Page 1: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

CFS near term & Required ADI input 6-12 month activities, required ADI information

10. AUG 2014 CFS-ADI Joint Meeting 1

KEK Linear Collider Project OfficeMasanobu Miyahara

10. Apr 2014

Page 2: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

■  Status of Facility Planning Progress

■ Near Term Activities (6-12 Month)

■  Pre-Construction Schedule

■  Summary

10. AUG 2014 CFS-ADI Joint Meeting 2

Pre-Project Scope of Work 6-12 Month activities

Page 3: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

Topographical Survey

Environmental Impact AssessmentGeological Survey

Basic Planning

1 annual 2 annual 3 annual 4 annual 5 annual

Estimation

Basic Design Detailed Design

Contract

Con

stru

ctio

n P

hase

Predesign Phase Design Phase Contract

Phase

LCC ReviewBasic Plan

ReportBasic Design

DocumentDetailed Design

Document

Con

tract

D

ocu

mentLCC Review

Investigation in the Design Phase

8. AUG 2014 CFS-ADI Joint Meeting 3

Pre Construction ScheduleLong term & Medium term

LCC Review

Page 4: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

Pre Construction Work Scope

Underground Facilities

Work ML AH DR BDS DH

Facility Arrangement B/C B/C C C B/C

Basic Shape, Dimension B/C B/C B/C C B/C

Civil/Architectural Design C C C C/D C

Electronic Design C C C C/D C

Mechanical Design C C C C/D C

10. AUG 2014 CFS-ADI Joint Meeting 4

Surface Facilities

AY CS CC

D C D

D C D

D C D

D C D

D C D

Current Status: Facility Planning Progress

Requirement Technical Study

A Clear Completed

B Clear Under study

C Unclear(50%) Partially executed

D Unclear Not yet started

Legend: Progress degreeTechnical Study

AH Access Hall

AY Access Yard

CS Central Substation

CC Central Campus

Legend: Facility

Page 5: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

Preliminary Basic Planning

• Expected Output• Basic arrangement plan (1:10,000 topographical map)

‒ Evaluation of geological condition (active fault, earthquake, ,)‒ Determination of DH Location (including elevation)‒ Layout of the Beam Line route and elevation

• Access way to Detector Hall (HT and VS)• Review the cross-section for the main part (include BDS)

• Investigation• Topographical survey (already done)

‒ Topographical mapping 1:10,000 (result by aviation laser survey)

• Geological investigation‒ Borehole investigation with logging test (near IR point /100 ~

150m )‒ Geophysical exploration (500 ~ 1000m)

10. AUG 2014 CFS-ADI Joint Meeting 5

Page 6: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

Required ADI Information

• Expected Input (for facility arrangement)• Determination of DH Location

‒ IR point (including elevation)‒ Layout of the Beam Line route and elevation

• Access way to DH (Vertical or Horizontal or,)

• Expected Input (for Cross section)• Decision of the Cross-section for the main part

‒ BDS Beam Line Layout & Cross-section‒ Shield Wall thickness in ML-tunnel (Sanami-san reported)

• Cryogenics Equipment layout‒ Arrangement of He-Tank & Cold box‒ Anti-vibration measure of the Compressor

• Install Method to MLT (include AH Cross-section)‒ Cryomodules & RF, Cold box

10. AUG 2014 CFS-ADI Joint Meeting 6

Page 7: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

Near Term Activities : 1

1 Decision of Facility arrangement

■ Determination: IR Point

10. AUG 2014 CFS-ADI Joint Meeting 7

• Revision the DH Configuration (TDR)• Access Facility to DH (VS & HT)• Underground Facilities Layout and configuration

■ Determination: Surface Facility Layout

• Surface Facilities planning (Assembly hall)• Kick off some kind of Investigation (Topographical survey, Environmental Assessment)• Consultation with regional society

In Basic planning stage

Page 8: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

2 Decision of Facility arrangement

■ Determination: Beam line level (elevation)

■ Determination: BL Route and Length

10. AUG 2014 CFS-ADI Joint Meeting 8

In Basic planning stage

• Revision the Access Point (AH & AT portal)• Access Facility to ML (AT length & location• Consistency with surface environment

• Vibration Impact Evaluation (Artificial, Separation from Riverbed)• Access Facility to ML (AT length & location• Groundwater treatment (Natural Drainage system)

Near Term Activities : 2

Page 9: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

3 Decision of the basic facilities plan

■ Specific study of Power equipment (Central power receiving facility)

10. AUG 2014 CFS-ADI Joint Meeting 9

In Basic planning term

• Location of the Central Power Station• Power voltage, power receiving system • Consultation of Power receiving line• Negotiation with local power company• Planning the emergency power system

Near Term Activities : 3

Page 10: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

■ Specific study of Cooling water system, Air-conditioning system, and

4 Decision of the basic facilities plan

10. AUG 2014 CFS-ADI Joint Meeting 10

In Basic planning term

• Finalize the Heat load capacity • Cooling water system (cooling tower, chiller )• Exhaust, Smoke facilities in the emergency• Facility planning in BDS & Detector Hall

Near Term Activities : 4

Page 11: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

■ Measurement of regular vibration

5 Geological Survey for Facilities Designs

■ Geological Survey for Underground Facility Design

Vp=4.5km/sec 以上

■ Investigation step by step for Development Design■ Bedrock strength confirmation for execution plans■ Weak layer distribution

Ele

vati

on

Microtremor measurement in Japan

P WaveLongitudinal Section in KITAKAMI Site

■ Artificial vibration (Traffic, etc )■ Effects of waves and earthquake

10. AUG 2014 CFS-ADI Joint Meeting 11

Medium Activities

Page 12: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

Summary

10. AUG 2014 CFS-ADI Joint Meeting 12

1. The specific engineering design depending on the Kitakami site conditions has started by unification of the site.

2. We need some reviews about Asian TDR configuration in the preliminary planning stage.

3. Important issue in the near term is the determination of IR point(DH) and Beam Line layout(BDS).

4. Surely doing a technological design at the basic planning phase enables shortening at the design period.5. Minimum geological survey is required to concrete the basic plan toward the design phase.6. We can push forward preparations for site acquisition and the environmental assessment by early determination of the every access point.

Page 13: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

10. AUG 2014 CFS-ADI Joint Meeting 13

Back Up

Page 14: CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1

Planning

1 annual 2 annual 3 annual 4 annual 5 annual

Additional Survey

Basic Survey Detailed Survey

Bidding

Topographic Document

Geological Document

Assessment Statement

Preliminarysurvey

Environmental Impact Assessment SurveyPreliminary

Survey

Basic DesignDetailed Design

Contract

Con

stru

ctio

n P

hase

Predesign phase Design phase Contract

phase

Geological Survey

Environmental Impact Assessment

Topographical Survey

Basic survey(1)

Review ReviewReview

Basic survey(2)

8. AUG 2014 CFS-ADI Joint Meeting 14

Pre Construction ScheduleLong term & Medium term

<Survey for land Acquisition>