CENTRE OF ENERGY STUDIES AND RESEARCH Devi Ahilya University, Indore. WELCOME . PROGRESS REPORT 2009-2011. CENTRE OF ENERGY STUDIES AND RSEARCH Devi Ahilya University, Indore. CENTRE OF ENERGY STUDIES AND RESEARCH. - PowerPoint PPT Presentation
Citation preview
CENTRE OF ENERGY STUDIES AND RESEARCH
Devi Ahilya University, Indore
WELCOME
PROGRESS REPORT2009-2011
CENTRE OF ENERGY STUDIES AND RSEARCHDevi Ahilya University, Indore
CENTRE OF ENERGY STUDIES AND RESEARCH
The Centre of Energy Studies and Research (CESR), an autonomous organization established by Devi Ahilya University, Indore and Madhya Pradesh Urja Vikas Nigam Ltd., Bhopal in December, 1989 to serve energy related academic, research and development needs in the state of Madhya Pradesh.
CESR registered as a society under the Society Registration act (1973), is academically a part of Devi Ahilya University, Indore under the faculty of Engineering Sciences and based at its Khandwa Road Campus of Devi Ahilya University, Indore.
ACTIVITIES CARRIED OUT (2009-2011)1. Energy Audit/Energy Conservation Projects2. Activities under the Biogas Development Training Centre3. Training Programme on Improved Chulha4. Physical Verification of Solar Photovoltaic based Home light
and Street Light systems in the Remote Villages Electrified under the govt. scheme
5. Testing Programme6. DPR’s Prepared7. Educational and Training Programme8 Other Achievements 9. Future Objectives 10. Project Proposal submitted11. Limitations
1.Energy Audit/Energy Conservation Projects
1. DETAILDED ENERGY AUDIT OF M/s Zenith Birla Steel Plant at Khopoli, Mharastra
Savings identified in terms of electricity = 763196 kWh/yr Savings worked out in terms of money = Rs. 49.22 lacs/yr Investment = Rs. 20.86 lacs Payback period = 5 months
Energy Audit/Energy Conservation Projects
2. DETAILED ENERGY AUDIT OF 132 KV/25 KV TSS, Sub Station, GURLA (WC Railway, Near Kota)
Savings identified in terms of electricity = 7104066.80 kWh/yrSavings worked out in terms of money = Rs. 396.71 lacs/yrInvestment = Rs. 25.00 lacs Payback period = 1 month
2.Activities under the Biogas Development and Training Centre (BDTC)
Following activities has been carried out under the programme in M.P. and Chhatisgarh
S.No. Name of the Activity Number Duration
1. Construction cum Maintenance Training Programmes
19 16 days
2. Turn key Workers Training Programmes 4 21 days
3. Staff Training Programmes 11 3 days4. User’s Training Programmes 80 1 day5. Feed back survey of the constructed
plants1100 -
6. Biogas plants constructed during the CCM training programmes 150 -
Activities under the Biogas Development and Training Centre
Photographs of Construction cum Maintenance (CCM) Trainings at various sites
Activities under the Biogas Development and Training Centre Photographs of Turn key workers (TKW)
Training Programmes at CESR
Activities under the Biogas Development and Training Centre Photographs of Staff Training Programmes for
various agencies
Activities under the Biogas Development and Training Centre
Photographs of User’s Training Programmes in different villages
Activities under the Biogas Development and Training Centre
1. LITERATURE DEVELOPED
2.RENOVATION OF CUT MODELS AT THE CENTRE
Activities under the Biogas Development and Training Centre
Other Activities
1 A Detailed Project Report of 25 M3 based on Kitchen Waste Biogas Plant at Daly College, Indore prepared and submitted to MPUVN.
2.Physical Verification Work of Biogas Plants Installed by M.P.Urja Vikas Nigam in the year 2008-09. 265 plants physically verified and report has been submitted to the Nigam.
3.Training Programme on Improved Chulha A 7 days Training Programme on Improved Chulha was conducted
by our Centre for Bio-Ray Organization, Kasrawad, District Khargone. 10 participants including women were trained. The organization set a target of installation of 2500 Chulhas in the rural area around.
Training Programme on Improved Chulha
4.Physical Verification work of Remote Electrified Villages through SPV systems
The Centre has carried out Physical Verification work of 2457 House Holds (100% basis) in 22 villages for the Solar Photovoltaic Systems installed by the M.P. Urja Vikas Nigam, Bhopal. Status report has been submitted to the nigam.S.No. District Number of
VillagesNo. of Solar Home Light Systems
No. of Street Light Systems
Total Systems Verified
1 Narsinghpur 8 323 34 357
2 Hoshangabad 6 203 21 224
3 Jhabua 4 900 73 973
4 Barwani 4 820 83 903
Total 22 2246 211 2457
Physical Verification work of Remote Electrified Villages through SPV systems
We have applied for the Physical Verification work of Remote Villages Electrified by the MPUVN and our rates are found to be the lowest in tendering procedure. Work order for the 20 districts is to be received.
Physical Verification work of Remote Villages Electrified Villages through SPV systems
Photographs of SPV Systems installed in the villages
5. Testing Programme
The Centre is providing Test facilities for Fuel, Reflectivity and Emissivity Test of Paints, Gasifiers and Testing of Energy Efficient Lighting systems to many industries.
Main clients are:
M/s Berger Paints M/s ICI India Limited M/s Kansi Nerolac Paints Ltd. Mumbai M/s Ipca Lab. Aurangabad M/s Paschim Chemicals, Aurangabad Shri Krishna Agro Engineering, Indore M/s CIMS Power Technologies Pvt.Ltd., Bhopal M/s K.K. Project and Engineering, Bhilai
6. DPR preparation for Solar City, Indore
We are appointed as technical consultant by the Nagar Nigam, for the preparation of Detailed Project Report to develop Indore as Solar City under the “Solar City” development programme of the Ministry of New and Renewable Energy, Govt . of India , New Delhi. DPR has been prepared and submitted to the IMC for further processing at their end.
DPR Preparation for 35 kWp grid connected SPV system for Ajmer Vidyut Vitran Nigam Ltd.
We have been allotted the work to prepare DPR of 35 kWp grid connected SPV system by the Ajmer Vidyut Vitran Nigam Ltd. DPR preparation for the same is in progress and the report will be submitted soon.
DPR Preparation for Renovation of Street Light Network
We have prepared a DPR for Renovation of Street Light Network with energy efficient lighting network at I/IA,II, III and Kheda Growth Centre, Pithampur for M.P. Audyogik Vikas Nigam, Indore. 2700 number of street lights are to be replaced with the energy efficient lighting systems. Report has been submitted to the MPAKVN.
7. Educational and Training Programmes
The MNRE had set-up an Energy Park at CESR. The Park is a unique facility for demonstration of different renewable energy gadgets. A number of students, visitors, faculties and general public visit the park.
8.Other Achievements and Activities
Centre is listed as Consultant for Development of Solar City by the Ministry of New and Renewable Energy, Govt. of India, New Delhi.
Centre has been approved as Certified Energy Auditing Agency by the MPUVN on its panel.
The Centre is supporting its sister concern School of Energy and Environmental Studies in their academic programmes i.e. M. Tech. (Energy Mgmt.) , M. Phil, (Energy and Environmental Mgmt.) and Ph.D. Programme.
9. Future ObjectivesThe centre aims at main thrust on the following Areas for fund generation:
Energy Audit and Energy Management Projects in Industries, Commercial and Residential Building sectors.
Third Party Verification for various agencies. Biogas based Power Generation projects. Testing of Fuels, Water, Solar Energy Devices etc.
10. Project Proposals Submitted for Funding Following Project Proposals have been submitted for
funding:-
Project on Modification Engine for Producer gas, submitted to MNRE
Regional Testing Centre for Biomass Gasifier
Detailed Energy Audit of Bhopal,Habibganj, Itarsi and Makronia Railway Stations.
One day Awareness and Training Programmes on Remote Village Electrification in district Raisen, Gwalior and Hoshangabad for the field functionaries, villagers and beneficiaries; submitted to MNRE through MPUVN
11. LimitationsDue to short of funds, the Centre is facing hardship and couldn't fill vacant positions and hence limits to achieve its set objectives. Present position of the staff is as under:
S.No. Position Status1 Director As per BOG’s decision,
Head, School of Energy is also acting as Director of CESR
2 Dy. Director -I Vacant3 Dy. Director - II Vacant4 Research Assistants (4 Positions) Filled 2
Vacant 2
CENTRE OF ENERGY STUDIES AND RESEARCH, DAVV, INDORE
THANK YOU