Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Certification Test Report
Harman Home HeatingFreestanding Pellet Stove
Model: P43
Report Number: 135-8-23-8.3
ACCREDITED(TL-130)
----~-#0654
sec ~redlted
IOCPS
Accnklite CCN
Mailing: Post Office Box 301367.97294Street: 13327 NE Airport Way. 97230
Portland, Oregon USA
OMNI-Test Laboratories, Inc.Product Testing & Certification
Phone: (503) 643.3788Fax: (503) 643.3799
Certification Test Report
Harman Home HeatingFreestanding Pellet Stove
Model: P43
Prepared for:
Prepared by:
Test Period:
Report Date:
Report Number:
Hannan Home Heating352 Mountain House RoadHalifax, PA 17032
OMN1-Test Laboratories, Inc.13327 NE Airport WayPortland, OR 97230(503) 643-3788
March 3-4, 2014
April 2014
135-S-23-8.3
All data alld illformatioll colltailled ill tllis report are cOllfidelltial alld proprietary to HarmallHome Heatillg. Its sigllificallce is subject to tile adequacy alld represelltative cllaracter of tilesamples alld to tile comprellellsivelless of tile tests, examillatiolls, or sun'eys made. TilecOlltellts of tllis report call1lot be copied or quoted, except ill full, without specific, writtellautllOrizatiollfrom Harmall Home Heatillg alld Oll</NI-Test Laboratories, Illc. No use of theOltINI-Test Laboratories, Illc. lIame, logo, or registered mark (O-TL) is permitted, except asexpressly authorized by OiVlNI-Test Laboratories, Illc. ill writillg.
O.\INI-Test LahoralOries. Inc.Cttnlj;,,:ulJfHl Tt,t R"p<"1 J.J/ttd Apnl 101-1: \ ""'111•.••.'n: U5<!rsFile:; SHOP Cllelll fifo' J/<JFm..JJ1 - I JJ TeSlmK ProJrl"_" I JJ.S.1J..JI.J. P43 135.5-13-11, J
j Of iii
1 of 3
Model: N3Harman Home Heating352 Mountain House RoadHalifax. PA 17032
AUTHORIZED SIGNATORIES
This report has been reviewed and approved by the following authorized signatories:
C:;~~ccL~~7>~__Chuck Bums, Accreditation & QA ManagerOMNI- Test Laboratories, Inc.
ebastI Button, Safety Testing SpecialistOMNI- Test Laboratories, Inc.
y C lssions Testing Specialistst Laboratories, Inc.
DUN/-Test Laboratories, Inc.Ct!rtijicafwn Tt .•t Rep<wt doled Apri/10I-l: 1'~Jlflm•.W!rvUyrs Fifes SHOP-Client FiJe'HwmaJ'. JJj Tes/mg ProP!'"'."IJ5-5-1J-8.3 - p.IJ' J35-5013-8.3
ii a/iii
20/3
Model: N3Harman Home Heating352 .\/ountain House RoadHalifax. PA. 17032
TABLE OF CONTENTS
PREFACE (3 pages)
I. PHOTOGRAPHS/APPLIANCE DESCRIPTIONIDRA WINGS 1-1 (20 I pages)Photographs 1-2Appliance Description 1-3Manufacturer Design Drawings (K List) 1-4Manufacturer Design Drawings (Remainder) 1-23
2. QUALITY ASSURANCE/QUALITY CONTROL 2-1 (60 pages)Sample Analysis 2-3Calibrations - Methods 28 and 5G 2-23Example Calculations 2-51
3. INSTALLATION AND OWNER'S MANUALS 3-1 (71 pages)
4. TEST DATA BY RUN 4-1 (27 pages)Run 1 4-4Run 2 4-10Run 3 4- I6Run 4 4-22
5. SAMPLING PROCEDURES AND TEST RESULTS 5-1 (7 pages)1ntrod ucti on 5-2
SummarY TablesTable I. I - Particulate Emissions Results 5-3Table 1.2 - Test Facility Conditions 5-3Table 1.3. I - Fuel Measurement Summary - PRETEST 5-4Table 1.3.2 - Fuel Measurement Summary - TEST 5-4Table 1.4 - Dilution Tunnel Gas Measurements and Sampling Data 5-5Table 1.5 - Heater Operation 5-5Table 1.6 - Pretest Configurations 5-6Table 1.7 - Test Configurations and Run Data 5-6
Test Results and Discussion 5-7
DAIS/-Test Laboratories. Inc.C(rfifi4'u"'''' TeslRq'(}rt""'cJ.~prif ;:01-1.'l'omlll_••••r."C!...,n Fifes'SHOP {.fi •.••' Fill' Harmull ./35 r"sling /''''ICC:/.' /15 ..,,";..13-8.3 .. /'.IJ 1)5••."..]3-8.3
iii of iii
3 of3
Model; N3/farman Home Healing352 Jlounlain House RoadHalifal:. fA /7032
Section 1
Photographs/Appliance Description/Drawings
OJfNJ-Tesl Laboratories. Inc.Ctr/lfi"~I"''' Tts' R"p"n<1ul.:dAprIl 10/-1: \ '_m •••.n.Usus Fit.::; SHOPChe/lf F,I••Hurm•.Ul- IJ5 TtS/I,,):f'roJt~'IS135.:}.13•.••.3. pn IJ5-S-1J-II.J
I-I of 1-201
I-I of 1-201
Model: N3Harman Home Healmg352 Jlo/{!lfain House RoadlIalifax. PA 17032
Harman Home HeatingP43
Test Dates: March 3-4, 2014
OJfXI-Tes/ Laboratories, Inc.CutifkallOfI !<iSfRq"'" dated April :01./: I'omm.",rv l}""n Files SHOP C1l<'ll1FIle flurm..m .. J 35 Tellmg "T'yrel.' 135.5.::3 •.8.3 - P-I1 J ]j-S-2J-'t, J
1-2 of 1-201
1-2 of 1-201
Model: N3Harman Home Healing352 J/ountain House RoadNalifax. PA 17032
APPLIANCE DESCRIPTION
Appliance Manufacturer: Harman Home Heating
Pellet Stove Model: P43
Type: Freestanding, Air-Circulating Type, Pellet-Fired Room Heater
PELLET HEATER DESCRIPTION
Materials of Construction: The firebox is constructed of mild steel with the exteriorbeing constructed entirely of steel.
Air Introduction System: Air enters the firepot through holes in the firepot. Air isdrawn through the pot via a combustion fan.
Combustion Control Mechanisms: Electronically controlled via user selectable controlknob.
Combustor: N/A.
Internal Baffles: N/A.
Other Features: Large capacity ash drawer.
Flue Outlet: The 3-inch diameter flue outlet is located in the bottom/rear of the unit.
PELLET HEATER OPERATING INSTRUCTIONS
Specific written instructions: See Section 3 of this report. All markings and instructionmaterials were reviewed for content prior to printing.
O.\/,VI-Test Laboratories. Inc.LtmjkuI1('" Te.',Rep<,,-/daleJAp"{ :014: "omm.,,,,rv UJ"rs fileJ SHO/' Clltm fIle HuTm,lIJ .. IJj T"."'''I:Prol"('lxIJ5 •.~1J.JI.J -pn 135-S-::3 ..JU
1-3 of 1-201
1-3 of 1-201
Model: p-IJHarman Home Heating352 J/ountain House RoadHalifax. PA /7032
Section 4
Test Data by Run
DUN/-Test Laboratories, Inc.Cer/lfinl/lm, Tnt Rq>urrdul(JAp',J ~Olol ' onrm-'>eTV (Jurs F'/es SlIOP ("/,,'ml''i1<! H.um,IJI- JJl Te.•rmj{Pm}",",.• 135.S-23-11.3-/'-IJ IJ5-S-23~t3
-1-1 of -1-27
l./_ I uf l.j -7-7
OMNI-Test Laboratories, Inc.
EPA Weighted Average EmissionsEPA Method 28
Page 1 of 1
Client: HarmanStove Model: P43Test Dates: 3/3/14 to 3/4/14
Project Number: 135-S-23-8.3Tracking Number: 1945Signature/Date:
Status: FinalStove Type: Pellet Stove
Weighted Average(glhr)1.3
Emission Rate Plot
"" 2.50"
I
9 2.00 •••••• .70a 1.50';; ..........-::-• 1.00Ew 0.50•" 0.00'3~ 0.00 0.50 1.00 1.50 2.00 2.50"roa. Bum Rate (kg/hr dry)
Run # 2Bum Rate (dry kglhr) 0.86Category 2Overall Efficiency (%) 78%Emissions (glhr) 1.0ICap (glhr) 15.00Weighting Factor 0.502Heat Output (BTU/hr) 12631
Run # 3Bum Rate (dry kglhr) 1.16Category 2Overall Efficiency (%) 78%Emissions (glhr) 1.30Cap (glhr) 15.00Weighting Factor 0.577Heat Output (BTU/hr) 17052
Run # 4Bum Rate (dry kglhr) 1.70Category 3Overall Efficiency (%) 78%Emissions (glhr) 1.47Cap (glhr) 18.00\Veighting Factor 0.427Heat Output (BTU/hr) 24947
Run #Bum Rate (dry kglhr) 2.13Category 4Overall Efficiency (%) 78%Emissions (glhr) 2.24Cap (glhr) 18.00\Veighting Factor 0.160Heat Output (BTU/hr) 31263
30.13%
34.62%
25.64%
9.60%
Document Control No, P-SSF-OOOB (EPA MelJlocl28 W~ghted Average ElTlsslons) xis, Effective Date 1211512010 W~gh1ed Average Emission Rate ;(lsm
4 -2 o\' y-:27
. . OMNI- Test Laboratories, Inc.
Moisture Content Worksheet
Client: Harman
Model: P43
Project #: 135-8-23-8.3 Tracking #: 1945Sample description: 190 % =:,otfws,....R f<~{~{e;~ts~ -------
Weight record:
I!: 3'""
Prior to Oven-Drying
Balance ID #: OMNI - 00 P-?>'
DatefTime in: Jh/,'tContainer: ID#: "IO'l)--~------
Audit ID #:
Audit weight:
Tare weight:
Total weight:
2-£;0.0 2JlOb. I
2'fL/.Q
Material weight (total weight - container tare weight):
Post Oven-Drying
Balance ID #: OMNI - 00 (2..«
13l:.~
DatefTime out: J;'/' 'f Audit ID #: OM,vI -Oo'l.'n ~
Total weight: Audit weight (if necessary): 'Z-.x:>.o :JMaterial weight (total weight - container tare weight):
Calculations:
(31. I
Dry basis (%) =
Wet basis (%) =
t'!>l.'l- 1;\. ,
\ '!> \. \
\"31.,- (31.1
,'n.'
Initial - FinalFinal
Initial - FinalInitial
x 100
x 100 1-/. 'I 3 "/"
Method: ASTM D4442-92 Method A-Oven-Drying Method-----------------,
Control No. L-SFH-0010.docx, Effective date: 11/2212013
Date: ~It.// 'f
Date: 4/q I/~
Page 10'2
,\fodel: N3Harman Home Heating352 Jlollntain House RoadlIalifa'r, PA J i032
Run 1
OMS/-Test Labora/ories. Inc.Crrllfial1lo" To'." RrlX"rJaled ApnllO/~' 1',,"'111-•.••". V'en file:! S1I0P('II..", Fil" H"rn"",. JJSTe .•tmll ProjeclJ IJ5 ..•';.lJ-X.J -/)~J IJ5-S-23_Y.J
.1-.1 of .1-27
OMNI- Test Laboratories. Jnc.
Wood Heater Test Data - EPA Method 50
Manufacturer:Model:
Project No.:Tracking No.:
Run:Test Date:
Bum Rate
Average Tunnel TemperatureAverage Gas Velocity in Dilution Tunnel - \ISAverage Gas Flow Rate in Dilution Tunnel - Qsd
Average Delta pAverage Delta HTotal Time of Test
HarmanP43135-523-831945103/03/14
2.13 kg/h' dry
113 degrees Fahrenheit12.9 feet/second
8050.7 dscf/hour
0.035 inches H201.82 inches H20120 minutes
AVERAGE SAMPLE TRAIN 1 SAMPLE TRAIN 2
Total Sample Volume ~Vm 17.55 cubic feet 17.42 cubic feet 17.67 cubic feetAverage Gas Meier Temperature 69 degrees Fahrenheit 68 degrees Fahrenheit 69 degrees FahrenheitTotal Sample Volume (Standard Conditions) - Vmstd 17.6 dscf 17.5 dsd 17.7 dscf
Total Particulates - mn 2.7 m9 2.9 mgParticulate Concentration (dry-standard) 0.00016 gramsldscf 0.00015 grams/dscf 0.00016 grams/dscfParticulate Emission Rate 1.28 gramslhour 1.25 gramslhour 1.32 gramslhourAdjusted Emissions 2.24 grams/hour 2.18 gramslhour 2.29 grams/hour
Difference from Average 0.05 gramslhour 0.05 gramslhour7.5% of the average emission rate 0.17Weighted Average Emission Rate limit 4.10 gramslhour7.5% of the weinhted averane emission rate limit 0.31
Results Are AcceDtable
~ ••••"-a'\I<lOO'lo....T....,.5G(_eao:-l"'.( __ 412\10= Page 1 01' 1 Run 1 Emission~ >Is
Method 28 Preburn Data
Run Data
Client: Harman Test Run: 4
Model: P43 Date: 3/4/2014
Project Number: 135-S-23-8.3 Test Crew: J. ClarkTracking Number: 1945 Equipment: 288,371,372
Coal Bed Range (Ib): N/A (pellet)
Logged Data
Temperatures (F)
ElapsedScale (Ib)
Stack DraftStack Ambient FB Top FB Bottom FB Back FB Left FB Right Cal. In Cal. OutTime (min) (in H2O)
0 29 -0.066 281 71 191 321 323 324 321
10 28.4 -0.073 333 71 241 387 380 408 415
20 27.7 -0.076 351 71 277 426 411 435 449
30 27 -0.078 361 71 299 447 434 453 468
40 26.3 -0.079 367 71 307 460 430 465 471
50 25.6 -0.078 365 71 299 453 434 455 474
60 25 -0.079 366 71 301 454 436 459 470
Averages: -0.076 346.29 71.00 273.57 421.14 406.86 428.43 438.29
.l:.,~
OMNI- Test Laboratories, Inc.
Run NotesClient: HarmanModel: P43Project #: 135-S-23-8.3Tracking #: 1945Run #: '1 Date:Test Crew: .J.. C{.ri.OMNI Equipment 10 #(5): __ N_!k _
PREBURNDESCRIBE OR SKETCH AIR OR THERMOMSTAT SETIINGS BELOW:(SETIINGS MUST BE ACCURATE AND REPRODUCABLE)
PRIMARY: SECONDARY: &.j,.,Co. +<j ,..-, 1IT
f"'..Q ~+<- :TERTIARY:
~
.:;.;, -.. ''''- ~ 1-1 FAN:
'Se-H-} • 5,~ ,/PREBURN SETTINGS AND ACTIVITIES
AIR (THERMO) CHANGES FAN ADD ADDRAKETIME SETIING FUEL FUEL COMMENTPRIMARY/SECON DARY /TERTIARY
CHANGE +WT. -WT. COAL
NIA
TEST FUEL CONFIGURATION SKETCH(INDICATE VIEW ANGLE)
START UP PROCEDURESBYPASS: N!A-
iFUEL LOADING -t- _DOOR:PRIMARY AIR: ::::::::::::::::=====t==========OTHER:
TERTIARY:
SECONDARY:
FAN:
T,,"",o," ,;g",,"re~ ""
DESCRIBE OR SKETCH TEST SETIINGS BELOW:(SETTINGS MUST BE ACCURATE AND REPRODUCIBLE)PRIMARY:
Control No. P-SFAK-0007.doc, Effective date: 0510912008 Page 1 of 1
OMNI- Test Laboratories, Inc.Portland, OR
Supplemental Data EPA 5G/5H
Client: Harman
Model: P43 Project #:
Date: 1/-1/' of,Test Crew: ~ .c(""L Start Time: [z.: >,,, Stop Time: I 'f ' ~o
2' 6-TI1 (>1-I( 17':it I '1kq'fl\ 2'01OMNI Equipment #(s): ,32.,
135-S-23-8.3
Run#:
Tracking #: 1945
'1 Booth: f 1..
CO2 (DT):
CO2 (DT):co: l.'n~
Dilution Tunnel Gas Leak Check (5H only):
Initial: I-J /AFinal: tv jA-
O2: 40.'1>- co: '1.1'63co2: {t.'6' '3co2: (Q.~ •..
Initial:
Final:
Stack Gas Leak Check:
Calibrations: Span Gas
Mid Gas
Time
O2CO2
COCO2 (OT)
Pre Test Post Test
Zero Span Mid Zero Span Mid
II : "/ :J I/'.~ l-. /I: '1'1 14~'-{o ,,' . Ii "- Jc /'f :1.{'2-D.DO 2-0. 'I f) to.~ O.O} 10,'0--><- 10.'",0,00 {b,'g3
,O,OL"1'.TI ,\.<- Q.19/..o,7f.< 0,01
0,000 L/15?~ Z.4';lf _ 0,007 ~4"- 2.4'1(,I-J fA •
1'1' 'ILL2.0, 'Ii1,.1>1-
'1.ltL
% Smoke Capture: (.0'" %Flue Pipe Cleaned Prior to First Test in Series:
Date: z./n Initials: ~A~K~__
Air Velocity (ftImin): Initial: ~~ Final: .;:'>UScale Audit (Ibs): Initial: (e Q Final: (().o
Pitot Tube Leak Test: Initial: Rf Final: iIStack Diameter (inches): ("
Induced Draft: r{
Page 1 of 1
Tunnel Traverse
dP (in H2O) TCF)
0.02'/ "I~
0.0>7- ct'lo.o~'/- q'l0,:) 34 'i(').07.-0 1:>.0
0.0.'1.. 100
,...,.n'1L 100
1\.r.>~2- to",IJ IA- NIA
Static P: -0.31"
Ending
30.0'+
Middle
'3D.O(,
7'-:2.•.
Technician signature:
Date: ~/'fII'!Control No. ;'SlA.0.0010, Effective date: 1012612011
Initial
Po (in/Hg) "3:).O){
Ambient CF) '?- I
Model: N3Harman flume Heating352 J/ountain House RoadHalifax. PA 17032
Section 5
Sampling Procedures and Test Results
O.\INJ-Tesl Laboratories. Inc.('ertificalwlI Te5/ R,'{'("", JuleJAp,,1 lOJ-I: l'omlJl_",,.,..Uun FilnSHOP ell..", fife H"r""", - JJj r"slmi<!/'roJeat IJ5-.'i-!J.JI,J - P-IJ lJ5-S-!3.J1.J
5-10/5-7
5-1 of 5-7
,\fodel: N3Harman Home Hearing352 "'fountain House RoadIlalifa" PA J 7032
INTRODUCTION
Harman Home Heating retained OMNI-Test Laboratories, Inc. (OivfNf) to performU.S. Environmental Protection Agency (EPA) certification testing on the P43 pellet stove. TheP43 is a non-catalytic, freestanding, convective-type room heater. The firebox is constructed ofmild steel and the stove is vented through a three-inch diameter flue collar located at the rear ofthe unit.
The testing was performed at OMNFs testing facility in Portland, Oregon. The altitude of thelaboratory is 30 feet above sea level. The unit was received in good condition and logged in onFebruary 27, 2014. It was assigned and labeled with OAINl ID #1945. OMNl representativeJeremy Clark conducted the certilication testing and completed all testing by March 4, 2014. TheEPA was notified of the testing dates in a letter dated February 3, 2014. A testing contract,including provisions for Random Compliance Audit (RCA) testing, has been signed by MatthewTroutman of Harman Home Heating and is on lile at Ok/NFs testing facility.
The P43 was tested in accordance with the U.S. EPA 40 CFR Part 60, Subpart AAA - Standardof Performance for Residential Wood Heaters (Appendix A, Methods 28 and 5G). Particulateemissions were measured using two Method 5G sampling trains consisting of two filters each(front and back). The weighted average emissions of the four test runs indicate a particulateemission rate of 1.3 g/hr. Test runs were conducted in each of three bum rate categories (0.80-1.25 kglhr, 1.25-1.90 kg/hr, and maximum). Emissions for each of the individual test runs didnot exceed the cap. The P43 results are within the emission limit of 7.5 g1hr for non-catalyticaffected facilities manufactured on or after July I, 1990, or sold at retail on or alier July I, 1992.
The wood heater was sealed after completion of testing in compliance with the EPA regulationas follows:
• "DO NOT TAMPER" labels were placed on the door and on all other openings.• Plastic material sealed with "00 NOT TAMPER" labels and tape was wrapped around
the unit.• The unit was sealed in a wood box constructed for the unit.• "DO NOT TAMPER" labels were placed on outer surfaces of the box.
This report is organized in accordance with the EPA-recommended outline and is summarized inthe Table of Contents immediately preceding this report. The results in this report are limited tothe item submitted.
OMS/-Test Laboratories. Inc.Cemfkalu", Te," Rq'wl ,J.ued Aprl/l0/4. I l,mm'.Wrt' V'a' FileI SHOP O,e'" Fil" Hurn"m. OJ Ttwmg P"'jet-IS 1]5 •.\'-13-8.3 .}'.IJ / J5-S-2J-8, J
5-20/5-7
5-2 of 5-7
Model: ?I3Harman Home Heating352 Afounfain /louse RoadHalifax, PA I j032
Table 1.1 - Particulate Emissions
Burn Rate Method 5G EmissionsRun (ka/hr drY) (a/hrl
1 2.13 2.24
2 0.86 1.01
3 1.16 1.30
4 1.70 1.47
Weighted particulate emission average of four test runs: 1.3 g/hr
Table 1.2 - Test Facility Conditions
Room Temperature Barometric Pressure Air Velocity(OF (Ha) (ft/min)
Run Before After Before After Before After
1 69 72 29.87 29.89 <50 <50
2 70 71 29.89 29.93 <50 <50
3 69 70 30.10 30.08 <50 <50
4 71 72 30.08 30.04 <50 <50
OJ/XI-Test Laboratories. Inc.c'em/iC(l/um T"'f R,'/">r(<iu •.J April 2014. 10"'111_.""'" Usen File .•SliD/' ('liml F,f" II,IfInall- fH Te.mll)!Pm}"'"'.1 135-5-23-11,)" P4J IJ5-.S-!J-IJ,J
5-30f5-7
5-3 of 5-7
.\Iodel: N3Harman Home Healing352 ,\/ountain House RoadHalifax. PA 17032
Table 1.3.1 - Fuel Measurement Summary - PRETEST
Run Beginning Fuel Weight Ending Fuel Weight(Ibs) (Ibs)
1 37.8 27.3
2 22.1 20.3
3 37.8 34.8
4 29.0 25.0
Table 1.3.2 - Fuel Measurement Summary - TEST
Run Beginning Fuel Weight Fuel Moisture Content Ending Fuel WeightIlbs) (Dry basis - %) (Ibs)
1 9.9 5.19 0.0
2 4.0 5.19 0.0
3 5.4 5.19 0.0
4 7.9 5.19 0.0
OJI.V/.TeSl Lahoratories. Inc.CtTllfica",," rt ..t R"p'lrl JaleJ .~prll~QI./:l'onmi-stn"UJtrs Flft:; SHOP Cbe/ll Ftl •• llamwlI .. IJj Ttl/III/[ PrvJtCh 135 ..S-!J~lJ .. YO IJJ-S-!J-lI,J
5.40J5-7
5. ./ of 5.7
Model: N3Harman Home Healing352 Mountain House RoadHalifax. PA 17032
Table 1.4 - Dilution Tunnel Gas Measurements and Sampling Data Summary
Averaae Dilution Tunnel Gas Measurements
Length of Test Velocity Flow Rate TemperatureRun -(min) IftIsec\ Idscf/min) (OF)
1 120 12.91 134.2 113
2 120 12.61 137.4 87
3 120 11.94 127.8 100
4 120 12.03 126.9 108
Table 1.5 - Heater Operation Data (Average Temperature Data)
Beginning Surface Ending SurfaceRun Temoerature Averaae' Temoerature Averaae' Surface Delta Tb
1 529.4 533.0 3.6
2 334.6 322.0 12.6
3 299.0 307.2 8.2
4 420.6 417.2 3.4a. All temoeratures are in OF.b. Represents the difference between beainnina and endina averaae surface temperature.
O.\f,Vl-TeSl Laboratories. Inc.(",,"'flow1l"" T.nt Rrl'0nJateJAl'rll ~OI-1: \ ''''''''_5<'n' Us.:rs N/.' .• SH(JP ('11<'111FIfO'Hurm<lu./35 T<!ltlllg ProJa"IS IJj-S-!J_~,J -P4]'{3J-S-23..x.3
5-5 of5-7
5-5 of 5-7
,\lod<l:N3Harman Home Heating352 "'fountain House RoadlIalifa:r.PA /7032
Table 1.6 - Pretest Configurations
Stove Control Stove Temperature TimeRun SettinQ Feed Adjuster SettinQ (min)
1 6.5 Level 4.5 High 60
2 1 Level 1 Low 60
3 3.5 Level 2 High 60
4 5.5 Level 3 High 60
Table 1.7 - Test Configurations and Run Data
InitialStove (Induced) Average RunControl Feed Temperature Burn Rate Draft Draft Time
Run SettinQ Adjuster SettinQ (dry kq/hr) (in H2O) (in H2O) (min)
1 6.5 Level 4.5 High 2.13 0 -0.086 120
2 1 Level 1 Low 0.86 0 -0.063 120
3 3.5 Level 2 High 1.16 0 -0.067 120
4 5.5 Level 3 High 1.70 0 -0.079 120
O.\IX1-Tesll.aboralOries. Inc.Cerl1ficuII<JII r"." Rq",,,,,,J,II,'J April :0/4: 'omm-~rvUu,s F'iles SHOP ellen! file HwmuJl -135 Te_"'''K ProJ ••,",sJJ5.s.::J~~,J -1'43 13J-S-2J-8.J
5-6 of5-7
5-60/5-7
Model ..N3Harman Home Healing352 Afountain House RoadHalifax, PA 17032
TEST RESULTS AND DISCUSSION
A total of four test runs were conducted in the following categories: two in the 0,80 to 1,25kg/hr dry category, one in the 1.25 to 1.90 kg/hr dry category, and one at maximum.
The weighted particulate emission rate was measured to be 1.3 g/hr.
The proportionality results for all four test runs were acceptable. Quality check results for eachtest run are presented in Section 2 of this report.
O.\lNI-Test Laboratories. Inc.CeffificQ/IOIlTest R"p"rlJaI ••d April :'014: l'omm-:;en;,Users Fi/esSHOP'Cllf'III File Harmun_ JJ5,Tes/IIIX Pr0l'!CU I3J-S-13./i.J .1"-11JJ5.S-l.U.J
5-70/5-7