Misrevailing souor the month
WR Site wherwind speeds
Geology
WR is locataphic provi
ene Epoch aleozoic age. as been modaximum relie
in the site rin Dome by[MYBP]) stion. The Ps, sandstonees of the Mi
Water ReactorPlan
Future Lan
ontinuously uand supportash landfillsstrial-use pror than perhapfuel is expe
cility, or liy to receive L
logy and Cli
cipal Airporlong standin
rmation in thspeed and dir
La Crosse rmore marke
es range fromrecord maxird low was -4
on averages easons and o
ssissippi Rivutherly windhs of Novere the river are typically
and Seismo
ted within ince. The and is charac
Moderate tdified by a mef in the regi
region consisy early Paleedimentary
Paleozoic roces and shalesississippi riv
r
nd Use
used for induing operatio, as well as operty after ps recreationected to remicensed temLACBWR f
imatology
rt located in ng active w
he La Crosserection, temp
region are tyed because m 20 °F in thmum tempe43 °F in Janu
in the area one to three
ver Valley chs for seven mmber througvalley runs y 6-10 mph.
ology
the WiscoWisconsin
cterized by to strong relmantle of loion is about
sts of Pre-Caeozoic (Camstrata. Ba
cks are 1,20s. About 600ver in the pl
1-3
ustrial purpoons (e.g. barg
the on-site decommiss
nal, can be emain at the mporary mofuel.
the town of weather statie – Genoa reperature, and
ypical of theof the riverhe three mo
erature of 10uary of 1873
ranges frominches per m
hannel the wmonths of thgh March onorth-south
onsin DriftlDriftless
flat lying nlief has been
oess and glac1,000 feet.
ambrian crymbrian and asement roc0-1,300 feet0 feet of thislant vicinity
oses since 1ge washing, ISFSI, it is
sioning is coenvisioned oISFSI until
onitored retr
f La Crosse aions that megion of the d precipitati
e extremes or valley locaonths of the w08 °F was re3.
m three to fmonth for the
winds at the Lhe year with of the year.
are from th
less sectionsection was
naturally disn produced ocial outwash
ystalline rockOrdovician,
cks in the st thick in ths sequence isy. Prior to t
941. Due toswitchyard)anticipated
ompleted. Nover the next
a federal rerievable sto
and the USAmonitor and
Mississippi on (6) (7).
of a contineation of the winter seasoecorded in J
five inches pe rest of the
LACBWR Sprevailing n Predomina
he north and
n of the Cs not glaci
ssected sedimon the unglah in the larg
ks exposed a, 572 Milliosite vicinity
he site vicinis exposed althe Pleistoce
o the presen) on the propthat the site
No other cret several decepository, oorage facilit
ACE Lock 8 archive stanRiver. Coll
ntal climateLACBWR
on to 72 °F iJuly of both
per month iyear.
Site. Airportnorth to northant winds a
d south. Mo
Central Lowiated duringmentary rocaciated landsger valleys o
at the crest oon Years By are of graity and conslong the blufene Epoch (
nce of perty, e will edible cades. offsite ty is
Dam ndard lected
e with Site.
in the 1936
in the
t data hwest at the onthly
wland g the ks of scape of the
of the Before
anitic sist of ffs on (more
La CrossLicense TRevisionthan 2 Mtoday. It
The site Region csynclinesSuperior formed d
Major upSome miMYBP). of the Wsediment
Many faucapable ageologic mapped iseveral nfound anseismicitsite” (8).
Seismic 2008 ocdecommi
1.3.5. The LACthe vicinPrairie duwidth. T
There is land, islasloughs athe uplanchannel a
The mainare operaof the sitdistance the site.
Part of thplant. Tone to th
se Boiling WTermination
n 0 MYBP) the rit was buried
is located consists of s and archessyncline, Fo
during the La
plift and dowinor tilting o The site is
Wisconsin Atary strata in
ults have beaccording toconditions i
in the site renuclear poweny evidencety. Therefor
activity (maccurred oveissioning (9)
Surface W
CBWR site iity of the situ Chien, app
The valley wa
little or no aands betweeand meandernd where trare wooded.
n channel ofated by the Ute) the river iof 20 miles,
he licensed herefore, dr
he south, so
Water ReactorPlan
iver had carvby post-glac
within the a vast area
s. Major strorest City baate Pre-Camb
wn-warping aoccurred durilocated on th
Arch, a soutn the vicinity
een mappedo the criteriain the site viegion, but iner plant sitese of capablre, capable
agnitudes raer 180 mile).
Water Hydr
is in the Mite, the valleyproximatelyalls rise shar
agricultural en river charing river chributary stre The flat up
f the river vaUSACE for nis nearly fouthen gradua
area (27 acainage at ththat only p
r
ved a gorge cial sedimen
Central Staba of large cructural featasin, Michigbrian and Ea
also occurreing and follohe southwesthward proj
y dip less tha
d in the site a in 10 CFR icinity that r
nvestigationss in the regioe faulting. faulting doe
anging from es from th
rology
ssissippi Rivy is deeply cy 40 miles sorply 500 to 6
use of the riannels and ehannels. Nuams intercep
pland areas a
aries greatly navigational ur miles widally widens a
cres) is on ae site has berecipitation
1-4
as much as nt.
ble Region circular uplitures includgan Basin, anarly Paleozo
ed during latowing the Plt flank of theection of th
an 20 feet per
region. No100, Appen
represent hazs of all of theon, in additio Additiona
es not need
3.5 to 5.4)e site and
ver valley ancut into highlouth, the val600 feet from
iver valley fextensions o
umerous shorpt the main
and some of t
in width abopurposes. A
de. Below thas the river a
a filled in areen establishthat falls on
150 to 210
tectonic proifts and sed
de the Wiscond Illinois B
oic (more tha
te Paleozoic leistocene ge Wisconsinhe Wisconsir mile to the
one of thesendix A. Per zard to the fese faults duon to studies
ally, the areto be consi
that has bedid not i
nd is relativly dissected lley varies b
m river level
floor which of low lyingrt, steep-side
n river vallethe tributary
ove and beloAbove Dam he site, the riapproaches D
rea south ofhed. One vn the bluff a
feet deeper
ovince. Thdimentary baonsin DomeBasin. Thesan 435 MYB
(330 MYBPlaciations (2
n Dome and in Dome.
e southwest.
e faults are the US NR
facility. Numuring the cous for the LAea is one odered in the
een noted beimpact plan
vely flat (seeuplands. Fr
between 2.5 .
consists primg flood plaied valleys hey. Both wy valleys are
ow the site. No. 8 (abou
iver is relativDam No. 9,
f the originavalley drains adjacent to t
than can be
he Central Sasins, and b
e and Arch, e structures
BP).
P to 240 MY2 MYBP to 0the western For this re
considered RC, “There a
merous faulturse of validCBWR, hav
of relativelye analysis o
etween 1975nt operation
e Figure 1-4rom La Crosand 4.5 mil
marily of min cut by pave been cu
walls of the cultivated.
A series of ut 0.75 mile vely narrow33 miles sou
al Genoa-1 s to the norththe site and
e seen
Stable broad Lake were
YBP). 0.001 flank
eason,
to be are no ts are
dating ve not y low f this
5 and ns or
4). In sse to les in
arshy onds,
ut into main
dams north for a uth of
steam h and on a
La CrossLicense TRevisionsmall popresentlyproblems
For a disand townpublishedDavenpopurposesmiles dowother knoChien, 40
1.3.6. Groundwfeet Belcommunfill matergroundwriver. Bsamplingvertical glikely du
As the swhich is but not penetratinof the rivwater quhas been
There areanalyzedHighway
1.3.7. The LACof Genoawest shocommunWisconsi(Populati
The areaincludes Agricultu
se Boiling WTermination
n 0 rtion of the
y channeled s of flash flo
tance of 40 mns along thed records, th
ort, Iowa, ab, excluding twnstream. Rown users o0 miles down
Ground W
water beneathlow Groundication withrial likely flo
water is also ased on a re
g in support gradient. Hoe to high riv
ite has valleunderlain byin valleys
ng the Mounver valley flouality of the
no extensiv
e onsite potad. Regionally 35 with the
Environs
CBWR Facila (populationore is Reno,ity in Iowa iin, an unincoion data is fr
a within a fHouston C
ure and fore
Water ReactorPlan
upland arealong the h
oods have oc
miles downse river are ohe nearest m
bout 195 mithe adjacent River water f river watenriver.
Water Hydr
h the site is d Surface (h the adjacenows towardslikely to floeview of the
of the Genowever, ther
ver stages an
ey sand ovey Mount Simcharacterize
nt Simon layoor. Use of deep aquifee withdrawa
able and groly, there are
e water table
s and Natur
lity is 17 miln about 260)
Minnesota,is New Albinorporated harom 2013 Ci
five-mile radCounty, Minestry are the
r
a contributehighway andcurred at the
stream of theobtained frommajor city uiles downstrfossil plant,at the Lansinr for industr
rology
first encoun(BGS) and nt Mississipps the west anow towards e groundwatnoa 3 fossil re are some d flooding.
erlaying a lamon sandstoned by sub-yer flow to thf water from ers is poorer al of water an
oundwater me five dome encountered
al Resource
les south of t). The near, an unincorn (pop. 513)amlet, is situity-Data.com
dius is prednnesota, ane predomina
1-5
es to runoff d railroad toe site.
e site, virtuam ground wusing river wream. The n, is the steamng plant is urial purposes
ntered at deptthe water
pi River. Gnd dischargethe west butter elevationstation, it aperiods whe
ayer of Eau ne, wells havlayers of Mhe surface inthese artesithan that fr
nd no signifi
monitoring westic wells sd from 20 to
es
the City of Lest communrporated ham), located fivuated five m
m) (9).
dominantly ind a small ant land use
directly acro prevent in
ally all municwater. On thwater for dnearest use
m-power planused for conds between L
ths ranging table aqui
Groundwateres into the Mut then may n measuremeappears thatere the grad
Claire sandve been driv
Mount Simondicating an ian aquifers rom shallowficant decrea
wells which asouth of theo 45 feet BG
La Crosse annity (three mmlet of abouve miles sou
miles south o
in Vernon Cportion of
es in Verno
ross the sitenterference w
cipal water she basis of
direct humanof river wa
nt in Lansingdenser cooli
LACBWR si
from approxifer is in r in the shall
Mississippi Rturn and floents collectet there is a dients are rev
dstone of thven in areas on sandstonartesian heahas been lim
w aquifers. Ase in the arte
are periodice LACBWR S.
nd a mile soumiles to the n
ut 350 peoputhwest of thof the plant o
County, Wisf Allamakeeon County a
e. This runowith traffic.
supplies for readily avai
n consumptiater for indug, Iowa, aboing. There aite and Prair
ximately 15 strong hydrlow deposit
River. The dow parallel ted during roslight down
versed and t
he Cambrianclosest to th
ne. Deep ad about the mited becausAs a result, esian head.
ally sampledR site and ea
uth of the Vinorthwest) ople. The nehe plant. Vicon the east s
sconsin, bute County, Ias well as in
off is No
cities ilable ion is ustrial out 15 are no rie du
to 25 raulic s and eeper to the outine nward this is
n Age he site wells level
se the there
d and ast of
illage on the earest ctory, shore.
t also Iowa. n the
La CrossLicense TRevisionneighborCounty's and marsof the cou
The primyears, thagricultuwoodlandhardwoo
A modesthroughointensity-commercand less related tononagricueast of LA
Land in twithin abottomlaportion osite, occuto the eas
Refuge bfor 2.5 mincluding26 and ho
Approximwater areThe fivepopulatio
1.4. O
Key stati
Allis-perfo
Dairyturbin
Allis-
Initia
se Boiling WTermination
n 0 ring counties
gross area ishlands is clunty's gross
mary agriculthere has beeural land to d. The foresds.
st amount oout Vernon C-use categorce, public, tr
than 0.3% o the proceultural induACBWR.
the vicinity oa five-mile ands includedof the Villagupies less thast and northe
bottomland amiles. Rougg vacation houseboats ar
mately 3.5 sea and refug-mile radius
on is 522.
Operational
ion mileston
-Chalmers, uormed startup
yland enteredne-generator
-Chalmers d
al Criticality
Water ReactorPlan
s on the weis agriculturlassified as uarea (10).
tural activityen a markewoodland. sts yield sub
f sandstone County. Furtries of residransportation
of gross aressing of agstries of the
of the LACBradius, app
d in the Uppge of Genoaan 100 acreseast consistin
and water sughly a third oomes and bore moored at
quare miles ge bottomlans includes a
Backgroun
es are presen
under contrap of the LAC
d into a contr for product
dockets appli
achieved: J
r
est side of tre and woodlundeveloped
y is dairy fad trend towAbout two-
bstantial amo
and limestother, 85% of
dential and pn, and utilitierea. Local gricultural ane industrial p
BWR Site is proximately per Mississipa, the only ss. The neareng of small t
urface, lying of the area roathouses, at several poin
of Iowa arend, although
a portion of
nd
nted in Chap
act with the ACBWR from
tact to purchtion of electr
ication for co
July 11, 1967
1-6
the Mississilands. Abou
d. Total dev
arming, meaward the co-fifths of theounts of oak
one quarryinf the developpark land. Tes) account findustry co
nd forest prpark in Viro
overwhelmione third
ppi River Wubstantial co
est residencetrailer parks
mainly in Mremains undare scattered nts at times d
within the Lh there is so
the incorpo
pter 2 of this
AEC, designm 1962 to 196
hase steam frricity: June 1
onstruction:
7,
ippi River. ut 3.4%, con
veloped land
at animals, anversion ofe total land
k and lesser q
ng also takeped land in VThe more infor less than
onsists almoroducts. Ooqua, Wisco
ingly rural ais account
Wildlife and Fommunity in
es to the LACand residen
Minnesota, exder cultivatiod along the sduring the y
LACBWR fome agricultorated town
s LTP. The m
ned, fabricate67,
rom the nucl1962,
November 5
Nearly 90%nsisting maid accounts fo
and crop farf Vernon C
in farms isquantities of
es place at aVernon Countensive lan
n 15% of totaost exclusiveOne notable onsin located
and undeveloted for by Fish Refugen the five mCBWR Site
nces on small
xtend west oon. A few dshoreline neayear.
five-mile radtural use onof New Al
major milest
ed, construct
lear plant to
5, 1962,
% of the Venly of wateror less than
rming. In rounty's mar
s now devotf maple and
a number of unty is in thend uses (indual developedely of operaexception i
d 25 miles t
oped. Of thewater area
e. The develmile radius o
are within al acreages.
of the reactodozen residear State Hig
dius. Most on the bottomlbin, whose
tones are:
ted and
operate a
ernon r area 6.6%
recent rginal ted to other
f sites e low-ustry, d land ations is the to the
e area a and loped of the a mile
or site ences, hway
f it is mland.
total
La CrossLicense TRevision
Low
Provi
Provi
LACB
Final
Comp
The reac96,274.6 The unit
The LACTurbine Storage Tare curreand metaVessel. holds fiv
1.5. P
1.5.1. The LTPlicense awith the Safety AamendmeThe subs
1.5.2. LTP Chaand extenremain asite charadetermin
The LACField WoAugust 2basis for specified(MARSSchange th
se Boiling WTermination
n 0
power testin
isional Oper
isional Oper
BWR perma
l reactor defu
pletion of fu
tor was critihours. Theavailability
CBWR unit Building, 1BTank Vault, ntly undergo
allic radioactThe ISFSI, e above-grou
Plan Summa
General I
P describes thand to releas
requirementAnalysis Repent that estabsections belo
Site Char
apter 2 discunt of radioacat the time oacterization,
ned to be imp
CBWR RadioWork (11) an
2015 Field Wdividing the
d in NUREGSIM) (13) fohe original c
Water ReactorPlan
ng completed
rating author
rating Licens
anently shut
ueling was c
uel loading in
ical for a tote total gross factor was 6
consists ofB Diesel GeVentilation
oing decommtive equipmelocated soutund Dry Sto
ary
Information
he process use the site fots in 10 CFRport (DSARblishes the c
ow provide a
racterizatio
usses the site ctive contamof license ter
Solutions wpacted by the
ological Chand LACBWRWork (12) pe site into suG-1575, Muor classificaclassification
r
d: Septembe
rization issue
se, DPRA-45
down: Apri
completed on
nto the ISFS
tal of 103,28electrical en
62.9%.
f major builenerator Buil
Stack, Lowmissioning (ent has beenth of the Genorage Casks w
n
used to meet or unrestrictR 50.82(a)(9
R). The LTPcriteria for wa brief summ
n
characterizamination on si
rmination, sowill plan reme operation o
aracterizatioR Radiologicrovided the
urvey units. ulti-Agency ation. Data n of an area,
1-7
er 1967,
ed (DPRA-6
5 issued: Au
il 30, 1987,
n June 11, 19
I was compl
87.5 hours. nergy genera
dings and slding, Waste
w Specific Asee Figure 1
n removed sinnoa 3 fossil with 333 spe
the requiremted use. Th9) and is subP submittal
when changesmary of the ot
ation that haite prior to roils, and gro
mediation andof LACBWR
on Survey Rcal Charactfoundation
The surveyRadiation from subse
, within the
6): October 3
ugust 28, 19
987, and
leted on Sep
The 50 MWated was 4.0
structures sue Treatment
Activity (LSA1-3). Intermnce 2007, instation, bec
ent fuel asse
ments for terhe LTP has bbmitted as a
is accompas to the LTPther seven ch
as been conduremediation, ound water. d Final RadiR.
Report for Oterization Sufor further
y units were Survey and
equent chararequirement
31, 1969,
73,
ptember 19, 2
We generato047 Gigawat
uch as the Rt Building, UA) building a
mittent systemncluding the came operatiemblies.
rminating thebeen prepar
a supplementanied by a
P require priohapters of th
ducted to deteincluding st Based on t
iation Survey
October and Survey Repo
site charactevaluated ag
d Site Invesacterization ts of this LT
2012.
or was on lintt-Hours (GW
Reactor BuilUndergroundand others w
ms dismantleReactor Pre
ional in 2012
e 10 CFR Paed in accordt to the Defuproposed lic
or NRC apprhe LTP.
ermine the ntructures thathe results oys (FRS) in
d November rt for June
terization angainst the crstigation Ma
may be usTP, up to the
ne for WH).
lding, d Gas which ement essure 2 and
art 50 dance fueled cense roval.
nature at will of the areas
2014 thru
nd the riteria anual ed to
e time
La CrossLicense TRevisionof FRS, remediat
1.5.3. LTP Chainformati
A des
A sum
Estim
An esdispo
Descr
Solutionsin NUREFacilitiesaccordanRadioactadministr
Activitiethan thodecommioperating
The infosections remainin
1.5.4. LTP Chdecommiin 10 CFremediat
The selecof contamsurfaces.at backgrcontaminstructurastandard other meDerived
se Boiling WTermination
n 0 as long as tion in the ar
Identifica
apter 3 idention provided
scription of t
mmary of ra
mates of asso
stimate of thosal, and
riptions of p
s is decommEG-0586, Gs, Supplemen
nce with thetive Waste rative, work
s conducted ose conductissioning acg activities th
rmation proof the LTP
ng dismantlem
Remedia
hapter 4 disissioning to FR 20.1402ion activitie
cted remediamination. T Very limiteround levels
nation has bl surfaces iand pressu
ethods. SurConcentrati
Water ReactorPlan
the classificarea.
ation of Rem
tifies the remd in Chapter
the areas and
diological co
ociated occup
he types and
proposed con
missioning LGeneric Envi
nt 1, Volumee Solutions
Program, control and
during decoted during ctivities is bhat occurred
vided in ChP and proviment activiti
tion Plans
scusses the reduce resid. This chaps on the Rad
ation methodThe principaed soil contas or a small been identifinclude scabre washing,
rface and suon Guidelin
r
ation reflect
maining Site
maining site 3 includes:
d equipment
onditions tha
pational radi
quantities o
ntrol mechan
LACBWR inironmental Ie 1, (14). Ts Safety an
Off-Site Ddecommissi
ommissioninplant oper
bounded byd during majo
hapter 3 suppides sufficieies.
various redual contamipter also di
diation Prote
ds used are dal materialsamination is
fraction of fied to datebbling and wiping, gr
ubsurface sone Level (DC
1-8
ts the level o
e Dismantle
dismantlem
t that need fu
at may be en
iation dose,
f radioactive
nisms to ensu
n accordanceImpact Stat
The decommnd Health PDose Calcuioning imple
ng do not porations. T
y previouslyor maintenan
ports the assent detail to
emediation ination to levscusses the ction Progra
dependent up that may bexpected; anthe drinking
e. Remediashaving, ch
rit blasting, oil with activCGL) will b
of residual a
ement Activ
ment and dec
urther remed
ncountered,
e material ge
ure areas are
e with the Dtement on D
missioning acProgram, Raulation Maementation p
ose any greatThe radioloy analyzed rnce and outa
sessment of o identify r
techniques vels that comALARA ev
am.
pon the contbe subject tny noted grog water stanation technihipping, spomechanical vity levels ibe removed
activity exis
vities
contaminatio
diation,
enerated for
e not re-cont
DECON alterDecommissioctivities willadiation Protanual (ODCprocedures.
ter radiologiogical risk radiological age activities
f impacts conresources ne
that may mply with thvaluation an
taminated mto remediatioundwater sandards; and ques that monge and a fracturing in excess ofand dispose
sting prior to
on activities.
release and
taminated.
rnative desconing of Nul be conducttection Prog
CM), and
ical or safetyassociated risk for fo
s.
nsidered in eeded during
be used dhe release crnd the impa
material and eon are strucamples haveno surface w
may be usedabrasive blaand cuttingf the approped as radioa
o any
The
cribed uclear ted in gram, plant
y risk with
ormer
other g the
during riteria act of
extent ctural been water d for sting, , and priate active
La CrossLicense TRevisionwaste. excavatoenvironmadequate
1.5.5. LTP Chapackagesof a Finremainindemonstruse speci
The FRSObjectiveassessmethat are iISFSI, w
1.5.6. LTP Chcomplianunrestrictscenariosanalysis, exposure
LTP Chacontaminwork towArgonne code to dlicense te
1.5.7. LTP Chareleasingwith the
1.5.8. LTP ChasignificanterminatiCFR 50.
se Boiling WTermination
n 0 Soil remedirs. Remed
mental contro erosion, sed
Final Rad
apter 5 preses, and instrucnal Status Sng building rate that the ified in 10 C
S Plan descres (DQO), suent and compidentified as
which will sti
Complian
hapter 6 prence with theted use. Chs, exposure
DCGLs ane compliance
apter 6 usesnation and rwards and be
National Ladetermine thermination.
Update o
apter 7 prog the site forfunds curren
Supplem
apter 8 updant environmion activities82(a)(9)(ii)(
Water ReactorPlan
ation equipmdiation of sool procedurediment, and
diation Surv
ents the FRSctions to perurvey (FSSbasements. LACBWR f
CFR 20.1402
ribes the devurvey methopliance. Ths impacted. ll remain a l
nce with the
esents the e radiologicapter 6 discu
pathways, nd Dose Face scenario an
s radiologicradioactivity e verified byaboratory REhe radiologic
of the Site-Sp
ovides an upr unrestrictedntly available
ent to the E
ates the Envimental impas. This sectG). In accor
r
ment will inoils will inces, as well air emission
vey Plan
S Plan whichrform the FR) for open The FRS
facility and s (e.g. annual
velopment oods and instrhe FRS Plan
The adjaceicensed area
e Radiologic
radiologicalcal criteria fusses the site
computatioctors, the dend evaluation
cal informatconcentrati
y the FSS orESidual RAcal release c
pecific Deco
pdated estimd use. This e in the deco
Environmen
ironmental Racts association of the Lrdance with
1-9
nclude, but clude the usas appropria
n controls du
h will be useRS of the LA
land areas Plan descr
site comply l dose limit o
of the surveyrumentation,addresses ont areas tha
a, will not be
cal Criteria
l informatiofor license e-specific inonal modelserivation of n of alternati
ion from Cion levels thr STS discus
ADioactive mcriteria for r
ommissionin
mate of thechapter also
ommissionin
tal Report
Report for Lted with th
LTP is prepar10 CFR 51
not be limse of establiate work pa
uring soil rem
ed to develoACBWR site
and a Sourribes the finwith radioloof 25 mrem
y plan, surv, data collectonly LACBWat are classife subject to F
a for License
on and metermination
nventory of rs used for area factor
ive exposure
Chapter 2 anhat Chapter ssed in Chap
materials (REremaining st
ng Costs
e remaining o compares tng trust fund
LACBWR whe site’s deared pursuan.53(d), Solu
mited to, bacished excav
ackage instrumediation.
op the site pr. The FRS Prce Term Snal survey
ogical criterito AMCG p
vey design ation and pro
WR structurefied as non-iFRS.
e Terminati
ethods used and release
radionuclidedose mode
rs, the basis e scenarios.
nd establish4 remediati
pter 5. SoluESRAD) v7.tructures an
decommissthe estimate
d.
with new infoecommissionnt to 10 CFRutions consid
ck and trackvation safetyuctions to en
rocedures, suPlan is comp
Survey (STSprocess use
ia for unrestrplus ALARA
and Data Quocessing, andes and land impacted an
ion
to demone of the sits, future laneling, sensi
for the sel
es the allowion methodsutions applie.0 dose mod
nd soils to en
sioning costed remaining
ormation andning and lic
R 51.53(d) anders Chapter
k hoe y and nsure
urvey prised S) for ed to ricted
A).
uality d data areas
nd the
strate te for nd use itivity lected
wable s will ed the deling nable
ts for g cost
d any cense nd 10 r 8 to
La CrossLicense TRevisionbe a supimpacts a
LTP ChNUREG-referencethat the adverse eenvironmLACBWhave resuEnvironmNUREG-
1.6. R
SolutionsLACBWdocumenDecommRevision LTP in aLTP, wit50.82(a)(
SolutionsconditionNRC app
Requ
Resu
Detradecom
DecreClassnotifi
Increminim
Increlevel an inv
Chantest, o
Incre
se Boiling WTermination
n 0 pplement to associated w
apter 8 com-0586, whiche nuclear facenvironmeneffects outsi
mental impaWR dated De
ulted in no mental Asse-0191 related
Regulatory N
s is submittiWR spans a pntation is unissioning PlMarch 2014
accordance wthout prior N(6), and 10 C
s is also subn that establproval. Chan
uires Commi
lts in signifi
acts or negatmmissioning
eases a surves 2 to Class 3ication prior
ases the DCmum detecta
ases the radi(or correspovestigation o
nges the statior
ases the Typ
Water ReactorPlan
the Environwith the execu
mpares the h provides acility. The
ntal effects fide the boun
acts was doecember 198
significant essment in d to operatio
Notification
ng the LTP period that innique in thalan and Post4 (15) whichwith 10 CFRNRC approv
CFR 50.82(a
bmitting a prlishes the crnges to the L
ssion approv
cant environ
tes the reasong,
ey unit area 3; or Class 1r to impleme
GLs (or decable concentr
ioactivity levonding sourcoccurs),
istical test ap
pe I decision
r
nmental Repution of the
described a generic env
environmenfor decommnds of NURcumented in87. LACBWenvironmensupport of
on of LACBW
s of Change
as a supplemncludes seveat the requit-Shutdown Dh serves as t
R 50.71(e). val, in acco
a)(7).
roposed ameriteria for dLTP require
val pursuant
nmental impa
nable assura
classificatio to Class 3 wnting the ch
creases dose rations (for b
vel, relative ce term inven
pplied to one
n error.
1-10
port addressidescribed de
decommissivironmental ntal assessm
missioning LAREG-0586. n a supplemWR decommntal impact the August
WR, dated A
es
ment to the Deral decommired safety aDecommissiothe DSAR foOnce approvrdance with
endment to tetermining wprior NRC a
to 10 CFR 5
acts not prev
ance that ade
on (i.e., impawithout provange in class
factors fromboth scan an
to the applicntory levels
e other than t
ing the actuaecommission
oning attribassessment f
ment performACBWR arReview of
ment to themissioning anot previou
t 7, 1991, April 21, 198
DSAR. Becmissioning re
analyses areoning Activi
for LACBWRved, Solutio
h the criteria
the LACBWwhen changapproval wh
50.59,
viously revie
equate funds
acted to not ividing NRC sification,
m the Basemend fixed mea
cable derivedin the Basem
the Sign test
al or potentining activiti
butes to thofor the decom
med by Solure minimal apost-operat
e Environmand dismantusly evaluatDecommiss80.
cause the licegulation chae included ities Report R. Solution
ons may maka in 10 CFR
WR license thges to the Len the chang
ewed,
will be avai
impacted, Cla minimum
ent Fill Modasurement m
d concentratment Fill Mo
t or Wilcoxo
ial environmes.
ose identifiemmissioning
utions determand there aring license ental Reportlement actived in the N
sioning Ord
censing histoanges, the Din the LAC(D-Plan/PSD
ns will updatke changes tR 50.59, 10
hat adds a licLTP require ge:
ilable for
lass 1 to Cla14 day
del) and relatmethods),
tion guidelinodel), at whi
on Rank Sum
mental
ed in g of a mined re no stage
rt for vities
NRC's er or
ory of DSAR CBWR DAR) te the to the CFR
cense prior
ass 2;
ted
ne ich
m
La CrossLicense TRevisionThe cont
Gerard PVice PreLaCrosseS4601 StGenoa, W(224) 789gpvannoo
1.7. R
1. LAL
2. UC2
3. Ufo
4. UreC
5. LP
6. w
7. w
8. DD
9. ht
10. 2
11. ES
12. ES
13. UR
14. USN
se Boiling WTermination
n 0 act for LTP
P. van Noordsident, RegueSolutions, Ltate Road 35WI. 54632-889-4025 ordennen@en
References
Letter from DApplication fLicense Ame
U.S. Nuclear Content of Li
011.
U.S. Nuclear or Evaluating
U.S. Nuclear elated to Ope
Cooperative -
Letter from Dlanning for I
www.wunder
www.mvp.wc
Dairyland PoDecommissio
ttp://www.ci
008 Vernon
EnergySolutiurvey Repor
EnergySolutiurvey Repor
U.S. Nuclear Radiation Sur
U.S. Nuclear tatement on
November 20
Water ReactorPlan
information
dennen ulatory AffaiLLC 5 846
nergysolution
Dairyland Pofor Order Apndments, da
Regulatory icense Termi
Regulatory g Nuclear Po
Regulatory eration of th- April 1980
Dairyland PoISFSI, LAC
rground.com
c.usace.army
wer Cooperaoning Plan, r
ity-data.com
County Tax
ons GG-EO-rt for Octobe
ons LC-RS-rt for June th
Regulatory rvey and Site
Regulatory Decommiss
002.
r
n, including a
irs
ns.com
ower Cooperpproving Licated October
Commissionination Plan
Commissionower Reacto
Commissionhe La Crosse .
ower Compan-14029, Mar
m.
y.mil/project
ative, LaCrorevised Nove
m/city/Genoa
x Assessmen
-313196-RSer and Novem
PN-164017-hru August 2
Commissione Investigati
Commissionsioning of Nu
1-11
any submitte
ative to the Ncense Transfe
8, 2015.
n, Regulators for Nuclea
n NUREG-1or License Te
n NUREG-0Boiling Wa
ny to the Nurch 10, 2008
ts/Lock 8.
osse Boiling ember 2003.
a-Wisconsin.
nt Rolls.
S-RP-001, LAmber 2014 F
-001, LACB2015 Field W
n, NUREG-1ion Manual (
n NUREG-0uclear Facili
ed changes a
Nuclear Regfer and Confo
ry Guide 1.1ar Power Rea
1700, Revisioermination P
0191, Final Eater Reactor
uclear Regul8.
Water Reac.
.html.
ACBWR RaField Work –
BWR RadioloWork – Nove
1575, Revisi(MARSSIM
0586, Generiities, Supple
and updates,
gulatory Comforming Adm
79, Standardactors, Revis
on 1, StandaPlans – Apri
Environmentby Dairylan
atory Comm
ctor (LACBW
adiological C– November
ogical Charaember 2015.
ion 1, Multi-M), August 20
ic Environmement 1, Vol
is:
mmission, ministrative
d Format andsion 1 - June
ard Review Pil 2003.
tal Statemennd Power
mission, Subj
WR)
Characterizatr 2015.
acterization
-Agency 000.
mental Impactlume 1 –
d e
Plan
nt
ject:
tion
t
La CrossLicense TRevision15. D
D
se Boiling WTermination
n 0 Dairyland PoDecommissio
Water ReactorPlan
wer Cooperaoning Activit
r
ative, LACBties Report (
1-12
BWR Decom(D-Plan/PSD
mmissioning DAR), Revis
Plan and Posion - March
ost-Shutdownh 2014.
n
La CrossLicense TRevision
se Boiling WTermination
n 0
Water ReactorPlan
Fig
r
ure 1-1 S
1-13
Site Regionaal Location
La CrossLicense TRevision
se Boiling WTermination
n 0
Water ReactorPlan
r
Figure 1-2
1-14
2 Site Ovverview
LLR
La Crosse BoilinLicense TerminRevision 0
ng Water Reactation Plan
or
Figure 1-3
1-15
LACBWR Buuildings
La CrossLicense TRevision
se Boiling WTermination
n 0
Water ReactorPlan
Fi
r
igure 1-4
1-16
Topographhical Map