45
Garth Fallis P.Eng. Chair DC-80 Repair, Rehabilitation and Strengthening

Chair DC-80 Repair, Rehabilitation And

  • Upload
    mrefaat

  • View
    222

  • Download
    3

Embed Size (px)

DESCRIPTION

Chair DC-80 Repair, Rehabilitation And

Citation preview

Page 1: Chair DC-80 Repair, Rehabilitation And

Garth Fallis P.Eng.Chair DC-80 Repair, Rehabilitation and

Strengthening

Page 2: Chair DC-80 Repair, Rehabilitation And

Background Document Specification External PT Certification ACI 562 Some neat stuff that is happening

Page 3: Chair DC-80 Repair, Rehabilitation And

Prestressed Concrete was first patented by a San Francisco Engineer P.H. Jackson - 1886

E. Freyssinet of France started modern development of Prestressed Concrete - 1928

North America’s first prestressed concrete bridge, Walnut Lane Memorial Bridge in Philadelphia - 1951

The first strand post-tensioning system used in the U.S. was developed by Edward K. Rice, the president of T. Y. Lin & Assoc. - 1960’s

Page 4: Chair DC-80 Repair, Rehabilitation And

That is over 50 years

In the past most reinforced concrete structures have been designed for 25 to 30 years

Repairs are required after as little as 5 years Concrete structures (like everything else)

have a service life Post-tensioned concrete structures are part

of this world

Page 5: Chair DC-80 Repair, Rehabilitation And

So if we are going to do repairs let’s make sure they are done right

That is the purpose of Committee DC-80 Repair, Rehabilitation, and Strengtheing of

Post-tensioned Structures

Page 6: Chair DC-80 Repair, Rehabilitation And

Some of things Committee DC-80 Repair, Rehabilitation, and

Strengthening of Post-tensioned Structures are doing

Page 7: Chair DC-80 Repair, Rehabilitation And
Page 8: Chair DC-80 Repair, Rehabilitation And
Page 9: Chair DC-80 Repair, Rehabilitation And
Page 10: Chair DC-80 Repair, Rehabilitation And
Page 11: Chair DC-80 Repair, Rehabilitation And
Page 12: Chair DC-80 Repair, Rehabilitation And
Page 13: Chair DC-80 Repair, Rehabilitation And
Page 14: Chair DC-80 Repair, Rehabilitation And
Page 15: Chair DC-80 Repair, Rehabilitation And

DIVISION 03CONCRETE

SECTION 03 01 24UNBONDED POST-TENSIONING REPAIRS

PART 1 – GENERAL1.1 SUMMARY

A. This section includes repair to unbonded post-tensioning in the slabs and beams (modify as appropriate to identify post-tensioned elements to be addressed) as

follows:Provide listing of work tasks specific to post-tensioning that are to be described/specified in this specification, possibly including the following:

1. Making inspection recesses2. Testing force in tendon3. Repairing damaged tendon sheathing4. Splicing of damaged or fractured post-tensioning strand5. Rebuilding damaged or deteriorated end anchorages6. Extraction and threading of beam post-tensioning strand7. Drying of existing tendon sheathing8. Stressing repaired post-tensioning tendons

Page 16: Chair DC-80 Repair, Rehabilitation And
Page 17: Chair DC-80 Repair, Rehabilitation And
Page 18: Chair DC-80 Repair, Rehabilitation And

Guide for Strengthening of Concrete Structuresby means of external post-tensioning tendons or bars

This guide provides an introduction to the repair or strengthening ofconcrete structures by means of external post-tensioned tendons or bars.The intent of this document is to familiarize owners, licensed designprofessionals, contractors, suppliers, and other interested parties with theprocedures, tests, equipment, and other aspects of the repair andstrengthening process.

Page 19: Chair DC-80 Repair, Rehabilitation And
Page 20: Chair DC-80 Repair, Rehabilitation And
Page 21: Chair DC-80 Repair, Rehabilitation And

Certification committee CRT-60 formed and having first meeting later today

Chair of committee Jim Beicker Committee members so far◦ Gabriel Jimenez◦ Doug Sarkkinen◦ Dan Moser◦ Garth Fallis◦ Please join

Format based in the Unbonded Technician Certification The Guide for the Evaluation and Repair of Post-tensioned

Concrete Structures will supply the material

Page 22: Chair DC-80 Repair, Rehabilitation And
Page 23: Chair DC-80 Repair, Rehabilitation And

ACI562 - Code Requirements for Evaluation, Repair, and Rehabilitation of Concrete Buildings

7.6.4 Prestressed structures

7.6.4.1 The effects of existing prestressing shall be included in the repair design.

7.6.4.1C Requirements for repair of structures with bonded and unbondedprestressing are different. Post-tensioned structures (with bonded and unbondedtendons) are often cast-in-place monolithic structures, whereas pretensionedstructures (with bonded strands) are often single-span precast structures. Each system is unique and should be individually considered. The repair of prestressedstructures requires an assessment of the existing tendons. Repair of unbondedtendons may require tendon detensioning. Guidance for evaluation methods and repair techniques of unbonded post-tensioned structures is provided in ACI 423.4R, ACI 222.2R, ICRI No. 210.2, ICRI No. 320.4., and PTI DC80.2 (2010).

Page 24: Chair DC-80 Repair, Rehabilitation And

ACI562 - Code Requirements for Evaluation, Repair, and Rehabilitation of Concrete Buildings

7.6.4 Prestressed structures

7.6.4.1 The effects of existing prestressing shall be included in the repair design.

7.6.4.2 The effects of modifications to existing structure geometry, existing damage conditions, prestressing force release, and construction sequence shall be included in the repair design.

7.6.4.3 Stresses in remaining section after concrete removal shall not exceed the limits established in the design basis code.

Page 25: Chair DC-80 Repair, Rehabilitation And

ACI562 - Code Requirements for Evaluation, Repair, and Rehabilitation of Concrete Buildings

7.7—Repair using supplemental post-tensioning

7.7.1 Supplemental post-tensioning shall be permitted for repair and rehabilitation of structures.

7.7.2 Design of repair shall include the effects of the supplemental post-tensioning on the behavior of the structure.

7.7.2.1 Stresses due to supplemental post-tensioning shall be combined with existing stresses and the total shall not exceed the limits in the design basis code.

7.7.2.2 Design of supplemental post-tensioning shall provide for the transfer of post-tensioning forces between the post-tensioning system and the structure. Design of concrete supplemental post-tensioning anchorage zones shall be in accordance with ACI 318-11. Design of steel brackets and supplementary steel shall be in accordance with ANSI/AISC 360-10.

7.7.3 Provisions shall be made for effects of post-tensioning, temperature, and shrinkage on adjoining construction, including immediate and long-term deformations, deflections, changes in length, and rotations due to prestressing

7.7.4 Post-tensioning losses shall be included in the design of supplemental post-tensioning systems

7.7.5 Repair construction documents shall define the repair sequence, including tendon placement, anchorage, and stressing of the post-tensioned system.

Page 26: Chair DC-80 Repair, Rehabilitation And

Some Neat Stuff that is happening in PT Repair

Page 27: Chair DC-80 Repair, Rehabilitation And
Page 28: Chair DC-80 Repair, Rehabilitation And
Page 29: Chair DC-80 Repair, Rehabilitation And
Page 30: Chair DC-80 Repair, Rehabilitation And
Page 31: Chair DC-80 Repair, Rehabilitation And
Page 32: Chair DC-80 Repair, Rehabilitation And
Page 33: Chair DC-80 Repair, Rehabilitation And
Page 34: Chair DC-80 Repair, Rehabilitation And
Page 35: Chair DC-80 Repair, Rehabilitation And
Page 36: Chair DC-80 Repair, Rehabilitation And
Page 37: Chair DC-80 Repair, Rehabilitation And
Page 38: Chair DC-80 Repair, Rehabilitation And
Page 39: Chair DC-80 Repair, Rehabilitation And
Page 40: Chair DC-80 Repair, Rehabilitation And
Page 41: Chair DC-80 Repair, Rehabilitation And
Page 42: Chair DC-80 Repair, Rehabilitation And
Page 43: Chair DC-80 Repair, Rehabilitation And
Page 44: Chair DC-80 Repair, Rehabilitation And
Page 45: Chair DC-80 Repair, Rehabilitation And

Questions