CFS / Global – 04 Aug, 2010 PM Report: SB2009: ADI meeting 23.07: Parameter tables with low energy / low power operation BA Workshop Planning CFS participation relatively small http://ilcagenda.linearcollider.org/ conferenceOtherViews.py? view=standard&confId=4593 CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 1

CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

Embed Size (px)

Citation preview

Page 1: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

CFS / Global – 04 Aug, 2010PM Report:

• SB2009: – ADI meeting 23.07:

• Parameter tables with low energy / low power operation

– BA Workshop Planning• CFS participation relatively small

– http://ilcagenda.linearcollider.org/conferenceOtherViews.py?view=standard&confId=4593

CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 1

Page 2: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

Reviews:

• AAP– Eckhard Elsen will help open the BAW at KEK– Will review the BA Workshop written summary

shortly after the meeting– (PM / AAP meeting)

• PAC: next in November

CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 2

Page 3: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

IWLC 2010

• Joint Plenary sessions: Monday PM, Tuesday AM, Friday PM– Monday afternoon: CERN Directorate, Physics, GDE,

Detectors– Tuesday AM:

• ‘Performance / Scope Joint session – GDE/PD/CLIC’• ?

– Friday: summaries and wrap – up

• GDE/CLIC Plenary: Tuesday PM, Friday AM– Critical RD Reports (FLASH, CESR, ATF, CTF, SRF,…)

• Parallel: Just Wednesday and Thursday– (roughly ½ day less than we are accustomed to)

CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 3

Page 4: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

IWLC 2010 draft schedule

CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 4

Monday Tuesday Wednesday Thursday Friday18.Oct 19.Oct 20.Oct 21.Oct 22.Oct

AM 1 Joint Plenary Parallel ParallelGDE / CLIC Plenary at CICG

AM 2

Joint Plenary - 'Performance Scope' Parallel Parallel

GDE / CLIC Plenary

PM 1 Joint PlenaryGDE / CLIC Plenary Parallel Parallel Joint Plenary at CERN

PM 2 Joint PlenaryGDE / CLIC Plenary Parallel Parallel Joint Plenary

Page 5: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

IWLC10 Working Groups

1) Sources: L. Rinolfi*, A. Variola, J Clarke, T. Omori

2) Damping rings, ATF and CESR-TA: Y. Papaphilippou*, M. Palmer, S. Guiducci, J. Urakawa

3) Main linac and superconducting RFHitoshi Hayano, Carlo Pagani, Christopher Nantista

4) Main linac and normal conducting RFW. Wuensch, T. Higo, Ch. Adolphsen

5) Interaction region, ATF2 and MDIR. Tomas*, L. Gatignon, A Seryi, D. Angal-Kalinin

6) Drive beam complex and CTF3J.-B. Jeanneret, C. Biscari

7) Low emittance transport and integrated simulationsK. Kubo, D. Schulte, N. Solyak, F. Stulle*

8) Technical systems, instrumentation, pre-alignment and stabilisationH. Schmickler*, G. Blair 

9) Civil engineering and schedulingJ. Osborne*, V. Kuchler, A. Enomoto

CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 5

Page 6: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

TA WebEx meeting schedule 2010

TA Date day Meetings/workshopsCFS/Global 8/4/2010 WednesdayAS 8/11/2010 WednesdaySCRF 8/25/2010 WednesdayAD&I 8/28/2010 Friday Note date!! (AY/MCR coordinate)CFS/Global 9/1/2010 WednesdayAS 9/8/2010 Wednesday ILC BAW I (KEK)AD&I 9/15/2010 Wednesday LINAC 10 (KEK)SCRF 9/22/2010 WednesdayCFS/Global 9/29/2010 WednesdayAS 10/6/2010 WednesdayAD&I 10/13/2010 WednesdaySCRF 10/20/2010 Wednesday GDE/CLIC/ECFA workshop (Geneva)CFS/Global 10/27/2010 WednesdayAS 11/3/2010 WednesdayAD&I 11/10/2010 Wednesday PAC (Oregon)SCRF 11/17/2010 WednesdayCFS/Global 11/24/2010 WednesdayAS 12/1/2010 WednesdayAD&I 12/8/2010 Wednesday SCRF 12/15/2010 WednesdayCFS/Global 12/22/2010 WednesdayAS 12/29/2010 Wednesday

Wednesday ‘Technical Area’

Webex meetings, 08-12.2010

6

To be used to prepare for Baseline Workshops – as needed

CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab

Page 7: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

Preparation for the 1st BAW

• July 23: AD&I meeting• July 28: SCRF meeting and draft BAW report

to be distributed– delayed

• Aug. 25: SCRF meeting and the final report (prior to the 1st BAW) to be distributed

• August 28: AD&I meeting

CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 7

Page 8: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

Baseline Assessment Workshop

CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 8

• At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.

• Developed prior to (and at ) the meeting itself

• A set of questions to be answered– Also serves as a draft outline for the summary

document

• The summary is the ‘Workshop Report’ – – to be submitted as part of ‘Top Level Change

Control’

Page 9: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

Workshop Report

• The ‘Baseline Assessment’ is an advocacy process – A problem solving and integration process– We intend to develop a positive recommendation– For BAW 1, this means:

• Answering in the positive sense review panel (and other) comments on single tunnel / HLRF and gradient

• Preparation – SLAC 03.08, KEK 25-27.08

CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 9

Page 10: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

AD & I 23.07 (M. Ross) 10

2nd BAW proposal

(SLAC)• January 18 2011: Reduced RF, focusing on

parameters, running scenarios and development plans

• January 19: Reduced RF focusing on cost and performance projections and potential upgrade paths and summary/recommendation,

• January 20: Positron Source Location, focusing on running scenarios and technical issues

• January 21: Positron Source Location, focusing on cost and performance projections and summary/recommendation.

7/23/2010

Page 11: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

AD & I 23.07 (M. Ross) 11

Discussion expected at SLAC - BAW

1. Reduced RF• Global Parameters• Pulse length, n_b, power and cryogenic consumption• AS impact – sources, damping rings and BDS• Upgrade paths• R & D strategies• Cost impact – key cost items• Performance impact – luminosity performance and impact on physics

2. Positron Source Location• Running Scenarios – key aspects and luminosity as a function of energy• Technical parameters – operational issues as a function of energy• Variable repetition rate issues – power and cryogenic consumption;

sources and damping ring performance• Cost impact – key cost items• Performance impact – luminosity performance and impact on physics

7/23/2010

Page 12: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

TDP-2 R&D Plan

• Release 5 submitted to EC 04.08; – hope for ~ immediate release

• Updated R&D Plan for TDP2 reviewed by EC – Paris mid July

• Please read the CFS and S2 sections carefully

• R & D Plan appears to be ‘well-read’

CFS/GBL 04 Aug, 2010 12Marc Ross, Fermilab

Page 13: CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation

2010/2011 – Schedule• CFS 2: 2-3 Aug. SLAC – just completed• First Baseline Workshop: 7-10 Sept. KEK• (Linac 2010: 13-17 Sept. Tsukuba)• LOwLBT (FLASH): - postponed 02.2011 (?)• ECloud ’10: 8-12 Oct. Ithaca• IWLC 2010: 18-22 Oct. Geneva• ILC PAC: 11-12 Nov. Eugene• Second Baseline Workshop: 18-21 Jan. 2011 SLAC• ALCPG011: 21-25 March 2011 Eugene

CFS/GBL 04 Aug, 2010 Marc Ross, Fermilab 13