    Tariff Determination of Generating Stations

    Controlled by Central Govt.

    As per Section 62 of the Electricity Act, 2003, tariff for supply of

    electricity by a generating company to a distribution licensee to be

    determined by Appropriate Commission

    As per Section 79, Central Electricity Regulatory Commission

    (CERC) has the jurisdiction to regulate tariff for the generating

    companies owned & controlled by the Central Government

    CERC from time to time notifies the Regulations for determination

    of tariff which specify the principles and methodology for working

    out the tariff of generating companies under its jurisdiction.

    CERC has notified the Tariff Regulation applicable from 1.4.2014 to

    31.3.2019

    2

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    3/80

    3

    Tariff Framework in Electricity Act 2003

    Commission

    Section 62

    (Tariff Determination)

    Section 63

    (Tariff Adoption)

    Bulk TariffGencos

    to Discoms

    Transmission Tariff

    Retail Tariff

    Competitive Bidding

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department3

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    4/80

    4

    CERC issues Tariff

    Regulations

    Guided by the Tariff

    Policy issued by GOI

    Contains Financial

    and Operationalnorms

    Framed after

    Consultative

    process through

    public hearing

    Petition filed bygenerator. Copy to

    beneficiaries

    Hosting petitionon website

    Hearings

    conducted by

    CERC and

    Tariff ordersissued

    I - TariffRegulations

    II - Petition byGenerator

    III - Tariff Order

    Prudence check

    conducted by the

    CERC

    Oral hearings

    conducted where

    the stakeholders

    can participate

    Process of Tariff Determination

    Posts entire petition on the

    website

    Publishes notice in 2 newspapers

    so that consumers can perusethe tariff application and submit

    their comments/

    suggestions/objections to

    Regulator

    Corporate Commercial Department

    CERC Tariff Regulation 2014-19

    4

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    5/80

    5

    Timelines of 2014-19 Tariff Regulations

    Applicable from

    01.04.2014

    CERC issued order

    for data. NTPC

    submitted data.

    (July 2013)

    Final Regulations

    issued on 21st

    February 2014

    Public Hearing

    conducted on 15th-

    16thJanuary

    NTPCs comments on

    Draft Regulations

    submitted- 29th

    January 2014

    Draft Regulations

    issued- 6thDec

    2013

    Approach paperissued by CERC,

    comments

    submitted (Aug 13)

    Process for

    formulation of

    Regulations starts

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    6/80

    Tariff of Thermal Stations

    CERC Tariff Regulation 2014-196

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    7/80

    Tariff Basics

    Cost-Plus Tariff

    Two-part tariff

    Capacity Charge (for recovery of annual fixed cost

    components)

    Energy Charge (for recovery of primary and

    secondary fuel costs)

    Incentive allowed separately

    7

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department7

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    8/80

    Capital cost for tariff

    CERC Tariff Regulation 2014-198

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    9/80

    Capital Cost

    9

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department

    Capital Cost of the Station (Rs. Lakhs) (Cash Basis)

    As on

    31.03.2014

    Date of

    Last Order

    As approved by

    CERC

    As per Final

    True up Petition

    TTPS 15.05.2014 100159.35 102633.18

    9

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    10/80

    Capital Cost

    Capital cost for tariff base for an existingstation-

    Capital cost admitted by the Commission prior to

    1.4.2014 duly trued up by excluding liability;

    Add-Cap and De-cap for the respective year of tariff;only for the category of works listed in the Regulation

    on projection basis (described in Add-cap slide)

    expenditure on account of renovation and

    modernisation after end of useful life (if SpecialAllowance is not claimed)

    Capex on PAT on case to case basis will be allowed

    (sharing of benefits due to PAT)

    10

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department10

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    11/80

    Capital Cost

    Capital Cost for tariff base for a new station-

    All the expenditure incurred or projected to be

    incurred till COD

    IDC/ IEDC

    Capitalized initial spares

    Additional capitalisation/ de-capitalisation

    Adjustment of revenue due to sale of infirm power

    prior to COD

    11

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department11

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    12/80

    Prudence check of Capital Cost for new stations

    Capital Cost prudence check w.r.t benchmark normsspecified/ to be specified by Commission from time to

    time.

    CERC has already issued an order on Benchmarking

    of capital cost for different unit size and unit

    configurations.

    12

    Unit Size in

    MW

    No of

    units

    Total Hard cost

    (Rs. Cr/ MW)

    Unit Size in MW No of units Total Hard cost

    (Rs. Cr/ MW)

    500

    (Greenfield)

    1 to 4 5.08 -4.34 660

    (Greenfield)

    1 to 4 5.37-4.37

    500

    (Extension)

    1 to 2 4.92-4.53 660

    (Extension)

    1 to 2 4.95-4.67

    600

    (Greenfield)

    1 to 4 4.87-4.01 800

    (Greenfield)

    1 to 4 4.96-4.44

    600

    (Extension)

    1 to 2 4.47-4.19 800

    (Extension)

    1 to 2 4.63-4.44

    BENCHMARKS NORMS AS ON DECEMBER 2011

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department12

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    13/80

    IDC/ IEDC- in case of delay in projects

    Additional IDC due to delay beyond Scheduled COD will

    be allowed only after prudence check.

    Additional IDC & IEDC will be allowed only for delay due

    to uncontrollable factors such as: Force Majeure

    Change in Law

    If the delay is attributable to agencies or contractors, no

    IDC/ IEDC will be allowed for the delay period. When time-over run is not allowed by CERC, the cost

    escalation in that period may be excluded from

    capitalization

    IDC- Interest Durin g Cons truc t ion , IEDC- Incidental Expens es Durin g Cons truc t ion

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department13

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    14/80

    Controllable/ Uncontrollable factors

    Controllable Factors Variations in capital expenditure on account of time and/or

    cost over-runs on account of land acquisition issues;

    Efficiency in the implementation of the project not involving

    approved change in scope of such project, change in statutory

    levies or force majeure events; and

    Delay in execution of the project on account of contractor,

    supplier or agency of the generating company or transmission

    licensee.

    Uncontrollable Factors

    Force Majeure events

    Change in Law

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department14

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    15/80

    Additional Capitalisation

    CERC Tariff Regulation 2014-19 15

    C C iff l i 20 9

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    16/80

    Cut Off Date

    Date by which all works within the original scope of workare required to be completed.

    means 31st March of the year closing after twoyears of the year of commercial operation of theproject, and in case the project is declared under

    commercial operation in the last quarter of a year,the cut-off date shall be 31st March of the yearclosing after three years of the year of commercialoperation.

    COD of Station Cut off Date

    1.4.2014 to 31.12.2014 31.3.2017

    1.1.2015 to 31.12.2015 31.3.2018

    16

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department16

    CERC T iff R l i 2014 19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    17/80

    Add cap allowed upto cut-off date

    new stations

    Following Capex projected to be incurred after COD andup to the Cut-Off Date is allowed:

    Deferred liabilities

    Works deferred for execution

    Procurement of initial capital spares within the originalscope of work

    Liabilities to meet award of arbitration or forcompliance of the order or decree of a court

    On account of change in law or compliance of an

    existing law CERC has asked for the details of works asset wise/

    work wise to be submitted along with tariff application

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department17

    CERC T iff R l ti 2014 19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    18/80

    Initial spares

    Initial spares as a % of the plant and machinery costupto cut-off date are as follows:

    Coal-based/lignite-fired thermal stations - 4.00%

    Gas Turbine/Combined Cycle thermal stations - 4.00%

    Hydro generating stations - 4.00%

    Transmission system - 3.5%~6.00%

    Earlier Initial Spares allowable amount was linked to the

    total Capital cost 2.5% for Coal stations 4.0% for Gas stations

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department18

    CERC T iff R l ti 2014 19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    19/80

    Add cap allowed beyond cut-off date-

    existing stations

    Liabilities to meet award of arbitration or for compliance of the

    order or decree of a court

    On account of change in law or compliance of an existing law

    Deferred works relating to ash pond or ash handling system in

    the original scope of work for coal stations.

    Expenses on account of higher safety and security of the plantas directed by appropriate government

    Discharge of liability on admitted works

    Capex necessitated on account of modification in fuel receiving

    system on account of non- materialisation of the fuel linkage Gas Stations: Capex necessary for efficient operation,

    deterioration of assets, obsolescence of technology, up-

    gradation of capacity for technical reason such as increased

    fault level.

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department19

    CERC T iff R l ti 2014 19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    20/80

    Projected/ Actual Capex

    Capital cost is determined based on the projected cost. If the projected cost is more than the actual capital

    cost on yearly basis by more than 5%, the excess

    tariff will refunded along with interest rate of 1.20

    times the bank rate If the projected cost is less than the actual capital cost

    on yearly basis by more than 5%, the shortfall in tariff

    will recovered along with interest rate of 0.8 times the

    bank rate

    Tariff Petitions have been filed based on the projected

    Capex given by the projects/ stations.

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department20

    CERC Tariff Regulation 2014 19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    21/80

    Truing up

    Truing up exercise based on actual CAPEX upto31.03.2019 to be done in 2019-20

    Interim True up to be done in 2016-17

    Difference between tariff allowed and revised after

    Truing-up to be adjusted with simple interest at thebank rate as on 1st April of respective year in six equal

    monthly installements.

    21

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department21

    CERC Tariff Regulation 2014 19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    22/80

    22

    Issues in Additional Capitalisation

    Add-Cap is allowed based on the projections

    Regulations allow add-cap only on limited grounds

    (Regulation 14 (3)), other Capital expenses are

    expected to be financed through Compensation

    Allowance

    The projections should be backed by proper

    justifications (documents, letters, statutory requirements,

    guidelines, directives etc.)

    Projection should be based on capitalisation and notcash expenses

    Implication in case of failure to meet the projected capex

    Interest liability

    Credibility22

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department

    CERC Tariff Regulation 2014 19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    23/80

    23

    Issues in Additional Capitalisation

    Add-Cap allowed/ disallowed in 2009-14 PeriodMajor Items

    23

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department

    Allowed Items

    Item Regulation Item Regulation

    Ash Handling Related

    Works. (Rs. 3.85 Crs)

    Environment System

    and Change of Law(Rs. 6.13 Crs)

    Reg 9(2)(iii)

    Reg 9(2)(ii)

    R&M Ph-II works

    (Rs 9.42 Crs)

    R&M Ph-III works

    (Rs. 105.79 Crs)

    R&M of Switchyard

    (Rs 29.17 Crs )

    Reg(10)

    Reg(10)

    Reg(10)

    CERC Tariff Regulation 2014 19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    24/80

    24

    Issues in Additional Capitalisation

    Add-Cap allowed/ disallowed in 2009-14 PeriodMajor Items

    24

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department

    Disallowed Items

    Items Remarks

    R&M Ph-IV(Rs. 32.11 Crs)

    Disallowed Rs. 19.11 Crs pertaining to StageI Unitsand Items executed under O&M

    Capital spares

    (Rs 27.95 Crs)

    Capital spares allowed earlier

    Crossing the limit of 2.5% allowable as per Regs.

    MBOA items(Rs. 3.83 Crs)

    No provision in Regulations.

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    25/80

    Capacity Charge

    CERC Tariff Regulation 2014-1925

    CERC Tariff Regulation 2014 19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    26/80

    Capacity Charge

    Based on the Annual Fixed Cost (AFC) Servicing of Capital Cost

    1.Return on Equity

    2.Interest on Loan Capital

    3.Depreciation

    Other Fixed Expenses4.Interest on Working Capital

    5.Operation and Maintenance Expenses

    6.Compensation Allowance (for units 10 ~ 25 years old)

    7.Special Allowance (for units more than 25 years old)

    Cost of Secondary Fuel Oil has been removed from AFC and made apart of the Energy Charge

    Compensatory Allowance for coal based stations upto 25 years of lifeor Special Allowance in lieu of R&M beyond 25 years will not beconsidered for Working Capital

    26

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department

    26

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    27/80

    Typical AFC Break up (%)

    27

    Old

    stations

    New

    Stations

    Gas

    Stations

    ROE 35~38% 28~ 30% 35~37%

    Interest on Loan 5% 20% 3%

    O&M Cost 40~ 45% 20~25% 27%

    Interest on

    Working Capital

    10% 8% 23%

    Depreciation 5% 20% 10~12%

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department

    27

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    28/80

    AFC Break up

    28

    Rs. Lakhs

    ROE 10409.64

    Interest on Loan 543.14

    O&M Cost 18818.60Interest on Working Capital 2594.44

    Depreciation 4564.42

    Compensation Allowance -

    Special Allowance -

    TOTAL 37937.03

    CERC Tariff Regulation 2014-19

    Corporate Commercial Department

    28

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    29/80

    Return on Equity (ROE)

    CERC Tariff Regulation 2014-1929

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    30/80

    Return on Equity (ROE)

    Equity Base of a Project: New projects: Based on Debt: Equity ratio of 70:30 for

    new projects

    Existing Projects: as already allowed by CERC prior to

    31.3.2014Actual Debt in excess of 70% would be allowed

    Actual Equity in excess of 30% will be treated as

    normative loan

    Basic rate of Return on Equity (ROE) will be 15.5% during

    2014-19 Tariff Period.

    30

    CERC Tariff Regulation 2014 19

    Corporate Commercial Department

    30

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    31/80

    Return on Equity (ROE)

    ROE for new projects allowed is 15.5%

    Additional 0.5% ROE would be allowed subject to

    completion of CoD from investment approval/Zero Date

    within the defined timeline of CERC.

    31

    Hydro Projects as per TEC

    200/210/250/300/330 MW 33 months at 4 mths interval

    500/600 MW 44 months at 6 mths interval

    660/800 MW 52 months at 6 mths intervalGas Stations >100MW 30 mth at 4 mths interval

    Extension Projects 2 months less than above time

    period

    CERC Tariff Regulation 2014 19

    Corporate Commercial Department

    31

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    32/80

    Return on Equity- treatment of tax

    ROE of 15.5% is Base Rate of Return Tax to be paid by the generator

    Mechanism of recovery of tax to be paid is through

    grossing up of the Base Rate of Return

    Actual effective tax rate to be used for grossing uppurpose.

    32

    CERC Tariff Regulation 2014 19

    Corporate Commercial Department

    Example:

    If estimated effective Income Tax rate is 25%, then Pre-Tax Grossedup ROE would be 15.5%/(1-25%) = 20.67%

    Grossed up ROE will be trued up at the end of each financial yearbased on actual income tax paid

    32

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    33/80

    Other elements of AFC

    CERC Tariff Regulation 2014-1933

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    34/80

    34

    Normative loan as on 1.4.2014 after considering the cumulative

    repayment upto 31.3.2014

    Repayment equal to depreciation irrespective of actual repayment

    To be charged from 1styear of CoD irrespective of moratorium @

    Actual Wt. Avg. Rate of interest at the beginning of each year

    If there is no actual loan available in any particular year, last

    available weighted average rate of interest shall be considered

    If there is no actual loan, then weighted average rate of interest of

    the company shall be considered Generator to attempt re-financing - Net Benefit of refinancing to be

    shared in the ratio of 1 (Gen):2 (beneficiaries) ; Refinancing cost is

    to be borne by the beneficiaries

    Interest on Loan

    CERC Tariff Regulation 2014 19

    Corporate Commercial Department

    34

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    35/80

    Interest on Working Capital

    35

    Coal Based Stations

    o Coal stock for 15 days for pit head stations, 30 days for non-pit

    head stations

    o Cost of coal for 30 days generation

    o

    Secondary fuel oil for 2 monthso Maintenance spares @ 20% of O&M

    o Receivables for 2 months (capacity charge and energy charge)

    o O&M expenses for 1 month

    Cost of fuel based on Price & GCV of preceding 3 months of the1stmonth for which tariff is decided andno fuel escalation allowed

    Rate of interest will be bank rate as on 1.4.2014 or 1stof April of the

    year in which the station is declared under commercial operation

    C C a egu at o 0 9

    Corporate Commercial Department

    35

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    36/80

    Interest on Working Capital

    Gas Based Stations

    o Fuel expenses for 30 days

    o Liquid fuel stock for 15 days

    o Maintenance spares @ 30% of O&M

    o Receivables for 2 months

    o O&M expenses for 1 month

    For Fuel expenses, Liquid fuel stock and receivables, mode of

    operation is to be considered

    Cost of fuel based on Price & GCV of preceding 3 months of the

    1stmonth for which tariff is decided andno fuel escalation allowed

    Rate of interest will be bank rate as on 1.4.2014 or 1stof April of the

    year in which the station is declared under commercial operation

    36

    g

    Corporate Commercial Department

    36

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    37/80

    37

    Depreciable value 90% (except land);

    Depreciable life:

    Thermal - 25 years

    Gas 25 years

    Hydro - 35 years

    Weighted Average % for the 12 years after commercial operation

    and balance shall be spread over balance life

    For existing stations the balance depreciable value as on 1.4.2014

    shall be worked out by deducting the cumulative depreciation as

    admitted by the Commission upto 31.3.2014 from the gross

    depreciable value of the assets.

    Depreciation

    g

    Corporate Commercial Department

    37

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    38/80

    Norm for O&M expenses in 2014-15 is as follows:

    Coal Based stations

    o 200 MW - 23.90 Lac/MW

    o 500 MW - 16.00 Lac/MW

    o 660 MW - 14.40 Lac/MW

    o TTPS - 43.16 Lac/MW

    o Tanda - 35.88 Lac/MWo BTPS (unit 1to3)- 35.88 Lac/MW

    Gas Based stations: Rs 14.67 Lac/MW

    Advanced F class machines Rs 26.55 Lac/ MW

    Escalation in the O&M expenses - @ 6.35% thereafter

    Water Charges (based on water consumption subject to prudence

    check) and Capital spares (actual with justification and should not be

    funded through SA/ CA) - shall be allowed separately

    38

    O&M Expenses

    g

    Corporate Commercial Department

    38

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    39/80

    O&M Expenses .. contd.

    Additional units which will be commissioned after1.4.2014 in the same station

    200/210/250 MW

    90% of above for Unit 5 & 6

    85% of above for 7thonwards

    300/330/350 MW

    90% of above for Unit 4 & 5

    85% of above for 6thonwards

    500 MW and above

    90% of above for Unit 3 & 4

    85% of above for 5thonwards

    39

    g

    Corporate Commercial Department

    39

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    40/80

    Compensatory Allowance

    CERC has provided following Compensatory Allowancefor meeting expenses on new assets of capital nature

    in lieu of any additional Capex beyond Cut Off Date

    Yrs of

    Operation

    Comp. Allowance (in Rs. Lac/MW/yr) for

    coal stations only0 10 Nil

    11 - 15 0.20

    16 20 0.50

    21 - 25 1.0

    40

    No other additional capitalisation, other than the heads

    provided in Regulation 14 (Add Cap) shall be allowed.

    Corporate Commercial Department

    40

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    41/80

    Renovation and Modernisation

    CERC Tariff Regulation 2014-1941

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    42/80

    Renovation and Modernisation

    R&M provision can be availed by a station/ unit on aftercompletion of useful life.

    CERC would do the prudence check based on the

    estimated cost, extension of life, detailed justification etc.

    New capital cost will be based of expenditure incurred

    after deducting the accumulated depreciation from

    original capital cost (Net Fixed Asset).

    For Gas stations, renovation is allowed after completion

    of 25 years and due to obsolescence of spares

    42Corporate Commercial Department

    42

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    43/80

    Special Allowance

    Alternatively, the generating company may opt to avail

    SpecialAllowance(SA). In such a case:

    There will be no revision of capital cost

    No relaxation in operating norms

    Will be allowed for units after completing 25 years from COD

    Will not be allowed to stations for which expenditure on R&Mhas been allowed earlier

    Amount of Special Allowance Rs 7.5 Lakh/ MW/ year in

    2014-15; thereafter escalated at 6.35% every year (5.72%

    for 2009-14 period) For stations availing SA, the amount for 2014-15 will be

    determined by escalating the amount allowed in 2013-14 by

    6.35% (~Rs 6.64 Lakh/MW/Year)

    43Corporate Commercial Department

    43

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    44/80

    Energy Charge

    CERC Tariff Regulation 2014-1944

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    45/80

    Computation of Energy charges (EC)EC covering primary fuel cost shall be payable for total

    ex-bus energy scheduled to be supplied to the

    beneficiary during the calendar month, at the specified

    energy charge rate.

    Total Energy Charge payable in a month:

    Energy Charge Rate x Scheduled Energy (ex-bus)

    45

    Energy Charges

    Corporate Commercial Department

    45

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    46/80

    Energy charge rate (ECR) in Rs. per kWh for coal based stations

    ECR = {(GHR-SFC xCVSF)xLPPF/ CVPF + SFC x LPSFi} x100/{(100AUX)}

    GHR normative station heat rate

    SFC normative Sp oil consumption

    AUX normative auxiliary energy consumption

    CVSF Calorific value of oilLPPF Weighted average landed cost of Coal

    LPSFi Weighted average landed price of secondary fuel

    CVPF Weighted average GCV of coal as received

    Landed Cost of Coal

    Price of coal corresponding to the grade and quality inclusive ofroyalty, taxes and duties applicable & transportation cost

    Considering normative transit and handling losses :

    Pit head / non-pit head stations : 0.2%/ 0.8%, imported coal- 0.2%

    Coal received through railways system: 0.8%

    46

    Computation of Energy Charge Rate - Coal

    Corporate Commercial Department

    46

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    47/80

    Energy charge rate (ECR) in Rs. per kWh for gas or liquid fuel

    based stations

    ECR = GHR x LPPF x 100 / {CVPF x (100 AUX)}

    GHR normative station heat rateAUX normative auxiliary energy consumption

    CVPF Weighted average GCV of primary fuel as received

    LPPF Weighted average landed cost of primary fuel

    Energy charge rate for a gas/liquid fuel based station shall be adjusted

    for open cycle operation based on certification of Member Secretary of

    respective Regional Power Committee for the open cycle operation

    during the month.

    47

    Computation of Energy Charge Rate - Gas

    Corporate Commercial Department

    47

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    48/80

    The generating company shall provide to the beneficiaries

    details of parameters of GCV and price of fuel i.e.

    domestic coal, impo rted coal, e-auct ion coal, lignite,

    natural gas, RLNG, liquid fuel etc.

    The details of blending ratio of the imported coal,proportion of e-auction coal and the weighted average

    GCV of the fuels as received shall also be provided

    separately, along with the bills of the respective month

    Copies of the bills and the above shall also be displayed

    on the website of the generating company on monthly

    basis for a period of three months.

    48

    Other provisions

    Corporate Commercial Department

    48

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    49/80

    Prior permission from beneficiaries not a pre-condition for use of

    alternative source of fuel unless agreed specifically in the PPA.

    The weighted average price of use of alternative source of fuel shall

    not exceed 30% of base energy charges.

    Prior consultation with beneficiary shall be made not later than three

    days in advance in case the :

    the energy charge rate exceeds the lower of

    30% of base energy charge rate as approved by the

    Commission for that year

    20% of energy charge rate for the previous month

    The Commission shall approve the base energy charge rate at thestart of the tariff period. The same for subsequent years shall be

    computed by escalating at the escalation rates for payment

    purposes, notified by the Commission under competitive bidding

    guidelines.

    49

    Other provisions

    Corporate Commercial Department

    49

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    50/80

    Operating Norms

    CERC Tariff Regulation 2014-1950

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    51/80

    Operating Norms

    Target Availability (NAPAF) for recovery of fixed

    charges83% (earlier 85%)

    The above provision shall be reviewed based on actual

    feedback after 3 years from 01.04.2014.

    Incentive will be based on PLF (earlier incentive waslinked to Availability)

    Normative Annual Plant Load Factor for incentive

    85%

    Rate of incentive 50 paise/ kwhr beyond ScheduleGeneration of 85%

    In 2009-14- incentive was @ FC/kWhr for old stations

    (>10 yrs old) and @ 50% of FC/kWhr for new stations.

    51

    Corporate Commercial Department

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    52/80

    Heat Rate norm for existing Coal Stations

    2009-14 2014-19 Difference

    200/210/250 MW Sets 2500 2450 -50

    500 MW Sets 2425 2375 -50

    BTPS 2825 2750 -75

    TTPS 2950 2850 -100

    Tanda 2825 2750 -75

    HR values in Kcal/kWhr

    Corporate Commercial Department

    52

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    53/80

    Heat Rate norm for existing Gas Stations

    Station Combined Cycle Open Cycle

    2009-14 2014-19 Difference 2009-14 2014-19 Difference

    Anta 2075 2075 No Change 3010 3010 No Change

    Auraiya 2100 2100 No Change 3045 3045 No Change

    Dadri Gas 2075 2000 (-75) 3010 3010 No Change

    Faridabad 2000 1975 (-25) 2900 2900 No Change

    Kawas 2075 2050 (-25) 3010 3010 No Change

    Gandhar 2040 2040 No Change 2960 2960 No Change

    Kayamkulam 2000 2000 No Change 2900 2900 No Change

    HR values in Kcal/kWhr

    Corporate Commercial Department

    53

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    54/80

    Heat Rate - New Stations

    Pressure Rating (Kg/cm2) 150 170 170 247

    SHT/RHT (0C) 535/535 537/537 537/565 565/593

    Type of BFP Electrical Turbine Turbine TurbineMax Turbine Cycle Heat rate

    (kCal/kWh)

    1955 1950 1935 1850

    Min.Boiler Efficiency

    Sub-Bituminous Indian Coal 0.86 0.86 0.86 0.86

    Bituminous Imported Coal 0.89 0.89 0.89 0.89Max Design Unit Heat rate

    (kCal/kWh)

    Sub-Bituminous Indian Coal 2273 2267 2250 2151

    Bituminous Imported Coal 2197 2191 2174 2078

    New coal based stations after 1.4.2014 4.5% margin over design Heat Rate

    New gas based stations after 1.4.2014 5% margin over design Heat Rate

    New liquid fuel stations after 1.4.2014 7.1% margin over design Heat Rate

    54Corporate Commercial Department

    54

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    55/80

    Norms for Auxiliary Energy Consumption

    2009-14 2014-19 Difference

    200 MW Series 8.5% 8.5% No Change

    500 MW Series SDBFP 6.0%

    EDBFP 8.5%

    SDBFP 5.25%

    EDBFP 7.75%

    - 0.75%

    For IDCT Additional 0.5% Additional 0.5% No Change

    Gas Stations 3.0%/ 1.0% 2.5%/ 1.0% -0.5% for

    Combined cycle

    TTPS 10.5% 10.5% No Change

    Tanda 12.0% 12.0% No Change

    BTPS 9.5% 8.5% -1.0%For Air Cooled Condenser system additional APC of 0.5%/1.0% has been

    allowed for direct/ indirect cooling respectively

    CERC has excluded Colony consumption from Auxiliary Energy Consumption)

    Corporate Commercial Department

    55

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    56/80

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    57/80

    Truing up

    Controllable Parameters: Station Heat rate

    Secondary Fuel Oil Consumption

    Auxiliary Energy Consumption

    Refinancing of Loans

    Uncontrollable Parameters

    Force Majeure

    Change in Law Primary Fuel Cost

    Corporate Commercial Department

    57

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    58/80

    Truing up

    The financial gains on account of controllableparameters shall be shared.

    Sharing will be done in the ratio of 60:40 between

    generating stations and beneficiaries. (sharing on

    refinancing of loan will be done in 2:1 ratio)

    Sharing on monthly basis with annual reconciliation

    Net Gain= (ECRNECRA) x Scheduled Generation

    ECRNNormative Energy Charge Rate

    ECRAActual Energy Charge Rate

    Corporate Commercial Department

    58

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    59/80

    Commercial Operation Declaration

    CERC Tariff Regulation 2014-1959

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    60/80

    COD of Thermal Station

    2009-14 : Successful full load demonstration earlier to COD after

    notice to Beneficiaries.

    2014-19:

    Trial Run : 72 hours successful running on continuous basis

    at MCR or IC

    7 days prior notice to beneficiaries before trial operation

    Self Certification: to the effect meeting technical standards of CEA

    Regulations, 2010 and GRID Code

    RGMO , Communication System- linked to RoE

    Certificate signed by CMD/CEO/ MD after approval of Board of

    Directors in the specified format

    CEA Tech. Standards for Construction of Elect. Plants & Elect.

    Lines Regulation-2010; Reg 3(8) , 5, 7(1), 7(2), 7(3),7(4) & 8

    To be submitted to RPC/ RLDC before COD

    Corporate Commercial Department

    60

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    61/80

    Truing up on

    Operational Parameters

    CERC Tariff Regulation 2014-1961

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    62/80

    Other provisions

    CERC Tariff Regulation 2014-1962

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    63/80

    FERV

    Generator to attempt to hedge FERV

    Cost of hedging as pass-through on normative loan on

    year on year basis

    To the extent loans are not hedged, FERV allowed as

    pass-through, as an expense on year-to year basis

    63Corporate Commercial Department

    63

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    64/80

    Rebate/ Late payment surcharge

    Rebate of 2% will be allowed for payments made within

    2 days of presentation of bills

    1% Rebate is to be paid for payments made within 30

    days of presentation of bills

    Late payment surcharge for a period beyond 60 days will

    be at the rate of 1.5% per month.

    Corporate Commercial Department

    64

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    65/80

    Sharing of CDM benefits

    In the 1

    st

    year after COD- 100% of the gross proceedson account of CDM to be retained by the project

    developer

    In the 2ndyear, the share of the beneficiaries shall be

    10%

    This shall be progressively increased by 10% every year

    till it reaches 50%

    Thereafter the proceeds shall be shared equally between

    generator and beneficiaries.

    Corporate Commercial Department

    65

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    66/80

    Issues for discussion

    CERC Tariff Regulation 2014-1966

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    67/80

    Operational aspects

    Target Availability for recovery of FC- 83%. Strategies for allocation of coal:

    In case of multi stage stations need to be devised.

    After meeting the 83% DC level, more coal may be diverted to

    efficient units (less ECR)

    Limit of 20% of ECR from the previous month / 30% of

    base need to be maintained so that need for consent of

    beneficiaries does not arise. PAT clause can be used for capitalization of Capex for

    successful and efficient operation.

    Corporate Commercial Department

    67

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    68/80

    Operational aspects

    Reporting of as received GCV of coal Reporting of Heat Rate/ APC/ Specific Oil to be shared

    in the ratio of 60:40

    O&M Cost - Capital spares and water charges spent on

    actual basis is to be allowed.

    RGMO/ FGMO provisions to be kept in service as the

    same would lead to loss of ROE.

    Target Availability for recovery of FC- 83%.

    Separate feeder for colony consumption from grid.

    Corporate Commercial Department

    68

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    69/80

    Operational aspects

    Additional capitalization provisions: proper documentation and

    justifications for claiming any additional capitalization underallowed provisions.

    Reasons for deviation from projected capitalization also needs to

    be maintained.

    Projected Capitalization has to be realistic. In the 2009-14 Tariff

    period, actual Capitalization was substantially less than projected

    and consequently NTPC had to refund tariff along with interest @

    12~14% p.a.

    Additional Capitalization to be shown in the year when

    Capitalization would take place & the asset shall be ready foruse.

    Expenditure incurred from Special Allowance and Compensation

    Allowance needs to be maintained properly so that the same can

    be furnished as and when asked by the Commission.

    Corporate Commercial Department

    69

    C

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    70/80

    Project Construction aspects

    IDC/IEDC in case of delay would be allowed only for

    uncontrollable factors

    Proper documentation, record keeping required for

    justification in case of delay in project completion

    particularly for the reasons if delay is beyond control

    of NTPC or its contractors.

    Expenditure for the delayed period is unlikely to be

    allowed in the Capital Cost (example: Farakka-III)

    Transmission Charges are also to be borne by Gencos

    for the delayed period

    APC will exclude Construction Power, to be tied up with

    local Discoms

    Corporate Commercial Department

    70

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    71/80

    P j t C t ti t D t ti

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    72/80

    Project Construction aspects-Documentation

    Help/Assistance given to Contractor/ sub-contractor to arrest

    delay

    Force -majeure event of contractor / sub-contractor

    Financial crisis of vendor / contractor

    In the cases of delays or anticipated delays, the related

    documents/ communications particularly attributable to actionsof governmental agencies/ Railways

    Reasons beyond reasonable control of NTPC and its contractorsmust be collected and maintained ;

    excessive rain/ flood,

    geological surprises etc.

    The actions identified for collection and maintaining suchdocuments may also be followed up/ monitored in PRTs.

    Corporate Commercial Department

    72

    P j t C t ti t

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    73/80

    Project Construction aspects

    Preparation for COD

    Readiness of all the major systems including Balance of Plants,

    Coal arrangement etc to ensure Trial run for a continuous period

    of 72 hours at maximum continuous rating or installed capacity.

    Notice to beneficiaries at least 7 days before Trial run.

    Compliance to CEA Regulations (check list to be a part of CODnote)

    Commissioning of RGMO/ FGMO before COD (1% to be

    deducted if not complied)

    Proper record keeping of less schedule during trial run period.

    Process should start at least 45 ~60 days prior to the target dateof COD.

    Certification of CMD for COD requires Board Approval

    Corporate Commercial Department

    73

    P j t C t ti t

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    74/80

    Project Construction aspects

    Prudence check of Capital Cost w.r.t. Benchmark cost-

    Proper justifications are required for any deviations from

    specified benchmark norms.

    Capitalization before Cut-off date of project-

    Completion of all works in original scope before cut-off

    date

    Procurement of Initial Spares of allowable amount before

    cut-off date

    Proper documentation required to justify extension of Cut-

    off date as beyond the control of generator.

    Corporate Commercial Department

    74

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    75/80

    ECR T d (P/K h)

    CERC Tariff Regulation 2014-19

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    76/80

    ECR Trend (P/Kwh)

    Corporate Commercial Department

    StationSep

    '13

    Oct

    '13

    Nov

    '13

    Dec

    '13

    Jan

    '14

    Feb

    '14

    Mar

    '14

    Apr

    '14

    May

    '14

    Jun

    '14

    Jul

    '14

    Aug

    '14

    TTPS 109 104 102 101 112 109 112 111 109 115 124 128

    76

    O ti P t

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    77/80

    Operating Parameters

    Description Norm 2009-10 2010-11 2011-122012-13 2013-14

    Heat Rate

    (kcal/kwh)2850 2859 2851 2842 2823 2810

    APC

    (%)10.50 10.47 10.56 10.64 10.50 10.52

    SOC

    (ml/kwh)

    0.5 0.63 0.52 0.44 0.38 0.40

    DC

    (%)83 90.27 93.58 91.88 95.72 94.56

    77

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    78/80

    Force Majeure

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    79/80

    j

    79

    Force Majeurefor the purpose of these regulations means the event or

    circumstance or combination of events or circumstances including those

    stated below which partly or fully prevents the generating company ortransmission licensee to complete the project within the time specified in the

    Investment Approval, and only if such events or circumstances are not within

    the control the generating company or transmission licensee and could not

    have been avoided, had the generating company or transmission licensee

    taken reasonable care or complied with prudent utility practices:

    a) Act of God including lightning, drought, fire and explosion, earthquake,

    volcanic eruption, landslide, flood, cyclone, typhoon, tornado, geological

    surprises, or exceptionally adverse weather conditions which are in excess

    of the statistical measures for the last hundred years; or(b) Any act of war, invasion, armed conflict or act of foreign enemy, blockade,

    embargo, revolution, riot, insurrection, terrorist or military action; or

    (c) Industry wide strikes and labour disturbances having a nationwide impact

    in India;

    Change In Law

  • 8/10/2019 CERC_2014-19 Tariff Regulations

    80/80

    gChange In Lawmeans occurrence of any of the following events:

    (a) enactment, bringing into effect or promulgation of any new Indian law; or

    (b) adoption, amendment, modification, repeal or re-enactment of any existing

    Indian law; or

    (c) change in interpretation or application of any Indian law by a competent

    court, Tribunal or Indian Governmental Instrumentality which is the final

    authority under law for such interpretation or application; or

    (d) change by any competent statutory authority in any condition or covenant

    of any consent or clearances or approval or licence available or obtained for the

    project; or

    (e) coming into force or change in any bilateral or multilateral agreement/

    treaty between the Government of India and any other Sovereign Government

    having implication for the generating station or the transmission system