CENTRE FOR INNOVATIONS IN
PUBLIC SYSTEMS( Innovative Practices in Urban Governance
in association with SPIPA, Ahmedabad)
26 August 2014
Automated Building Plan Approval System (ABPAS)
Project Background
3
The building plan approval process relates to the issue of permission for the construction of buildings based on specific set of rules and regulations.
Initially…Most of the building plan applications and drawing plans were submitted manually in paper format. All
the processes related to scrutiny, approval and rejection were carried out manually.
Objectives for ABPAS
Improvequality
Easier AccessImprove
Efficiency Transparent & Citizen friendly
Current Building Permission & Control Practices
4
Applicable rules & Regulations
• Approved Colony Layouts
• City Master Plans
• Bhumi VikasNiyam 2012
Applicants
• Architects
• Engineers
• Structural Engineers
• Supervisors
• Town planners
Building Permission
• Drawing Verifications
• Document Verifications
• Site verification
• Payments
Building Control (Plinth/ Completion/ Occupancy)
• Document Verifications (If any)
• Site verification
• Payments
For building height Above 12.5 mtrs
5
Document Validation & Verification (6 Working Days)
Site Inspection (6 Working Days)
Drawing Scrutiny (8 Working Days)
Payments at Single Window (3 Working Days)
REJ
ECTI
ON
NO
TIC
E L
ETTE
R IS
SUED
TO
A
RC
HIT
ECT,
NO
TIFY
BY
PO
ST
Application Hard copy submitted to Single window
Overview of Building plan Approval Prior to ABPAS
Process Flow
ISSUE OF FINAL CERTIFICATE (in 3 days)(TOTAL – 26 Working days)
Verifying hard copies of documents
Do site inspection and compare with site Plan
Manual Scrutiny of Drawings
Payments by Cash/ Cheque/ DD.
Resubmission
Total 26
working days
Slow and error prone manual approval process
Impact
Issues & Challenges in Manual Process
6
• Errors and variance in
evaluation
• Loss of revenue
• High number of
Lokayukta/ RTI cases
related to plan
scrutiny
• No measurement of
efficiency.
Corporation
• Loss of confidence• Likelihood of corrupt
practices • Needed to visit offices
physically for status
updates
Citizens
• Status tracking of
application is a
cumbersome process
• Decentralized
application
submission process
• Lack of transparency
• Historical application
data/ MIS not readily
available.
Architects/ Builders
AutoDCR® - High level workflow for Building Plan
Approvals
DOCUMENT VALIDATION & SCRUTINYScans documents & attachments.
SITE INSPECTION (Manual Process)
DRAWING SCRUTINY (Max 15 Minutes)AutoDCR checks compliance to DC Rules & produces Report
PAYMENTS (1 Working day)Demand note generation to architect/ Citizen and payment
realization
ISSUE OF FINAL APPROVAL CERTIFICATE (Immediate)
TOTAL MAX. 3 DAYS FOR - G+1, RESIDENTIAL CASES, UP TO 2400 SQ. FT. MAX. 18 – 21 DAYS FOR OTHERS
REJ
ECTI
ON
NO
TIC
E TO
AR
CH
ITEC
T In
cas
e o
f d
iscr
epan
cies
ONLINE APPLICATION SUBMISSION
ALE
RTS
AN
D M
IS
REP
OR
TSM
ail.
SMS
& W
EB
PAYMENT GATEWAY
INTEGRATION
7
Resubmission
8
• Reduced Public Capital Investment
• Project managed by highly skilled resources
• Onus of success and implementation lies with vendor. PPP model
• Complex Rules and interrelated, Interpretation may vary.
• Now everyone follows same process using system
Uniformity and standardization
• Enhance citizen services through efficient, responsive and transparent e-governance systems
• Showcasing best practicesGood governance
• Digitized data management
• Timely deliveries
• Standard Procedures
Better quality of services
• Every Process with fixed time limits
• Early alerts through SMS / Email / WebAccountability
And many more…
ABPAS Key reforms
ABPAS Key Achievements
9
Processes Before ABPAS Percentage efficiency
improved (After)
Accepting Permission Applications Online by Applicants Manual 100 % Achieved
Permissions for the cases G + 1/ 2400 Sq. ft. (Almost 55 % of
cases comes in this category)
10 – 15 days Maximum 3 days
Permissions for the cases other then G + 1/ 2400 Sq. ft. 30 days Maximum 21 days
Providing Alerts (SMS / Email based) on delay of proposal on
desk
NA 100 % achieved
Providing Proposal status online and through SMS NA 100 % achieved
Providing Commencement certificate (CC) with approved
drawings online
Manual 100 % achieved
In next phase planned to provide
Digitally signed copies of
certificates.
Providing Citizen search for status of any building approved
with in IMC limit
NA 100 % achieved
Providing Training on system to all stake holders including
external agencies like Architects
NA 100 % done
• First Come First Serve
• Self Service facility resulting in lesser iterations
• Notifications & alerts through SMS / eMails
• Online submission and status tracking bringing in transparency
• Anywhere & anytime access
• Eliminates Human Errors
• Simplification of procedure and process
• Status of acceptance/ rejection could available on real time basis.
• Information of approved proposals are available online
Benefits to Citizens
Benefits to Corporation
11
• Uniform interpretation of rules and regulations
• Accuracy in area & Fee calculations.
• Reduction in litigations.
• Escalation of Alerts on unnecessary delays [MIS, SMS & Email].
• Reductions in complaints against corporation in Lokayukta and EOW (Economic Offence Wing)
• Generation of regular MIS report & evaluation of workforce efficiency.
• Cases are not getting permitted on Illegal colonies.
• Storage and archival of all digitized data records.
Statistics – Indore Municipal Corporation
12Indore Municipal Corporation
Before ABPAS System After ABPAS System
Number of Users Architects – 250Employees – 65
Citizens – No Access Applicants – No Access
Architects – 365Employees – 54 (Recently 29 villages added)
Citizen – Anybody can track there fileApplicants- Anyone can submit and track application
Total scrutinized and approved
Up to 2400 Sq. Ft. , Residential, G+1 Casesapproved in maximum 3 working days.
Other cases which were approved in maximum 18 – 21 working days.
1 Jan, 11 to 31 Dec 11 3861 2113 (54% of cases) 1748Residential – 1621Commercial – 89Others- 36
1 Jan, 12 to 31 Dec 12 3932 2071 (52% of cases) 1861Residential – 1753Commercial – 82Others- 24
1 Jan, 13 to 30 Nov 13 4248 2139 (51% of cases) 2109Residential – 1664Commercial – 328Others- 117
1 Jan, 14 to 30 June 14 2320 829 (35% of cases) 1491Residential – 1091Commercial – 269Others- 131
We will not stop ourselves - Other Key reforms
13
• Integration with other departments and with Central government agencies
• Energy Conservation Building Codes (ECBC).
• Site Inspection Using Mobile Devices.
• Integration with GIS
Recognitions
14
Best Innovative technology Award and appreciations given by Department of Information Technology, Govt. of Madhya Pradesh.
National Award for e-Governance 2013 – 14, Gold Award on Best innovative use of technology
Appreciations – Government by India
15
Invitation for National Symposium on Affordable housing to deliver presentation on ABPAS: 22nd July 2013
Invitation from Ministry of Housing & Urban Poverty Alleviation, New Delhi to deliver presentation on Indore ABPAS model: 7th Jan, 2013
ABPAS Roll out status in Madhya Pradesh
16
Municipal Corporations Status
Phase I – Indore Running Successfully
Phase II – Gwalior, Ujjain Running Successfully
Phase III – Jabalpur and Bhopal Made live from 1st May, 2014
Katni Pilot run started from 30th
June, 14
Devas, Sagar, Khandwa By 30th September, 2014
Singrauli, Burhanpur, Ratlam, Satna, Rewa By 31th December, 2014
PPP Model 1 – Scrutiny Fee Paid By ULB
(Currently at Indore)
Indore
Licensed architect, Structural engineer, Engineer, Supervisor or Town planner
1 2 3 4 5 6If, Drawing is final
Submit relevant documents to Corporation
If not in format then notify for resubmit
If any deviations then notify for resubmit
If Print is improper then reprint
Scrutiny Center @ Corporation
Applicants Submit Online application along with Drawing
SoftTech Payments by Corporation based on area scrutinized of each approved drawing
Document Verification
Site Inspection
Verify Drawing Scrutiny reports & Prints
generated by AutoDCR
Submit Documents in Corporation
Ownership Documents.
Approve/ Reject
application
Approved
If Rejected, Send backApplicant submits application to corporation with relevant documents
PPP Model 2 – Scrutiny Fee Paid By
Applicant
18
Licensed architect, structural engineer, Engineer, Supervisor or Town planner
1 2 3 4 5 6
If, Drawing is final
Submit relevant documents to Corporation
If not in format then notify for resubmit
If any deviations then notify for resubmit
If Print is improper then reprint
Scrutiny Center @ Corporation
Applicants Submit Online application along with Drawing
Collect charges from applicant based on built up area proposed in drawing.
Collect charges from applicant based on number of Prints given.
SoftTech Team
Investments made
• By Municipal Corporationo No Upfront cost to Municipal Corporationo The project is on transactional basis at a cost Rs 1.42 Per Sq. Ft.o Infrastructure work space provided by Municipal Corporation (Apprx. Cost 3 Lakhs)
• By Vendoro Application Software - AutoDCR customizations, up gradations and Maintenance
for 5 years o Tier 3 Data Center o 5 Persons operational and Management team at each cityo Providing Awareness Programs, Trainings and Technical supporto Upfront Investment Finance costo All data along with the software and entire infrastructure will be handed over to
UADD after the completion of Project.
19
Advantages of PPP Model
• Minimum IT infrastructure and capital investment for delivery of Projects
• Majority of Project risks lies with Private Partner who has expertise on project management and domain.
• Creation of added value through synergies between public authorities and private companies through the integration and cross transfer of public and vendor skills, knowledge and expertise
• Project managed by high skill resource with greater helpdesk facility.
• Payments to the vendor is linked to how they perform, creating incentives and efficiency
• Vendor bears cost on project failure
• All payments to the vendor are after the project Go-Live
• Accountability of success of Project lies with vendor who has to collaborate and work “Inclusive”
20Indore Municipal Corporation
AutoDCR other Implementations
21
22
ABPAS – A Quick Tour
23Indore Municipal Corporation
ABPAS - Process flow for Building Plan Approvals at
Indore Municipal Corporation.
24Indore Municipal Corporation
Applicant– Connects to ABPAS through Indore Nagar Nigam
website
SubmissionDrawing Scrutiny
Documents Submission
Documents Validation
Site Inspection
PaymentPermission Certificate
MIS ReportOnline
Tracking
Login Here
Architect – Online Submission of Proposal with Drawing
25
• Architect Fill in Proposal online.
• Attach Drawing with Proposal• Get file number for future
reference.• Send for Drawing Scrutiny,
Document Checklist and site visit Checklist.
Indore Municipal Corporation
SubmissionDrawing Scrutiny
Documents Submission
Documents Validation
Site Inspection
PaymentPermission Certificate
MIS ReportOnline
Tracking
26
Area Statements on CAD Drawing.
Textual Reports.
Failed Entity on CAD Drawings.
Automatic CAD Drawing Scrutiny by AutoDCR
Indore Municipal Corporation
SubmissionDrawing Scrutiny
Documents Submission
Documents Validation
Site Inspection
PaymentPermission Certificate
MIS ReportOnline
Tracking
27Indore Municipal Corporation
Architect – Drawing Verified, submit ownership Documents
SubmissionDrawing Scrutiny
Documents Submission
Documents Validation
Site Inspection
PaymentPermission Certificate
MIS ReportOnline
Tracking
Architect’s view Drawing
status and then submit the
document.
Gets Acknowledgement.
Attach Scanned Copies of the
Documents Relevant to
Proposal Type (Optional)
Architect – Drawing Verified, submit ownership Documents
SubmissionDrawing Scrutiny
Documents Submission
Documents Validation
Site Inspection
PaymentPermission Certificate
MIS ReportOnline
Tracking
29
• Authorities will look into the document submitted.
• Generate Acknowledgement letter of the documents submitted by the Architect
SubmissionDrawing Scrutiny
Documents Submission
Documents Validation
Site Inspection
PaymentPermission Certificate
MIS ReportOnline
Tracking
Corporation – Documents validations by authorities
30
• Authority can upload site inspection remarks.• Remarks can be uploaded through web /
mobile devices.• Upload site photographs from Mobile devices.• Generate / view Site inspection reports.• Site inspection reminders through SMS / e-
Mails.
SubmissionDrawing Scrutiny
Documents Submission
Documents Validation
Site Inspection
PaymentPermission Certificate
MIS ReportOnline
Tracking
Corporation – Site Inspection by authorities
Demand note is issued to the architect for payment
31
• System Automatically calculates fee required to be paid.
• Generates letters and receipts.• Payment alerts through SMS / e-Mails.• Optional facility to integrate with Payment
Gateways.
SubmissionDrawing Scrutiny
Documents Submission
Documents Validation
Site Inspection
PaymentPermission Certificate
MIS ReportOnline
Tracking
Generation of permission certificate
32
• System Generated Permission Letters and Certificates.
• Localized Certificates in Hindi.• Attaching conditions and remarks on certificates.• Permission alerts through SMS / e-Mails.
SubmissionDrawing Scrutiny
Documents Submission
Documents Validation
Site Inspection
PaymentPermission Certificate
MIS ReportOnline
Tracking
Generation of MIS reports (Monitoring & Evaluation)
33
SubmissionDrawing Scrutiny
Documents Submission
Documents Validation
Site Inspection
PaymentPermission Certificate
MIS ReportOnline
Tracking
Online proposal status tracking by applicant/ Citizens
34
SubmissionDrawing Scrutiny
Documents Submission
Documents Validation
Site Inspection
PaymentPermission Certificate
MIS ReportOnline
Tracking
Digitization of colony data
35
Digitization of colony data – Plot Data
36
Thank You.