William Donovan Plant Manager Bay Park Sewage Treatment Plant 2 Marjorie Lane East Rockaway, NY 11518-2020 November 24, 2018 CERTIFIED MAIL Ms. Meredith Streeter, P.E. Chief, SPDES Compliance Information Section NYSDEC - Division of Water, Bureau of Water Compliance 625 Broadway 4th Floor Albany, New York 12233-3506 Re: Bay Park Sewage Treatment Plant SPDES Permit Number: NY 0026450 NPDES Electronic NetDMR Report October 2018 Dear Ms. Streeter: Please find the NPDES NetDMR Report submission for the Bay Park Sewage Treatment Plant for October 2018. Please note that the facility is still engaged in recovery efforts, repairing and replacing components of the plant that were damaged by superstorm Sandy in late October 2012. The County of Nassau entered into an “Agreement for the Operation and Maintenance of the Nassau County Sewer System” (“O&M Agreement”) with SUEZ Water Long Island Inc. (“SWLI”; formerly known as United Water Long Island Inc.) on September 10, 2014, with SWLI’s commencement of operations taking place on January 2, 2015. The facility was in compliance with all SPDES Permit effluent limitations for the reporting period. The following laboratories performed the analyses reported in the monthly DMR: Laboratory ELAP ID Number Analyses Performed Pace Analytical Services Inc. 10478 Metals, Total and Fecal Coliform, TSS, CBOD5, Volatile and Semi-Volatile Organics Nassau County Department of Health 10339 Total and Fecal Coliform

CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

William Donovan

Plant Manager

Bay Park Sewage Treatment Plant

2 Marjorie Lane

East Rockaway, NY 11518-2020

November 24, 2018

CERTIFIED MAIL

Ms. Meredith Streeter, P.E.

Chief, SPDES Compliance Information Section

NYSDEC - Division of Water, Bureau of Water Compliance

625 Broadway – 4th Floor

Albany, New York 12233-3506

Re: Bay Park Sewage Treatment Plant

SPDES Permit Number: NY 0026450

NPDES Electronic NetDMR Report – October 2018

Dear Ms. Streeter:

Please find the NPDES NetDMR Report submission for the Bay Park Sewage Treatment Plant for

October 2018. Please note that the facility is still engaged in recovery efforts, repairing and

replacing components of the plant that were damaged by superstorm Sandy in late October 2012.

The County of Nassau entered into an “Agreement for the Operation and Maintenance of the Nassau

County Sewer System” (“O&M Agreement”) with SUEZ Water Long Island Inc. (“SWLI”;

formerly known as United Water Long Island Inc.) on September 10, 2014, with SWLI’s

commencement of operations taking place on January 2, 2015.

The facility was in compliance with all SPDES Permit effluent limitations for the reporting period.

The following laboratories performed the analyses reported in the monthly DMR:

Laboratory ELAP ID

Number

Analyses Performed

Pace Analytical Services Inc.

10478

Metals, Total and Fecal Coliform, TSS, CBOD5,

Volatile and Semi-Volatile Organics

Nassau County Department of

Health

10339

Total and Fecal Coliform

Page 2: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

Also, as discussed with the Region 1 office, attached is a summary of the repair and replacement

progress made during October 2018.

Should you have any questions or comments concerning the above, please contact me at (516) 519-

5560.

Very truly yours,

William Donovan

Plant Manager

Enc.

c. NCDPW: Commissioner Kenneth G. Arnold, Deputy Commissioner Vincent Falkowski,

Richard Cotugno, Pasquale Assalone

NCHD: Donald Irwin

SWLI: Sunil Mehta

Page 3: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

William Donovan

Plant Manager

Bay Park Sewage Treatment Plant

2 Marjorie Lane

East Rockaway, NY 11518-2020

Bay Park S.T.P. – Major Work Activities Started, Continuing and/or Completed for the Month of October 2018

Contract #S3B119-05G

Generator Controls:

Granted Final Completion on July 11, 2016.

Contract #S35100-01G

Cleaning and Repair of Digesters and Storage Tanks:

Granted Final Completion on November 10, 2015.

Contract #S3B119-06G

Heating the Hot Water Piping System:

Granted Final Completion on March 2, 2017.

Contract #S3B120-01G

Improvements to the Influent Screenings Facility:

Granted Final Completion on December 22, 2017.

Contract #S3B120-02G

Grit Removal Facility Improvements:

Granted Final Completion on March 6, 2018.

Contract #S35114-03G

Sludge Thickening Facility:

Granted Final Completion on August 2, 2017.

Contract #S35116-01G

Odor Control Bio-Filter Projects:

Granted Final Completion on November 7, 2015.

Page 4: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

Contract #S35121-01G&E

Final Settling Tanks Project for both (G&E):

General Contractor; Letter of understanding change order approved.

Electrical Contractor; Granted Final Completion on June 26, 2017.

Contract #S35121-09G

Sludge Dewatering:

Continued submission of Training Plans and O & M Manuals.

Continued misc. mechanical insulation.

Continued Power, lighting, fire alarm, and control conduit and wire installations.

Continued misc. painting.

Continues installation, repair, and operation of Conveyor Systems.

Continued Centrifuges Performance operation.

Continued PMCS integration.

Continued misc. patching.

Continue cleaning of existing stainless-steel doors & frames.

Started installation of interior stainless-steel doors and frames.

Continued installation of roof fans.

Continued installation of HVAC devices and controls.

Continued start-up of Motor Control Centers.

Started demolition of existing and installation of new digested sludge pumps and grinder.

Thirty-day Lookahead:

Continue Centrifuge Operation.

Continue PMCS integration and installation of Control equipment.

Continue HMCS system start-up and integration.

Continue HVAC & Fan installations.

Continue electric installations (lighting, controls, grounding, lightning protection).

Page 5: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

Continue Flooring installations.

Continue painting and labeling.

Continue Conveying system repairs and installations.

Start replacement of exterior and continue installation of new interior doors.

Continue FM-200 System installation.

Continue Fire Alarm installation.

Contract #S35121-13E

E-1, Electrical Distribution:

Granted Final Completion on April 6, 2017.

Contract #S35121-14E

E-2, USS 2 & Electrical Distribution:

Granted Final Completion on December 22, 2017.

Contract #S35121-14F

E-3 Main Substation and Electrical Distribution:

Continued to submit shop and As-Built drawings, Submittals and RFI’s.

Continued canopy fascia installation and started upper panels on west elevation, MSS.

Completed Stonehard floor installation at EL. 41.25 rooms and corridor, MSS.

Completed mechanical interior shades installation, MSS.

Continued painting (stairs, steel structures at various locations) and wall patching, MSS.

Continued installation of interior/exterior doors and associated hardware, MSS.

Completed installation of cabinets, countertops, wash basin and faucets in breakroom, MSS.

Continued installation of exterior light fixtures under soffit and at EL. 57.00, MSS.

Began installation of lightning protection system on roof, MSS.

Continued Emergency Generator control wiring, MSS.

Began installation of generator enclosure fire suppression system, MSS.

Continued installation of Substation, EMCS, MIMIC panels, battery system: electrical power and

control wiring conduits, panels, and pull boxes at MSS.

Continued Switchgear and cable testing, MSS.

Completed installation of Medium Voltage 5 KV cables to Substations No. 4.

Continuing termination of branch circuits at various lighting and emergency panels.

Completed installation of Generator Parallelism control panel, MSS.

Page 6: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

Completed installation of battery racks and batteries, MSS.

Continuing termination of power and control wiring at MCC-MSS.

Began Site Lighting (CO No 97), HH test pits in Grids 1-12.

Completed energization of PSE&G interim 13.2 KV service to MSS.

Completed installation of SE-1 / S1 Annunciator Control Panel.

Thirty-day Lookahead:

Layout for and begin installation of lighting fixtures in Switchgear room, MSS.

Continue painting at various locations, MSS.

Continue installation of flood doors, MSS.

Continue installation of upper canopy panels, MSS.

Complete installation of one window in the Control Room 2nd floor, MSS.

Continue conduit and wire installation in MSS.

Install fire alarm control panel and terminate device wiring at same, MSS.

Continue installation of Substation, EMCS, MIMIC panels, electrical power and control wiring

conduits, panels, and pull boxes at MSS.

Continue working on Change Order No 97 – Site Lighting.

Continue installation of exterior lighting at EL. 57.00 at underside of sunshade outriggers.

Continue installation of exterior lighting just below EL. 18.25 walkway.

Continue terminating control wiring for Mimic panel at S1 Switchgear.

Pull to and terminate control wiring at Generator Parallelism control panel.

Contract #S35121-17G

Perimeter Flood Protection Berm and Flood Wall:

Substantial Completion Granted on June 9, 2017.

Contract #S35121-16V

De-chlorination Vault Storm Mitigation:

Granted Final Completion on January 11, 2018.

Time Delay Analysis was finalized and was issued to the County for review.

Contract # S35121-18G

Flood Protection Phase 1 Stormwater Pumping Stations:

Completed the Erection of the Structural Steel for the South MCC.

Page 7: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

Placed Reinforced Concrete Deck for South MCC Slab.

Completed Installation of the South Pump Station Cable Tray.

Completed Painting of the North Pump Station Piping.

Completed Installation of Communication and Feeder Duct Banks for the South MCC.

Completed Installation of the South Pump Station Stop Logs.

Completed installation of the Catch Basins for Miscellaneous Improvement #2.

Completed the HVAC Ductwork for the North MCC Building.

Set all Wet Well Float Switches at South Pump Station.

Started Painted the Structural Steel for the South MCC Building.

Started Installing the Framing for the South MCC Building Siding.

Stated the installation of the Slide Gate in the North Gate Chamber.

Thirty-day Lookahead:

Miscellaneous Stormwater Improvements:

o Complete Miscellaneous Improvement Nos. 1, 2 and 5.

North Pump Station:

o Install Stop Log Frame at North Gate Chamber.

o Start up and Test Wet Well Submersible Pumps.

o Install Exterior Lighting Conduit and Fixtures.

o Install Equipment/Pipe ID Tags.

North Pump Station MCC Building:

o Install ACCU and CRAC units.

o Complete Lighting Conduit and Wire.

o Start up and Test CRAC units, ACCU Units.

South Pump Station:

o Continue RCP Placement to Diversion Chamber.

o Install SCADA Conduit.

o Paint Pump Piping.

o Install Exterior Lighting Conduit and Fixtures.

o Complete Conduit Duct Bank into South Pump Station.

South MCC Building:

o Install Grounding

o Install Stairs to MCC Platform.

o Install Building Siding.

o Install Building Sun Screen System.

Page 8: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

Contract #S35121-16TR

Vehicle Fueling Facility and Tanks Reconstruction:

Granted Substantial Completion on February 16, 2018.

Contract #S3P311-02G

Pump Stations No. 2 – Cedar Drive, Roosevelt, Whitewood, Biltmore and Alhambra:

Granted Final Completion dated July 17, 2018.

Contract #S3P311-03G

Pump Stations No. 3 – Wantagh, Newbridge, Merrick and Ray Street:

Granted Final Completion dated August 15, 2018.

Contract #S3P311-04G

Pump Stations No. 4 – Felix, Fox, Northern, and Grand:

Granted Final Completion on July 20, 2018.

Contract #S3P311-05G

Pump Stations No. 5 – Miller, Mott, Long Beach, Royal, and Lido:

Granted Final Completion on July 12, 2018.

Contract #S3P311-09G

Hempstead Wastewater Pumping Station:

At HPS, graded site & installed bollards.

Thirty-day Lookahead:

Placement of final asphalt on northeast portion of HPS site.

PO No. BPNC16000136

Interim Generators:

Completed testing interim emergency generators.

Contract #S3P311-06G

Pump Stations No. 6 – Ocean, Mill, Woodmere and Longacre:.

Progressed completion of final punch list

Thirty-day Lookahead:

Complete final punch list items, including As-Builts and O&M Manuals

Contract #S3P311-09G

Hempstead Wastewater Pumping Station:

At HPS, graded site & installed bollards

Page 9: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

Thirty-day Lookahead:

Placement of final asphalt on northeast portion of HPS site.

Contract #S3P311-09S

Hempstead Wastewater Force Main:

Continued dewatering at the Jerusalem Ave./Uniondale Ave. intersection for pipe jacking operation.

Excavated jacking pit at the Jerusalem Ave./Uniondale Ave. intersection (western side).

Start pipe jacking 39.25 ID steel casing pipe from west to east under Uniondale Ave.

Thirty-day Lookahead

Continue dewatering at the Jerusalem Ave./Uniondale Ave. intersection for pipe jacking operation.

Complete pipe jacking 39.25 ID steel casing pipe from west to east under Uniondale Ave.

Installation of MH SDA-07 at the Jacking Pit Location.

Begin installation of remaining 30” FM from Uniondale Ave. to Clark Pl.

PO No. BPNC16000136

Interim Generators:

Completed testing interim emergency generators.

Contract #S3P311-06G

Pump Stations No. 6 – Ocean, Mill, Woodmere and Longacre:.

Progressed completion of final punch list

Thirty-day Lookahead:

Complete final punch list items, including As-Builts and O&M Manuals

Contract #S3P311-07G

Pump Stations No. 7 – Inwood, Doughty, Bayview and Roslyn:

Progressed submittals.

Completed 5-day pump test for the Doughty Blvd. P.S. new submersible pumps.

Progressed electrical work at Inwood, Doughty Blvd., and Roslyn Rd. P.S. (Peak flow pump electrical work ;

lighting work at Doughty Blvd. P.S, demolition work at Roslyn)

Completed flood door installation at Roslyn Rd. P.S.

Completed access hatch installation at Bayview Ave. P.S.

Progressed Fire Alarm installation work at Bayview and Doughty P.S.

Page 10: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

Progressed painting at Inwood P.S. (dry well and sewage piping).

Completed sump pump installation at Inwood and Doughty P.S. (field testing remains to be performed).

Installed Fuel Oil Tank hold down straps (Inwood and Bayview P.S.).

Progressed submersible pump training (scheduled training for 10/30 and 11/1).

Thirty-day Lookahead:

Progress submittals.

Progress installation of peak flow pumps at Inwood P.S.

Progress painting at all pump stations.

Complete field testing of Inwood and Doughty submersible sump pumps.

Progress fire alarm installation at all pump stations.

Progress training (schedule training for sump pumps, odor control, peak flow pumps).

Progress electrical work at all pump stations.

Complete hatch installations at Roslyn and Inwood P.S.

Contract #S3P311-10G

Pump Stations No. 10 – Lawrence STP, and Sage Lake:

Lawrence P.S.

Granted Substantial Completion on August 13, 2018.

Contract #S35123-L39G

Level 1 BNR Improvements:

Continued to progress Cost Loaded Baseline Schedule, Subcontractor/Venders Approval, RFI, and Shop

Drawing Submittals.

Installed FRP effluent troughs in Final Settling Tank No. 8.

Conducted Field Tests for the Invent Mixers and Sanitaire Diffusers.

Restored Influent Flow in Aeration Tank No. 5.

Took Aeration Tank No. 5 out of operation.

Completed tank cleaning and demolition of the existing diffusers.

Conducted survey of the structural condition of Aeration Tank No. 4 and Started concrete repair.

Page 11: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

Thirty-day Lookahead:

Replace the defoament dilution valve after the Plant isolates the effluent water loop.

Continue concrete repair in Aeration Tank No. 4.

Install SWAS box in Pass A in Aeration Tank No. 4.

Apply MIC Coating in Aeration Tank No. 4.

Install SWAS piping in Aeration Tank No. 4.

Continue to install SWAS Piping in Pipe Gallery.

Start the installation of baffle wall in Aeration Tank No. 4.

Contract #S5121-16A

Engine Facility Auxiliary Upgrade:

Continued to process submittals, subcontractor/vendor approvals and RFI’s.

Continued insulation of TCL and ECL piping

Thirty-day Lookahead:

Complete TCL Heat Exchanger and test piping.

Receive Natural Gas Compressors.

Start installation of Natural Gas Compressors.

Contract #S35123-L39G

Level 1 BNR Improvements:

Continued to progress Cost Loaded Baseline Schedule, Subcontractor/Venders Approval, RFI, and Shop

Drawing Submittals.

Installed FRP effluent trough in Final Settling Tank No. 8.

Installed wood baffle and FRP baffle in Final Settling Tank No. 2.

Conducted Structural repair and applied MIC Coating in RAS Box No. 2

Completed installation of Invent Mixer in Aeration Tank No. 5.

Completed installation of diffusers in Aeration Tank No. 5.

Installed interim power to feed mixers in Aeration Tank No. 5.

Thirty-day Lookahead:

Install FRP effluent trough in Final Settling Tank No. 7.

Page 12: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

Replace the defoament dilution valve after the Plant isolates the effluent water loop.

Restore influent flow in Aeration Tank No.5.

Take Aeration Tank No.4 out of operation and start to clean the tank.

Remove all existing diffusers in Aeration Tank No. 4

Conduct structural condition survey and perform structural repair in Aeration Tank No. 4.

Install communication wiring for instrumentation in Aeration Tank No. 5.

Contract #S80019-03GR

Cedar Point Lake PS:

Progressing with submittals.

Placed concrete for New Pump Station.

Installed Discharge Piping.

Continue groundwater dewatering.

Thirty-day Lookahead:

Progress with submittal.

Install Trash Rack for new Pump Station.

Remove sheeting.

Install metal railings and grating at Tide Gates.

Page 13: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

DISCHARGE NUMBER MAJOR

Facility Bay Park STP WWTP OUTFALL

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

00010 1 0 PERMIT

Effluent Gross REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

Effluent Gross REQUIREMENT

SAMPLE

MEASUREMENT

00530 1 0 PERMIT

Effluent Gross REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

00545 1 0

Effluent Gross

Nitrogen, total [as N]

00600 Y

PERMIT

Season: 0 REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

0

0

mg/LDaily MX

Req. Mon

2.9

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

Raw, Sewage Influent

00545 1 0

Nitrogen, nitrite total (as N)

*****

*****

***************

GrabDaily MX

0.3**********

GR

Six per Day

06/010

ml/L

<0.10

*****

*****

*****

*****

*****

*****

*****

MO AVG

**********Solids, Settleable

9

**********

*****

*****

24

Daily

01/010

mg/LReq. Mon

251

*****

*****

Raw, Sewage Influent

00530 G 0

Solids, Total Suspended***** *****

*****

6

Comp24

24

Daily

01/010

mg/L7 DA AVG

45

6

MO AVG

30

5

*****

*****

lb/d7 DA AVG

26,000

2,935

30 DA AVG

18,000

2,417Solids, Total Suspended

Daily MX

Req. Mon Comp24

24

Monthly

01/30

*****

*****

Comp24Monthly

2401/30

Grab

GR

Six per Day

06/01

CA

Comp24

Six per Day

Effluent Gross

00545 1 0

Nitrogen, nitrite total (as N)

UNITSUNITS

06/01

*****

Daily MX

Req. Mon

**********

11/24/2018

MM/DD/YYYY

MONITORING PERIOD

PERMIT NUMBER

No Discharge

MAXIMUM

NUMBER

mg/L

OMB No. 2040-004

Form Approved

11518-2020

External Outfall

(SUBR 01)

DMR Mailing ZIP Code

SU

Deg C*****

*****

*****

*****

*****

MINIMUM

10/31/2018

MM/DD/YYYY

10/01/2018

MM/DD/YYYY

Grab

GR

**********

VALUEVALUEVALUEVALUE

SAMPLE

TYPE

FREQUENCY

OF ANALYSIS

NO.

EX

QUALITY OR CONCENTRATIONQUANTITY OR LOADING

0

0

7.3*****6.8*****

23.9*****

516

**********

NY0026450 001-A

Temperature, water deg.

centigrade

PARAMETER

*****

VALUE

East Rockaway, NY 11518-2020

lb/d Monthly CALCTD

01/30

TYPED OR PRINTED

William Donovan

Plant Manager

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

0.1*****

519-5560

***** *****

DATE

pH 00400 1 0E ffluent Gross

0

SIGNATURE OF PRICIPAL EXECUTIVE OFFICER

OR AUTHORIZED AGENT

TELEPHONE

*****

*****

*****

***************

*****

*****

*****Effluent Gross (Supplementary) 16,500

12 MO AVG*****

15,168 *****SAMPLE

MEASUREMENT

*****

Page 14: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

**********

*****

*****

*****

*****

Daily MX

Req. Mon

*****

*****

*****

*****

*****

*****

*****

*****

Req. Mon

Daily MX

**********

Effluent Gross

00625 1 0

Nitrogen, Kjeldahl, total (as N)

Raw, Sewage Influent

00620 1 0

Nitrogen, nitrate total (as N)

Daily MX

Req. Mon

Nitrogen, Kjeldahl, total (as N)

0.2

Req. Mon

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

SAMPLE

TYPE

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

UNITS

Monthly

01/30

FREQUENCY

OF ANALYSIS

MM/DD/YYYY

11/24/2018

DATE

0

0

0

mg/L

mg/L

0

0

0

mg/L

mg/L

OMB No. 2040-004

Form Approved

0

NO.

EX

No Discharge

11518-2020

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

mg/L

mg/L

mg/L

Daily MX

Req. Mon

24.1

Daily MX

NUMBER

519-5560516

TELEPHONE

30.4

20.6

External Outfall

(SUBR 01)

DMR Mailing ZIP Code

*****

Req. Mon

*****

VALUE

*****

*****

49.3

MONITORING PERIOD

PERMIT NUMBER

*****

*****

*****

*****

VALUE

QUALITY OR CONCENTRATION

9.1

VALUE

10/01/2018

MM/DD/YYYY

001-M

10/31/2018

MM/DD/YYYY

*****

*****

*****

*****

UNITS

NY0026450

*****

*****

*****

VALUE

QUANTITY OR LOADING

*****

*****

*****

VALUE

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

Raw Sewage Influent

34726 1 0

Nitrogen, ammonia, total (as

NH3)

Effluent Gross

34726 1 0

Nitrogen, ammonia, total (as

NH3)

Effluent Gross

00665 1 0

Phosphorus, total (as P)

Nitrogen, nitrate total (as N)

PARAMETER

Raw, Sewage Influent

00625 1 0

Effluent Gross

00620 1 0

*****

DISCHARGE NUMBER

*****

*****

*****

*****

*****

*****

*****

*****

Req. Mon

Daily MX

2.6

MO AVG

*****

*****

*****

*****

*****

*****

Page 15: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 3

700

*****

*****

**********

*****

*****170

MO AVG

70

Comp24

24

Daily

01/010

mg/L*****

*****180*****

*****

*****

*****

*****

*****Reg. Mon

MO AVG

*****

*****

Raw Sewage Influent

80082 G 0

BOD, carbonaceous, 5 day, 20

C

Comp24

24

Daily

01/010

mg/L

54*****

Lb/d

2,148

MO AVG

15,000

1,723

Effluent Gross

80082 1 0

BOD, carbonaceous, 5 day, 20

C

Grab

GR

Daily

01/010

MPN/100

mL*****

*****

*****

*****

*****

*****

81383 K

Coliform, Total General

Grab

GR

Daily

01/010

MPN/100

mL

20

*****

*****

*****

*****

*****

*****

*****

Comp24

24

Monthly

01/300

mg/L

1.5

*****

**********

*****

*****

*****

*****

*****

*****

Effluent Gross

70507 1 0

Phosphorus, In Total

orthophosphate

PARAMETER

Flow, in conduit or thru

treatment plant

Effluent Gross

Chlorine, total residual

50060 1 0

QUANTITY OR LOADING

VALUE

52.8

*****

Effluent Gross

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

William Donovan

Plant Manager

TYPED OR PRINTED

Effluent Gross

74055 1 0

Coliform, Fecal General

Effluent Gross

*****

NY0026450

PERMIT NUMBER

MONITORING PERIOD

MM/DD/YYYY

10/01/2018

VALUE

*****

*****

*****

*****

UNITS

*****

*****

*****

*****

MM/DD/YYYY

10/31/2018

001-M

DISCHARGE NUMBER

QUALITY OR CONCENTRATION

VALUE

DMR Mailing ZIP Code

(SUBR 01)

External Outfall

*****

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

VALUE

*****

*****

*****

VALUE

*****

0.08

TELEPHONE

516 519-5560

NUMBER

UNITS

*****

*****

mg/L

40

Form Approved

OMB No. 2040-004

11518-2020

No Discharge

NO.

EX

0 RC

0

DATE

11/24/2018

MM/DD/YYYY

FREQUENCY

OF ANALYSIS

99/99

Continuous

99/99

Continuous

SAMPLE

TYPE

RCORDR

RC

RCORDR

50050 G

*****

*****

0.5

DAILYMX

Req. Mon

Daily MX

7 DA AVG

23,000*****

MO AVG 7 DA AVG

25

21

30DA GEO 7 DA GEO

200

*****

*****

*****400

MO MEDIAN

Page 16: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 4

PARAMETER

Solids, suspended percent

removal

81011 K 0

Percent Removal

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

William Donovan

Plant Manager

TYPED OR PRINTED

QUANTITY OR LOADING

VALUE

*****

*****

NY0026450

PERMIT NUMBER

MONITORING PERIOD

MM/DD/YYYY

10/01/2018

VALUE

*****

UNITS

*****

*****

MM/DD/YYYY

10/31/2018

001-M

DISCHARGE NUMBER

QUALITY OR CONCENTRATION

VALUE VALUE

DMR Mailing ZIP Code

(SUBR 01)

External Outfall

98

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

VALUE

*****

*****

TELEPHONE

516 519-5560

NUMBER

UNITS

%

Form Approved

OMB No. 2040-004

11518-2020

No Discharge

NO.

EX

0

SAMPLE

TYPE

CA

DATE

11/24/2018

MM/DD/YYYY

FREQUENCY

OF ANALYSIS

01/30

Monthly CALCTD

Carbonaceous oxygen demand,

% removal

81383 K

Percent Removal

*****

*****

***** ***** *****

*****

*****

*****%

0 01/30

Monthly

CA

CALCTD

*****

*****

MO AV MIN

MO AV MIN

85

85*****

98

Page 17: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane 10.5

East Rockaway, NY 11518-2020 MAJOR 10.5

3.7

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT) 4.5

Location 2 Marjorie Lane 4.1

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 1

PARAMETER

Copper. total (as Cu)

01042 1 0

Effluent Gross

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

William Donovan

Plant Manager

TYPED OR PRINTED

QUANTITY OR LOADING

VALUE

*****

*****

NY0026450

PERMIT NUMBER

MONITORING PERIOD

MM/DD/YYYY

10/01/2018

VALUE

10.5

UNITS

lb/d

MM/DD/YYYY

10/31/2018

001-F

DISCHARGE NUMBER

QUALITY OR CONCENTRATION

VALUE

*****

*****

VALUE

*****

*****

DMR Mailing ZIP Code

(SUBR 01)

External Outfall

VALUE

*****

*****

TELEPHONE

516 519-5560

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT NUMBER

UNITS

*****

*****

0

Form Approved

OMB No. 2040-004

11518-2020

No Discharge

NO.

EX

11/24/2018

MM/DD/YYYY

FREQUENCY

OF ANALYSIS

01/07

Weekly

DATE

SAMPLE

TYPE

24

COMP2424

Daily MX

Page 18: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2

PARAMETER

Cadmium, total (as Cd)

01027 V 0

See Comments

Chromium, total (as Cr)

01034 V 0

See Comments

Lead, total (as Pb)

01051 V 0

See Comments

Nickel, total (as Ni)

01067 V 0

Effluent Gross

Silver total (as Ag)

01077 V 0

See Comments

Zinc, total (as Zn)

01092 V 0

See Comments

Chloroform

32106 V 0

See Comments

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

William Donovan

Plant Manager

TYPED OR PRINTED

QUANTITY OR LOADING

VALUE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

NY0026450

PERMIT NUMBER

MONITORING PERIOD

MM/DD/YYYY

10/01/2018

VALUE

0.74

1.5

Daily MX

<3.05

5.2

Daily MX

2.13

4.2

Daily MX

3.79

9

Daily MX

<0.44

0.9

Daily MX

25.69

87

Daily MX

0.88

1.7

Daily MX

UNITS

lb/d

lb/d

lb/d

lb/d

lb/d

lb/d

MM/DD/YYYY

10/31/2018

001-V

DISCHARGE NUMBER

QUALITY OR CONCENTRATION

VALUE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

VALUE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

DMR Mailing ZIP Code

(SUBR 01)

External Outfall

VALUE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

TELEPHONE

516 519-5560

NUMBER

UNITS

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

Form Approved

OMB No. 2040-004

11518-2020

No Discharge

NO.

EX

0

0

0

0

0

0

DATE

Monthly

01/30

Monthly

01/30

11/24/2018

MM/DD/YYYY

FREQUENCY

OF ANALYSIS

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

SAMPLE

TYPE

24

Comp24

24

Comp24

24

Comp24

24

Comp24

lb/d

0

24

Comp24

24

Comp24

24

Comp24

Page 19: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2

PARAMETER

Phenolics, Total

32730 V 0

See Comments

Toluene

34010 V 0

See Comments

Benzene

34030 V 0

See Comments

Benzo (k) Fluoranthe

34242 V 0

Effluent Gross

Diethyl Phthalate

34336 V 0

See Comments

Methylene Chloride

34423 V 0

See Comments

Tetrachloroethylene

34475 V 0

See Comments

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

William Donovan

Plant Manager

TYPED OR PRINTED

QUANTITY OR LOADING

VALUE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

NY0026450

PERMIT NUMBER

MONITORING PERIOD

MM/DD/YYYY

10/01/2018

VALUE

12.80

47

Daily MX

0.44

1.1

Daily MX

<0.44

0.6

Daily MX

<0.44

0.6

Daily MX

<0.44

2.4

Daily MX

0.62

5.9

Daily MX

1.59

3.8

Daily MX

UNITS

lb/d

lb/d

lb/d

lb/d

lb/d

lb/d

lb/d

MM/DD/YYYY

10/31/2018

001-V

DISCHARGE NUMBER

QUALITY OR CONCENTRATION

VALUE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

*****

*****

*****

*****

*****

*****

*****

*****

*****

DMR Mailing ZIP Code

(SUBR 01)

External Outfall

VALUE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

TELEPHONE

516 519-5560

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

NUMBER

UNITS

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

Form Approved

OMB No. 2040-004

11518-2020

No Discharge

NO.

EX

0

0

0

0

0

0

0

DATE

11/24/2018

MM/DD/YYYY

FREQUENCY

OF ANALYSIS

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

SAMPLE

TYPE

24

Comp24

24

Comp24

24

Comp24

24

Comp24

Comp24

24

Comp24

24

Comp24

24

Page 20: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 3

PARAMETER

1,1Dichloroethylene

345010 V 0

See Comments

1,1,1 Trichloroethane

34506 V 0

See Comments

Benzo (a) Anthracine

34526 V 0

See Comments

Pentachlorophenol

39032 V 0

Effluent Gross

Bis(2-ethylhexyl)Phtalate

39100 V 0

See Comments

Di-n-Butyl Phthalate

39110 V 0

See Comments

Trichloroethylene

39180 V 0

See Comments

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

William Donovan

Plant Manager

TYPED OR PRINTED

QUANTITY OR LOADING

VALUE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

NY0026450

PERMIT NUMBER

MONITORING PERIOD

MM/DD/YYYY

10/01/2018

VALUE

<0.44

0.8

Daily MX

<0.44

1.5

Daily MX

<0.44

0.6

Daily MX

<0.75

1.0

Daily MX

<0.44

11

Daily MX

<0.44

11

Daily MX

<0.44

1.7

Daily MX

UNITS

lb/d

lb/d

lb/d

lb/d

lb/d

lb/d

lb/d

MM/DD/YYYY

10/31/2018

001-V

DISCHARGE NUMBER

QUALITY OR CONCENTRATION

VALUE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

*****

*****

*****

*****

*****

*****

*****

*****

*****

DMR Mailing ZIP Code

(SUBR 01)

External Outfall

VALUE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

TELEPHONE

516 519-5560

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

NUMBER

UNITS

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

Form Approved

OMB No. 2040-004

11518-2020

No Discharge

NO.

EX

0

0

0

0

0

0

0

DATE

11/24/2018

MM/DD/YYYY

FREQUENCY

OF ANALYSIS

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

SAMPLE

TYPE

24

Comp24

24

Comp24

24

Comp24

24

Comp24

Comp24

24

Comp24

24

Comp24

24

Page 21: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 4

**********Daily MX

***** Comp24

24

SAMPLE

TYPE

Monthly

01/30

FREQUENCY

OF ANALYSIS

MM/DD/YYYY

11/24/2018

DATE

0

NO.

EX

No Discharge

11518-2020

UNITS

QUALITY OR CONCENTRATION

DISCHARGE NUMBER

001-V

OMB No. 2040-004

Form Approved

*****

*****

NUMBER

519-5560516

TELEPHONE

*****

VALUE

External Outfall

(SUBR 01)

DMR Mailing ZIP Code

*****

VALUE

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

VALUE

10/31/2018

MM/DD/YYYY

<0.44

VALUE

10/01/2018

2.2

MM/DD/YYYY

MONITORING PERIOD

PERMIT NUMBER

NY0026450

*****

*****

VALUE

QUANTITY OR LOADING

UNITS

lb/d

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

See Comments

78028 V 0

Tetrachloroethane

PARAMETER

Page 22: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

BAY PARK SEWAGE TREATMENT PLANT

MONTHLY LABORATORY REPORT

PLANT PRIMARY GBT RETURN AERATION AERATION PLANT PRIMARY

INFLUENT EFFLUENT FILRATE SLUDGE EFFLUENT AVERAGE INFLUENT EFFLUENT

mg/L mg/L mg/L mg/L mg/L mg/L °C mg/L mg/L mg/L %TS %VS %TS %VS

10/01/18 220 158 4.0 3,037 1,744 2,041 178 103 23.4 154 140 2.7 183 2.2 85.3 1.9 75.8

10/02/18 264 70 132.50 4.0 3,163 1,207 1,894 138 114 23.8 148 87 < 2.0 112 1.4 86.1 1.8 77.5

10/03/18 118 112 4.0 3,100 1,441 1,744 133 94 23.5 162 131 2.5 176 1.6 85.7 1.8 77.9

10/04/18 226 130 101.00 7.2 3,113 1,222 1,981 128 104 23.6 150 129 2.7 168 2.1 85.8 2.0 77.8

10/05/18 236 136 4.8 3,063 1,394 1,891 148 106 23.4 195 150 2.7 220 2.2 85.7 1.8 77.7

10/06/18 238 166 4.4 143 23.1 161 150 3.0 247 1.8 84.8 1.8 77.6

10/07/18 246 156 6.4 175 23.4 205 195 4.2 213 1.7 83.2 1.9 75.6

10/08/18 288 120 5.2 180 23.5 205 180 4.4 197 1.4 86.9 1.8 77.5

10/09/18 288 112 42.00 6.8 3,363 1,438 1,916 158 111 23.7 197 186 2.5 180 1.4 86.8 1.8 78.0

10/10/18 340 116 5.6 3,613 1,144 2,085 155 136 23.4 174 161 3.6 194 1.9 84.5 1.8 77.9

10/11/18 244 114 52.50 7.6 3,663 1,447 2,097 185 128 23.5 220 369 6.8 205 1.3 85.8 1.9 77.4

10/12/18 292 82 124.00 6.4 3,788 1,450 2,069 183 126 23.1 201 218 6.3 176 1.3 85.3 1.8 78.0

10/13/18 208 138 6.8 173 22.4 136 163 4.6 180 1.3 88.8 1.8 79.4

10/14/18 228 140 4.0 190 22.5 153 139 3.5 151 2.1 82.8 2.1 76.0

10/15/18 280 146 7.2 3,550 1,363 2,035 183 135 22.4 155 161 4.6 186 2.4 78.9 1.8 77.8

10/16/18 258 150 6.4 3,838 1,432 2,063 205 144 22.7 195 179 6.2 240 2.2 82.0 1.8 77.6

10/17/18 228 138 6.8 3,550 1,610 2,091 223 139 22.3 156 152 4.3 120 1.6 88.7 1.8 78.0

10/18/18 252 90 65.00 5.2 3,488 1,622 2,113 225 139 22.2 171 103 2.6 94 0.7 87.7 1.8 77.8

10/19/18 160 106 4.4 3,450 1,457 2,022 210 144 22.0 175 152 3.5 105 1.4 87.0 1.9 78.0

10/20/18 336 56 4.0 213 21.7 237 91 3.1 85 1.4 85.1 1.8 77.5

10/21/18 340 82 5.2 200 21.9 203 132 4.3 125 2.8 83.4 1.9 77.4

10/22/18 296 100 4.8 3,363 1,266 1,960 198 156 21.7 203 168 5.0 105 2.6 83.7 1.9 77.7

10/23/18 284 72 88.00 4.8 3,188 1,166 1,903 193 165 21.9 196 150 2.7 112 1.7 86.7 1.9 78.2

10/24/18 280 60 4.0 3,188 1,482 1,941 200 138 21.7 179 150 2.5 118 1.2 87.1 1.9 78.2

10/25/18 214 46 72.00 5.6 3,025 1,238 1,953 183 147 21.7 192 118 2.6 100 1.5 88.3 1.9 77.8

10/26/18 230 96 4.0 3,063 1,494 2,025 210 141 21.4 156 152 2.9 118 1.6 88.2 1.8 77.7

10/27/18 224 98 4.0 195 21.3 173 159 4.1 115 1.8 88.9 1.9 77.8

10/28/18 176 110 7.2 193 20.8 143 145 4.4 258 2.0 85.3 1.9 77.3

10/29/18 220 114 6.8 2,988 1,538 2,025 180 118 20.9 183 176 4.4 260 2.3 83.8 1.9 77.7

10/30/18 328 86 50.00 7.6 3,150 1,441 2,060 165 118 21.3 190 162 6.1 173 1.7 85.5 1.9 77.7

10/31/18 232 88 4 3,450 1,372 1,941 198 144.05 21.2 203 149 5.7 151 1.7 85.4 1.9 77.8

MAXIMUM 340.00 166.00 132.50 7.60 3838.00 1744.00 2112.75 225.00 165.20 23.77 237 369 6.80 260.00 2.80 88.90 2.10 79.38

MINIMUM 118.00 46.00 42.00 < 4.00 2988.00 1144.00 1744.25 127.50 93.76 20.80 136 87 2.00 84.90 0.70 78.90 1.80 75.62

AVERAGE 251 109 81 < 5 3327 1407 1993 182 130 22 180 158 4 163 2 86 2 78

DATE DIGESTERS PRIMARY SETTLING

TANKS

PLANTPLANT

mg/L

EFFLUENTEFFLUENT

mg/L

DEPARTMENT OF PUBLIC WORKS

COUNTY OF NASSAU

SLUDGE SOLIDS

INFLUENT

CHLORIDES

CBOD5AERATION

EFFLUENT

TEMPERATURESLUDGE

INDEX

AERATION 30

MINUTE

SETTLING

TOTAL SUSPENDED SOLIDS

October, 2018

Page 23: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

INFLUENTEFFLUEN

TINFLUENT

EFFLUEN

T%TS %TVS %TS %Solids mg/L mg/L mg/L mg/L mL/L mL/L Minimum Maximum Minimum Maximum °C °C MGD

10/01/18 200 0.03 16.2 <0.10 7.0 7.2 7.0 7.1 23.0 23.6 56.9

10/02/18 5 84 338 7.29 3,903 99 0.03 0.05 15.8 <0.10 7.0 7.2 6.9 7.1 23.1 23.7 52.2

10/03/18 205 0.08 10.0 <0.10 7.0 7.2 6.8 7.1 22.7 23.7 55.7

10/04/18 5 86 315 4,145 119 0.03 0.08 12.7 <0.10 7.1 7.3 6.9 7.1 22.7 23.6 52.9

10/05/18 5 86 0.05 12.3 <0.10 7.0 7.4 7.0 7.1 22.7 23.4 53.5

10/06/18 0.05 12.4 <0.10 7.1 7.3 6.9 7.1 22.5 23.3 51.3

10/07/18 0.03 12.3 <0.10 7.0 7.2 6.9 7.2 23.1 23.7 51.3

10/08/18 0.04 14.0 <0.10 7.0 7.4 7.1 7.2 22.6 23.5 52.1

10/09/18 5 87 1,613 3,795 140 0.04 0.04 15.2 <0.10 7.0 7.2 7.0 7.2 22.8 23.7 52.1

10/10/18 290 7.35 0.07 12.4 <0.10 6.8 7.2 7.0 7.2 22.9 23.8 52.9

10/11/18 5 87 253 7.31 3,975 139 0.04 0.05 12.8 <0.10 7.1 7.2 7.0 7.2 23.0 23.9 54.0

10/12/18 5 87 330 7.36 0.04 11.5 <0.10 7.1 7.3 7.0 7.1 22.0 22.7 64.5

10/13/18 7.34 0.03 10.3 <0.10 7.0 7.3 7.0 7.2 21.0 21.8 57.4

10/14/18 0.04 10.8 <0.10 7.0 7.3 6.9 7.2 20.8 21.8 54.8

10/15/18 85 0.04 11.0 <0.10 7.0 7.3 7.0 7.3 21.4 22.3 54.0

10/16/18 4 87 4,650 107 0.02 0.04 12.0 <0.10 7.0 7.4 7.0 7.3 21.5 22.1 53.7

10/17/18 263 7.36 0.04 12.8 <0.10 7.0 7.3 7.1 7.3 21.1 22.0 52.9

10/18/18 4 87 238 7.32 4,110 129 0.03 0.03 11.7 <0.10 7.1 7.4 7.0 7.2 20.9 21.6 52.0

10/19/18 198 7.33 0.03 26.8 <0.10 6.8 7.4 7.0 7.2 21.3 21.9 52.0

10/20/18 7.36 0.03 14.8 <0.10 6.9 7.3 7.0 7.3 21.3 21.8 50.6

10/21/18 0.04 14.2 <0.10 7.0 7.4 7.0 7.3 20.3 21.1 50.0

10/22/18 188 0.03 14.3 <0.10 6.8 7.4 7.0 7.3 20.6 20.8 50.4

10/23/18 5 87 965 5,205 103 0.02 0.04 11.3 <0.10 7.1 7.4 7.0 7.2 20.9 21.7 51.2

10/24/18 1,000 7.37 0.05 9.6 <0.10 7.1 7.3 7.0 7.2 19.8 21.4 48.3

10/25/18 5 87 1,693 7.35 4,560 165 0.04 0.05 10.4 <0.10 7.1 7.4 7.0 7.2 20.3 21.1 49.0

10/26/18 368 7.35 0.05 10.4 <0.10 7.2 7.5 7.1 7.2 20.0 20.7 50.0

10/27/18 7.28 0.04 8.8 <0.10 7.1 7.2 7.0 7.2 19.3 20.5 56.8

10/28/18 0.04 9.3 <0.10 7.1 7.4 7.0 7.2 19.8 20.5 53.7

10/29/18 435 0.04 9.3 <0.10 7.2 7.4 7.1 7.2 20.4 20.5 51.9

10/30/18 5 87 418 7.36 3,465 173 0.06 0.04 14.1 <0.10 7.0 7.5 7.1 7.2 20.1 20.8 51.1

10/31/18 528 0.05 10.3 <0.10 7.1 7.5 7.1 7.2 20.3 20.8 49.1

MAXIMUM 5.00 87.00 1693 7.37 5205 173 0.06 0.08 26.8 <0.10 7.2 7.5 7.1 7.3 23.1 23.9 64.5

MINIMUM 4.20 84.00 85 7.28 3465 99 0.02 0.03 8.83 <0.10 6.8 7.2 6.8 7.1 19.3 20.5 48.3

AVERAGE 4.6 87 496 7 4201 131 0 0 13 <0.10 7.0 7.3 7.0 7.2 21.4 22.2 52.8

PLANT PRIMARY PLANT

INFLUENT EFFLUENT EFFLUENT

TSS - mg/L 251 109 56.4 5 98

CBOD5 - mg/L 180 158 12.1 4 98

DATEDAILYDAILYTHICKENED SLUDGE

FEED

SLUDGE

PLANT

EFFLUENT

FLOW

AVERAGE DAILY

TEMPERATURES

pH

EFFLUENTINFLUENTVOLATILE

ACIDS/

ALKALINITY

VOLATILE

ACIDS

DIGESTERSDE-WATERED SLUDGE

ALKALINITYAVERAGE

pH

FILTRATECAKE

% REMOVED % REMOVED

TREATMENT PLANT EFFICIENCY - MONTHLY AVERAGE

pHAVERAGE DAILY

SETTLEABLE SOLIDS

AVERAGE

DAILY

CHLORINE

RESIDUAL

GRAVITY BELT

THICKENERS

Page 24: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

October, 2018

WEEK WEEK WEEK WEEK WEEK MONTHLY

PERMIT OF OF OF OF OF TOTALS

LIMIT 30-Sep-18 07-Oct-18 14-Oct-18 21-Oct-18

06-Oct-18 13-Oct-18 20-Oct-18 27-Oct-18 Date Sampled:

10/11/18 mg/L

TEMPERATURE; INFLUENT [°C] HIGHEST DAILY VALUE 23.1

TEMPERATURE; EFFLUENT [°C] HIGHEST DAILY VALUE 23.9 INFLUENT 4 30.40

EFFLUENT 4 20.60

pH; INFLUENT LOWEST DAILY VALUE 6.8

HIGHEST DAILY VALUE 7.5 INFLUENT 1 0.1

EFFLUENT 1 2.9

pH; EFFLUENT LOWEST DAILY VALUE 6.00 6.8

HIGHEST DAILY VALUE 9.00 7.3 INFLUENT 1 0.2

EFFLUENT 1 9.1

MONTHLY AVERAGE [lbs/day] 110,265

MONTHLY AVERAGE [mg/L] 251 INFLUENT 1 49.3

12 MONTH ROLLING AVERAGE [lbs/day] 16,500 lbs/d 15,168

EFFLUENT 1 24.1

MONTHLY AVERAGE [lbs/day] 18000 lbs/d 2,417

WEEKLY AVERAGE [lbs/day] 26000 lbs/d 2,081 2,935 2,398 1,957 2,935 INFLUENT 1 7.5

MONTHLY AVERAGE [mg/L] 30 mg/L 5 EFFLUENT 1 2.6

WEEKLY AVERAGE [mg/L] 45 mg/L 5 6 5 5 6

INFLUENT 1 2.1

SETTLEABLE SOLIDS; INFLUENT DAILY MAXIMUM 26.8 EFFLUENT 1 1.5

SETTLEABLE SOLIDS; EFFLUENT DAILY MAXIMUM 0.3 mL/L <0.10

NUMBER OF READINGS >0.3 0

EFFLUENT FLOW MONTHLY AVERAGE [MGD] 70 MGD 52.8

Date Sampled: LBS/DAY LBS/DAY

COLIFORM, FECAL MONTHLY GEOMETRIC MEAN 200/100mL 20 METHYLENE CHLORIDE 5.90 0.62

WEEKLY GEOMETRIC MEAN 400/100mL 20 21 13 13 21 1,1-DICHLOROETHYLENE 0.80 <0.44

# OF DAYS>2400 (Interstate Parameter) 0 1,1,1-TRICHLOROETHANE 1.40 <0.44

TRICHLOROETHYLENE 1.70 <0.44

COLIFORM, TOTAL MONTHLY MEDIAN <700 700/100mL 170 TETRACHLOROETHANE 2.20 <0.44

COLIFORM, TOTAL NO MORE THAN 10% EXCEEDING 2300 10% 0 TETRACHLOROETHYLENE 3.80 1.59

BENZO (a) ANTHRACENE 0.60 <0.44

MONTHLY AVERAGE LBS/DAY 79,051 BENZO (k) FLUORANTHENE 0.60 <0.44

MONTHLY AVERAGE mg/L 180 DIETHYL PHTHALATE 2.40 <0.44

DI-N-BUTHYL PHTHALATE 11.00 <0.44

MONTHLY AVERAGE [lbs/day] 15000 lbs/d 1,723 BIS (2-ETHYLHEXYL) PHTHALATE 11.00 <0.44

WEEKLY AVERAGE [lbs/day] 23000 lbs/d 1,133 2,148 1,757 1,467 2,148 PENTACHLOROPHENOL 1.00 <0.75

MONTHLY AVERAGE [mg/L] 25 mg/L 4 CHLOROFORM 1.70 0.88

WEEKLY AVERAGE [mg/L] 40 mg/L 3 5 4 3 5 BENZENE 0.60 <0.44

TOLUENE 1.10 0.44

TSS; % REMOVAL MONTHLY PERCENT REMOVAL 85% 98 PHENOLICS, TOTAL 47.00 12.80

CBOD5; % REMOVAL MONTHLY PERCENT REMOVAL 85% 98

CHLORINE, TOTAL RESIDUAL LOWEST DAILY VALUE 0.01

DAILY MAX 0.5 mg/L 0.08

09/30/18 10/07/18 10/14/18 10/21/18

10/06/18 10/13/18 10/20/18 10/31/18

Max Lbs 10.5 3.7 4.5 4.1 10.5

Date 10/06/18 10/13/18 10/20/18 10/27/18 10/02/18

MERCURY, TOTAL 200 ng/L

METALS ACTION LEVEL

10/06/18 10/13/18 10/20/18 10/27/18 11/03/18

CADMIUM, TOTAL 1.5 LBS/DAY 0.74 0.74

CHROMIUM, TOTAL 5.2 LBS/DAY <3.05 <3.05

LEAD, TOTAL 4.2 LBS/DAY 2.13 2.13

NICKEL, TOTAL 9.3 LBS/DAY 3.79 3.79

SILVER, TOTAL 0.9 LBS/DAY <0.44 <0.44

ZINC, TOTAL 87 LBS/DAY 25.69 25.69

BAY PARK SEWAGE TREATMENT PLANT

ORGANIC COMPOUNDS

TOTAL SUSPENDED SOLIDS;

EFFLUENT

CBOD5 EFFLUENT

CBOD5 INFLUENT

DATE

MAXIMUM

MONITORING REQUIREMENTS

TOTAL NITROGEN EFFLUENT

NITROGEN INFLUENT

MAXIMUM

VALUE

ANALYTICAL

RESULTS

ACTION

LEVEL

SUMMARY

NUMBER OF

SAMPLES

OPERATIONS AND LABORATORY ANALYSES

ORTHOPHOSPHATE AS P

PHOSPHORUS, TOTAL AS P

NITRATE AS N

TOTAL KJELDAHL NITROGEN

AMMONIA AS NH3-N

NITRITE AS N

METALS PERMIT LIMIT

24 LBS/DAYCOPPER, TOTAL

MAXIMUM

Week

DATE

Page 25: CERTIFIED MAIL Re: Bay Park Sewage Treatment Plant SPDES ... DMRs/Bay Park/20… · Began Site Lighting (CO No 97), HH test pits in Grids 1-12. Completed energization of PSE&G interim

Effluent

Dissolved

Oxygen

Effluent

Temperature

Chlorine

ResidualFlow Total Coliform Fecal Coilform

[mg/L] [°C] [mg/L] [MGD] [MPN/100mL] [MPN/100mL]

Monday 10/1/18 5:30am 7.44 23.4 0.0 37.4 170 17

Monday 10/1/18 11:35am 6.57 23.7 0.1 73.9 330 49

Tuesday 10/2/18 12:37pm 6.78 23.4 0.1 61.3 79 8

Wednesday 10/3/18 5:26am 7.50 23.4 0.0 38.0 46 5

Wednesday 10/3/18 12:33pm 6.75 22.7 0.1 64.8 330 17

Thursday 10/4/18 1:12pm 7.31 23.5 0.1 59.7 79 33

Friday 10/5/18 11:32am 7.75 23.2 0.1 66.0 130 49

Saturday 10/06/2018 11:08 am 8.15 23.1 0.0 60.8 79 14

Sunday 10/07/2018 12:05 pm 7.62 23.1 0.0 64.9 23 23

Monday 10/8/18 11:42am 7.64 22.5 0.0 60.5 170 7

Tuesday 10/09/2018 11:25 am 6.96 23.3 0.0 63.0 79 13

Wednesday 10/10/2018 5:25 am 6.80 23.7 0.0 27.0 230 33

Wednesday 10/10/2018 12:39 pm 5.66 22.5 0.1 65.7 33 11

Thursday 10/11/2018 12:10 pm 6.08 23.7 0.0 67.3 230 33

Friday 10/12/2018 5:27 am 7.30 23.7 0.0 37.0 330 49

Friday 10/12/2018 12:15 pm 6.28 22.3 0.1 72.7 170 31

Saturday 10/13/18 11:13am 5.90 21.3 0.0 56.8 280 23

Sunday 10/14/18 1:33pm 6.72 21.7 0.1 71.8 170 23

Monday 10/15/2018 5:20 am 7.90 21.9 0.0 40.9 330 49

Monday 10/15/2018 1:15 pm 6.73 22.2 0.0 69.4 230 79

Tuesday 10/16/18 12:18pm 7.65 21.8 0.0 64.5 70 8

Wednesday 10/17/2018 5:26 am 6.90 21.8 0.0 26.0 220 22

Wednesday 10/17/2018 11:36 am 7.85 21.4 0.0 60.2 49 2

Thursday 10/18/2018 12:34 pm 7.95 21.4 0.0 60.5 49 7

Friday 10/19/18 12:20pm 6.95 20.2 0.0 63.3 17 8

Saturday 10/20/2018 12:10 pm 7.91 21.6 0.0 58.2 79 5

Sunday 10/21/2018 12:24 pm 8.65 19.6 0.0 55.5 33 7

Monday 10/22/2018 5:40 am 7.79 22.1 0.0 27.1 49 17

Monday 10/22/2018 11:23 am 8.03 20.7 0.0 61.7 230 22

Tuesday 10/23/18 12:12pm 1.80 19.0 0.1 59.6 130 7

Wednesday 10/24/18 5:26am 7.50 21.5 0.0 31.0 170 33

Wednesday 10/24/18 11:55am 7.91 21.0 0.1 61.1 490 23

Thursday 10/25/18 12:30pm 7.74 19.7 0.1 60.2 49 13

Friday 10/26/18 11:15am 7.69 20.6 0.1 62.0 79 8

Saturday 10/2718 11:38am 6.90 20.3 0.0 59.6 490 8

Sunday 10/28/18 12:45pm 7.51 21.2 0.1 67.3 110 31

Monday 10/29/18 5:35am 7.04 22.5 0.0 31.2 330 49

Monday 10/29/18 11:25 am 6.97 20.4 0.0 62.5 490 230

Tuesday 10/30/2018 12:25 pm 7.70 19.8 0.0 61.8 490 79

Wednesday 10/31/18 5:28am 7.80 19.0 0.0 28.0 330 79

Wednesday 10/31/18 12:03pm 7.59 20.9 0.1 59.6 230 130

LIMITS

170 700 20

20 200 21

21 400 13

13

1.80

October, 2018

Fecal Coliform Weekly Max

Monthly Minimum DO

Date Time

WEEKLY COLIFORM GEOMETRIC MEAN

Week One

Week Two

Week Three

Week Four

Week Five

Bay Park Sewage Treatment Plant

Total and Fecal Coliform Sampling Results and Miscellaneous Effluent Data

Day

MONTHLY COLIFORM RESULTS

Total Coliform Monthly Median

Fecal Coliform Monthly Geometric Mean