CEPC 650MHz Klystron R&D Zusheng ZHOU On behalf of High Efficiency RF Source R&D Collaboration Institute of High Energy Physics Jan. 21, 2020 1

CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

CEPC 650MHz Klystron R&DZusheng ZHOU

On behalf of High Efficiency RF Source R&D CollaborationInstitute of High Energy Physics

Jan. 21, 2020

1

Page 2: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Outline1st prototype tube• Manufacture completed

• Conditioning progress

High efficiency design• High voltage klystron

• Multi-beam klystron

2

Page 3: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

1st prototype tube

3

Page 4: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

1st prototype tubeConventional method based on 2nd harmonic cavity in order toinvestigate the design and manufacture technologies for highpower CW klystron.

4

Main parameters GoalFreq. (MHz) 650Vk (kV) -81.5Ik (A) 15.1Perveance (µP) 0.65Efficiency (%) >60Output power (kW) 8001dB bandwidth (MHz) ±0.5

Design Parameters

Mechanical design

Page 5: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Components manufacture

5

Modulator anode Input coupler Cooling pipe Gun welding edge

Cavity body Cavity nose Coil Collector

Page 6: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Gun subassembly

6

Focusing electrode and support assembly Modulator anode assembly

Page 7: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Cavity and window components

74th CAV Window

Input coupler loop 1st CAV 2nd CAV 3rd CAV

5th & 6th CAV

Page 8: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Cavity brazing and cold test

8

Cavity brazing Cold test

The measured frequency is within design scope.

Parameters 1st 2nd 3rd 4th 5th 6th

Frequency(MHz)Design 650.5 649.5 1293.5 669.2 668 649.5

Measure 650.2 649.29 1293.1 668.98 668.68 649.15

QeDesign 291.4 67

Measure 292.2 69.4

Leak test

Page 9: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Collector brazing

9

Collector brazing

Page 10: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Gun processing

10

Temperature measurement Gun processing

Page 11: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Auxiliary components

11

Girder

Coil

Oil tank

There is about 3% error between the measurement results and the simulation values. Theexcitation current of the solenoids will be adjusted to meet the design requirements.

Coil measurement

Page 12: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Vacuum-Assy assembly

12

Component leak test

Cavity assemble

Collector assemble Final welding Completed assembly

Final assemble is completedon Oct.19

Page 13: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Prototype bake-out

13

Prototype installation Top view

Bake out is started from Oct.26 and finished on Nov.24.

Page 14: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Prototype bake-out

14

Tube temperature(430°C)

Filament current(30A)

Vessel pressure(-6Pa)

Tube Pressure(-8Pa)

Almost one month

Page 15: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Final assembly

15

Klystron pinch off Lead shield

Vertical to horizontal

Horizontal placement

Coil installation

Remove assembly bracket Final placement on Dec. 11

Water jacket installation

Page 16: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Packing and Transportation

16

Before delivery Packing

Leave factory on Dec.24(10:30)

Loading

Arrived IHEP on Dec.25(21:00)

Page 17: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Unloading and In place

17

Unboxing and unloading

In place at 2nd floor of building 1 on Dec. 26

Lifting

Page 18: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Test condition preparationHigh voltage power supply: ADS projectHigh power load: ADS project (400kW max.)

18

Interlock and data collectionWater cooling and waveguide system connectionLLRF and arc detector

High voltage conditioning is started from this year.

Page 19: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Test procedure

19

① Cathode Low-voltage emission test② Vacuum treatment and cold voltage conditioning③ High voltage conditioning④ RF processing⑤ Power and stability

Test condition preparation

Page 20: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Until Jan.19

20

① Cathode Low-voltage emission test-FINISHED② Vacuum treatment and cold voltage conditioning-FINISHED③ High voltage conditioning-UNDERWAY④ RF processing⑤ Power and stability

Conditioning status

Page 21: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

High efficiency design

21

Page 22: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

High efficiency designGOAL Scheme 1:With high voltage gun (110kV~120kV/9.1 A), low perveanceScheme 2:MBK, 54 kV/20A electron gun

22

Parameter Scheme1 Scheme2Freq. (MHz) 650 650Voltage (kV) 110 54Current (A) 9.1 20(2.5×8)Beam No. 1 8Perveance (µP) 0.25 1.6(0.2×8)Efficiency (%) ~80 >80Power(kW) 800 800(100×8)

Page 23: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

High voltage klystron

23

High efficiency design

AJDISK(1D) EFF: 85.6% KLYC(1D) EFF: 85.6% EMSYS(2.5D) EFF: 81.4%

CST(3D) EFF(asymmetrical output): 78.2%

The 110kV design is almost finished and 3Defficiency is up to 78.2%. 120kV design ison going and expect higher efficiency.

Page 24: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Multi-beam klystron Parameters Unit ValueGun Voltage kV 54

Beam number 8

Beam perveance μP 0.2

Output power kW 875

Gain dB 44.2

Efficiency(3-D simulation) % 80.7

19

MBK Length

Component Unit Value

RF interaction m 1.9

Gun m 0.5

Collector m 1.0

Total m 3.4

Page 25: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

3-D PIC simulation predicts bandwidth of ±0.8 MHz

MBK bandwidth curve by CST20

Multi-beam klystron

Page 26: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Gun design

5MV/m

20

Multi-beam klystron

Parameters Unit Value

High voltage kV 54

Current A 8*2.5

Beam waist mm 7.5

Filling ratio 0.625

Electric filed on cavities

Page 27: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

MBK output window design

21

Multi-beam klystron

The output window design is almost completed

Page 28: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Design progress status

21

Multi-beam klystron

Design title Status

MBK beam dynamicsGoal 1 : output power> 800kW Goal 2 :efficiency >80%

Finished Finished

Design on input and output cavity Finished

Gun design Finished

Design on output window Finished

Coil design In progress

MBK collector In progress

We are fully prepared for future possibility of manufacture.

Page 29: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

Summary• The components machining, brazing, welding and final assembly for

1st prototype are finished in collaboration partner.

• The conditioning and commissioning of 1st prototype is started at thebeginning of this year.

• The both schemes for high efficiency design are progressing well.

• The mechanical design for 2nd tube(high efficiency) will be start aftercompletion of design review.

• The design of MBK is fully prepared for next stage.

29

Page 30: CEPC 650MHz Klystron R&Dias.ust.hk/program/shared_doc/2020/202001hep/conf/...Jan 21, 2020  · 1. st. prototype tube. Conventional method based on 2nd harmonic cavity in order to investigate

30

Thanks for your attention!