Estimating Volatility : Consolidated Approach

Volatility of a project is not the same as the volatility of any of the input variables, nor is it equal to the volatility of the company’s equity.

How to use a Monte Carlo approach to value a project.

Monte Carlo tools are fairly simple to use and can model the cross correlations among various inputs such as price and quantity, as well as time series properties such as mean reversion.

Page 3: Chap 9 Estimating Volatility : Consolidated Approach

Two approaches for estimating a consolidated measure of the volatility of a value-based event tree are discussed later in this chapter.

We call them the historical and the subjective approaches.

We use the term “consolidated” because the output is a single estimate of volatility, built up from the many uncertainties that contribute to it .

Estimates of these separate uncertainties are taken either from historical data, or from the subjective estimates of management.

Page 4: Chap 9 Estimating Volatility : Consolidated Approach

Monte Carlo analysis for combining uncertainties

Each sampling of a set of parameters generates an estimate of the present value of a project ( or a company), PVt

rtt ePVPV 0

rtPV

PVt 0

ln

Page 5: Chap 9 Estimating Volatility : Consolidated Approach
Page 6: Chap 9 Estimating Volatility : Consolidated Approach

We start with a present value spreadsheet, model the variable uncertainties, use the Monte Carlo simulation to estimate the standard deviation of rates of return, and then construct the event tree binomial lattice.

1. Price per unit 2. Quantity of output 3. Variable cost per unit

Page 7: Chap 9 Estimating Volatility : Consolidated Approach
Page 8: Chap 9 Estimating Volatility : Consolidated Approach

If the weighted average cost of capital is 12 percent, the present value is $1,507.63; and if the investment outlay is $1,600, the net present value is -$92.37.

The expected price per unit starts out at $10,but declines over time due to anticipated competitive pressure.

The expected quantity sold grows at 20 percent in the year after the product is released, but despite price cuts, growth shows to 5.8 percent in the last year of the forecast.

Page 9: Chap 9 Estimating Volatility : Consolidated Approach

The variable cost per unit is expected to decline from $6.00 in the first year of operation to $3.56 per unit in the last year.

They believe that their errors of estimation will be highly positively correlated through time (autocorrelation of 90%), implying that if they underestimate the price that is achievable in one year, they are highly likely to have underestimated it the next year as well.

Page 10: Chap 9 Estimating Volatility : Consolidated Approach
Page 11: Chap 9 Estimating Volatility : Consolidated Approach

This time dependence is called autocorrelation, and if it is negative, implying that a high value is more likely to be followed by a low value (and vice versa), then it is called mean reversion.

1. Define Assumption. 2. Set Autocorrelations.

“correlate icon”

Crystal Ball to “select an assumption” 3. Define Forecast Variable.

Page 12: Chap 9 Estimating Volatility : Consolidated Approach

0

11lnPV

FCFPVz

7

211 )1(t

tt

WACC

FCFPV

4. Run the Simulation.

“run” icon

“reset” “run preferences”

Page 13: Chap 9 Estimating Volatility : Consolidated Approach

The mean return was 13 percent, and the annual standard deviation was 21 percent.

The standard deviation of prices was equal to 10 percent, but the standard deviation of the rate of return on the project is 21 percent.

The input variables that drive uncertainty is not the same as the volatility of the project.

Page 14: Chap 9 Estimating Volatility : Consolidated Approach
Page 15: Chap 9 Estimating Volatility : Consolidated Approach

Building the event tree

T = 1; therefore, and d = 1/u = 0.8106.

The present value of the project, after the free cash flows have been paid out at the end of the first time period, is $1,569.12.

By the end of the second time period, we can see from Exhibit9.7 that the value can be either $1,935.79 or $1,271.90.

2337.121.0 eeu T

Page 16: Chap 9 Estimating Volatility : Consolidated Approach
Page 17: Chap 9 Estimating Volatility : Consolidated Approach
Page 18: Chap 9 Estimating Volatility : Consolidated Approach

The present value of the expected free cash flow that period is $262 and the expected present value at that point in time is

7

23 (1 )

$261 $265 $253 $233 $209 $180

$1401

tt

t

FCFPV

WACC

$261/$1,401 = 0.1863

Page 19: Chap 9 Estimating Volatility : Consolidated Approach
Page 20: Chap 9 Estimating Volatility : Consolidated Approach

Multiplying this ratio times the up state value, $1,935.79 yields the up state dividend, namely $360.66.

The down state dividend is the same ratio multiplied by the down state value, namely $236.95.

Page 21: Chap 9 Estimating Volatility : Consolidated Approach

More on auto-correlation

1 [ ( )]t t t tX X b X E X

( ) (1 ) t tbE X b X

t tX

1 1t t tX X

1

1

( , )t t

t t

COV X X

)(

),( 1

t

tt

XVAR

XXCOV

Page 22: Chap 9 Estimating Volatility : Consolidated Approach
Page 23: Chap 9 Estimating Volatility : Consolidated Approach

And therefore Consequently This implies that the r-squared and beta

coefficient are identical, that is, . Note also that beta is equal to one minus the

speed of adjustment, 1-b,

)()( 122

tt XX

1 tt )(2

1 tttt XVAR

Page 24: Chap 9 Estimating Volatility : Consolidated Approach

Positive autocorrelation will result in greater volatility than assuming independence across time.

Negative autocorrelation, with the simple mean reversion that we have been describing, assumes that positive error terms are followed by negative errors.

Note that positive autocorrelation increase the standard deviation of project returns and negative autocorrelation decreases it.

Page 25: Chap 9 Estimating Volatility : Consolidated Approach
Page 26: Chap 9 Estimating Volatility : Consolidated Approach
Page 27: Chap 9 Estimating Volatility : Consolidated Approach

Using historical data

Use the r-squared of the time serious regression to capture the autocorrelation effect.

Cross-correlation between variables is captured by the r-squared between them.

The standard deviation for each of the variables is the standard deviation of the residuals that results from the time serious regression.

Page 28: Chap 9 Estimating Volatility : Consolidated Approach

22

20

)(

)(1)95.0,2(ˆ eysxS

xEx

nnty

2

0 2 22 2

2

2 2

2

( )1 1 21 10

( ) 20 ( )

( ) 20(11) 1 11

20 ( ) 20 ( )

1 12

20 ( )

ey ey

ey ey

ey

x E xs s

n S x S x

S xs s

S x S x

sS x

Page 29: Chap 9 Estimating Volatility : Consolidated Approach
Page 30: Chap 9 Estimating Volatility : Consolidated Approach

Therefore, the confidence interval, out-of-sample, increase approximately as T

Page 31: Chap 9 Estimating Volatility : Consolidated Approach

Subjective estimates provided by management

Geometric Brownian motion ]2,2[ TTrTTrr

[ ] 2upper r rT T

[ ] 2lower r rT T

20[ ] rT T

Tupper V V e 2

0[ ] rT TTlower V V e

Page 32: Chap 9 Estimating Volatility : Consolidated Approach

T

iiT rR

1

2

0[ ]rT T

Tupper V V e

2

0[ ]rT T

Tlower V V e

T

rV

V n

ii

upperT

2

ln10

T

V

Vr

lowerT

n

ii

2

ln01

rtttt eVV

Page 33: Chap 9 Estimating Volatility : Consolidated Approach

A more complicated case : mean-reverting procedures

The general model for mean reversion may be written as :

dzVVVV ttttt )(

VVE tt )(

0 ttVVE 0)( dzE

VVEVE ttt )()(

Page 34: Chap 9 Estimating Volatility : Consolidated Approach

2

2

)1(

T

t

tTtT

2

2

2

2

)1(2,)1(2T

t

tTt

T

t

tTtT VVV

2

2

2

2

)1(2)1(2

T

t

tT

upperT

T

t

tT

lowerT

T

VVVV

dzVVVV ttttt )(

Page 35: Chap 9 Estimating Volatility : Consolidated Approach
Page 36: Chap 9 Estimating Volatility : Consolidated Approach