CERN

Erik van der Bij TS-DEM

TS-DEMDevelopment of Electronic Modules

TS-DEMDevelopment of Electronic Modules

Erik van der Bij

CERN

Electronics development support: how it is organized

Page 2: CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized

CERN

Erik van der Bij TS-DEM

ContentsContents

• Overview of DEM

• Supply contracts

• Service contracts

• The good and bad of service contracts

• Ingredients for success

Page 3: CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized

CERN

Erik van der Bij TS-DEM

DEMTurns schematics

into boards

DEMTurns schematics

into boards

• PCB design

• Manufacture of PCBs and special circuits

• Assembly

Page 4: CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized

ALICE HMPID

TS-DEMTS-DEM

Micromega CAST

1 KW RF Ampli LEIR

NA60

Layout

Production

Assembly

Expertises

TOTEM

ATLAS CMS LHC

NA60

Page 5: CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized

CERN

Erik van der Bij TS-DEM

Turn-around timeTurn-around time Prototype electronics production

multi-layer PCB, standard priority

• Tight planning and follow-up needed

• Need companies that you can rely on

Queue

2-3 weeks

Layout

1-2 weeks

Layout (and queue)

4 weeks

PCB fabrication

3 weeks

Assembly

2 weeks

Margin

1 week

We do these steps for over 2000 projects per year

We do these steps for over 2000 projects per year

Page 6: CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized

Design office

DEM-BE

Circuit manufacturing

DEM-PMT

Assembly

DEM-WS

Sub-contracting

Large quantitiesmember states

Planning office(DEM-BE)

‘commercial’ contact

Ordering

Tracking

Invoicing

Circuit or moduleRequest

TS-DEM TS-DEM

Sub-contracting

(overflow of CERN capacity)

Prototypes, fast turn-aroundlocal industry

0.5 staff 2 staff prod.9 IS

0.5 staff 2 staff prod.9 IS

1.5 staff3.5 staff prod.10 IS

1.5 staff3.5 staff prod.10 IS

1 staff3 staff prod.3 IS

1 staff3 staff prod.3 IS

1 staff2 IS

1 staff2 IS

staff: includes section leaders staff prod: staff dedicated to production IS: industrial support

Page 7: CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized

CERN

Erik van der Bij TS-DEM

Supply contractsSupply contracts

• Printed circuit boards– 300 KCHF/year, increases to 400 KCHF (LHC production)

– Have 4 contracts (Italy, Belgium, France, Norway)

– difficult to balance (60%, 15%, 15% and 10%) as one is much cheaper => next time only two companies

• Front-panels and small mechanics– 150 KCHF/year

– distributed over 2 companies (Spain, France)

– has a local stock of half-products (from Stores)

– Call for Tender came up with 3 interesting companies (ESP, FR, S), try them all out for three months (blanket order) before deciding to make a contract with only 2.

• Pay some attention to small contracts– you can save on a single Xerox copier 1500 CHF/year

Page 8: CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized

CERN

Erik van der Bij TS-DEM

Service contractsService

contracts• Design office (S081-> FSU-03)

– 11 people (9 designers + 2 for documentation, ordering and billing)

– per year: 500 new designs, 150 modifications, 150 production only

– 1. Client sees first Section Leader about planning and technical solution

2. Section leader plans during weekly meeting with Team Leader

• Fabrication of Printed circuit boards (S081-> FSU-04)– 10-11 people

– around 1000 jobs per year

– Client sees first Section Leader for complicated projects; for simple projects client goes directly to Team leader

Page 9: CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized

CERN

Erik van der Bij TS-DEM

Service contractsService

contracts

• Assembly (S081-> FSU-03)– 3 people. Part of FSU of design office

– around 200 prototype jobs per year

– Client sees first Section Leader for complicated projects; for simple projects client goes directly to Team leader

– larger jobs done on premises of contractor

Page 10: CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized

CERN

Erik van der Bij TS-DEM

The good and bad of service contracts

The good and bad of service contracts• A good way to stay competitive

–keeps us and the contractor sharp (DEM has real prices, no mix w staff)

• Flexibility in size–can add or remove people with low effort and within a short time

• Contractor does not have knowledge in our domains–it’s only the Team at CERN

• Skills not updated–hardly any formal training given

• To keep clear separation staff/IS, cannot use IS forCERN core technologies, responsability for software and hardware, research on working methods and new programs, contacts with companies, reception of clients during absence of section leader

++

__

Page 11: CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized

CERN

Erik van der Bij TS-DEM

FSU should improve some things

FSU should improve some things

• Extra layer of management– Team leader has now a manager local at CERN

– IS personnel will feel more part of their own company

• Contract for 5+1+1 years instead of 3+1+1– a change of contract is always difficult

• However: price increase– extra layer of management

– Swiss contract instead of French

Page 12: CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized

CERN

Erik van der Bij TS-DEM

Ingredients for success

Ingredients for success

• Keep CERN core technologies with CERN staff– manufacturing of high-density circuits in cleanroom

– SMD assembly of prototypes (<10 pieces)

– still it would be a disaster if full change of IS personnel happens

• Don’t mix CERN staff and contract personnel

• CERN staff should be first interface to client– planning & decisions where and how work should be done

– technical discussions directly between client and industrial support