CHAMPAIGN COMMUNITY UNIT SCHOOL DISTRICT NO. 4 Champaign, Illinois Central and Centennial High Schools Edison Middle School Gym Floors Protection Systems Bid Clarifications 1. The initial RFP has been updated and a site visit is not required. 2. One (1) demonstration/training session should be included in the quote/bid. Staff from all schools will come to one location. 3. The District would like to choose one color for each school, from a palette of standard colors. 4. Please see attached (exhibit A) floor plans for Centennial Carrodine gym. 5. Central multipurpose wrestling room - subdivided rooms - see attached (exhibit B) floor plans. a. The multipurpose wrestling room should be able to be laid out in two parts with ½ the area not covered should the school staff choose to leave it bare. 6. Storage Racks a. All storage racks included in the quote/bid should have manual pulls, not electric. b. Centennial - separate racks for each gym and include the multipurpose room on the new gym rack (total of 2 racks) c. Central - separate racks for each gym and each multipurpose room (total of 4 racks)

Champai gn, Il l i noi s CH AM PAIG N CO M M UNIT Y UNIT

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

CHAMPAIGN COMMUNITY UNIT SCHOOL DISTRICT NO. 4Champaign, Illinois

Central and Centennial High SchoolsEdison Middle School

Gym Floors Protection Systems

Bid Clarifications

1. The initial RFP has been updated and a site visit is not required.2. One (1) demonstration/training session should be included in the quote/bid. Staff from all

schools will come to one location.

3. The District would like to choose one color for each school, from a palette of standardcolors.

4. Please see attached (exhibit A) floor plans for Centennial Carrodine gym.

5. Central multipurpose wrestling room - subdivided rooms - see attached (exhibit B) floorplans.

a. The multipurpose wrestling room should be able to be laid out in two parts with ½the area not covered should the school staff choose to leave it bare.

6. Storage Racksa. All storage racks included in the quote/bid should have manual pulls, not electric.b. Centennial - separate racks for each gym and include the multipurpose room on

the new gym rack (total of 2 racks)c. Central - separate racks for each gym and each multipurpose room (total of 4

racks)

FACP

DN

DN

DN

W

UP

DN

RAMP DN RAMP DN

DN

RAMP UP

UP

DN

D

DN

XG

X5

X4

X3

YB

YD YE YF YH YK YNYC

Y10

Y11

YJ XBL

Y14

Y17

XB20

Y21

XB15

XB13

XB18

Y24

YG XBM XBO XBO'

A10

A9

A4

A8

A6

A5

A7

A11

A3

A3.1

A3.7

A4.9

A4.5

XB16

AF

OFFICE1434

OFFICE1435

BOY'S LOCKER1416

GIRL'S LOCKER1412

STOR1414A

STOR1414C INST. LOCKER

1406

OFFICE1410

JAN.1408A

JAN1416B

STORAGE1416A

STORAGE1412E

TLT1412A

SHOWER1412C

PE OFFICE1417

MAINT. OFFICE1430

STORAGE1431

LOCKER ROOM1432

SHOWER1432B

TLT1432A

TLT1433D

SHOWER1433A

LOCKER ROOM1433

SHOWER1416G

STORAGE1416E

TLT1416D

GYMNASIUM1414

SHWR1415A

TLT1415B

INST. LOCKER1415

NATATORIUM1442

CORRIDOR1400C

CORRIDOR1400D

PASSAGE1400E

PASSAGE1412D

PASSAGE1400H

LOCKER ROOM1420

OFFICE1420B

PASSAGE1420D

SHWR1421D

TLT1421C

LOCKER ROOM1422

TLT1420C

STOR1421B

LOCKER ROOM1421

LOCKER ROOM1421A

STAIR1ST12

STAIR1ST06

CORRIDOR1400A

PASSAGE1400K

CORRIDOR1400B

RECEIVING1444

POOL OFC1442B

MECH1425

PASSAGE1416C

POOL STOR1442C

STAIR1ST08

AD RECEPTION1443 AD OFFICE

1443A

TLT1443B

STOR.1441

OFFICE1440

PASSAGE1442D

POOL OFC1442A

TOILETS/SHOWERS1518

GIRLS' LOCKERROOM

1520

PASSAGE1400J

MA

TC

HLI

NE

SE

E/

1C

TN

.004

A11

-01A

MA

TC

HLI

NE

SE

E/

1C

TN

.004

A11

-01A

MA

TC

HLI

NE

SE

E/

1C

TN

.004

A11

-01B

MA

TC

HLI

NE

SE

E/

1C

TN

.004

A11

-01D

8"31

' - 8

"16

' - 0

"11

' - 0

"5'

- 0

"16' - 0" 32' - 0" 32' - 4" 17' - 8" 14' - 4" 16' - 0" 16' - 0" 24' - 2" 4' - 2" 3' - 8" 3' - 8" 6' - 10" 56' - 2"

2' -

4"

9' -

8"

9' -

0"

11' -

0"

11' -

0"

18' -

4"

2' -

8"

3' -

0"

1' -

8"

15' -

4"

7' -

0"

5' -

0"

9' -

4"

9' -

8"

9' -

3"

4' -

3 1

/2"

10' -

5 1

/2"

3' -

0"

21' -

0"

20' -

0"

5CTN.004A41-02

16CTN.004A43-02

CORRIDOR1400A

XP

1443

A

1442

BA

1442

CA

1432A

1431A

1430A

1416

EA

1416CB1416CA

1400

AA

1434A

1435A 1416

HA

1415A

1416BA

1416AA

1414F

1414

G

1414

AA

1414

CA

1414

H

1414J

1414E

1414K

1414

D

1414

C

1414

A

1414

B

1422C

1421AA

1422

A

1421

A

1420

A

1420

DB

1420

B

1412

DA

1444

A

1433

A

1409

A

1407

A

1405

A

1ST

08A

1411

A

1500HA

1412EA

1421

B

1420

BA

1420CA

1420DA

1422B

1ST04D

1ST04E

1501D

1501E

1441

A

1442

DB

1443

BA

1443AA

1403

FB

1406JA

1444B

1442

AA

1400

BG

1400

BF

1400

BE

1400

BD

1400

BC

1400

BA

1400

BB

1ST

06E

1442A

1442B

1442C

1400DA

1430

B

1425B

1412

A

1406A

1ST06A

1ST06B

1411

C

1442

DA

1416

A

1408AA

1417A

JANITOR STORAGE1444A

1444AA

6

A3.9

VEST.1ST04A

MB-1

1ST06D

1ST06C

XR

32' - 4" 16' - 0"

1ST04A

E22

C40

N40

N40

B41

C40

N40N40

B41

A41

B41

115

1313

SLOPE

A41

1410A

1440

A

LOBBY1501

BOY'S LOCKER1416H

FEC-2FEC-2

DR-1

WA-1

N40

N42

11CTN.004A41-02

12CTN.004A41-02

23

N42 N42

N42

STAIR1ST13

3' -

5"

N40

6CTN.004A21-01

7CTN.004A21-01

6CTN.004A30-02

13' -

4"

11' - 3 3/8" 3' - 10 1/8"

20' - 8 1/2" 14' - 9 1/2" 12' - 3" 4' - 9 5/8" 10' - 10"

9' -

4 3

/8"

3' -

0"

6' -

4"

11"1

4' -

4"

19' - 4 1/8"

1251

B

2 1/8" 5' - 5 5/8" 3' - 6" 14' - 4 1/4" 1' - 4" 6' - 6" 18' - 5 7/8"

1' -

4" 1'

- 4

" 3"11

"

3"3"

4' -

2"

7"

12CTN.004A41-01

1425A

US-1

US-1

US-1

AREA

AAREA B

AREA C AREA D

YE

Y17

EQUIP0001

MECH-10007

MECH-20008

0007A

0008A

0001A

STAIR1ST13

N305' - 6"

5' -

11

1/2"

5' -

6 1

/2"

X4

YDYC

Y11A3.9

SWIMMING POOL(NATATORIUM ABOVE)

VEST.0005

CHLORINE0004

EQUIP0003

EQUIP0006

0006

A

0005A

AREAWAY0009

2

TITLE

A

SHEET NUMBER

TITLE

Approved

Checked

Drawn

Job Number

ISSUE CHARTCONSULTANTS PROJECT

STRUCTURAL

TGRWA600 W. VAN BUREN ST., STE. 900

CHICAGO, IL 60607

MEP

WEBB ENGINEERING SERVICES2919 CROSSING CT. #11

CHAMPAIGN, IL 61822

CIVIL

CLARK DIETZ125 W. CHURCH ST.

CHAMPAIGN, IL 61820

IT TELECOM

MECHANICAL SERVICES ASSOCIATES111 S. VIRGINIA ST.

CRYSTAL LAKE, IL 60014

KITCHEN

REITANO DESIGN GROUP302 N. EAST ST., STUDIO ONE

INDIANAPOLIS, IN 46202

ASSOCIATE ARCHITECT

114 W. MAIN ST.URBANA, IL 61801

POOL

WATER TECHNOLOGY, INC.100 PARK AVE., P.O. BOX 614

BEAVER DAM, WISCONSIN 53916

KEYPLAN

913 CRESCENT DR.

CHAMPAIGN, IL 61821

CHAMPAIGN CENTENNIAL HIGH SCHOOL

703 S. NEW ST.

CHAMPAIGN, IL 61820

CHAMPAIGN UNIT 4 SCHOOL DISTRICT

13456

2 13456

B

C

D

E

A

B

C

D

E

6/2/

2020

10:

41:0

6 A

MB

IM 3

60:/ /

Cha

mpa

ign

U4/

023 5

30_C

EN

TE

NN

IAL.

rvt

CTN.004A11-01C

ENLARGED FLOOR PLAN - LEVEL 01, AREA C

RG/SW

SP/CM

023531.000

RG/SW Cop

yrig

ht ©

201

8 P

erki

ns+

Will

ADDITIONS ANDRENOVATIONS

1/8" = 1'-0"1 LEVEL 01 - AREA C

KEYED NOTES

12 RAMP WITH HANDRAILS

The Wrigley Building410 North Michigan Ave.

Suite 1600Chicago, IL 60611

t 312.755.0770f 312.755.0775

www.perkinswill.com

1 FEC 18 NEW DOOR IN EXISTING FRAME

27INSTALL 5" THICK CONC. FLOOR SLABWHERE EXCAVATED

28 RE-INSTALL SALVAGED LOCKERS/TRIM

13DISPLAY CASE - SEE DETAIL 10/CTN.004A50-02

19 EXISTING DRINKING FOUNTAIN

15 INFILL OPENINGS - TYP.

23FLOOR LEVELLING AND TRANSITION -SEE FINISH PLANS

GENERAL NOTES:

A. INFILL OPENINGS TO MATCH EXISTING WALLS. USE CMU WHERE EXISTING MATERIAL IS CLAY TILE. MATCH EXISTING WALL TILE IN CORRIDOR WALL INFILLS. MATCH EXISTING PLASTER AS NEEDED.

1/8" = 1'-0"3 LEVEL 00 - PARTIAL FLOOR PLAN - MECH ROOMS

1/8" = 1'-0"2 LEVEL 00 - PARTIAL FLOOR PLAN - SE

39 PROTECT EXISTING MURAL

CROSS-HATCHED AREA INDICATES AREA

OF WORK NOT IN CONTRACT - TYPICAL49

REPLACE ELECTRIC DRYERS W/ NEW ATSAME LOCATION

50REMOVE & REINSTALL AS NEEDED - EX.MARKERBDS/ TACKBDS/ MIRRORS/CLOCKS, BANNERS, ETC.

53 EXISTING BLEACHERS TO REMAIN

54 EXISTING DIVIDER PANELS TO REMAIN

48 PAINT EXISTING HANDRAILS

6 EXISTING DISPLAY CASE 45 REPAIR AND PATCH WALLS - TYP.

MARK ISSUE DATE

0 ISSUED FOR BID 03/01/19

3 ADDENDUM #3 04/11/19

61 RFI#569 05/19/20

62 RFI#567 05/21/20

66 PR#194 06/02/20

jritter
Callout
existing chase wall to remain, no new CMU wall, per RFI.567
jritter
Callout
south restroom wall shifted per RFI.567
jritter
Cloud+
jritter
Cloud+
new door, see PR#133 and AR68 attached
jritter
Cloud+
jritter
Cloud+
change to C40, see RFI.478
jritter
Callout
wall shifted per RFI.569
jritter
Callout
added urinal partitions per PR#194
jritter
Callout
added urinal partitions per PR#194
jritter
Callout
laminate drywall to face of existing CMU per RFI.577
jritter
Callout
laminate drywall to face of existing walls per RFI.583
jritter
Arrow
jritter
Arrow
jritter
Arrow
jritter
Callout
rebuild section of wall per RFI.553 & RFI.583
jritter
Callout
fur out existing CMU & laminate new CMU and tile wall to match corridor per RFI.583
jritter
Callout
raise floor height 7" in entire office per RFI.603
khawkins
Highlight
khawkins
Highlight
khawkins
Highlight
khawkins
Highlight
khawkins
Highlight
khawkins
Highlight
khawkins
Highlight
khawkins
Highlight
khawkins
Highlight
khawkins
Highlight
giurgeda
Text Box
Exhibit A

UP

UP

WD

13 14

U

15

K.7

T.3

MATSTORAGE

B410ASTOR.B415

WEIGHTROOM

B406

CORRB400

ELECB409

STAIR 15BST15

STAIR 16BST16

MECHB401

1CTR.003A41-01

4CTR.003A41-01

1CTR.003A42-01

12CTR.003G01-06

12CTR.003G01-06

MULTIPURPOSE/

WRESTLINGB410

CORRB400

TLTB404

TLTB402

BST16.A

B410.A

BST15.A

BST15.B

B415

.A

B413.C

B405

.A

B403.A

B406.A

B406.B

B408.A

B408.B

B410.B

B413.B

B401.A

B411.A

B409.A

B405.C

B411.B

-14' - 0"

MATCHLINESEE /1 CTR.003 A11-00A

MATC

HLIN

E

SEE

/----

N40

N40

T

S

R

Q

N

L

P

M

K.8

AED1

MULTIPURPOSE/

WRESTLINGB408

EXISTING MATS (14) 3' X 3' X 6'

PULL UP BARS BY OWNER

PULL UP BARS BY OWNER

POWER LIFTING ZONE WITH ENHANCED

SPORTS FLOORING

ELEVATOR05

BEL05

P.8

LAUNDRYB403

18' - 2" 45' - 4"

1' - 1

0"8'

- 6"

12' -

0"24

' - 0"

24' -

0"18

' - 0"

6' - 0

"24

' - 0"

24' -

0"24

' - 0"

10' -

4"13

' - 8"

N40

N40

N40

N41

N40

ALT-001SEE 01 23 00

N40

N40

N40

N40

N40

N40

N40

N40

N20

N20

N20

N20

N20

N20N20

N20

N20

N20

B402.A

B404.A

STORAGEB411

STORB405C

STORB413B

4CTR.003G01-06

4CTR.003G01-06

1CTR.003A43-03

N40N40

N40

N40

N40

N41N41

N40

N40

N40

N40

N41

N40

D1W1

OVERHEAD PROJECTOR, REFER TO AV AND ELEC.

OVERHEAD PROJECTOR, REFER TO AV AND ELEC.

MB2

MB2

TA9

B405.B

B413.A

FEC1

SUMP PUMP & SEWAGE EJECTOR

STORAGEB407

WP1

WP1WP1

WP1

N30

WP1

STORB405B

CUSTODIALB405A

N40

N40

N40

N40

N40

SHEAR WALL, SEE STRUCTURAL

12CTR.003A30-01

STORAGEB413C

STORAGEB413A

DC2

N20

N20

N20N20

N20

N20

N20

N20

4' - 8

"3'

- 8"

2' - 0

"

2' - 7

"

10' -

2 1/4"

10' -

7 3/4"

11' -

8"10

' - 8 1

/2"10

' - 8 1

/4"11

' - 3 1

/2"12

' - 8"

10' -

0"11

' - 0"

11' -

10"

11' -

0"9'

- 0"

16' -

10"

15' -

6 1/2"

4' - 1

"

27' -

0 1/2"

6' - 4

"16

' - 1 3

/4"33

' - 0 1

/2"5'

- 11 3

/4"6'

- 10 1

/2"5'

- 11 3

/4"5'

- 0 1/

2"10

' - 2"

7' - 7

3/4"

25' -

11"

C LEQ

EQC L

EQEQ

C LEQ

EQ3'

- 3"

10' -

8 3/4"

17' -

7 1/2"

6' - 8

"

15' - 4 3/4" 43' - 6" 3' - 2" 3' - 6"

9' - 2 3/4" 3' - 2 1/2"

1' - 0"

2' - 10 1/2"

1' - 6 1/4"

10' - 9" 10' - 10"

CTR.003A45-07 6

CTR.003A45-07 5

WATERPROOFING

WATERPROOFING

N30

N40

TYP.

U.N

.O.

1' - 0

" TYP. U.N.O.1' - 0"

45' - 8 3/8"

2

C LEQ

EQ

EQEQ

C LEQ

EQC L

EQEQ

C LEQ

EQC L

EQEQ

C LEQ

EQ

FEC2

116'

- 3"

N41

N41

N41

N41N41

N42

N42

N42

1-HR

2-HR

N41

N41

N41

1-HR

8CTR.003A52-04 2-HR

N42

N42

30' - 2"

3' - 10"

WALL MIRROR, SEE ELEVATION

4"

4"

3

1. REFER TO SHEET CTR.003 A11-00A FOR FLOOR PLAN KEYNOTES AND GENERAL NOTES.

FLOOR PLAN NOTES

D

A

B

C

16 2345

A

E

B

C

D

16 2345

A

E

B

C

D

SHEET NUMBER

TITLEApproved

Checked

Drawn

Job Number

ISSUE CHART

CONSULTANTS

KEYPLAN

PROJECT

NOTE: DOCUMENTS ARE INCOMPLETE AND MAY NOT BE

USED FOR REGULATORY APPROVAL, PERMITTING, OR CONSTRUCTION PURPOSES.

STRUCTURAL

TGRWA600 W. VAN BUREN ST., STE. 900

CHICAGO, IL 60607MEP

GHR ENGINEERS AND ASSOCIATES1615 S. NEIL ST.

CHAMPAIGN, IL 61820CIVIL

CLARK DIETZ125 W. CHURCH ST.

CHAMPAIGN, IL 61820IT TELECOM

MECHANICAL SERVICES ASSOCIATES111 S. VIRGINIA ST.

CRYSTAL LAKE, IL 60014KITCHEN

REITANO DESIGN GROUP302 N. EAST ST., STUDIO ONE

INDIANAPOLIS, IN 46202THEATER

SCHULER SHOOK750 N. ORLEANS, STE 400

CHICAGO, IL 60654ACOUSTIC

THRESHOLD ACOUSTICS141 W. JACKSON BLVD., STE 2080

CHICAGO, IL 60604

ASSOCIATE ARCHITECT

114 W. MAIN ST.URBANA, IL 61801

610 W. UNIVERSITY AVE.CHAMPAIGN, IL 61820

CHAMPAIGN CENTRALHIGH SCHOOL

703 S. NEW ST.CHAMPAIGN, IL 61820

CHAMPAIGN UNIT 4SCHOOL DISTRICT

2/17/ 2

021 2

:45:53

PM

BIM

3 60:/

/Cha

m paig

n U4 /0

2353

0_C E

NTRA

L .rvt

CTR.003A11-00D

LEVEL 00 AREA D

JF

SL

023531.000

Approver

Copyright © 2018 Perkins+Will

ADDITIONS ANDRENOVATIONS

The Wrigley Building410 North Michigan Ave.

Suite 1600Chicago, IL 60611

t 312.755.0770f 312.755.0775

www.perkinswill.com

1/8" = 1'-0"1 LEVEL 00 - AREA 'D'

1

1

1

1

2

2

3

3

MARK ISSUE DATE0 ISSUED FOR BID 02/15/20191 ASI_#CTR.003-017 08/21/20192 PR_#CTR.003-070 4/10/20203 PR #CTR.003-158 10/16/2020

abarton
Highlight
abarton
Highlight
abarton
Highlight
abarton
Highlight
abarton
Highlight
abarton
Highlight
abarton
Highlight
abarton
Highlight
abarton
Highlight
giurgeda
Text Box
EXHIBIT B