Challenges faced and Effective Solutions for Ensuring Water Quality by Delhi Jal Board
Presented By:Naresh Kumar Dargan
Ex. Engineer Delhi Jal Board
• TOTAL AREA : 1486 SQ KM
• POPULATION : 20 MILLION
• PROJECTED POPULATION 2021 : 23 MILLION
• ANNUAL MIGRATION FROM
• NEIGHBOURING STATES : 1.4 MILLION (APPROX)
• FLOATING POPULATION : 1.5 MILLION (APPROX)
• 5-6 MILLION PEOPLE LIVE IN UNPLANNED HABITATIONS
• COVERAGE WITH WATER SUPPLY NETWORK : 83 %
• SEWERAGE NETWORK COVERAGE : 50 %
• UNCOVERED : MAINLY UNAUTHORIZED COLONIES
DELHI’s DEMOGRAPHY: UNIQUENESS
Providing drinking water to every household
Enhance Service Standards for the consumers
Improve water quality
Reduction in Non – Revenue Water (NRW)
Energy Conservation
Better collection efficiency of revenue
Extension of water supply in un-served areas
FUNCTIONS & OBLIGATION OF DJB FOR WATER
WATER DEMAND & SUPPLY STATISTICS OF DELHI
Present Population of Delhi : 20 Million
Present Water Demand : 1140 MGD
Water Availability : 900 MGD(including 80 MGD ground water)
Water Treatment Plants : 09 Nos.
Water Lines network : 14500 Km
Rainey Wells : 16 Nos
Tubewells : 4500 Nos
UGR and Booster Pumping Stations : 117 Nos
QUALITIES OF POTABLE WATER
Safe / wholesome
water
Aesthetically acceptable
Radioactive elements absent
Free from Bacteria
Absence of organic
substances
Chemically safe
Parameters
Physical Inorganic
OR
Chemical
Toxic
Metals
Organic,
Nutrient
& Demand
Alpha emitter
Beta emitter
BiologyRadioactive
elementsBacteriological
Phytoplankton
Zooplankton
Total Coliform
Faecal Coliform
BOD
COD
Phenols
Oil &
Grease
Pesticides
Nitrate
Copper
Chromium
Cadmium
Zinc
Lead
Mercury
Iron
Manganese
PH
Conductivity
Total Dissolved
Solids
Temperature
Colour
Odour
Taste
Turbidity
Fluoride
Alkalinity
Nitrate
Phosphate
Hardness
Calcium
Magnesium
Chloride
Sulphate
Water Quality Assessment
S. No Zonal Lab Command Area
1. Wazirabad Central, North and New Delhi
2. Haiderpur North-West Delhi
3. Trans Yamuna Region East and North East District
4. Nangloi/ Haiderpur West- Delhi
5. Okhla South-Delhi District
6. G.K./ Nangloi/ Haiderpur South-West Delhi
7. Dwarka Part of West & South
8. Bawana North West
DETAILS OF DJB ZONAL LABORATORIES
Domestic Consumption
As per BIS Standards IS 10500-2012 with up to date amendments
S. NO. PARAMETERS UNITACCEPTABLE
LIMIT PERMISSABLE
LIMIT
1 pH - 6.5 – 8.5 NO Relaxation
2 Turbidity NTU 1 5
3 Colour Hazen 5 15
4 Odour - Agreeable Agreeable
5 Taste - Agreeable Agreeable
6 Total Dissolved Solids (TDS) Mg/L 500 2000
7 Total Alkalinity (as CaCo3 ) Mg/L 200 600
8 Total Hardness (as CaCo3 ) Mg/L 200 600
9 Chlorine (as Cl) Mg/L 250 1000
10 Sulphate (as So4) Mg/L 200 400
Water Quality standards in india
• RIVER YAMUNA AND CANAL ORIGNATING FROM RIVER GANGA ARE THE MAIN
SOURCES OF RAW WATER FOR DELHI
• MIXING OF DRAINS AND INDUSTRIAL WASTE IN RAW WATER SOURCES.
• SOMETIMES EXCESS AMMONIA IN RAW WATER OF RIVER YAMUNA BECOMES A
CONCERN
8
SOURCES OF CONTAMINATION IN RAW WATER
Quality monitoring at Water treatment plant
Raw water/Canal Water
Screening
Pre Chlorination
Coagulation Flocculation
Sedimentation
Decantation
Filtration Post Chlorination
Storage and Pumping
Consumers
LEAKAGES IN THE WATR SUPPLY NETWORK
ILLEGAL WATER CONNECTIONS FROM DJB WATER LINES
MIXING OF DRAIN WATER WITH DRINKING WATER DUE TO
DAMAGED HOUSEHOLD WATER CONNECTION
POOR MAINTENANCE OF HOUSE SERVICE CONNECTIONS
OF THE CONSUMERS
13
CAUSES OF CONTAMINATION IN NETWORK
LEAKAGE THROUGH HSC NORMAL PRACTICE OF REPAIR
POOR QUALITY OF SADDLEGI PIPE BELOW GL
CORRODED EXISTING GI WATER CONNECTIONS
PROTECTION OF WATER SOURCES FROM CONTAMINATION.
PROPER MAINTENANCE OF TRANSMISSION AND DISTRIBUTION NETWORK
MONITORING OF QUALITY AT EVERY STEP OF TREATMENT IN WTP
REPLACEMENT OF OLD OVERAGE AND DAMAGED WATER MAINS
URGENT REPAIRS OF WATER LINE LEAKAGES
REGULAR SAMPLING OF WATER IN THE DISTRIBUTION NETWORK
EDUCATING THE CONSUMERS TO MAINTAIN THE HOUSE SERVICE CONNECTION
PROPERLY
GENERAL STEPS TO KEEP THE WATER QUALITY SAFE
DJB HAS IMPLEMENTED THREE PILOT PROJECTS ON PPP MODEL WITH
PRIVATE OPERATORS FOR WATER DISTRIBUTION IN THE COMMAND
AREAS OF MALVIYA NAGAR UGR, NANGLOI WTP AND MEHRAULI-
VASANT VIHAR GROUP OF COLONIES.
IN PPP PROJECTS, KPIS (KEY PERFORMANCE INDICATORS) RELATED TO
IMPROVEMENT IN SERVICES HAVE TO BE ACHIEVED IN FIXED TIME
LINES
THESE PROJECTS ARE OF 10 TO 15 YEARS O&M DURATION
METERING OF EVERY HOUSEHOLD CONNECTION
16
INITIATIVES TAKEN BY DJB FOR ENHANCING SERVICE STANDARDS AND QUALITY MANAGEMENT
PROJECT AREA : 129 SQM (8.6% OF ENTIRE DELHI)
POPULATION : 15 LACS ( 8% OF ENTIRE DELHI)
TOTAL COST OF PROJECT : RS 4585.40 MILLION
CONCESSION AGREEMENT
WITH THE OPERATOR : 15 YEARS
17
HIGHLIGHTS OF NANGLOI PPP PROJECT
DJB Share
70 %
Rs. 3209.80 Million
Operator’s Share
30 %
Rs 1375.60 million
Total Estimated Project Cost
Rs. 4585.40 Million
PROJECT STRUCTURE
• MAINTENANCE OF EXISTING WATER SUPPLY NETWORK
• REPLACEMENT OF OLD AND DEFECTIVE WATER LINES WITH HDPE/DI PIPELINES
• REPLACEMENT OF ALL EXISTING HOUSEHOLD SERVICE CONNECTION (HSC) WITH
MDPE PIPES WITH 15 YRS FREE MAINTENACE WITHOUT ANY COST TO CONSUMER
• INSTALLTION OF WATER METERS ON EVERY HSC BY CHARGING RS 400/-
• LAYING OF WATER LINES IN NO NETWORK COLONIES WITH HSC INSTALLATION
• REGULAR SAMPLING OF WATER IN THE PROJECT AREA
• TIME BOUND REPAIR OF LEAKAGES AND COMPLAINT REDRESSALS
• MEET OUT KEY PERFORMANCE INDICATORS AFTER CONSTRUCTION PERIOD
19
MAIN OBLIGATIONS OF THE PPP OPERATOR
ILLEGAL AND UNAUTHORIZED WATER CONNECTIONS FROM DJB
WATER LINES IN NETWORK AND NO NETWORK COLONIES
HIGH NON REVENUE WATER ( 79 % IN 2013)
RELUCTANCE OF RESIDENTS TO TAKE LEGAL CONNECTION
RELUCTANCE OF CONSUMERS FOR INSTALLATION OF WATER METERS
ACCEPTANCE OF A PRIVATE OPERATOR AS A WATER SERVICE PROVIDER
20
CHALLENGES FACED IN NANGLOI PPP AREA
21
CHALLENGES FACED IN NANGLOI PPP AREA
EXTENDED UNAUTHORIZED WATER CONNECTIONS
LEAKAGE THROUGH HSC NORMAL PRACTICE OF REPAIR
RUST INSIDE THE CI PIPE CONTAMINATION OF WATER
GI PIPE USED FOR
HSC
DEFUNCT WATER METER
PREVIOUS SCENERIO
PE pipes - Use of Medium Density Polyethylene pipe for HSC and HDPEpipes for distribution Network
Quality Total System Cost Service Life Reliability
PE Pipe Cont……
TECHNICAL INNOVATION IN PPP PROJECT
TECHNICAL INNOVATION IN PPP PROJECT
ELECTRO-FUSION SADDLE
APPROPRIATE SADDLES TO PROVIDEHOUSE SERVICE CONNECTION ON PE PIPE LINE, STANDARD EN 12201-3 / ISO 4427 .
TECHNICAL INNOVATION IN PPP PROJECT
• Good quality of materials (Body – Ductile Iron,Strap – Stainless Steel with Epoxy coating, nutbolt- Brass) which guarantees a life time equalto those of the pipes and are also anticorrosive.
• Reduced risk of leakage – No metal to metalcontact due to insertion EPDM bush.
• Perfect stability on pipe, whereas ferrulesprone to bend and leak, where pipe laid atshallow depth due to surplus /traffic load.
TECHNICAL INNOVATION IN PPP PROJECT
• 15 % REDUCTION IN NRW
• 91% INCREASE IN CONSUMERS
• REDUCTION IN WATER CONTAMINATION COMPLAINTS
• CUSTOMER SATISFACTION
• 80 % CONSUMERS HAVE WATER METERS
• REDUCTION IN LOSSES AT WATER TREATMENT PLANT
• 24 HR TOLL FREE COMPLAINT NO
27
ACHIEVEMENTS IN NANGOI PPP PROJECT
29
30
THANK YOU