Challenges of power transmission expansion in a fast growing country Hugh Rudnick Professor Pontificia Universidad Católica de Chile International Experience in Transmission Planning and Delivery Imperial College, London, 11-12th January 2013

Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Challenges of power transmission expansion in a fast growing country

Hugh Rudnick Professor

Pontificia Universidad Católica de Chile

International Experience in Transmission Planning and Delivery Imperial College, London, 11-12th January 2013

Page 2: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Abstract

The talk presents and discusses the power transmission expansion model of a fast growing country (Chile), where power capacity has to be doubled, approximately, every 10 years.

The market structure is explained, describing the wholesale spot market, contract PPA market, capacity market, locational marginal pricing, transmission toll scheme, and the centralized transmission expansion model.

2

Page 3: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Takeaways

Basis of Chilean model: •Regulations that transmit economic signals to players, reflecting real costs and restrictions (including transmission ones), to achieve short and long term efficiency. •Clear separation of wholesale roles (generation, transmission, operation), with no vertical integration (except distribution).

Fast growing countries need proactive transmission expansion models. An auction approach to build new predefined lines is proving an attractive efficient alternative in Chile. Transmission system infrastructure development challenged by many uncertainties, mainly in power generation competitive investment decisions. Need for evolving electricity market regulations, particularly in transmission. New challenge of operating multiple owner transmission systems.

3

Page 4: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

0

5.000

10.000

15.000

20.000

25.000

30.000

35.000

40.000

45.000

0 2.000 4.000 6.000 8.000 10.000 12.000 14.000

GDP (2000 US$)

PPP per cápita

kWh per cápita

India

Brasil

Chile

España

Reino Unido

EEUU

OECD

Mundo

Alemania

Francia

Colombia

Centro America

Peru

Chilean Electricity Needs Energy growth around 6% per year

High correlation between energy growth and GDP growth

4

Page 5: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Chilean Electricity Market Interconnected Systems (December, 2011)

I

II

III

IV

V RM VI

VII VIII

IX XIV X

XI

XII

XV

Northern Interconnected System (SING)

Max demand (MW) 2,002

Energy sales (GWh) 14,263

Installed Capacity (MW)

4,580

Region I and II

Population 5.7%

Central Interconnected System (SIC)

Max demand (MW) 6,158

Energy sales (GWh) 42,449

Installed Capacity (MW)

12,365

Region III to X

Population 92.6%

Aysen isolated networks

Magallanes isolated networks

5

Page 6: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Northern Interconnected System (SING) Parinacota

Tarapacá

Lagunas

Pozo

AlmonteCollahuasi

Crucero

Tocopilla

Chuquicamata

Encuentro

Atacama

Chacaya

Domeyko

Laberinto

Angamos

Coast Mountain

Approximate distance:

200 km

6

Page 7: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Central Interconnected System (SIC)

7

Page 8: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Sufficiency & Efficiency in the Long Term

Efficiency in the Short Term and avoid Market

Power

Adjustment betweeen Contracts and Minimum

Dispatch Cost

Long Term Energy Contracts

Compulsory Pool and Audited Costs

Spot Transfers among Generators +

Capacity Charge

Regulatory Principles

8

Page 9: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

0

100

200

300

400

500

600

0 1000 2000 3000 4000 5000 6000 7000 8000 9000

Var

iab

le C

ost

[U

S$/M

Wh

]

Available Capacity [MW]

Generation Supply Demand

Run of River Hydro& Wind

Coal CC GNL

CA GNL

CC&CA Diesel

Turbinas Diesel & Otros

Low ValuedDam Hydro

High ValuedDam Hydro

Market Operation by ISO Dispatch Example

Source: Systep, 2012

9 ISO completely independent of TO

Page 10: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Electricity Market and Products Basic Concepts

• Generators supply (and sell) two main products:

– Energy (supply energy hour by hour, MWh)

– Capacity (supply peak demand, MW)

Marginal cost tariff system in optimal conditions:

Investment + Operation costs = Energy sold at marginal cost + capacity component

Capacity

Hours

Energy

10

Page 11: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Generation fully contracted

Contract Market

Demand buying through long term PPA contracts (15 to 20 years)

Investments based on contracts

New entrants can challenge incumbents via contracts

Spot market as balance for differences market

But cost based, eliminating market power by design

Market competition takes place at PPA market, not in spot

11

Page 12: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Transmission Generation Distribution

Regulated clients

Large clients Low voltage

Market price

Market price

Auction price

Tolls

Tolls

Tolls

Distribution tolls

Nodal price + VAD

Spot price (energy)

Capacity nodal price

Large clients High voltage

Transmission Open access passive market facilitator Transmission companies separate from ISO

12

Page 13: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Transmission:

–Longitudinal network

–Voltage over 23kV

–Regulated natural monopoly

–Remuneration independent of equipment loading and congestion

–Replacement value & auction value

–Rate of return over investment: 10% fixed by law

–Open access and public service

–Low risk activity

Transmission Regulation Cardones 220

C. Pinto 220

D. Almagro 220

Punta Colorada 220

Maitencillo 220

Pan de Azúcar 220

Los Vilos 220

Nogales 220

Quillota 220

Polpaico 220

Polpaico 500Lampa 220

C. Navia 220

Chena 220

A. Jahuel 220

System 154 kV

A. Jahuel 500

Ancoa 500

Ancoa 220

Charrua 500

Charrua 220Esperanza 220Cautin 220

Temuco 220

P. Montt 220

B. Blanco 220

Additional

Subtransmission

Trunk System

Valdivia 220

13

Page 14: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Trunk System: are the economically efficient and necessary facilities to supply overall system demand*.

TRUNK SYSTEM

SUBTRANSMISSION

ADDITIONAL

ADDITIONAL

ADDITIONAL ADDITIONAL

SUBTRANSMISSION

Customers

Generators

Distributors Customers

Distributors

Additional Systems: in-feed lines of generators and lines used exclusively by non-regulated customers.

Subtransmission System: are the facilities used by groups of customers (regulated or non regulated price) located in distribution concession zones.

Transmission Structure

*defined by regulator every 4 years 14

Page 15: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Transmission tolls

-Providing system wide service

-Paid for that service

-Ex ante tolls determined by ISO, under regulated procedure

-Experts panel ruling on divergences

-Tolls reflecting:

• Use of system under expected economic dispatch

• Cost-benefit relation (more easily identified in long. system)

15

Cardones 220

C. Pinto 220

D. Almagro 220

Punta Colorada 220

Maitencillo 220

Pan de Azúcar 220

Los Vilos 220

Nogales 220

Quillota 220

Polpaico 220

Polpaico 500Lampa 220

C. Navia 220

Chena 220

A. Jahuel 220

System 154 kV

A. Jahuel 500

Ancoa 500

Ancoa 220

Charrua 500

Charrua 220Esperanza 220Cautin 220

Temuco 220

P. Montt 220

B. Blanco 220

Additional

Subtransmission

Trunk System

Valdivia 220

Page 16: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Transmission tolls

Area of Common Influence

ACI Polpaico Charrúa

W (100%)

I (100%)

W (100%)

W (100%)

I (100%) I (100%) I (80%) W (20%)

Injections and withdrawals participation on power flow (magnitude & direction) are determined by Generalized Distribution Factors (GGDF / GLDF)*

**Rudnick, H., Palma, R., Fernández, J. "Marginal pricing and supplement cost allocation in transmission open access". IEEE Transactions on Power Systems, Vol. 10, Nº2, May 1995, pp. 1125-1132

16

Market

Page 17: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Puerto Montt

Charrúa

Ancoa

Alto Jahuel

Maintecillo

Diego de

Almagro

Temuco

S

1G

S

2L

Mg

4G

N

5G

N

6G

S

3G

S

2G

S

1L

S

3L

N

4L

N

5L

1 S

1 1 1Line 1 T a G

5 Mg 5 N 5 N

4 4 5 5 6 6

55 S 5 S 5 S

1 1 2 2 3 3

0.8 a G + a G + a GLine 5 T

0.2 b L + b L + b L

7 N

7 5 5Line 7 T b L

7T

6T

5T

4T

3T

2T

1T

Toll TL

TL= AVNRL+COMAL-ITL

akL = f(GGDFL) bj

L = g (GLDFL)

Quillota

Transmission tolls

17

Page 18: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Nodal prices LMP

Short term locational

spot prices

reflecting:

• Generation costs

• Losses

• System congestion

18

Page 19: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

SIC real LMP decoupling along 2012

Nodal prices

19

Page 20: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Congestion in trunk transmission

(2010-2012, % of hours a year)

Ref.: Gener, Chile

20

Page 21: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Transmission expansion

Nodal prices

SIC projected LMP decoupling 21

Page 22: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Impact of nodal prices

22

Page 23: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

23

Page 24: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

24

Page 25: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

congestion

25

Page 26: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

26

Page 27: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

27

Page 28: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

2010 SIC Balance of injections and withdrawals

28

Page 29: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

• Only generators pay for transmission, use of system approach • Market oriented transmission toll regulation

– Two party negotiations, no coherency checks for the global system – Different understanding of area of influence – High transaction costs and barriers of entry to new investors – Remuneration risks (over or under payments) – Opportunities for free-riders

• Market oriented transmission expansion – Expansion linked to generator investments or specific wholesale loads – Expansion needs originated by demand growth are not necessarily fulfilled – Questionable transmission solutions – Over and under investment – No simple solutions to congestion problems –reliability problems

ORIGINAL EXPANSION REGULATION 1982-2003

29

Page 30: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Questionable expansion solutions

1996 Transelec Colbun system expansion solution proposal 1997

30

Page 31: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

• Cooperative scheme, with valuation and expansion of the trunk system determined every 4 years through a Trunk System Study (ETT) prepared by an external consultant.

• All agents participate in the study via a consultation process.

• The study determines the value of transmission installations.

• The study defines a preliminary 4 year expansion plan.

NEW TRANSMISSION EXPANSION 2004

31

Page 32: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

32 Information flow

Monetary flow

Page 33: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

• All agents participate in the study via a consultation process (Regulator, SIC and SING gencos, SIC and SING trunk transcos, discos and large consumers).

• Study assigned to consultant through international tender.

• Study determines the trunk system VI (investment), COMA (operation), Economic Life and Indexation Formula (for existing installations).

• Study subject to Experts Panel process.

33

Page 34: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

• Study determines a four year referential transmission expansion plan.

• Expansion depends on expected generation investments (generation expansion plan determined by regulator) and load forecasts.

34

Page 35: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Generation expansion plans (indicative)

Minimizing investment + operation + unserved energy under competitive environment

Need to consider uncertainties on hydro energy production in SIC 35

Investment model

Page 36: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

• The expansion plan is revised and adapted by the operator every year and the regulator defines the definitive plan. All agents participate in the revision.

• The trunk system expansion projects may be upgrades of the existing system or new projects:

• Upgrades of the existing system are assigned directly to the facility owner (awarded through auction to the contractor with minimum value of investment VI, with a cap VI+15%)

• New projects are awarded through a competitive auction process called by the operator (winner is the company that offers the minimum AVI+COMA, valid for 20 years)

36

Page 37: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

37

Page 38: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Transmission system expansion SIC 2012 auction process

Cardones

Diego Almagro

Carrera Pinto

P. Montt

Rahue

Valdivia

Pichirropulli

Ciruelos

CautínTemuco

Charrúa

Ancoa

Alto Jahuel

Lo AguirreChena

Cerro Navia

Polpaico

Quillota

Nogales

Los Vilos

Las Palmas

Pan Azúcar

Punta Colorada

Maitencillo

38

Bidders: 2 Colombian, 2 Spanish, 1 Brazilian, 1 Israeli and 2 Chilean companies

Page 39: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Transmission system expansion SIC auction process- bids for main lines

39

Page 40: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Construction of new installations

• Each transmission expansion is auctioned by a “closed envelope” scheme, where each bidder offers a fixed annual remuneration for its construction and operation. – Successful auctions (except for minimum administrative problems).

– Lack of information provided not perceived as a limitation by newcomers.

– The auction winner (smallest bid) starts to receive the requested remuneration when the facility starts operation. The annual rent is fixed during the first 20 years (indexed), and after that period goes into the four year valuation ETT process.

– No congestion revenues are assigned to the transmission lines.

– Building timing restrictions and penalties imposed by delays in complying.

– Transmission facilities must comply with Grid Code and there are penalties imposed by Superintendence in case of disruptions.

– New players must incorporate into a Transmission Company (Transco).

– The ISO manages transmission operation, use of transmission and toll calculations , overlooking the network and each Transco. ISO´s duty is to secure supply and minimize cost of system operation.

40

Page 41: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Trunk Expansion

2012 2013 2014 2015 . . . . 2018

JAS OND EFM AMJ JAS ON

D

EF

M

AM

J

JA

S

ON

D

EF

M

AM

J

JA

S

ON

D

EF

M

AM

J

JA

S

ON

D

Revision CDEC Oct

Expansion Plan CNE Dic

Discrepancies Experts Panel Dic

Resolution Experts Panel Feb

Decree Ministry of Energy Abr

Projects tendering and

awarding

Transmission lines

Substations works (larger)

Substations works (minor)

60 months

30 months

18 months

Coal Plant: 36 months

Onshore Wind Plant: 18 months

Biomass Plant: 30 months

Small Hydro Plant: 24 months

Source: JC Araneda, Transelec

Timing restrictions

Dynamic market plus long environmental approval process and RoW negotiations require faster transmission expansion decisions for generation projects to develop. 41

Page 42: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

66104

63 13 53 835

6646

184

802

127

2004 2007 2008 2009 2010 2011 2012

Valores en millones de USD

Expansions (CDEC auctions) Upgrades (of existing facilities)

Figures in Million USD

ELECNOR

TRANSELEC

ISA: 489

ELECNOR: 140

TRANSELEC: 90

SAESA-Chilquinta: 83

TransChile 132 150

63

197

53

885

132

Source: JC Araneda, Transelec

Uncertainties and opportunity

42

Page 43: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

66104

63 13 53 835

6646

184

802

127

2004 2007 2008 2009 2010 2011 2012

Valores en millones de USD

Uncertainties and opportunity in ETT

2006: One generation expansion scenario and deterministic analysis (10 years)

2010: Three generation scenarios and min max regret approach (15 years)

43

bottlenecks

Page 44: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

-

100

200

300

400

500

600

700

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

MW

Proyección de crecimiento de demanda Industrial para Zona Norte

Crecimiento Esperado de Demanda por Nuevos Proyectos (Systep) Proyección ITD Abril 2009 (CNE)

PASCUALAMA

EL MORRO

CASERONES

Load uncertainties

Systep (consultant) Regulator

Timing of new mining projects in northern SIC

44

Page 45: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Basic system operation

Reserves EDAG EDAC

Reserves EDAG (intertripping) EDAC (load shedding)

Maximum allowed flow

Reserves

EDAG EDAC

Reservae EDAG

EDAC

Maximum allowed flow

Operation with smart control

System n-1 security may be incremented through smart control schemes Diverge positions at ISO, based on cost impacts.

How much use of smart options?

45

Page 46: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Some difficulties and challenges

• Dissociation between competitive generation market and centralized transmission planning (Experts panel solving controversies) • Conflictive interests of generation companies may lead to incremental

solutions. • Transmitter interested in increasing investments –gold plating (n-1

discussion on transformers).

• Dynamic market plus long environmental approval process and RoW negotiations require faster transmission expansion decisions for generation projects to develop (Risks for incumbent and new investors)

• Uncertainty in value of investment for upgrades- cap too low in some cases, with no contractor offers, delaying commissioning.

• Risks of generation expansion and load forecast inaccuracy impact generators and load. Transmission protected from risks.

46

Page 47: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

New challenges

SIC-SING interconnection (central vs merchant)

Anticipatory investments for new generation poles (20 years view)

47

Page 48: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

• Mistrust of regulation • Decided that Transco and Regulator should not be responsible for

transmission expansions

• Public Contest method • Users to propose, vote and pay for major expansions

• Construction O&M out to competitive tender

Transmission expansion in Argentina*

*”Beyond regulation”, Stephen Littlechild, ESNIE Cargese, Corsica, 16 May 2006 48

Page 49: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Several years delay to much needed Fourth Line from Comahue (major generation source) to Buenos Aires (major demand center) Congestion increasing on corridor • Sept 1994 -3 generators proposed 4th Line • Public hearing Feb 1995 - 50% vote against

(surprise and concern) • May 1996 revised proposal – accepted • Finally, 4th Line was not economic -Delay was socially beneficial, not costly -Cheaper to locate generation near demand instead -None of alleged problems materialized here -Public contest method worked well in other cases

HENDERSONHENDERSON

PUELCHESPUELCHES

CHOELECHOELE

CHOELCHOEL

ALICURAALICURA

P. DEL AGUILAP. DEL AGUILA

PLANICIEPLANICIE

BANDERITABANDERITA

BAHIABAHIA

BLANCABLANCACHOCONCHOCON

EZEIZAEZEIZA

ABASTOABASTO

OLAVARRIAOLAVARRIA

Fourth line

49

Page 50: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

• Public Contest method made better use of existing lines • Competitive tendering lowered costs and innovative

technologies introduced • Bidding to construct was very successful, new companies • 4th Line: 4 bidders, cost/km about halved (pre-reform at

least $230k/km, with 4th Line $130k/km)

• Regulation would have yielded to political pressures to build many uneconomic lines

• Method resisted political pressure and led to more economic outcomes than regulation

Public contest method worked well

50

Page 51: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Information flow

Monetary flow

Mechanisms of particular importance for uncertainty treatment/risk allocation

Legend:

Load forecasts

(AUST)

Gen. system config.

Centralizedplanning

Trans.expansion

plan

Auction arrangements

Call for auctions,

directives and support doc., opening bids

Auction results: winners

Bids

Auction results: allowed

revenues Centralized contract/

accountingmanagement, calculation of transmission

tariffs

Environmental licensing,

construction

Distcos

Large cons.

Generation auctionswinners

Reference equipment

costs

Regulator

Minstry of Mines & Energy

TranscosTransmission

(dutch) auctions

Transmission entrepreneurs

Regulator

ISO

Operation

Transmission charges collected from network users

Remuneration equals allowed revenues

Planning agency

ISO

Transmission expansion in Brazil

Source: L. Barroso, PSR, Brazil 51

Page 52: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

• Dealing with uncertainty in generation expansion:

– Generation expansion in Brazil made mainly via auctions, held 5 or 3 years before commissioning date of winner plants.

– 3 to 5 years for planning, auctioning and constructing transmission.

• Environmental licensing is often cause for delays.

Centralizedplanning

Expansion plan

Auction winner

Bids

TranscosTransmission

(dutch) auctions

Transmission entrepreneurs

Planning agency

ISO

7 Months

Transco/MMA-IBAMA

Environmental licensing:

Public Hearing/Environmental Impact Study

Concession contract

4 Months

Previous Envir.

Licence

Installation License

Varying time frames

Basic Environ.Project

Transco/MMA-IBAMA

Transco / ISO

Construction works, tech.

tests

Mitigation of environ.

impacts

Operation Licence

Tech. issues solved

Operation

Auction arrangements

Regulator

Minstry of Mines & Energy

Actual time window for construction

Transco/MMA-IBAMA

Transmission expansion in Brazil

Source: L. Barroso, PSR, Brazil 52

Page 53: Challenges of power transmission expansion in a fast growing … · 2013. 8. 2. · Diego Almagro Carrera Pinto P. Montt Rahue Valdivia Pichirropulli Ciruelos Cautín Temuco Charrú

Challenges of power transmission expansion in a fast growing country

Hugh Rudnick Professor

Pontificia Universidad Católica de Chile

International Experience in Transmission Planning and Delivery Imperial College, London, 11-12th January 2013