Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
William Donovan
Plant Manager
Bay Park Sewage Treatment Plant
2 Marjorie Lane
East Rockaway, NY 11518-2020
November 24, 2018
CERTIFIED MAIL
Ms. Meredith Streeter, P.E.
Chief, SPDES Compliance Information Section
NYSDEC - Division of Water, Bureau of Water Compliance
625 Broadway – 4th Floor
Albany, New York 12233-3506
Re: Bay Park Sewage Treatment Plant
SPDES Permit Number: NY 0026450
NPDES Electronic NetDMR Report – October 2018
Dear Ms. Streeter:
Please find the NPDES NetDMR Report submission for the Bay Park Sewage Treatment Plant for
October 2018. Please note that the facility is still engaged in recovery efforts, repairing and
replacing components of the plant that were damaged by superstorm Sandy in late October 2012.
The County of Nassau entered into an “Agreement for the Operation and Maintenance of the Nassau
County Sewer System” (“O&M Agreement”) with SUEZ Water Long Island Inc. (“SWLI”;
formerly known as United Water Long Island Inc.) on September 10, 2014, with SWLI’s
commencement of operations taking place on January 2, 2015.
The facility was in compliance with all SPDES Permit effluent limitations for the reporting period.
The following laboratories performed the analyses reported in the monthly DMR:
Laboratory ELAP ID
Number
Analyses Performed
Pace Analytical Services Inc.
10478
Metals, Total and Fecal Coliform, TSS, CBOD5,
Volatile and Semi-Volatile Organics
Nassau County Department of
Health
10339
Total and Fecal Coliform
Also, as discussed with the Region 1 office, attached is a summary of the repair and replacement
progress made during October 2018.
Should you have any questions or comments concerning the above, please contact me at (516) 519-
5560.
Very truly yours,
William Donovan
Plant Manager
Enc.
c. NCDPW: Commissioner Kenneth G. Arnold, Deputy Commissioner Vincent Falkowski,
Richard Cotugno, Pasquale Assalone
NCHD: Donald Irwin
SWLI: Sunil Mehta
William Donovan
Plant Manager
Bay Park Sewage Treatment Plant
2 Marjorie Lane
East Rockaway, NY 11518-2020
Bay Park S.T.P. – Major Work Activities Started, Continuing and/or Completed for the Month of October 2018
Contract #S3B119-05G
Generator Controls:
Granted Final Completion on July 11, 2016.
Contract #S35100-01G
Cleaning and Repair of Digesters and Storage Tanks:
Granted Final Completion on November 10, 2015.
Contract #S3B119-06G
Heating the Hot Water Piping System:
Granted Final Completion on March 2, 2017.
Contract #S3B120-01G
Improvements to the Influent Screenings Facility:
Granted Final Completion on December 22, 2017.
Contract #S3B120-02G
Grit Removal Facility Improvements:
Granted Final Completion on March 6, 2018.
Contract #S35114-03G
Sludge Thickening Facility:
Granted Final Completion on August 2, 2017.
Contract #S35116-01G
Odor Control Bio-Filter Projects:
Granted Final Completion on November 7, 2015.
Contract #S35121-01G&E
Final Settling Tanks Project for both (G&E):
General Contractor; Letter of understanding change order approved.
Electrical Contractor; Granted Final Completion on June 26, 2017.
Contract #S35121-09G
Sludge Dewatering:
Continued submission of Training Plans and O & M Manuals.
Continued misc. mechanical insulation.
Continued Power, lighting, fire alarm, and control conduit and wire installations.
Continued misc. painting.
Continues installation, repair, and operation of Conveyor Systems.
Continued Centrifuges Performance operation.
Continued PMCS integration.
Continued misc. patching.
Continue cleaning of existing stainless-steel doors & frames.
Started installation of interior stainless-steel doors and frames.
Continued installation of roof fans.
Continued installation of HVAC devices and controls.
Continued start-up of Motor Control Centers.
Started demolition of existing and installation of new digested sludge pumps and grinder.
Thirty-day Lookahead:
Continue Centrifuge Operation.
Continue PMCS integration and installation of Control equipment.
Continue HMCS system start-up and integration.
Continue HVAC & Fan installations.
Continue electric installations (lighting, controls, grounding, lightning protection).
Continue Flooring installations.
Continue painting and labeling.
Continue Conveying system repairs and installations.
Start replacement of exterior and continue installation of new interior doors.
Continue FM-200 System installation.
Continue Fire Alarm installation.
Contract #S35121-13E
E-1, Electrical Distribution:
Granted Final Completion on April 6, 2017.
Contract #S35121-14E
E-2, USS 2 & Electrical Distribution:
Granted Final Completion on December 22, 2017.
Contract #S35121-14F
E-3 Main Substation and Electrical Distribution:
Continued to submit shop and As-Built drawings, Submittals and RFI’s.
Continued canopy fascia installation and started upper panels on west elevation, MSS.
Completed Stonehard floor installation at EL. 41.25 rooms and corridor, MSS.
Completed mechanical interior shades installation, MSS.
Continued painting (stairs, steel structures at various locations) and wall patching, MSS.
Continued installation of interior/exterior doors and associated hardware, MSS.
Completed installation of cabinets, countertops, wash basin and faucets in breakroom, MSS.
Continued installation of exterior light fixtures under soffit and at EL. 57.00, MSS.
Began installation of lightning protection system on roof, MSS.
Continued Emergency Generator control wiring, MSS.
Began installation of generator enclosure fire suppression system, MSS.
Continued installation of Substation, EMCS, MIMIC panels, battery system: electrical power and
control wiring conduits, panels, and pull boxes at MSS.
Continued Switchgear and cable testing, MSS.
Completed installation of Medium Voltage 5 KV cables to Substations No. 4.
Continuing termination of branch circuits at various lighting and emergency panels.
Completed installation of Generator Parallelism control panel, MSS.
Completed installation of battery racks and batteries, MSS.
Continuing termination of power and control wiring at MCC-MSS.
Began Site Lighting (CO No 97), HH test pits in Grids 1-12.
Completed energization of PSE&G interim 13.2 KV service to MSS.
Completed installation of SE-1 / S1 Annunciator Control Panel.
Thirty-day Lookahead:
Layout for and begin installation of lighting fixtures in Switchgear room, MSS.
Continue painting at various locations, MSS.
Continue installation of flood doors, MSS.
Continue installation of upper canopy panels, MSS.
Complete installation of one window in the Control Room 2nd floor, MSS.
Continue conduit and wire installation in MSS.
Install fire alarm control panel and terminate device wiring at same, MSS.
Continue installation of Substation, EMCS, MIMIC panels, electrical power and control wiring
conduits, panels, and pull boxes at MSS.
Continue working on Change Order No 97 – Site Lighting.
Continue installation of exterior lighting at EL. 57.00 at underside of sunshade outriggers.
Continue installation of exterior lighting just below EL. 18.25 walkway.
Continue terminating control wiring for Mimic panel at S1 Switchgear.
Pull to and terminate control wiring at Generator Parallelism control panel.
Contract #S35121-17G
Perimeter Flood Protection Berm and Flood Wall:
Substantial Completion Granted on June 9, 2017.
Contract #S35121-16V
De-chlorination Vault Storm Mitigation:
Granted Final Completion on January 11, 2018.
Time Delay Analysis was finalized and was issued to the County for review.
Contract # S35121-18G
Flood Protection Phase 1 Stormwater Pumping Stations:
Completed the Erection of the Structural Steel for the South MCC.
Placed Reinforced Concrete Deck for South MCC Slab.
Completed Installation of the South Pump Station Cable Tray.
Completed Painting of the North Pump Station Piping.
Completed Installation of Communication and Feeder Duct Banks for the South MCC.
Completed Installation of the South Pump Station Stop Logs.
Completed installation of the Catch Basins for Miscellaneous Improvement #2.
Completed the HVAC Ductwork for the North MCC Building.
Set all Wet Well Float Switches at South Pump Station.
Started Painted the Structural Steel for the South MCC Building.
Started Installing the Framing for the South MCC Building Siding.
Stated the installation of the Slide Gate in the North Gate Chamber.
Thirty-day Lookahead:
Miscellaneous Stormwater Improvements:
o Complete Miscellaneous Improvement Nos. 1, 2 and 5.
North Pump Station:
o Install Stop Log Frame at North Gate Chamber.
o Start up and Test Wet Well Submersible Pumps.
o Install Exterior Lighting Conduit and Fixtures.
o Install Equipment/Pipe ID Tags.
North Pump Station MCC Building:
o Install ACCU and CRAC units.
o Complete Lighting Conduit and Wire.
o Start up and Test CRAC units, ACCU Units.
South Pump Station:
o Continue RCP Placement to Diversion Chamber.
o Install SCADA Conduit.
o Paint Pump Piping.
o Install Exterior Lighting Conduit and Fixtures.
o Complete Conduit Duct Bank into South Pump Station.
South MCC Building:
o Install Grounding
o Install Stairs to MCC Platform.
o Install Building Siding.
o Install Building Sun Screen System.
Contract #S35121-16TR
Vehicle Fueling Facility and Tanks Reconstruction:
Granted Substantial Completion on February 16, 2018.
Contract #S3P311-02G
Pump Stations No. 2 – Cedar Drive, Roosevelt, Whitewood, Biltmore and Alhambra:
Granted Final Completion dated July 17, 2018.
Contract #S3P311-03G
Pump Stations No. 3 – Wantagh, Newbridge, Merrick and Ray Street:
Granted Final Completion dated August 15, 2018.
Contract #S3P311-04G
Pump Stations No. 4 – Felix, Fox, Northern, and Grand:
Granted Final Completion on July 20, 2018.
Contract #S3P311-05G
Pump Stations No. 5 – Miller, Mott, Long Beach, Royal, and Lido:
Granted Final Completion on July 12, 2018.
Contract #S3P311-09G
Hempstead Wastewater Pumping Station:
At HPS, graded site & installed bollards.
Thirty-day Lookahead:
Placement of final asphalt on northeast portion of HPS site.
PO No. BPNC16000136
Interim Generators:
Completed testing interim emergency generators.
Contract #S3P311-06G
Pump Stations No. 6 – Ocean, Mill, Woodmere and Longacre:.
Progressed completion of final punch list
Thirty-day Lookahead:
Complete final punch list items, including As-Builts and O&M Manuals
Contract #S3P311-09G
Hempstead Wastewater Pumping Station:
At HPS, graded site & installed bollards
Thirty-day Lookahead:
Placement of final asphalt on northeast portion of HPS site.
Contract #S3P311-09S
Hempstead Wastewater Force Main:
Continued dewatering at the Jerusalem Ave./Uniondale Ave. intersection for pipe jacking operation.
Excavated jacking pit at the Jerusalem Ave./Uniondale Ave. intersection (western side).
Start pipe jacking 39.25 ID steel casing pipe from west to east under Uniondale Ave.
Thirty-day Lookahead
Continue dewatering at the Jerusalem Ave./Uniondale Ave. intersection for pipe jacking operation.
Complete pipe jacking 39.25 ID steel casing pipe from west to east under Uniondale Ave.
Installation of MH SDA-07 at the Jacking Pit Location.
Begin installation of remaining 30” FM from Uniondale Ave. to Clark Pl.
PO No. BPNC16000136
Interim Generators:
Completed testing interim emergency generators.
Contract #S3P311-06G
Pump Stations No. 6 – Ocean, Mill, Woodmere and Longacre:.
Progressed completion of final punch list
Thirty-day Lookahead:
Complete final punch list items, including As-Builts and O&M Manuals
Contract #S3P311-07G
Pump Stations No. 7 – Inwood, Doughty, Bayview and Roslyn:
Progressed submittals.
Completed 5-day pump test for the Doughty Blvd. P.S. new submersible pumps.
Progressed electrical work at Inwood, Doughty Blvd., and Roslyn Rd. P.S. (Peak flow pump electrical work ;
lighting work at Doughty Blvd. P.S, demolition work at Roslyn)
Completed flood door installation at Roslyn Rd. P.S.
Completed access hatch installation at Bayview Ave. P.S.
Progressed Fire Alarm installation work at Bayview and Doughty P.S.
Progressed painting at Inwood P.S. (dry well and sewage piping).
Completed sump pump installation at Inwood and Doughty P.S. (field testing remains to be performed).
Installed Fuel Oil Tank hold down straps (Inwood and Bayview P.S.).
Progressed submersible pump training (scheduled training for 10/30 and 11/1).
Thirty-day Lookahead:
Progress submittals.
Progress installation of peak flow pumps at Inwood P.S.
Progress painting at all pump stations.
Complete field testing of Inwood and Doughty submersible sump pumps.
Progress fire alarm installation at all pump stations.
Progress training (schedule training for sump pumps, odor control, peak flow pumps).
Progress electrical work at all pump stations.
Complete hatch installations at Roslyn and Inwood P.S.
Contract #S3P311-10G
Pump Stations No. 10 – Lawrence STP, and Sage Lake:
Lawrence P.S.
Granted Substantial Completion on August 13, 2018.
Contract #S35123-L39G
Level 1 BNR Improvements:
Continued to progress Cost Loaded Baseline Schedule, Subcontractor/Venders Approval, RFI, and Shop
Drawing Submittals.
Installed FRP effluent troughs in Final Settling Tank No. 8.
Conducted Field Tests for the Invent Mixers and Sanitaire Diffusers.
Restored Influent Flow in Aeration Tank No. 5.
Took Aeration Tank No. 5 out of operation.
Completed tank cleaning and demolition of the existing diffusers.
Conducted survey of the structural condition of Aeration Tank No. 4 and Started concrete repair.
Thirty-day Lookahead:
Replace the defoament dilution valve after the Plant isolates the effluent water loop.
Continue concrete repair in Aeration Tank No. 4.
Install SWAS box in Pass A in Aeration Tank No. 4.
Apply MIC Coating in Aeration Tank No. 4.
Install SWAS piping in Aeration Tank No. 4.
Continue to install SWAS Piping in Pipe Gallery.
Start the installation of baffle wall in Aeration Tank No. 4.
Contract #S5121-16A
Engine Facility Auxiliary Upgrade:
Continued to process submittals, subcontractor/vendor approvals and RFI’s.
Continued insulation of TCL and ECL piping
Thirty-day Lookahead:
Complete TCL Heat Exchanger and test piping.
Receive Natural Gas Compressors.
Start installation of Natural Gas Compressors.
Contract #S35123-L39G
Level 1 BNR Improvements:
Continued to progress Cost Loaded Baseline Schedule, Subcontractor/Venders Approval, RFI, and Shop
Drawing Submittals.
Installed FRP effluent trough in Final Settling Tank No. 8.
Installed wood baffle and FRP baffle in Final Settling Tank No. 2.
Conducted Structural repair and applied MIC Coating in RAS Box No. 2
Completed installation of Invent Mixer in Aeration Tank No. 5.
Completed installation of diffusers in Aeration Tank No. 5.
Installed interim power to feed mixers in Aeration Tank No. 5.
Thirty-day Lookahead:
Install FRP effluent trough in Final Settling Tank No. 7.
Replace the defoament dilution valve after the Plant isolates the effluent water loop.
Restore influent flow in Aeration Tank No.5.
Take Aeration Tank No.4 out of operation and start to clean the tank.
Remove all existing diffusers in Aeration Tank No. 4
Conduct structural condition survey and perform structural repair in Aeration Tank No. 4.
Install communication wiring for instrumentation in Aeration Tank No. 5.
Contract #S80019-03GR
Cedar Point Lake PS:
Progressing with submittals.
Placed concrete for New Pump Station.
Installed Discharge Piping.
Continue groundwater dewatering.
Thirty-day Lookahead:
Progress with submittal.
Install Trash Rack for new Pump Station.
Remove sheeting.
Install metal railings and grating at Tide Gates.
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
DISCHARGE NUMBER MAJOR
Facility Bay Park STP WWTP OUTFALL
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
00010 1 0 PERMIT
Effluent Gross REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
Effluent Gross REQUIREMENT
SAMPLE
MEASUREMENT
00530 1 0 PERMIT
Effluent Gross REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
00545 1 0
Effluent Gross
Nitrogen, total [as N]
00600 Y
PERMIT
Season: 0 REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
0
0
mg/LDaily MX
Req. Mon
2.9
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
Raw, Sewage Influent
00545 1 0
Nitrogen, nitrite total (as N)
*****
*****
***************
GrabDaily MX
0.3**********
GR
Six per Day
06/010
ml/L
<0.10
*****
*****
*****
*****
*****
*****
*****
MO AVG
**********Solids, Settleable
9
**********
*****
*****
24
Daily
01/010
mg/LReq. Mon
251
*****
*****
Raw, Sewage Influent
00530 G 0
Solids, Total Suspended***** *****
*****
6
Comp24
24
Daily
01/010
mg/L7 DA AVG
45
6
MO AVG
30
5
*****
*****
lb/d7 DA AVG
26,000
2,935
30 DA AVG
18,000
2,417Solids, Total Suspended
Daily MX
Req. Mon Comp24
24
Monthly
01/30
*****
*****
Comp24Monthly
2401/30
Grab
GR
Six per Day
06/01
CA
Comp24
Six per Day
Effluent Gross
00545 1 0
Nitrogen, nitrite total (as N)
UNITSUNITS
06/01
*****
Daily MX
Req. Mon
**********
11/24/2018
MM/DD/YYYY
MONITORING PERIOD
PERMIT NUMBER
No Discharge
MAXIMUM
NUMBER
mg/L
OMB No. 2040-004
Form Approved
11518-2020
External Outfall
(SUBR 01)
DMR Mailing ZIP Code
SU
Deg C*****
*****
*****
*****
*****
MINIMUM
10/31/2018
MM/DD/YYYY
10/01/2018
MM/DD/YYYY
Grab
GR
**********
VALUEVALUEVALUEVALUE
SAMPLE
TYPE
FREQUENCY
OF ANALYSIS
NO.
EX
QUALITY OR CONCENTRATIONQUANTITY OR LOADING
0
0
7.3*****6.8*****
23.9*****
516
**********
NY0026450 001-A
Temperature, water deg.
centigrade
PARAMETER
*****
VALUE
East Rockaway, NY 11518-2020
lb/d Monthly CALCTD
01/30
TYPED OR PRINTED
William Donovan
Plant Manager
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
0.1*****
519-5560
***** *****
DATE
pH 00400 1 0E ffluent Gross
0
SIGNATURE OF PRICIPAL EXECUTIVE OFFICER
OR AUTHORIZED AGENT
TELEPHONE
*****
*****
*****
***************
*****
*****
*****Effluent Gross (Supplementary) 16,500
12 MO AVG*****
15,168 *****SAMPLE
MEASUREMENT
*****
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
**********
*****
*****
*****
*****
Daily MX
Req. Mon
*****
*****
*****
*****
*****
*****
*****
*****
Req. Mon
Daily MX
**********
Effluent Gross
00625 1 0
Nitrogen, Kjeldahl, total (as N)
Raw, Sewage Influent
00620 1 0
Nitrogen, nitrate total (as N)
Daily MX
Req. Mon
Nitrogen, Kjeldahl, total (as N)
0.2
Req. Mon
Comp24
24
Comp24
24
Comp24
24
Comp24
24
Comp24
24
Comp24
24
Comp24
24
SAMPLE
TYPE
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
UNITS
Monthly
01/30
FREQUENCY
OF ANALYSIS
MM/DD/YYYY
11/24/2018
DATE
0
0
0
mg/L
mg/L
0
0
0
mg/L
mg/L
OMB No. 2040-004
Form Approved
0
NO.
EX
No Discharge
11518-2020
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
*****
*****
mg/L
mg/L
mg/L
Daily MX
Req. Mon
24.1
Daily MX
NUMBER
519-5560516
TELEPHONE
30.4
20.6
External Outfall
(SUBR 01)
DMR Mailing ZIP Code
*****
Req. Mon
*****
VALUE
*****
*****
49.3
MONITORING PERIOD
PERMIT NUMBER
*****
*****
*****
*****
VALUE
QUALITY OR CONCENTRATION
9.1
VALUE
10/01/2018
MM/DD/YYYY
001-M
10/31/2018
MM/DD/YYYY
*****
*****
*****
*****
UNITS
NY0026450
*****
*****
*****
VALUE
QUANTITY OR LOADING
*****
*****
*****
VALUE
TYPED OR PRINTED
Plant Manager
William Donovan
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
Raw Sewage Influent
34726 1 0
Nitrogen, ammonia, total (as
NH3)
Effluent Gross
34726 1 0
Nitrogen, ammonia, total (as
NH3)
Effluent Gross
00665 1 0
Phosphorus, total (as P)
Nitrogen, nitrate total (as N)
PARAMETER
Raw, Sewage Influent
00625 1 0
Effluent Gross
00620 1 0
*****
DISCHARGE NUMBER
*****
*****
*****
*****
*****
*****
*****
*****
Req. Mon
Daily MX
2.6
MO AVG
*****
*****
*****
*****
*****
*****
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 3
700
*****
*****
**********
*****
*****170
MO AVG
70
Comp24
24
Daily
01/010
mg/L*****
*****180*****
*****
*****
*****
*****
*****Reg. Mon
MO AVG
*****
*****
Raw Sewage Influent
80082 G 0
BOD, carbonaceous, 5 day, 20
C
Comp24
24
Daily
01/010
mg/L
54*****
Lb/d
2,148
MO AVG
15,000
1,723
Effluent Gross
80082 1 0
BOD, carbonaceous, 5 day, 20
C
Grab
GR
Daily
01/010
MPN/100
mL*****
*****
*****
*****
*****
*****
81383 K
Coliform, Total General
Grab
GR
Daily
01/010
MPN/100
mL
20
*****
*****
*****
*****
*****
*****
*****
Comp24
24
Monthly
01/300
mg/L
1.5
*****
**********
*****
*****
*****
*****
*****
*****
Effluent Gross
70507 1 0
Phosphorus, In Total
orthophosphate
PARAMETER
Flow, in conduit or thru
treatment plant
Effluent Gross
Chlorine, total residual
50060 1 0
QUANTITY OR LOADING
VALUE
52.8
*****
Effluent Gross
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
Plant Manager
TYPED OR PRINTED
Effluent Gross
74055 1 0
Coliform, Fecal General
Effluent Gross
*****
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
10/01/2018
VALUE
*****
*****
*****
*****
UNITS
*****
*****
*****
*****
MM/DD/YYYY
10/31/2018
001-M
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
*****
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
VALUE
*****
*****
*****
VALUE
*****
0.08
TELEPHONE
516 519-5560
NUMBER
UNITS
*****
*****
mg/L
40
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0 RC
0
DATE
11/24/2018
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
99/99
Continuous
99/99
Continuous
SAMPLE
TYPE
RCORDR
RC
RCORDR
50050 G
*****
*****
0.5
DAILYMX
Req. Mon
Daily MX
7 DA AVG
23,000*****
MO AVG 7 DA AVG
25
21
30DA GEO 7 DA GEO
200
*****
*****
*****400
MO MEDIAN
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 4
PARAMETER
Solids, suspended percent
removal
81011 K 0
Percent Removal
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
Plant Manager
TYPED OR PRINTED
QUANTITY OR LOADING
VALUE
*****
*****
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
10/01/2018
VALUE
*****
UNITS
*****
*****
MM/DD/YYYY
10/31/2018
001-M
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE VALUE
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
98
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
*****
*****
VALUE
*****
*****
TELEPHONE
516 519-5560
NUMBER
UNITS
%
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0
SAMPLE
TYPE
CA
DATE
11/24/2018
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
01/30
Monthly CALCTD
Carbonaceous oxygen demand,
% removal
81383 K
Percent Removal
*****
*****
***** ***** *****
*****
*****
*****%
0 01/30
Monthly
CA
CALCTD
*****
*****
MO AV MIN
MO AV MIN
85
85*****
98
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane 10.5
East Rockaway, NY 11518-2020 MAJOR 10.5
3.7
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT) 4.5
Location 2 Marjorie Lane 4.1
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 1
PARAMETER
Copper. total (as Cu)
01042 1 0
Effluent Gross
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
Plant Manager
TYPED OR PRINTED
QUANTITY OR LOADING
VALUE
*****
*****
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
10/01/2018
VALUE
10.5
UNITS
lb/d
MM/DD/YYYY
10/31/2018
001-F
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE
*****
*****
VALUE
*****
*****
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
VALUE
*****
*****
TELEPHONE
516 519-5560
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT NUMBER
UNITS
*****
*****
0
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
11/24/2018
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
01/07
Weekly
DATE
SAMPLE
TYPE
24
COMP2424
Daily MX
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2
PARAMETER
Cadmium, total (as Cd)
01027 V 0
See Comments
Chromium, total (as Cr)
01034 V 0
See Comments
Lead, total (as Pb)
01051 V 0
See Comments
Nickel, total (as Ni)
01067 V 0
Effluent Gross
Silver total (as Ag)
01077 V 0
See Comments
Zinc, total (as Zn)
01092 V 0
See Comments
Chloroform
32106 V 0
See Comments
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
Plant Manager
TYPED OR PRINTED
QUANTITY OR LOADING
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
10/01/2018
VALUE
0.74
1.5
Daily MX
<3.05
5.2
Daily MX
2.13
4.2
Daily MX
3.79
9
Daily MX
<0.44
0.9
Daily MX
25.69
87
Daily MX
0.88
1.7
Daily MX
UNITS
lb/d
lb/d
lb/d
lb/d
lb/d
lb/d
MM/DD/YYYY
10/31/2018
001-V
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
TELEPHONE
516 519-5560
NUMBER
UNITS
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0
0
0
0
0
0
DATE
Monthly
01/30
Monthly
01/30
11/24/2018
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
SAMPLE
TYPE
24
Comp24
24
Comp24
24
Comp24
24
Comp24
lb/d
0
24
Comp24
24
Comp24
24
Comp24
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2
PARAMETER
Phenolics, Total
32730 V 0
See Comments
Toluene
34010 V 0
See Comments
Benzene
34030 V 0
See Comments
Benzo (k) Fluoranthe
34242 V 0
Effluent Gross
Diethyl Phthalate
34336 V 0
See Comments
Methylene Chloride
34423 V 0
See Comments
Tetrachloroethylene
34475 V 0
See Comments
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
Plant Manager
TYPED OR PRINTED
QUANTITY OR LOADING
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
10/01/2018
VALUE
12.80
47
Daily MX
0.44
1.1
Daily MX
<0.44
0.6
Daily MX
<0.44
0.6
Daily MX
<0.44
2.4
Daily MX
0.62
5.9
Daily MX
1.59
3.8
Daily MX
UNITS
lb/d
lb/d
lb/d
lb/d
lb/d
lb/d
lb/d
MM/DD/YYYY
10/31/2018
001-V
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
TELEPHONE
516 519-5560
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
*****
*****
NUMBER
UNITS
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0
0
0
0
0
0
0
DATE
11/24/2018
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
SAMPLE
TYPE
24
Comp24
24
Comp24
24
Comp24
24
Comp24
Comp24
24
Comp24
24
Comp24
24
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 3
PARAMETER
1,1Dichloroethylene
345010 V 0
See Comments
1,1,1 Trichloroethane
34506 V 0
See Comments
Benzo (a) Anthracine
34526 V 0
See Comments
Pentachlorophenol
39032 V 0
Effluent Gross
Bis(2-ethylhexyl)Phtalate
39100 V 0
See Comments
Di-n-Butyl Phthalate
39110 V 0
See Comments
Trichloroethylene
39180 V 0
See Comments
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
William Donovan
Plant Manager
TYPED OR PRINTED
QUANTITY OR LOADING
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
NY0026450
PERMIT NUMBER
MONITORING PERIOD
MM/DD/YYYY
10/01/2018
VALUE
<0.44
0.8
Daily MX
<0.44
1.5
Daily MX
<0.44
0.6
Daily MX
<0.75
1.0
Daily MX
<0.44
11
Daily MX
<0.44
11
Daily MX
<0.44
1.7
Daily MX
UNITS
lb/d
lb/d
lb/d
lb/d
lb/d
lb/d
lb/d
MM/DD/YYYY
10/31/2018
001-V
DISCHARGE NUMBER
QUALITY OR CONCENTRATION
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
DMR Mailing ZIP Code
(SUBR 01)
External Outfall
VALUE
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
TELEPHONE
516 519-5560
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
*****
*****
NUMBER
UNITS
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
*****
Form Approved
OMB No. 2040-004
11518-2020
No Discharge
NO.
EX
0
0
0
0
0
0
0
DATE
11/24/2018
MM/DD/YYYY
FREQUENCY
OF ANALYSIS
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
01/30
Monthly
SAMPLE
TYPE
24
Comp24
24
Comp24
24
Comp24
24
Comp24
Comp24
24
Comp24
24
Comp24
24
PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)
Name Nassau (County) Bay Park STP
Address 2 Marjorie Lane
East Rockaway, NY 11518-2020 MAJOR
Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)
Location 2 Marjorie Lane
East Rockaway, NY 11518-2020 FROM TO o
Attn: William Donovan
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED
AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED
ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR
OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS
TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE
SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND
33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA
$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE
COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 4
**********Daily MX
***** Comp24
24
SAMPLE
TYPE
Monthly
01/30
FREQUENCY
OF ANALYSIS
MM/DD/YYYY
11/24/2018
DATE
0
NO.
EX
No Discharge
11518-2020
UNITS
QUALITY OR CONCENTRATION
DISCHARGE NUMBER
001-V
OMB No. 2040-004
Form Approved
*****
*****
NUMBER
519-5560516
TELEPHONE
*****
VALUE
External Outfall
(SUBR 01)
DMR Mailing ZIP Code
*****
VALUE
SIGNATURE OF PRICIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
*****
VALUE
10/31/2018
MM/DD/YYYY
<0.44
VALUE
10/01/2018
2.2
MM/DD/YYYY
MONITORING PERIOD
PERMIT NUMBER
NY0026450
*****
*****
VALUE
QUANTITY OR LOADING
UNITS
lb/d
TYPED OR PRINTED
Plant Manager
William Donovan
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER
See Comments
78028 V 0
Tetrachloroethane
PARAMETER
BAY PARK SEWAGE TREATMENT PLANT
MONTHLY LABORATORY REPORT
PLANT PRIMARY GBT RETURN AERATION AERATION PLANT PRIMARY
INFLUENT EFFLUENT FILRATE SLUDGE EFFLUENT AVERAGE INFLUENT EFFLUENT
mg/L mg/L mg/L mg/L mg/L mg/L °C mg/L mg/L mg/L %TS %VS %TS %VS
10/01/18 220 158 4.0 3,037 1,744 2,041 178 103 23.4 154 140 2.7 183 2.2 85.3 1.9 75.8
10/02/18 264 70 132.50 4.0 3,163 1,207 1,894 138 114 23.8 148 87 < 2.0 112 1.4 86.1 1.8 77.5
10/03/18 118 112 4.0 3,100 1,441 1,744 133 94 23.5 162 131 2.5 176 1.6 85.7 1.8 77.9
10/04/18 226 130 101.00 7.2 3,113 1,222 1,981 128 104 23.6 150 129 2.7 168 2.1 85.8 2.0 77.8
10/05/18 236 136 4.8 3,063 1,394 1,891 148 106 23.4 195 150 2.7 220 2.2 85.7 1.8 77.7
10/06/18 238 166 4.4 143 23.1 161 150 3.0 247 1.8 84.8 1.8 77.6
10/07/18 246 156 6.4 175 23.4 205 195 4.2 213 1.7 83.2 1.9 75.6
10/08/18 288 120 5.2 180 23.5 205 180 4.4 197 1.4 86.9 1.8 77.5
10/09/18 288 112 42.00 6.8 3,363 1,438 1,916 158 111 23.7 197 186 2.5 180 1.4 86.8 1.8 78.0
10/10/18 340 116 5.6 3,613 1,144 2,085 155 136 23.4 174 161 3.6 194 1.9 84.5 1.8 77.9
10/11/18 244 114 52.50 7.6 3,663 1,447 2,097 185 128 23.5 220 369 6.8 205 1.3 85.8 1.9 77.4
10/12/18 292 82 124.00 6.4 3,788 1,450 2,069 183 126 23.1 201 218 6.3 176 1.3 85.3 1.8 78.0
10/13/18 208 138 6.8 173 22.4 136 163 4.6 180 1.3 88.8 1.8 79.4
10/14/18 228 140 4.0 190 22.5 153 139 3.5 151 2.1 82.8 2.1 76.0
10/15/18 280 146 7.2 3,550 1,363 2,035 183 135 22.4 155 161 4.6 186 2.4 78.9 1.8 77.8
10/16/18 258 150 6.4 3,838 1,432 2,063 205 144 22.7 195 179 6.2 240 2.2 82.0 1.8 77.6
10/17/18 228 138 6.8 3,550 1,610 2,091 223 139 22.3 156 152 4.3 120 1.6 88.7 1.8 78.0
10/18/18 252 90 65.00 5.2 3,488 1,622 2,113 225 139 22.2 171 103 2.6 94 0.7 87.7 1.8 77.8
10/19/18 160 106 4.4 3,450 1,457 2,022 210 144 22.0 175 152 3.5 105 1.4 87.0 1.9 78.0
10/20/18 336 56 4.0 213 21.7 237 91 3.1 85 1.4 85.1 1.8 77.5
10/21/18 340 82 5.2 200 21.9 203 132 4.3 125 2.8 83.4 1.9 77.4
10/22/18 296 100 4.8 3,363 1,266 1,960 198 156 21.7 203 168 5.0 105 2.6 83.7 1.9 77.7
10/23/18 284 72 88.00 4.8 3,188 1,166 1,903 193 165 21.9 196 150 2.7 112 1.7 86.7 1.9 78.2
10/24/18 280 60 4.0 3,188 1,482 1,941 200 138 21.7 179 150 2.5 118 1.2 87.1 1.9 78.2
10/25/18 214 46 72.00 5.6 3,025 1,238 1,953 183 147 21.7 192 118 2.6 100 1.5 88.3 1.9 77.8
10/26/18 230 96 4.0 3,063 1,494 2,025 210 141 21.4 156 152 2.9 118 1.6 88.2 1.8 77.7
10/27/18 224 98 4.0 195 21.3 173 159 4.1 115 1.8 88.9 1.9 77.8
10/28/18 176 110 7.2 193 20.8 143 145 4.4 258 2.0 85.3 1.9 77.3
10/29/18 220 114 6.8 2,988 1,538 2,025 180 118 20.9 183 176 4.4 260 2.3 83.8 1.9 77.7
10/30/18 328 86 50.00 7.6 3,150 1,441 2,060 165 118 21.3 190 162 6.1 173 1.7 85.5 1.9 77.7
10/31/18 232 88 4 3,450 1,372 1,941 198 144.05 21.2 203 149 5.7 151 1.7 85.4 1.9 77.8
MAXIMUM 340.00 166.00 132.50 7.60 3838.00 1744.00 2112.75 225.00 165.20 23.77 237 369 6.80 260.00 2.80 88.90 2.10 79.38
MINIMUM 118.00 46.00 42.00 < 4.00 2988.00 1144.00 1744.25 127.50 93.76 20.80 136 87 2.00 84.90 0.70 78.90 1.80 75.62
AVERAGE 251 109 81 < 5 3327 1407 1993 182 130 22 180 158 4 163 2 86 2 78
DATE DIGESTERS PRIMARY SETTLING
TANKS
PLANTPLANT
mg/L
EFFLUENTEFFLUENT
mg/L
DEPARTMENT OF PUBLIC WORKS
COUNTY OF NASSAU
SLUDGE SOLIDS
INFLUENT
CHLORIDES
CBOD5AERATION
EFFLUENT
TEMPERATURESLUDGE
INDEX
AERATION 30
MINUTE
SETTLING
TOTAL SUSPENDED SOLIDS
October, 2018
INFLUENTEFFLUEN
TINFLUENT
EFFLUEN
T%TS %TVS %TS %Solids mg/L mg/L mg/L mg/L mL/L mL/L Minimum Maximum Minimum Maximum °C °C MGD
10/01/18 200 0.03 16.2 <0.10 7.0 7.2 7.0 7.1 23.0 23.6 56.9
10/02/18 5 84 338 7.29 3,903 99 0.03 0.05 15.8 <0.10 7.0 7.2 6.9 7.1 23.1 23.7 52.2
10/03/18 205 0.08 10.0 <0.10 7.0 7.2 6.8 7.1 22.7 23.7 55.7
10/04/18 5 86 315 4,145 119 0.03 0.08 12.7 <0.10 7.1 7.3 6.9 7.1 22.7 23.6 52.9
10/05/18 5 86 0.05 12.3 <0.10 7.0 7.4 7.0 7.1 22.7 23.4 53.5
10/06/18 0.05 12.4 <0.10 7.1 7.3 6.9 7.1 22.5 23.3 51.3
10/07/18 0.03 12.3 <0.10 7.0 7.2 6.9 7.2 23.1 23.7 51.3
10/08/18 0.04 14.0 <0.10 7.0 7.4 7.1 7.2 22.6 23.5 52.1
10/09/18 5 87 1,613 3,795 140 0.04 0.04 15.2 <0.10 7.0 7.2 7.0 7.2 22.8 23.7 52.1
10/10/18 290 7.35 0.07 12.4 <0.10 6.8 7.2 7.0 7.2 22.9 23.8 52.9
10/11/18 5 87 253 7.31 3,975 139 0.04 0.05 12.8 <0.10 7.1 7.2 7.0 7.2 23.0 23.9 54.0
10/12/18 5 87 330 7.36 0.04 11.5 <0.10 7.1 7.3 7.0 7.1 22.0 22.7 64.5
10/13/18 7.34 0.03 10.3 <0.10 7.0 7.3 7.0 7.2 21.0 21.8 57.4
10/14/18 0.04 10.8 <0.10 7.0 7.3 6.9 7.2 20.8 21.8 54.8
10/15/18 85 0.04 11.0 <0.10 7.0 7.3 7.0 7.3 21.4 22.3 54.0
10/16/18 4 87 4,650 107 0.02 0.04 12.0 <0.10 7.0 7.4 7.0 7.3 21.5 22.1 53.7
10/17/18 263 7.36 0.04 12.8 <0.10 7.0 7.3 7.1 7.3 21.1 22.0 52.9
10/18/18 4 87 238 7.32 4,110 129 0.03 0.03 11.7 <0.10 7.1 7.4 7.0 7.2 20.9 21.6 52.0
10/19/18 198 7.33 0.03 26.8 <0.10 6.8 7.4 7.0 7.2 21.3 21.9 52.0
10/20/18 7.36 0.03 14.8 <0.10 6.9 7.3 7.0 7.3 21.3 21.8 50.6
10/21/18 0.04 14.2 <0.10 7.0 7.4 7.0 7.3 20.3 21.1 50.0
10/22/18 188 0.03 14.3 <0.10 6.8 7.4 7.0 7.3 20.6 20.8 50.4
10/23/18 5 87 965 5,205 103 0.02 0.04 11.3 <0.10 7.1 7.4 7.0 7.2 20.9 21.7 51.2
10/24/18 1,000 7.37 0.05 9.6 <0.10 7.1 7.3 7.0 7.2 19.8 21.4 48.3
10/25/18 5 87 1,693 7.35 4,560 165 0.04 0.05 10.4 <0.10 7.1 7.4 7.0 7.2 20.3 21.1 49.0
10/26/18 368 7.35 0.05 10.4 <0.10 7.2 7.5 7.1 7.2 20.0 20.7 50.0
10/27/18 7.28 0.04 8.8 <0.10 7.1 7.2 7.0 7.2 19.3 20.5 56.8
10/28/18 0.04 9.3 <0.10 7.1 7.4 7.0 7.2 19.8 20.5 53.7
10/29/18 435 0.04 9.3 <0.10 7.2 7.4 7.1 7.2 20.4 20.5 51.9
10/30/18 5 87 418 7.36 3,465 173 0.06 0.04 14.1 <0.10 7.0 7.5 7.1 7.2 20.1 20.8 51.1
10/31/18 528 0.05 10.3 <0.10 7.1 7.5 7.1 7.2 20.3 20.8 49.1
MAXIMUM 5.00 87.00 1693 7.37 5205 173 0.06 0.08 26.8 <0.10 7.2 7.5 7.1 7.3 23.1 23.9 64.5
MINIMUM 4.20 84.00 85 7.28 3465 99 0.02 0.03 8.83 <0.10 6.8 7.2 6.8 7.1 19.3 20.5 48.3
AVERAGE 4.6 87 496 7 4201 131 0 0 13 <0.10 7.0 7.3 7.0 7.2 21.4 22.2 52.8
PLANT PRIMARY PLANT
INFLUENT EFFLUENT EFFLUENT
TSS - mg/L 251 109 56.4 5 98
CBOD5 - mg/L 180 158 12.1 4 98
DATEDAILYDAILYTHICKENED SLUDGE
FEED
SLUDGE
PLANT
EFFLUENT
FLOW
AVERAGE DAILY
TEMPERATURES
pH
EFFLUENTINFLUENTVOLATILE
ACIDS/
ALKALINITY
VOLATILE
ACIDS
DIGESTERSDE-WATERED SLUDGE
ALKALINITYAVERAGE
pH
FILTRATECAKE
% REMOVED % REMOVED
TREATMENT PLANT EFFICIENCY - MONTHLY AVERAGE
pHAVERAGE DAILY
SETTLEABLE SOLIDS
AVERAGE
DAILY
CHLORINE
RESIDUAL
GRAVITY BELT
THICKENERS
October, 2018
WEEK WEEK WEEK WEEK WEEK MONTHLY
PERMIT OF OF OF OF OF TOTALS
LIMIT 30-Sep-18 07-Oct-18 14-Oct-18 21-Oct-18
06-Oct-18 13-Oct-18 20-Oct-18 27-Oct-18 Date Sampled:
10/11/18 mg/L
TEMPERATURE; INFLUENT [°C] HIGHEST DAILY VALUE 23.1
TEMPERATURE; EFFLUENT [°C] HIGHEST DAILY VALUE 23.9 INFLUENT 4 30.40
EFFLUENT 4 20.60
pH; INFLUENT LOWEST DAILY VALUE 6.8
HIGHEST DAILY VALUE 7.5 INFLUENT 1 0.1
EFFLUENT 1 2.9
pH; EFFLUENT LOWEST DAILY VALUE 6.00 6.8
HIGHEST DAILY VALUE 9.00 7.3 INFLUENT 1 0.2
EFFLUENT 1 9.1
MONTHLY AVERAGE [lbs/day] 110,265
MONTHLY AVERAGE [mg/L] 251 INFLUENT 1 49.3
12 MONTH ROLLING AVERAGE [lbs/day] 16,500 lbs/d 15,168
EFFLUENT 1 24.1
MONTHLY AVERAGE [lbs/day] 18000 lbs/d 2,417
WEEKLY AVERAGE [lbs/day] 26000 lbs/d 2,081 2,935 2,398 1,957 2,935 INFLUENT 1 7.5
MONTHLY AVERAGE [mg/L] 30 mg/L 5 EFFLUENT 1 2.6
WEEKLY AVERAGE [mg/L] 45 mg/L 5 6 5 5 6
INFLUENT 1 2.1
SETTLEABLE SOLIDS; INFLUENT DAILY MAXIMUM 26.8 EFFLUENT 1 1.5
SETTLEABLE SOLIDS; EFFLUENT DAILY MAXIMUM 0.3 mL/L <0.10
NUMBER OF READINGS >0.3 0
EFFLUENT FLOW MONTHLY AVERAGE [MGD] 70 MGD 52.8
Date Sampled: LBS/DAY LBS/DAY
COLIFORM, FECAL MONTHLY GEOMETRIC MEAN 200/100mL 20 METHYLENE CHLORIDE 5.90 0.62
WEEKLY GEOMETRIC MEAN 400/100mL 20 21 13 13 21 1,1-DICHLOROETHYLENE 0.80 <0.44
# OF DAYS>2400 (Interstate Parameter) 0 1,1,1-TRICHLOROETHANE 1.40 <0.44
TRICHLOROETHYLENE 1.70 <0.44
COLIFORM, TOTAL MONTHLY MEDIAN <700 700/100mL 170 TETRACHLOROETHANE 2.20 <0.44
COLIFORM, TOTAL NO MORE THAN 10% EXCEEDING 2300 10% 0 TETRACHLOROETHYLENE 3.80 1.59
BENZO (a) ANTHRACENE 0.60 <0.44
MONTHLY AVERAGE LBS/DAY 79,051 BENZO (k) FLUORANTHENE 0.60 <0.44
MONTHLY AVERAGE mg/L 180 DIETHYL PHTHALATE 2.40 <0.44
DI-N-BUTHYL PHTHALATE 11.00 <0.44
MONTHLY AVERAGE [lbs/day] 15000 lbs/d 1,723 BIS (2-ETHYLHEXYL) PHTHALATE 11.00 <0.44
WEEKLY AVERAGE [lbs/day] 23000 lbs/d 1,133 2,148 1,757 1,467 2,148 PENTACHLOROPHENOL 1.00 <0.75
MONTHLY AVERAGE [mg/L] 25 mg/L 4 CHLOROFORM 1.70 0.88
WEEKLY AVERAGE [mg/L] 40 mg/L 3 5 4 3 5 BENZENE 0.60 <0.44
TOLUENE 1.10 0.44
TSS; % REMOVAL MONTHLY PERCENT REMOVAL 85% 98 PHENOLICS, TOTAL 47.00 12.80
CBOD5; % REMOVAL MONTHLY PERCENT REMOVAL 85% 98
CHLORINE, TOTAL RESIDUAL LOWEST DAILY VALUE 0.01
DAILY MAX 0.5 mg/L 0.08
09/30/18 10/07/18 10/14/18 10/21/18
10/06/18 10/13/18 10/20/18 10/31/18
Max Lbs 10.5 3.7 4.5 4.1 10.5
Date 10/06/18 10/13/18 10/20/18 10/27/18 10/02/18
MERCURY, TOTAL 200 ng/L
METALS ACTION LEVEL
10/06/18 10/13/18 10/20/18 10/27/18 11/03/18
CADMIUM, TOTAL 1.5 LBS/DAY 0.74 0.74
CHROMIUM, TOTAL 5.2 LBS/DAY <3.05 <3.05
LEAD, TOTAL 4.2 LBS/DAY 2.13 2.13
NICKEL, TOTAL 9.3 LBS/DAY 3.79 3.79
SILVER, TOTAL 0.9 LBS/DAY <0.44 <0.44
ZINC, TOTAL 87 LBS/DAY 25.69 25.69
BAY PARK SEWAGE TREATMENT PLANT
ORGANIC COMPOUNDS
TOTAL SUSPENDED SOLIDS;
EFFLUENT
CBOD5 EFFLUENT
CBOD5 INFLUENT
DATE
MAXIMUM
MONITORING REQUIREMENTS
TOTAL NITROGEN EFFLUENT
NITROGEN INFLUENT
MAXIMUM
VALUE
ANALYTICAL
RESULTS
ACTION
LEVEL
SUMMARY
NUMBER OF
SAMPLES
OPERATIONS AND LABORATORY ANALYSES
ORTHOPHOSPHATE AS P
PHOSPHORUS, TOTAL AS P
NITRATE AS N
TOTAL KJELDAHL NITROGEN
AMMONIA AS NH3-N
NITRITE AS N
METALS PERMIT LIMIT
24 LBS/DAYCOPPER, TOTAL
MAXIMUM
Week
DATE
Effluent
Dissolved
Oxygen
Effluent
Temperature
Chlorine
ResidualFlow Total Coliform Fecal Coilform
[mg/L] [°C] [mg/L] [MGD] [MPN/100mL] [MPN/100mL]
Monday 10/1/18 5:30am 7.44 23.4 0.0 37.4 170 17
Monday 10/1/18 11:35am 6.57 23.7 0.1 73.9 330 49
Tuesday 10/2/18 12:37pm 6.78 23.4 0.1 61.3 79 8
Wednesday 10/3/18 5:26am 7.50 23.4 0.0 38.0 46 5
Wednesday 10/3/18 12:33pm 6.75 22.7 0.1 64.8 330 17
Thursday 10/4/18 1:12pm 7.31 23.5 0.1 59.7 79 33
Friday 10/5/18 11:32am 7.75 23.2 0.1 66.0 130 49
Saturday 10/06/2018 11:08 am 8.15 23.1 0.0 60.8 79 14
Sunday 10/07/2018 12:05 pm 7.62 23.1 0.0 64.9 23 23
Monday 10/8/18 11:42am 7.64 22.5 0.0 60.5 170 7
Tuesday 10/09/2018 11:25 am 6.96 23.3 0.0 63.0 79 13
Wednesday 10/10/2018 5:25 am 6.80 23.7 0.0 27.0 230 33
Wednesday 10/10/2018 12:39 pm 5.66 22.5 0.1 65.7 33 11
Thursday 10/11/2018 12:10 pm 6.08 23.7 0.0 67.3 230 33
Friday 10/12/2018 5:27 am 7.30 23.7 0.0 37.0 330 49
Friday 10/12/2018 12:15 pm 6.28 22.3 0.1 72.7 170 31
Saturday 10/13/18 11:13am 5.90 21.3 0.0 56.8 280 23
Sunday 10/14/18 1:33pm 6.72 21.7 0.1 71.8 170 23
Monday 10/15/2018 5:20 am 7.90 21.9 0.0 40.9 330 49
Monday 10/15/2018 1:15 pm 6.73 22.2 0.0 69.4 230 79
Tuesday 10/16/18 12:18pm 7.65 21.8 0.0 64.5 70 8
Wednesday 10/17/2018 5:26 am 6.90 21.8 0.0 26.0 220 22
Wednesday 10/17/2018 11:36 am 7.85 21.4 0.0 60.2 49 2
Thursday 10/18/2018 12:34 pm 7.95 21.4 0.0 60.5 49 7
Friday 10/19/18 12:20pm 6.95 20.2 0.0 63.3 17 8
Saturday 10/20/2018 12:10 pm 7.91 21.6 0.0 58.2 79 5
Sunday 10/21/2018 12:24 pm 8.65 19.6 0.0 55.5 33 7
Monday 10/22/2018 5:40 am 7.79 22.1 0.0 27.1 49 17
Monday 10/22/2018 11:23 am 8.03 20.7 0.0 61.7 230 22
Tuesday 10/23/18 12:12pm 1.80 19.0 0.1 59.6 130 7
Wednesday 10/24/18 5:26am 7.50 21.5 0.0 31.0 170 33
Wednesday 10/24/18 11:55am 7.91 21.0 0.1 61.1 490 23
Thursday 10/25/18 12:30pm 7.74 19.7 0.1 60.2 49 13
Friday 10/26/18 11:15am 7.69 20.6 0.1 62.0 79 8
Saturday 10/2718 11:38am 6.90 20.3 0.0 59.6 490 8
Sunday 10/28/18 12:45pm 7.51 21.2 0.1 67.3 110 31
Monday 10/29/18 5:35am 7.04 22.5 0.0 31.2 330 49
Monday 10/29/18 11:25 am 6.97 20.4 0.0 62.5 490 230
Tuesday 10/30/2018 12:25 pm 7.70 19.8 0.0 61.8 490 79
Wednesday 10/31/18 5:28am 7.80 19.0 0.0 28.0 330 79
Wednesday 10/31/18 12:03pm 7.59 20.9 0.1 59.6 230 130
LIMITS
170 700 20
20 200 21
21 400 13
13
1.80
October, 2018
Fecal Coliform Weekly Max
Monthly Minimum DO
Date Time
WEEKLY COLIFORM GEOMETRIC MEAN
Week One
Week Two
Week Three
Week Four
Week Five
Bay Park Sewage Treatment Plant
Total and Fecal Coliform Sampling Results and Miscellaneous Effluent Data
Day
MONTHLY COLIFORM RESULTS
Total Coliform Monthly Median
Fecal Coliform Monthly Geometric Mean