27
COPYRIGHT NOTICE: Copyright of this electronic document belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic document may not be forwarded to others, transmitted, downloaded or reproduced in any format, whether print or electronic, without the express, written permission of the copyright owner. Scale Drawn by Date Project No. 12 St. Paul Street Thunder Bay, ON, CA P7A 4S5 807.346.2277 (office) 8555.558.1459 (fax) i4a.ca Project Name Project Address Sheet Name Sheet Number Professional Seal DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED. Lakehead University - 955 Oliver Road, Thunder Bay Cover Sheet LU CASES Addition + Renovation A0.0 2015-74A 05-DEC-2016 SCV Lakehead University - 955 Oliver Road, Thunder Bay CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND SCIENCES (CASES) Lakehead University Mechanical Sheet List Sheet Number Sheet Name M0.0 Symbols, Legend & Drawing Schedule M1.1 Crawlspace - Plumbing Demo Plan M1.2 Lower Level - Plumbing Demo Plan M1.3 Upper Level - Plumbing Demo Plan M2.1 Crawlspace - HVAC Demo Plan M2.2 Lower Level - HVAC Demo Plan M2.3 Upper Level - HVAC Demo Plan M2.4 Mechanical Room - HVAC Demo Plan M3.1 Crawlspace - Plumbing Reno Plan M3.2 Lower Level - Sanitary Reno Plan M3.3 Upper Level - Sanitary Reno Plan M3.4 Crawlspace - Domestic Water Piping Reno Plan M3.5 Lower Level - Domestic Water Piping Reno Plan M3.6 Upper Level - Domestic Reno Plan M4.1 Fire Protection Demo Plan M5.1 Crawlspace - HVAC Reno Plan M5.2 Lower Level - General Ventilation Reno Plan M5.3 Lower Level - Lab Supply Air & Exhaust Air Reno Plan M5.4 Upper Level - General Ventilation Reno Plan M5.5 Upper Level - Lab Supply Air & Exhaust Air Reno Plan M5.6 Roof - Mechanical Reno Plan M6.1 Lower Level - Hydronic Reno Plan M6.2 Enlarged Mechanical Room - Hydronic Piping M6.3 Upper Level - Hydronic Reno Plan M6.4 Roof Level - Hydronic Reno Plan M7.1 Lower Level - Enlarged Biomass Utilization Gas Layout M7.2 Lower Level - Enlarged LU Instrumentation Lab Gas Layout M7.3 Lower Level - Enlarged Community Ecology and Human Origins Lab Gas Layout M7.4 Lower Level - Human Origins Lab & Prototype Development Lab Gas Layout M7.5 Upper Level - Enlarged Nano Materials and Advanced Technologies Innovation Centre Lab Gas Layout M7.6 Roof - Mechanical Penthouse Lab Gas Layout M8.1 Lower Level - Fire Protection Reno Plan M8.2 Upper Level - Fire Protection Reno Plan M8.3 Roof - Fire Protection Reno Plan M9.1 Mechanical Details M9.2 Mechanical Details M9.3 Mechanical Details M10.1 General System Schematic M10.2 Lab Exhaust Duct System Schematic M10.3 Lab Supply Duct System Schematic M10.4 Domestic Water Schematic ME1.1 Mechanical and Electrical Schedules ME1.2 Mechanical and Electrical Schedules ME1.3 Mechanical and Electrical Schedules ME1.4 Mechanical and Electrical Schedules ME1.5 Mechanical and Electrical Schedules ME1.6 Mechanical and Electrical Schedules ME1.7 Mechanical and Electrical Schedules Electrical Sheet List Sheet Number Sheet Name E1.0 Electrical Symbol Legend & Drawing List E1.1 Electrical Site Plan EDL2.0 Crawlspace - Lighting Demo Plan EDL2.1 Lower Level - Lighting Demo Plan EDL2.2 Upper Level - Lighting Demo Plan EDL 2.3 Penthouse - Lighting Demo Plan EDP2.0 Crawlspace - Pwr & Sys Demolition Plan EDP2.1 Lower Level - Pwr & Sys Demolition Plan EDP2.2 Upper Level - Pwr & Sys Demolition Plan EDP2.3 Penthouse - Lighting & Renovation Plan E2.0 Crawlspace - Power Distribution Renovation Plan E2.1 Lower Level - Power Distribution Renovation Plan E2.2 Upper Level - Power Distribution Renovation Plan E2.3 Penthouse - Power Distribution Renovation Plan EL2.0 Crawlspace - Lighting Reno Plan EL2.1 Lower Level - Lighting Reno Plan EL2.2 Upper Level - Lighting Reno Plan EL2.3 Penthouse - Lighting Reno Plan EP2.0 Crawlspace - Pwr & Sys Reno Plan EP2.1 Lower Level - Pwr & Sys Reno Plan EP2.2 Upper Level - Pwr & Sys Reno Plan EP2.3 Penthouse - Pwr & Sys Reno Plan ES2.0 Crawlspace - Security & Intrusion Plan ES2.1 Lower Level - Security & Intrusion Plan ES2.2 Upper Level - Security & Intrustion Plan ES2.3 Penthouse - Security & Intrusion Plan E4.0 Single Line Distribution Diagram E5.0 Electrical Schedules E5.1 Electrical Schedules E5.2 Eelctrical Schedules E6.0 Electrical Details Structural Sheet List Sheet Number Sheet Name S1.0 Foundation Plan, Footing Schedule, Foundation Notes S1.1 Foundation Sections S1.2 Foundation Elevations, Foundation Sections, Plan Details S2.0 Lower Floor Framing Plan, General Notes, Column Schedule S3.0 Upper Framing Plan, Partial Framing & Slab Contour Plan, General Notes, Column Schedule S4.0 Roof Framing Plan, General Notes, Column Schedule S4.1 Penthouse / Atrium Roof & Floor Framing Plan, Penthouse Floor Framing & Slab Contour, General Notes, Column Schedule S5.0 Structural Elevations, Structural Sections S5.1 Column Schedule, Structural Sections, Structural Elevations S6.0 Structural Sections, Structural Details S6.1 Penthouse, Structural Sections, Structural Details, Typical Base Plates S7.0 Bridge Link, Structural Sections, Structural Details S7.1 Bridge Link, Structural Sections, Structural Details Civil Sheet List Sheet Number Sheet Name A1-351570-G1 Site Servicing A1-351570-G2 Site Grading A1-351570-P1 Sanitary, Storm Sewer and Watermain A1-351570-R1 Sanitary, Storm Sewer and Watermain STRUCTURAL ENGINEER: Peterson Design Consultants Inc. R.R. 13, 947 Blind Crescent Thunder Bay, Ontario, P7B 5E4 Tel: (807) 983-3330 MECHANICAL ENGINEER: MCW/AGE Consulting Professional Engineers ELECTRICAL ENGINEER: CIVIL ENGINEER: HATCH 200 South Syndicate Avenue Thunder Bay, Ontario, P7E 1C9 Tel: (807) 623-3449 Fax: (807) 623-5925 www.hatch.ca 114 Hemlock Place Thunder Bay, Ontario, P7C 1W4 Tel: (807) 633-3295 Fax: (204) 779-1119 www.mcw.com MCW/AGE Consulting Professional Engineers 114 Hemlock Place Thunder Bay, Ontario, P7C 1W4 Tel: (807) 633-3295 Fax: (204) 779-1119 www.mcw.com Architectural Sheet List Sheet Number Sheet Name A3.23 (Reserved) Upper Level Plan Details A3.24 (Reserved) Upper Level Plan Details A3.25 Ceiling Section Details A3.26 Penthouse Sections - Plan Detail & Section Details A3.27 Roof Access Ladder Details A3.28 Roof Section Details A3.29 Roof Section Details A3.30 (Reserved) Building Section Details A3.31 (Reserved) Building Section Details A3.32 (Reserved) Building Section Details A4.1 Existing Stair Plans A4.2 New Stairs Plans A4.3 New Stairs - Sections & 3D View A4.4 (Reserved) Stair Details A4.5 (Reserved) Stair Details A5.0 Shipping/Recieving Area & Community Ecology & Energetics Lab - Interior Elevations A5.1 Community Ecology & Integrated Freshwater Lab - Interior Elevations A5.2 Integrated Freshwater Lab - Interior Elevations A5.3 Integrated Freshwater Lab - Interior Elevations A5.4 Community Ecology & Energetics Lab & Intergrated Freshwater Lab 3D Views A5.5 LU Instrumentation Lab - Interior Elevations A5.6 LU Instrumentation Lab - Interior Elevations A5.7 LU Instrumentation Lab - Interior Elevations A5.8 LU Instrumentation Lab - 3D View A5.9 Human Origins Lab & Prototype Developement Lab Space - Interior Elevations A5.10 Human Origins Lab & Prototype Developement Lab Space - Interior Elevations A5.11 Human Origins Lab & Prototype Development Lab Space - 3D View A5.12 Biomass Utilization Research Lab - Interior Elevations A5.13 Biomass Utilization Research Lab - Interior Elevations A5.14 Biomass Utilization Research Lab - Interior Elevations A5.15 Biomass Utilization Research Lab - Interior Elevations A5.16 Biomass Utilization Research Lab - Interior Elevations A5.17 Biomass Utilization Research Lab - 3D View A5.18 Nano Materials & Advanced Technologies Innovation Centre - Interior Elevations A5.19 Nano Materials & Advanced Technologies Innovation Centre - Interior Elevations A5.20 Nano Materials & Advanced Technologies Innovation Centre - Interior Elevations A5.21 Nano Materials & Advanced Technologies Innovation Centre - Interior Elevations A5.23 Nano Materials & Advanced Technologies Innovation Centre - Interior Elevations A5.24 Nano Materials & Advanced Technologies Innovation Centre - 3D View A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's Washrooms - Interior Elevations A5.28 Universal Washroom & Upper Level - Interior Elevations A5.29 Upper Level - Interior Elevations A6.1 Lab Casework Legends A6.2 Millwork Section Details A7.0 Lower Level - Furniture Plan A7.1 Upper Level - Furniture Plan A7.2 Lower Level - Finish Plan A7.3 Upper Level - Finish Plan A7.4 Building Perspective Views A7.5 Building Perspective Views A7.6 Building Perspective Views A7.7 Structural Skeleton & New Building To Existing 3D Reference Views Architectural Sheet List Sheet Number Sheet Name A0.0 Cover Sheet A0.1 OBC & General Notes A0.2 Assemblies, Legends & Details A0.3 (Reserved) Existing Door Schedules, Types A0.4 (Reserved) New Door Schedules, Types A0.5 Room Finish Schedules A0.6 (Reserved) Window & Curtain Wall Type Legend A0.7 (Reserved) Curtain Wall Type Legend A0.8 (Reserved) Screen Type Legend A0.9 (Reserved) Screen Type Legend A0.10 (Reserved) Screen Type Legend A0.11 (Reserved) Screen Type Legend A0.12 Washroom Accessory Legend & Mounting Heights, Barrier Free Design Standards A0.13 Barrier Free Design Standards A1.0 Site Plan - Existing & Demolition A1.1 Site Plan - New A1.2 Site - Plan and Section Details A2.1 Demolition Plans A2.2 Demolition Reflected Ceiling Plans A2.3 Demolition Roof Plan & Details A2.4 Demolition Roof Details A2.5 Lower & Upper Level - Travel Distance Plan A2.6 Crawlspace Plan A2.7 Lower Level - Overall Plan A2.8 Upper Level - Overall Plan A2.9 Enlarged Lower Level - Existing Renovation A2.10 Enlarged Lower Level - New Construction A2.11 Enlarged Upper Level - Existing Renovation A2.12 Enlarged Upper Level - New Construction A2.13 Crawlspace - Renovated Reflected Ceiling Plan A2.14 Lower Level - Renovation Reflected Ceiling Plan A2.15 Upper Level - Renovation Reflected Ceiling Plan A2.16 Penthouse - Renovated Reflected Ceiling Plan A2.17 Penthouse Level Plan A2.18 Overall Roof Plan A2.19 Enlarged Community Ecology Lab, Integrated Freshwater Lab & Equipment Schedules A2.20 Enlarged LU Instrumentation Laboratory A2.21 LU Instrumentation Laboratory Equipment Schedule A2.22 Enlarged Human Origins & Prototype Development Lab A2.23 Enlarged Biomass Utilization Research Lab A2.24 Biomass Equipment Schedule A2.25 Enlarged Nano Materials & Advanced Technologies Innovation Centre A2.26 Nano Materials Equipment Schedule A2.27 Enlarged Washroom Plans A2.28 Elevations North + South A2.29 Elevations East + West A3.1 Building Longitudinal Sections A3.2 Building Cross Sections A3.3 Bridge - Plan & 3D Framing View A3.4 Bridge - Cross & Longitudinal Sections A3.5 Bridge - Plan Details A3.6 Bridge - Section Details A3.7 (Reserved) Building Section Details A3.8 Building Section Details A3.9 (Reserved) Building Section Details A3.10 Building Section Details A3.11 Building Section Details A3.12 Building Section Details A3.13 Building Section Details A3.14 (Reserved) Bulding Section Details A3.15 Building Section Details A3.16 (Reserved) Building Section Details A3.17 (Reserved) Building Section Details A3.18 (Reserved) Building Section Details A3.20 Lower Level Plan Details A3.21 Lower Level Plan Details A3.22 Lower Level Plan Details PRIME CONSULTANT: i4architecture 12 St. Paul Street Thunder Bay, Ontario, P7A 4S5 Tel: (807) 346.2277 Fax: (855) 558.1459 www.i4a.ca LANDSCAPE ARCHITECT: WERNER SCHWAR P.O. Box 21048, 640 River Street Thunder Bay, Ontario, P7A 3S0 Tel: (807) 346-0607 Fax: (807) 346-0607 [email protected] Landscape Sheet List Sheet Number Sheet Name L-1 Layout + Grading Plan L-2 Planting Plan L-3 Details L-4 Planting & Amenity Details INTERIOR DESIGN: Lisa Sandham Interior Design 12 St. Paul Street Thunder Bay, Ontario, P7A 4S5 Tel: (807) 627-3522 www.lisasandham.com Rev. No. Description Date 1 ISSUED FOR COORDINATION 05-MAY-2016 2 ISSUED FOR CLASS 'C' 04-AUG-2016 3 ISSUED FOR CLASS 'B' 50% CONSTRUCTION DOC'S 18-OCT-2016 4 ISSUED FOR PERMIT 05-DEC-2016

CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

Lakehead University - 955 Oliver Road, Thunder Bay

Cover Sheet

LU CASESAddition +Renovation

A0.0

2015-74A

05-DEC-2016

SCV

Lakehead University - 955Oliver Road, Thunder Bay

CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND SCIENCES (CASES)Lakehead University

Mechanical Sheet List

SheetNumber Sheet NameM0.0 Symbols, Legend & Drawing ScheduleM1.1 Crawlspace - Plumbing Demo PlanM1.2 Lower Level - Plumbing Demo PlanM1.3 Upper Level - Plumbing Demo PlanM2.1 Crawlspace - HVAC Demo PlanM2.2 Lower Level - HVAC Demo PlanM2.3 Upper Level - HVAC Demo PlanM2.4 Mechanical Room - HVAC Demo PlanM3.1 Crawlspace - Plumbing Reno PlanM3.2 Lower Level - Sanitary Reno PlanM3.3 Upper Level - Sanitary Reno PlanM3.4 Crawlspace - Domestic Water Piping Reno PlanM3.5 Lower Level - Domestic Water Piping Reno PlanM3.6 Upper Level - Domestic Reno PlanM4.1 Fire Protection Demo PlanM5.1 Crawlspace - HVAC Reno PlanM5.2 Lower Level - General Ventilation Reno PlanM5.3 Lower Level - Lab Supply Air & Exhaust Air Reno PlanM5.4 Upper Level - General Ventilation Reno PlanM5.5 Upper Level - Lab Supply Air & Exhaust Air Reno PlanM5.6 Roof - Mechanical Reno PlanM6.1 Lower Level - Hydronic Reno PlanM6.2 Enlarged Mechanical Room - Hydronic PipingM6.3 Upper Level - Hydronic Reno PlanM6.4 Roof Level - Hydronic Reno PlanM7.1 Lower Level - Enlarged Biomass Utilization Gas LayoutM7.2 Lower Level - Enlarged LU Instrumentation Lab Gas LayoutM7.3 Lower Level - Enlarged Community Ecology and Human Origins Lab Gas

LayoutM7.4 Lower Level - Human Origins Lab & Prototype Development Lab Gas

LayoutM7.5 Upper Level - Enlarged Nano Materials and Advanced Technologies

Innovation Centre Lab Gas LayoutM7.6 Roof - Mechanical Penthouse Lab Gas LayoutM8.1 Lower Level - Fire Protection Reno PlanM8.2 Upper Level - Fire Protection Reno PlanM8.3 Roof - Fire Protection Reno PlanM9.1 Mechanical DetailsM9.2 Mechanical DetailsM9.3 Mechanical DetailsM10.1 General System SchematicM10.2 Lab Exhaust Duct System SchematicM10.3 Lab Supply Duct System SchematicM10.4 Domestic Water SchematicME1.1 Mechanical and Electrical SchedulesME1.2 Mechanical and Electrical SchedulesME1.3 Mechanical and Electrical SchedulesME1.4 Mechanical and Electrical SchedulesME1.5 Mechanical and Electrical SchedulesME1.6 Mechanical and Electrical SchedulesME1.7 Mechanical and Electrical Schedules

Electrical Sheet List

SheetNumber Sheet Name

E1.0 Electrical Symbol Legend & Drawing ListE1.1 Electrical Site PlanEDL2.0 Crawlspace - Lighting Demo PlanEDL2.1 Lower Level - Lighting Demo PlanEDL2.2 Upper Level - Lighting Demo PlanEDL 2.3 Penthouse - Lighting Demo PlanEDP2.0 Crawlspace - Pwr & Sys Demolition PlanEDP2.1 Lower Level - Pwr & Sys Demolition PlanEDP2.2 Upper Level - Pwr & Sys Demolition PlanEDP2.3 Penthouse - Lighting & Renovation PlanE2.0 Crawlspace - Power Distribution Renovation PlanE2.1 Lower Level - Power Distribution Renovation PlanE2.2 Upper Level - Power Distribution Renovation PlanE2.3 Penthouse - Power Distribution Renovation PlanEL2.0 Crawlspace - Lighting Reno PlanEL2.1 Lower Level - Lighting Reno PlanEL2.2 Upper Level - Lighting Reno PlanEL2.3 Penthouse - Lighting Reno PlanEP2.0 Crawlspace - Pwr & Sys Reno PlanEP2.1 Lower Level - Pwr & Sys Reno PlanEP2.2 Upper Level - Pwr & Sys Reno PlanEP2.3 Penthouse - Pwr & Sys Reno PlanES2.0 Crawlspace - Security & Intrusion PlanES2.1 Lower Level - Security & Intrusion PlanES2.2 Upper Level - Security & Intrustion PlanES2.3 Penthouse - Security & Intrusion PlanE4.0 Single Line Distribution DiagramE5.0 Electrical SchedulesE5.1 Electrical SchedulesE5.2 Eelctrical SchedulesE6.0 Electrical Details

Structural Sheet List

SheetNumber Sheet Name

S1.0 Foundation Plan, Footing Schedule, Foundation NotesS1.1 Foundation SectionsS1.2 Foundation Elevations, Foundation Sections, Plan DetailsS2.0 Lower Floor Framing Plan, General Notes, Column ScheduleS3.0 Upper Framing Plan, Partial Framing & Slab Contour Plan, General

Notes, Column ScheduleS4.0 Roof Framing Plan, General Notes, Column ScheduleS4.1 Penthouse / Atrium Roof & Floor Framing Plan, Penthouse Floor

Framing & Slab Contour, General Notes, Column ScheduleS5.0 Structural Elevations, Structural SectionsS5.1 Column Schedule, Structural Sections, Structural ElevationsS6.0 Structural Sections, Structural DetailsS6.1 Penthouse, Structural Sections, Structural Details, Typical Base PlatesS7.0 Bridge Link, Structural Sections, Structural DetailsS7.1 Bridge Link, Structural Sections, Structural Details

Civil Sheet List

Sheet Number Sheet NameA1-351570-G1 Site ServicingA1-351570-G2 Site GradingA1-351570-P1 Sanitary, Storm Sewer and WatermainA1-351570-R1 Sanitary, Storm Sewer and Watermain

STRUCTURAL ENGINEER:

Peterson Design Consultants Inc.R.R. 13, 947 Blind CrescentThunder Bay, Ontario, P7B 5E4Tel: (807) 983-3330

MECHANICAL ENGINEER:

MCW/AGE Consulting Professional Engineers

ELECTRICAL ENGINEER:CIVIL ENGINEER:

HATCH

200 South Syndicate AvenueThunder Bay, Ontario, P7E 1C9Tel: (807) 623-3449Fax: (807) 623-5925www.hatch.ca

114 Hemlock PlaceThunder Bay, Ontario, P7C 1W4Tel: (807) 633-3295Fax: (204) 779-1119www.mcw.com

MCW/AGE Consulting Professional Engineers114 Hemlock PlaceThunder Bay, Ontario, P7C 1W4Tel: (807) 633-3295Fax: (204) 779-1119www.mcw.com

Architectural Sheet List

SheetNumber Sheet Name

A3.23 (Reserved) Upper Level Plan DetailsA3.24 (Reserved) Upper Level Plan DetailsA3.25 Ceiling Section DetailsA3.26 Penthouse Sections - Plan Detail & Section DetailsA3.27 Roof Access Ladder DetailsA3.28 Roof Section DetailsA3.29 Roof Section DetailsA3.30 (Reserved) Building Section DetailsA3.31 (Reserved) Building Section DetailsA3.32 (Reserved) Building Section DetailsA4.1 Existing Stair PlansA4.2 New Stairs PlansA4.3 New Stairs - Sections & 3D ViewA4.4 (Reserved) Stair DetailsA4.5 (Reserved) Stair DetailsA5.0 Shipping/Recieving Area & Community Ecology & Energetics Lab - Interior

ElevationsA5.1 Community Ecology & Integrated Freshwater Lab - Interior ElevationsA5.2 Integrated Freshwater Lab - Interior ElevationsA5.3 Integrated Freshwater Lab - Interior ElevationsA5.4 Community Ecology & Energetics Lab & Intergrated Freshwater Lab 3D

ViewsA5.5 LU Instrumentation Lab - Interior ElevationsA5.6 LU Instrumentation Lab - Interior ElevationsA5.7 LU Instrumentation Lab - Interior ElevationsA5.8 LU Instrumentation Lab - 3D ViewA5.9 Human Origins Lab & Prototype Developement Lab Space - Interior

ElevationsA5.10 Human Origins Lab & Prototype Developement Lab Space - Interior

ElevationsA5.11 Human Origins Lab & Prototype Development Lab Space - 3D ViewA5.12 Biomass Utilization Research Lab - Interior ElevationsA5.13 Biomass Utilization Research Lab - Interior ElevationsA5.14 Biomass Utilization Research Lab - Interior ElevationsA5.15 Biomass Utilization Research Lab - Interior ElevationsA5.16 Biomass Utilization Research Lab - Interior ElevationsA5.17 Biomass Utilization Research Lab - 3D ViewA5.18 Nano Materials & Advanced Technologies Innovation Centre - Interior

ElevationsA5.19 Nano Materials & Advanced Technologies Innovation Centre - Interior

ElevationsA5.20 Nano Materials & Advanced Technologies Innovation Centre - Interior

ElevationsA5.21 Nano Materials & Advanced Technologies Innovation Centre - Interior

ElevationsA5.23 Nano Materials & Advanced Technologies Innovation Centre - Interior

ElevationsA5.24 Nano Materials & Advanced Technologies Innovation Centre - 3D ViewA5.25 Atrium - Interior ElevationsA5.26 Existing & Unisex Washrooms - Interior ElevationsA5.27 Men's & Women's Washrooms - Interior ElevationsA5.28 Universal Washroom & Upper Level - Interior ElevationsA5.29 Upper Level - Interior ElevationsA6.1 Lab Casework LegendsA6.2 Millwork Section DetailsA7.0 Lower Level - Furniture PlanA7.1 Upper Level - Furniture PlanA7.2 Lower Level - Finish PlanA7.3 Upper Level - Finish PlanA7.4 Building Perspective ViewsA7.5 Building Perspective ViewsA7.6 Building Perspective ViewsA7.7 Structural Skeleton & New Building To Existing 3D Reference Views

Architectural Sheet List

SheetNumber Sheet Name

A0.0 Cover SheetA0.1 OBC & General NotesA0.2 Assemblies, Legends & DetailsA0.3 (Reserved) Existing Door Schedules, TypesA0.4 (Reserved) New Door Schedules, TypesA0.5 Room Finish SchedulesA0.6 (Reserved) Window & Curtain Wall Type LegendA0.7 (Reserved) Curtain Wall Type LegendA0.8 (Reserved) Screen Type LegendA0.9 (Reserved) Screen Type LegendA0.10 (Reserved) Screen Type LegendA0.11 (Reserved) Screen Type LegendA0.12 Washroom Accessory Legend & Mounting Heights, Barrier Free Design

StandardsA0.13 Barrier Free Design StandardsA1.0 Site Plan - Existing & DemolitionA1.1 Site Plan - NewA1.2 Site - Plan and Section DetailsA2.1 Demolition PlansA2.2 Demolition Reflected Ceiling PlansA2.3 Demolition Roof Plan & DetailsA2.4 Demolition Roof DetailsA2.5 Lower & Upper Level - Travel Distance PlanA2.6 Crawlspace PlanA2.7 Lower Level - Overall PlanA2.8 Upper Level - Overall PlanA2.9 Enlarged Lower Level - Existing RenovationA2.10 Enlarged Lower Level - New ConstructionA2.11 Enlarged Upper Level - Existing RenovationA2.12 Enlarged Upper Level - New ConstructionA2.13 Crawlspace - Renovated Reflected Ceiling PlanA2.14 Lower Level - Renovation Reflected Ceiling PlanA2.15 Upper Level - Renovation Reflected Ceiling PlanA2.16 Penthouse - Renovated Reflected Ceiling PlanA2.17 Penthouse Level PlanA2.18 Overall Roof PlanA2.19 Enlarged Community Ecology Lab, Integrated Freshwater Lab & Equipment

SchedulesA2.20 Enlarged LU Instrumentation LaboratoryA2.21 LU Instrumentation Laboratory Equipment ScheduleA2.22 Enlarged Human Origins & Prototype Development LabA2.23 Enlarged Biomass Utilization Research LabA2.24 Biomass Equipment ScheduleA2.25 Enlarged Nano Materials & Advanced Technologies Innovation CentreA2.26 Nano Materials Equipment ScheduleA2.27 Enlarged Washroom PlansA2.28 Elevations North + SouthA2.29 Elevations East + WestA3.1 Building Longitudinal SectionsA3.2 Building Cross SectionsA3.3 Bridge - Plan & 3D Framing ViewA3.4 Bridge - Cross & Longitudinal SectionsA3.5 Bridge - Plan DetailsA3.6 Bridge - Section DetailsA3.7 (Reserved) Building Section DetailsA3.8 Building Section DetailsA3.9 (Reserved) Building Section DetailsA3.10 Building Section DetailsA3.11 Building Section DetailsA3.12 Building Section DetailsA3.13 Building Section DetailsA3.14 (Reserved) Bulding Section DetailsA3.15 Building Section DetailsA3.16 (Reserved) Building Section DetailsA3.17 (Reserved) Building Section DetailsA3.18 (Reserved) Building Section DetailsA3.20 Lower Level Plan DetailsA3.21 Lower Level Plan DetailsA3.22 Lower Level Plan Details

PRIME CONSULTANT:

i4architecture12 St. Paul StreetThunder Bay, Ontario, P7A 4S5Tel: (807) 346.2277Fax: (855) 558.1459www.i4a.ca

LANDSCAPE ARCHITECT:

WERNER SCHWAR

P.O. Box 21048, 640 River StreetThunder Bay, Ontario, P7A 3S0Tel: (807) 346-0607Fax: (807) [email protected]

Landscape Sheet List

SheetNumber Sheet Name

L-1 Layout + Grading PlanL-2 Planting PlanL-3 DetailsL-4 Planting & Amenity Details

INTERIOR DESIGN:

Lisa Sandham Interior Design12 St. Paul StreetThunder Bay, Ontario, P7A 4S5Tel: (807) 627-3522www.lisasandham.com

Rev.No. Description Date

1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50%

CONSTRUCTION DOC'S18-OCT-2016

4 ISSUED FOR PERMIT 05-DEC-2016

Page 2: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

# Pound OR Number& And@ AtAB Air BarrierACT Acoustic Ceiling TileAFF Above Finished FloorALUM AluminumANOD AnodizedAVB Air-Vapor BarrierBF Barrier FreeBSMT BasementBYND BeyondBOT BottomCHNL ChannelCIP Cast In PlaceCJ Control JointCLG CeilingCLR ClearCM Concrete Masonry UnitCOL ColumnCONC ConcreteCONT ContinuousCPT CarpetCR Card ReaderCT Ceramic TileDBL DoubleDEMO Demolish or DemolitionDGL Double GlazingDIA DiameterDIM DimensionDIMS DimensionsDN DownDWG DrawingEA EachEJ Expansion JointEL ElevationELEC ElectricalELEV ElevatorEPDM Ethylene Propylene Diene M-Class (Roofing / Membrane)EQ EqualEXIST'G ExistingEXT ExteriorFD Floor DrainFEC Fire Extinguisher CabinetFF Finished FaceFGL Fire Glass/Ceramic GlassFIXT FixtureFLR FloorFO Face OfFPA-R Fall Protection Anchor - Roof MountedFPA-W Fall Protection Anchor - Wall MountedFND FoundationG1S Good One SideGA GaugeGALV GalvanizedGWB Gypsum Wall BoardHC Hollow CoreHM Hollow MetalHR HourHVAC Heating, Ventilating, And Air ConditioningIGL Insulated GlassINSUL Insulated or InsulationINT InteriorLGL Laminated GlassMAX MaximumMO Masonry OpeningMECH MechanicalMEMBR MembraneMIN MinimumMTL MetalNIC Not In ContractNO NumberNOM NominalOC On CenterO/F Outside FacePCC Pre-Cast ConcretePGL Plain GlassPLUMB PlumbingPLYD PlywoodPTD Pressure TreatedPMF Pre-finished Metal FlashingPNT Paint or PaintedPWT Perimeter Weep TilePVC Polyvinyl ChlorideRBR RubberRCP Reflected Ceiling PlanRD Roof DrainREQD RequiredRM RoomSCW Solid Core WoodSGC Soil Gas ControlSD Scupper Drain (Roof)SIM SimilarSPEC Specified OR SpecificationSPK SpeakerS/S Stainless SteelSTC Sound Transmission CoefficientSTL SteelSTN Stained and SealedSTRUCT Structure or StructuralSWG Safety Wired GlassT&G Tongue And GrooveTELE TelephoneTLT ToiletTO Top OfTOC Top Of ConcreteTOS Top Of SteelTM Transition MembraneTPD Toilet Paper DispenserT/D Telephone/DataTYP TypicalU/S UndersideVIF Verify In FieldVP Vision PanelVB Vapor BarrierW/ WithWD Wood

Abbreviation Legend

ONTARIO'S 2012 BUILDING CODE DATA MATRIX PARTS 3 & 9

ITEM OBC REFERENCE

1 PROJECT DESCRIPTION: NEW

ADDITION

ALTERATIONCHANGE OF USE

PART 11 PART 3 PART 9

11.1 TO 11.4 1.1.2. [A] 1.1.2. [A] & 9.10.1.3.

2 MAJOR OCCUPANCY(S): 3.1.2.1.(1) 9.10.2

3 BUILDING AREA (metres square) 1.4.1.2. [A] 1.4.1.2. [A]EXISTING NEW TOTAL

4 GROSS AREA (metres square) 1.4.1.2. [A] 1.4.1.2. [A]EXISTING NEW TOTAL

5 NUMBER OF STOREYS 1.4.1.2. [A] & 3.2.1.1. 1.4.1.2.[A] & 9.10.4ABOVE GRADE BELOW GRADE

6 NUMBER OF STREETS/FIRE FIGHTER ACCESS: 3.2.2.10 & 3.2.5 9.10.20.

7 BUILDING CLASSIFICATION: 3.2.2.20-.83 9.10.2.

8 SPRINKLER SYSTEM PROPOSED 3.2.2.20-.83 9.10.8.2.ENTIRE BUILDING3.2.1.5SELECTED COMPARTMENTS3.2.2.17SELECTED FLOOR AREAS

NOT REQUIRED

9 STANDPIPE REQUIRED 3.2.9 N/AYES NO

10 FIRE ALARM REQUIRED 3.2.4 9.10.18.YES NO

11 WATER SERVICE/SUPPLY IS ADEQUATE 3.2.5.7 N/AYES NO

12 HIGH BUILDING 3.2.6 N/AYES NO

13 CONSTRUCTION RESTRICTIONS 3.2.2.20-.83 9.10.6NON-COMBUSTIBLEREQUIRED

COMBUSTIBLEPERMITTED

BOTH

ACTUAL CONSTRUCTIONNON-COMBUSTIBLECOMBUSTIBLE BOTH

14 MEZZANINE(S) AREA (metres square): 3.2.1.1.(3)-(8) 9.10.4.1

15 OCCUPANT LOAD BASED ON 3.1.17 9.9.1.3DESIGN OF BUILDINGAREA

1st FLOOR: LOADOCCUPANCY persons

2nd FLOOR: LOADOCCUPANCY persons

3rd FLOOR: LOADOCCUPANCY persons

4th FLOOR: LOADOCCUPANCY persons

FOR ADDITIONAL FLOORS (IF REQUIRED), REFER TO BELOW

16 BARRIER-FREE DESIGN 3.8 9.5.2YES NO (EXPLAIN)

17 HAZARDOUS SUBSTANCES 3.3.1.2 & 3.3.1.19 9.10.1.3(4)YES NO

18 REQUIRED 3.2.2.20-.83 & 3.2.1.4 9.10.8HORIZONTAL ASSEMBLIESFRR (HOURS)FIRE 9.10.9

RESISTANCE FLOORS HOURSRATING ROOF HOURS

(FRR)MEZZANINE HOURS

FRR OF SUPPORTING MEMBERSLISTED DESIGN NO.

OR DESCRIPTION (SG-2)

FLOORS HOURS

ROOF HOURS

MEZZANINE HOURS

19 SPATIAL SEPARATION - CONSTRUCTION OF EXTERIOR WALLS 3.2.3 9.10.14

WALL

NORTH

SOUTH

EAST

WEST

AREA OF EBF (m2)

L.D. (m)

L/H OR H/L

PROPOSED % OF OPENINGS

FRR (HOURS)

LISTED DESIGN OR

DESCRIPTION

COMB. CONST

COMB. CONSTR. NONC.

CLADDING

NON-COMB. CONSTR.

FOR ADDITIONAL WALLS (IF NECESSARY), REFER TO BELOW. ABOVE APPLIES TO NEW ADDITION ONLY.

20 PLUMBING FACILITIES: (OBC 3.7.4)

FIRM NAME:

CERTIFICATE OF PRACTICE NUMBER:

NAME OF PROJECT:

CORY R STECHYSHYN ARCHITECT INC - O/A I4ARCHITECTURE12 ST PAUL ST THUNDER BAY, ON CANADA, P7A 465T. 807 346 2277F. 855 558 1459i4a.ca

4394

LU - CENTRE FOR ADVANCED STUDIES IN ENGINEERING & SCIENCES

PROJECT LOCATION: 955 OLIVER ROAD, THUNDER BAY, ONTARIO

GROUP-A, DIVISION 2

1103 m2

TWO N/A

TWO

3.2.2.2.6 GROUP A, DIVISION 2, UP TO 2 STORIES, INCREASED AREA, SPRINKLERED

2 STAGE FIRE ALARM DESIGNED

N/A

XXX

XXX

0 HR.

N/A

0 HR.

NON-COMBUSTIBLE CONSTN.

NOT REQUIRED

References are to Division B unless noted[A] for Divison A or [C] for Division C.

INDEXBASEMENT IN LIEU OF ROOF RATING INDEX

LEGAL DESCRIPTION:

GROUP '2' XXX /m2

GROUP '2' XXX /m2

21

OCCUPANCY TYPE TABLE / CLAUSE REQ'D W/C OCCUPANCY COUNT REQUIRED WATER CLOSET COUNT PROVIDED

GROUP 'A' - DIV 2 OBC 3.7.4.3.(15) 75 FEMALE & 100 MALE 6 FEMALE W/C & 5 MALE W/C ( 2 URINALS IN LIEU OF MALE W/C's)

BARRIER FREE WASHROOMS: 5 TOTAL W/C(s) INCLUDED IN THE REQUIRED FIXTURE COUNT ABOVE HAVE BEEN DESIGNATED BARRIER FREE AND ARE WITHIN 45m TRAVEL DISTANCE TO ANY NON-BARRIER FREE WASHROOM ON THE SAME LEVEL UNLESS NOT REQUIRED UNDER OBC 3.8.2.3. ALL DESIGNATED BARRIER FREE WASHROOMS ARE DESIGNED TO MEET THE APPROPRIATE REQUIREMENTS IN ARTICLES 3.8.3.8. TO 3.8.3.12.

URINALS: WHERE MORE THAN 1 PROVIDED IN A ROOM, SHALL CONFORM TO 3.8.3.10.(2)

LAVATORY COUNTS: LAVATORY COUNTS ARE DESIGNED TO CONFORM TO OBC 3.7.4.2.(6)

OTHER - DESCRIBE:

Ontario's Building Code Data Matrix Parts 3 & 9

2204 m2

2117.6 m2

4413.2 m2

1014.6 m2

2029.2 m2

NON-COMBUSTIBLE CONSTN.

0 HR.

N/A

0 HR.

NON-COMBUSTIBLE CONSTN.

NOT REQUIRED

NON-COMBUSTIBLE CONSTN.

LISTED DESIGN NO.OR DESCRIPTION (SG-2)

GROUP 'A' - DIV 2 OBC 3.8.3.12 1 UNIVERSAL W/R 1 PROVIDED ON UPPER FLOOR LEVEL

PUBLIC CORRIDOR: ARE CORRIDORS USED BY THE PUBLICI AND TRAVEL DISTANCE IS WITHIN 45m, NO CORRIDOR FIRE SEPERATIONS REQ'D

INTERCONNECTED FLOOR SPACE

PERMITTED MAX % OF OPENINGS

EXISTING CONDITION

NO

T AP

PLIC

ABLE

22 ENERGY EFFICIENCY DESIGN - PART 3 BUILDING: (OBC SUPPLEMENTARY STANDARD SB-10) (EFFECTIVE DEC. 31, 2016)

CLIMATIC ZONE: THUNDER BAY - ZONE 7

YES NO

CLIMATIC ZONE BUILDING ENVELOPE TABLE: TABLE SB5.5-7 (IMPERIAL)

BUILDING ENERGY MODELLING:

OPAQUE ELEMENTS:

ROOFS:

ASSEMBLY MAXIMUM U VALUE:

U-0.028

INSULATION MINIMUM R-VALUE:

R35.0 ci

WALLS ABOVE GRADE: U-0.037 R18.8 ci

INSUL. ABOVE DECK

STEEL FRAMED

WALLS BELOW GRADE: C-0.050 R20.0 ciBELOW GRADE

FLOORS: N/A

SLAB ON GRADE FLOORS: F-0.300 R15.0 for 24" + R5.0 ci BELOWUNHEATED

ELEMENT TYPE:

OPAQUE DOORS: U-0.400 N/ASWINGING

BUILDING TYPE: NON-RESIDENTIAL

FENESTRATION:

VERTICAL FENESTRATION, 0% TO 40% OF WALL

ASSEMBLY MAXIMUM U VALUE: ASSEMBLY MAXIMUM SHGC:

NON-METAL FRAMING: ALL U-0.25 0.45

METAL FRAMING: CURTAIN WALL / STOREFRONT U-0.30 0.45

METAL FRAMING: ENTRANCE FRAME U-0.70 0.45

METAL FRAMING: ALL OTHER U-0.35 0.45

SKYLIGHT WITH CURB - GLASS, 0% TO 5% OF ROOF: U-0.67 0.46

SKYLIGHT WITH CURB - PLASTIC, 0% TO 5% OF ROOF: U-0.69 0.50

FENESTRATION CALCULATIONS:

GROSS WALL AREA:

TOTAL WINDOW AREA:

TOTAL EXTERIOR DOOR AREA:

RATIO TOTAL VERTICAL FENESTRATION AND DOOR AREA / TOTAL GROSS WALL AREA:

- GROSS ROOF AREA:

TOTAL SKYLIGHT AREA:

EXPOSED FLOOR AREA:

RATIO TOTAL SKYLIGHT AREA/ TOTAL GROSS ROOF AREA:

OTHER ENERGY EFFICIENCY REQUIREMENTS - DESCRIBE:

PROJECT IS TARGETING LEED GOLD CERTIFICATION , ENERGY MODELLING HAS BEEN UNDERTAKEN.

NOT REQUIRED - BUILDING ENERGY MODEL PERFORMED

-

-

-

-

-

-

-

SCREEN TAG SC??

XXXXXXXXX

Ref

101

XX

XXAX.XX AX.XX

Ref

SC??

DETAILS

BUILDING SECTION

STRUCTURAL GRID & BUBBLE

ROOM NAME & NUMBER TAG

ELEVATIONS/DATUMS

CEILING HEIGHT

DOOR NUMBER

INTERIOR/EXTERIOR WALL TYPE TAG

WINDOW/LOUVER TYPE TAG

LIGHT FIXTURE w/ TYPE TAG

CEILING MATERIAL

Symbol Legend

XXXXXXXXX

Ref DETAIL NUMBER

SHEET NUMBER WHEREDETAIL REFERENCE FOUND

SHEET NUMBER WHEREDETAIL IS DRAWN

EXTERIOR BUILDING ELEVATION

INTERIOR BUILDING ELEVATION

CEILING TAG

AX.XX XX

DETAIL NUMBERSHEET NUMBER WHERE DRAWN

Level NameElevation

PARTITION TYPEFIRE RATING DESIGNATION

XD

AX.XX XX

P?????

ACT 1' - 0"

Room name

101

ROOM NAME, ROOM AREA & NUMBER TAGRoom name

101

150 m2

DETAIL NUMBERSHEET NUMBER WHERE DRAWN

CURTAIN WALL TAG CW?

ARCHITECTURAL

COMPLETE RENOVATION OF EXISTING 2 STOREY BUILDING AND ADDITION OF 2 STORY BUILDING , INCLUDING SITE WORK, LANDSCAPING AND A BRIDGE LINK TO THE EXISITNG ADJACENT LIBRARY BUILDING.

STRUCTURAL

MECHANICAL

DEMOLITION IN THE EXISTING BUILDING WILL INCLUDE THE REMOVAL OF AIR HANDLING EQUIPMENT AND CIRCULATING PUMPS IN THE PENTHOUSE MECHANICAL ROOM, AND CIRCULATING PUMPS, HEAT EXCHANGERS AND ASSOCIATED PIPEWORK IN THE LOWER LEVEL MECHANICAL ROOM. THE EXISTING ROOF MOUNTED COOLING TOWER WILL BE REMOVED TOGETHER WITH EXISTING ROOF MOUNTED EXHAUST FANS, AND FUME HOOD EXHAUST DUCTWORK. SECTIONS OF THE LABORATORY SUPPLY DUCTWORK, GENERAL SUPPLY DUCTWORK AND GENERAL EXHAUST AIR DUCTWORK WILL BE REMOVED, AND THE MAJORITY OF LOCAL SUPPLY DUCTS FROM EXISTING HEAT PUMPS WILL ALSO BE REMOVED. ACID WASTE PIPEWORK AND ACID DILUTION TANKS WILL BE DISCONNECTED AND REMOVED, AND ALL SPRINKLER HEAD CONNECTIONS FROM THE EXISTING TRI-WATER SYSTEM AND EXISTING SPRINKLER HEADS WILL BE REMOVED.

RENOVATION OF THE EXISTING BUILDING WILL INCLUDE NEW AIR HANDLING UNITS FOR LABORATORY AND GENERAL SUPPLY SYSTEMS, WITH A NEW FUME HOOD EXHAUST SYSTEM AND GENERAL EXHAUST SYSTEM WITH HEAT RECOVERY. EXISTING HEAT PUMPS SHALL GENERALLY BE RETAINED IN THEIR EXISTING LOCATIONS, WITH SUPPLY AIR DISTRIBUTION DUCTS BEING REPLACED. HEAT EXCHANGE EQUIPMENT SHALL BE RENEWED, INCLUDING THE COOLING TOWER, TOGETHER WITH CIRCULATING PUMPS ASSOCIATED WITH HEATING AND COOLING SYSTEMS. NEW DOMESTIC HOT AND COLD WATER SYSTEMS SHALL SERVE NEW FIXTURES, AND NEW LABORATORY GAS AND SPRINKLER SYSTEMS SHALL BE INSTALLED. NEW ACID WASTE PIPEWORK FROM FIXTURES IN THE EXISTING WING SHALL CONNECT TO THE ACID WASTE SYSTEM IN THE NEW WING.

THE NEW ADDITION SHALL BE PROVIDED WITH NEW AIR HANDLING UNITS FOR LABORATORY AND GENERAL SUPPLY, WITH A NEW FUME HOOD EXHAUST SYSTEM AND GENERAL EXHAUST SYSTEM WITH HEAT RECOVERY. A NEW HEAT PUMP SYSTEM WITH LOW TEMPERATURE WATER CIRCULATION SHALL BE PROVIDED. EXHAUST SYSTEMS SHALL BE PROVIDED IN WASHROOMS, PRINT ROOMS, GAS BOTTLE STORES, ETC. NEW PIPED SERVICES SHALL INCLUDE DOMESTIC HOT AND COLD WATER SYSTEMS, SANITARY, ACID WASTE, LABORATORY GASES, AND SPRINKLER SERVICES. A NEW ACID DILUTION TANK SHALL BE PROVIDED IN THE CRAWLSPACE, AND THIS SHALL BE A SINGLE SOURCE FACILITY FOR BOTH THE RENOVATED AND NEW ADDITION. A NEW DDC AUTOMATIC CONTROL SYSTEM SHALL BE INSTALLED, AND THIS SHALL BE INTEGRATED WITH RETAINED CONTROLS WITHIN THE RENOVATED WING.

ELECTRICAL

DEMOLITION IN THE EXISTING BUILDING WILL INCLUDE THE REMOVAL OF ALL LUMINAIRES, SWITCHES AND EMERGENCY FIXTURES LOCATED ON THE LOWER AND UPPER LEVELS, BASEMENT AND PENTHOUSE LUMINAIRES WILL REMAIN THE SAME. ALL ELECTRICAL DISTRIBUTION SUB-PANELS, GENERAL POWER OUTLETS AND SPECIFIED MECHANICAL EQUIPMENT LOCATED ON THE LOWER AND UPPER LEVELS WILL BE REMOVED. ALL NETWORKING OUTLETS (VOICE/DATA) AND RACKS SHALL BE REMOVED ALL FIRE ALARM DEVICES WILL BE REMOVED INCLUDING THE FIRE ALARM CONTROL PANEL. ALL PUBLIC-ADDRESS SYSTEMS WILL BE REMOVED. ALL CABLING AND WIRING FOR THE ABOVE COMPONENTS WILL BE REMOVED BACK TO SOURCE. ELECTRICAL DISTRIBUTION CONSISTING OF 4160V SWITCHGEAR AND SPECIFIC DISTRIBUTION PANELS SHALL REMAIN.

RENOVATION OF THE EXISTING BUILDING AND THE ADDITION TO THE BUILDING SHALL INCLUDE NEW LUMINAIRES, SWITCHES AND OCCUPANCY SENSORS PER THE DESIGN LAYOUT. NEW LIFE SAFETY DEVICES. NEW ELECTRICAL DISTRIBUTION SUB-PANELS, RECEPTACLES AND CONTROLS FOR EXISTING AND NEW MECHANICAL EQUIPMENT. NEW NETWORK SYSTEM (VOICE/DATA) OUTLETS LOCATIONS ONLY WITH NEW RACKS (CABLING BY LU). NEW FIRE ALARM DEVICES INCLUDING NEW EDWARDS EST3 - FIRE ALARM CONTROL PANEL. NEW PUBLIC ADDRESS SYSTEMS. NEW SECURITY CAMERA SYSTEM. NEW CABLING AND WIRING THROUGHOUT. ELECTRICAL DISTRIBUTION CONSISTING OF 4160V SWITCHGEAR AND SPECIFIC DISTRIBUTION PANELS SHALL REMAIN AND NEW SUB-PANELS WILL CONNECT TO EXISTING DISTRIBUTION. NEW EMERGENCY POWER VIA CAMPUS EMERGENCY POWER SUPPLY SHALL BE ROUTING INTO THE BUILDING FOR USE BY REQUIRED EQUIPMENT.

IF THE 4160V ELECTRICAL SERVICES IS INCLUDED, PROVIDE THE FOLLOWING:NEW POWERHOUSE BLDG. SHALL BE ERECTED FOR FUTURE GROWTH OF THE LU CAMPUS, THIS WILL INCLUDE THE REMOVAL OF THE ABANDONED FEEDER, INSTALLATION OF NEW FEEDER AND RELOCATION OF EXISTING FEEDER. NEW 4160V SWITCHGEAR INSTALLED FOR CAPACITY OF THE LU CASES BLDG. AND FUTURE. DISCONNECT THE EXISTING CNFER BLDG. 4160V SWITCHGEAR FROM THE LIBRARY BLDG. AND RE-CONNECT THE LU CASES BLDG. TO THE NEW POWERHOUSE BLDG.

CIVIL

LANDSCAPE

THE LANDSCAPE SCOPE OF WORK INVOLVES BOTH ‘HARD ‘AND ‘SOFT’ LANDSCAPE ELEMENTS AND THE ROUGH GRADING AND SITE PREPARATION FOR BOTH. HARD LANDSCAPING IS TO INCLUDE POURED IN PLACE CONCRETE PLANTER AND FREESTANDING SEATWALLS, TERRACED BOULDER RETAINING WALLS AS WELL AS DECORATIVE PATTERNED UNIT PAVING PATIO AREAS AND CONCRETE SIDEWALKS. IN ADDITION, THE SUPPLY AND INSTALLATION OF SITE AMENITIES SUCH AS BENCHES AND ACCENT LIGHTING IS INCLUDED IN HARD-SCAPING. SOFT LANDSCAPING IS TO INCLUDE SODDING, TREE, SHRUB AND PERENNIAL PLANTING AND THE PREPARATION OF PLANTING BEDS AND ROCK GARDEN BOULDERS. LOW IMPACT DESIGN STORMWATER MANAGEMENT AREAS WILL BE CREATED INTEGRATING SOFT LANDSCAPE GRADING AND PLANTING WITH ENGINEERED SOIL AND GRANULAR MIXES AND SUBGRADE DRAINAGE STRUCTURES.

Scope of WorkTHIS OUTLINE IS PROVIDED AS GENERAL REFERENCE AND SHOULD BE READ IN CONJUNCTION WITH ALL DRAWINGS AND SPECIFICATIONS.

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

OBC & General Notes

LU CASESAddition +Renovation

A0.1

2015-74A

05-DEC-2016

SCV

Lakehead University - 955Oliver Road, Thunder Bay

Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

4 ISSUED FOR PERMIT 05-DEC-2016

Page 3: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

Interior Partition Assemblies - Wood + Metal Stud - New Construction

TAG ASSEMBLY THICKNESS (5/8" / 16mm) NOTES

P1

M

SI

GYPSUM WALL BOARD41 METAL STUDS @ 400 O/CGYPSUM WALL BOARD

GYPSUM WALL BOARD1 5/8" METAL STUDS @ 16" O/CGYPSUM WALL BOARD

73

2-7/8"

P2

GYPSUM WALL BOARD64 METAL STUDS @ 400 O/CGYPSUM WALL BOARD

GYPSUM WALL BOARD2 1/2" METAL STUDS @ 16" O/CGYPSUM WALL BOARD

96

3-3/4"

P3

GYPSUM WALL BOARD92 METAL STUDS @ 400 O/CGYPSUM WALL BOARD

124

4-7/8"

P4

GYPSUM WALL BOARD152 METAL STUDS @ 400 O/CGYPSUM WALL BOARD

184

7-1/4"

P5

GYPSUM WALL BOARD203 METAL STUDS @ 400 O/CGYPSUM WALL BOARD

235

9-1/4"

GYPSUM WALL BOARD3-5/8" METAL STUDS @ 16" O/CGYPSUM WALL BOARD

GYPSUM WALL BOARD6" METAL STUDS @ 16" O/CGYPSUM WALL BOARD

GYPSUM WALL BOARD8" METAL STUDS @ 16" O/CGYPSUM WALL BOARD

-

-

-

-

76

3"

-

-

-

-

SOUND ATT.THICKNESS

P6

GYPSUM WALL BOARD250 METAL STUDS @ 400 O/CGYPSUM WALL BOARD

282

11-1/4"GYPSUM WALL BOARD10" METAL STUDS @ 16" O/CGYPSUM WALL BOARD

-

-

P7

GYPSUM WALL BOARD300 METAL STUDS @ 400 O/CGYPSUM WALL BOARD

GYPSUM WALL BOARD12" METAL STUDS @ 16" O/CGYPSUM WALL BOARD

-

-

1 HOUR FRR = ULC DESIGN #W407 STC = 51

NOTE: USE 16 GYPSUM WALL BOARD ALL ASSEMBLIES UNLESS OTHERWISE NOTED

UNITSVISUAL

336

12-3/4"

M

SI

M

SI

M

SI

M

SI

M

SI

M

SI

P8

GYPSUM WALL BOARD (1 SIDE)64 METAL STUDS @ 400 O/C

GYPSUM WALL BOARD (1 SIDE) 5/8" METAL STUDS @ 16" O/C

-

-

80M

SI

P9

GYPSUM WALL BOARD (1 SIDE)92 METAL STUDS @ 400 O/C

GYPSUM WALL BOARD (1 SIDE)2 1/2" METAL STUDS @ 16" O/C

-

-

108M

SI

P10

GYPSUM WALL BOARD (1 SIDE)152 METAL STUDS @ 400 O/C

GYPSUM WALL BOARD (1 SIDE)3 5/8" METAL STUDS @ 16" O/C

-

-

168M

SI

3-1/8"

4-1/4"

6-5/8"

P11

GYPSUM WALL BOARD 102 METAL STUDS @ 400 O/C

GYPSUM WALL BOARD (1 SIDE)4" METAL STUDS @ 16" O/C

-

-

134M

SI 5-1/4"

P11

25 SHAFTWALL GYPSUM LINER PANEL

64 CH STUDS16 TYPE-X GYPSUM BOARD

105M 45 MIN FRR

Exterior Wall Assemblies - Existing Construction

ASSEMBLY NOTESVISUALTAG

250 CONCRETE FOUNDATION WALL38 RIGID INSULATION'INSULCRETE' INSULATION PROTECTION COATING AT ABOVEGRADE LOCATIONS AND TO 300BELOW FINISH GRADE

Interior Partition Assemblies - Existing Construction

ASSEMBLYVISUALTAG

'INSULCRETE' INSULATION PROTECTIONCOATING AT ABOVE GRADE LOCATIONSAND TO 300 BELOW FINISH GRADE38 RIGID INSULATION250 CONCRETE FOUNDATION WALL152 METAL STUDS @ 400 O/C16 GYPSUM BOARD

16 GYPSUM BOARD22 FURRING CHANNELS @ 400 O/C HORIZONTALLY150 CONCRETE BLOCK

16 GYPSUM BOARD92 METAL STUDS @ 400 O/CNOISE STOP INSULATION16 GYPSUM BOARD

16 GYPSUM BOARD152 METAL STUDS @ 400 O/CNOISE STOP INSULATION16 GYPSUM BOARD

XW1

XW2

XW3

XW4

XW5

XW6

PREFINISHED METAL CLADDING38 RIGID INSULATIONAIR BARRIER MEMBRANE (TYVEK)16 GYPSUM BOARD SHEATHING 152 METAL STUDS @ 400 O/CBATT INSULATION R.S.I. 3.5VAPOUR BARRIER16 GYPSUM BOARD

100 BRICKMASONRY TIES @ 400 O/C VERTICALLYAND 600 O/C HORIZONTALLY16 GYPSUM BOARD92 METAL STUDS @ 400 O/C92 METAL STUDS @ 400 O/C16 GYPSUM BOARD

250 CONCRETE BLOCK

XP1

XP2

XP3

XP4

XP5

XP6

XP7

XP8

250 CONCRETE WALL

100 CONCRETE WALL

16 GYPSUM BOARD92 METAL STUDS @ 400 O/CNOISE STOP INSULATION92 METAL STUDS @ 400 O/C16 GYPSUM BOARD

16 GYPSUM BOARD92 METAL STUDS @ 400 O/CNOISE STOP INSULATION16 GYPSUM BORAD

100 BRICKAIR SPACEMASONRY TIES @ 400 O/C VERTICALLYAND 600 O/C HORIZONTALLY38 RIGID INSULATIONAIR BARRIER MEMBRANE (TYVEK)16 GYPSUM BOARD SHEATHING152 STUDS @ 400 O/CBATT INSULATION R.S.I. 3.5VAPOUR BARRIER16 GYPSUM BOARD

100 BRICKAIR SPACEMASONRY TIES @ 400 O/C VERTICALLYAND 600 HORIZONTALLY38 RIGID INSULATIONAIR BARRIER MEMBRANE16 GYPSUM BOARD SHEATHING152 METAL STUDS @ 400 O/CBATT INSULATION R.S.I. 3.5VAPOUR BARRIER16 GYPSUM BOARDMASONRY TIES @ 400 O/C VERTICALLYAND 600 O/C HORIZONTALLY100 CONCRETE BLOCK

NOTES

XP1412.5 G.I.S. PLYWOOD (PAINTED)38x89 WOOD STUDS @ 400 O/C

• All fire-rated partitions are to use type-x or firecode-C labelled gypsum board of thickness suitable to achieve fire-rating

• Non rated fire separations require, at a minimum:- Top of wall fire-stopping- Smoke sealing of all penetrations- Fire taping- Door closers

• Rated fire separation require fire rated closures, dampers in addition to above.• Submit ULC rated designs from chosen fire-stop material manufacturer prior to

performing related work.- Perform work in accordance with manufacturer's written instruction.

• Sound attenuation insulation in fire rated walls or partitions exceeding a 45-minute rating is to be mineral wool based, all insulation is to be rated for fire separations of their specified rating

• Firestopping is to be completed on both sides of partitions unless otherwise specifically designed to be one-sided, as in shaft wall construction.

• Electrical boxes cannot be located within same stud space on opposite sides of the partitions unless properly fire-stopped.

Fire Rated Wall and Partition Notes

• Refer to plans for partition tags, not all partition assemblies are used.

• Where a partition is shown without a tag, use partition type P3, full height with sound attenuation.

• Wall and partition type are followed by a letter designation indicating the following requirements where used (more than one letter may be used):

*All fire rated walls are full height, continuous

A = Non rated fire separationB = 30 minute fire separationC = 45 minute fire separationD = 60 minute (1 hr) fire separationE = 90 minute (1.5 hr) fire separationF = 120 minute (2 hr) fire separationG = 180 minute (3 hr) fire separationH = Full height partitionJ = Wall height to min. 150mm above ceilingsK = Wall to finish at u/s ceiling, tapeable L mold @

t-bar, tape @ GWBL = Load bearing wallM = Wall height to u/s floor/ceiling joistsN = Gypsum one side onlyP = Plumbing wallS = Sound attenuation acoustic seal top and

bottom track continuous

Wall and Partition Type Legend

Floor Assemblies - Existing

TAG ASSEMBLY

XF1 100 CONCRETE TOPPINGMTL DECK

CONSTRUCTION

F1 TYP. LOWER + UPPER FLOOR SLAB

100 CONCRETE SLAB38 MTL DECK

Floor Assemblies - New

TAG ASSEMBLYCONSTRUCTION

F2 PENTHOUSE FLOOR SLAB

150 CONCRETE SLAB76mm MTL DECK(SEE PLAN FOR HOUSEKEEPING PADS)

F3 CRAWLSPACE FLOOR

50 SAND LAYER15 MIL VAPOUR BARRIERGRANULAR-B FILL

Roof Assemblies - Existing

TAG ASSEMBLY

XR15 ROOF MEMBRANE13 PLYWOOD2 LAYERS 75 RIGID INSULATIONAIR/VAPOUR BARRIERSLOPED REINFORCED CONCRETE SLAB ON 38 MTL DECK

CONSTRUCTION

XR17 ROOF MEMBRANE13 PLYWOOD2 LAYERS 75 RIGID INSULATIONAIR/VAPOUR BARRIER16 EXTERIOR GYPSUM38 MTL DECK

R1

Roof Assemblies - New Construction

TAG ASSEMBLYCONSTRUCTION

WHITE EPDM FULLY ADHERED MEMBRANE13 HD BOARD50 ISOGUARD POLY ISO INSULATION MECHANICALLY FASTENED TO EXIST'G 13 PLYWOOD SHEATHINGPLYWOOD IS COVERING EXIST'G RIGID INSULATION ON MTL DECK OR CONC ON MTL DECK(SLICE OPEN EXIST'G EPDM AS NOTED)

R2

R3

WHITE EPDM FULLY ADHERED MEMBRANE76 ISOGUARD HD COMPOSITE POLYISO INSULATIONISO GL TAPERED INSULATION, MIN 13mm100 ISO GL POLY ISO INSULATIONV-FORCE VAPOR BARRIER MEMBRANE13 DENS DECK BOARD OVER METAL DECK38 METAL DECK (VERIFY W/ STRUCT. DWG'S)

MINIMUM R-VALUE

R40 + VALUE FROMTAPERED INSULULATION

R40 + VALUE FROMTAPERED INSULULATION

WHITE EPDM FULLY ADHERED MEMBRANE76 ISOGUARD HD COMPOSITE POLYISO INSULATIONISO GL TAPERED INSULATION, MIN 13mm100 ISO GL POLY ISO INSULATIONV-FORCE VAPOR BARRIER MEMBRANE13 DENS DECK BOARD OVER METAL DECK76 METAL DECK (VERIFY W/ STRUCT. DWG'S)

Exterior Wall Assemblies - New Construction

TAG ASSEMBLY

W1

VISUAL

FOUNDATION WALL

REINFORCED CONCRETE FOUNDATIONFOUNDATION WATERPOOFING MEMBRANE100 EXTERIOR RIGID EXPANDED POLYSTYRENE INSULATION (R20)13 CEMENT BOARD WITH CEMENT PARGING FINISH TO 300 BELOW GRADEFOUNDATION DRAINAGE MAT TO OUTSIDE FACE OF FOOTING

W2 EXTERIOR WALL (MASONRY) / STONE

100 MASONRY VENEER WITH TOP VENTS AND BOTTOM WEEPS25 AIR SPACE W/ MOTAR CONTROLR28 MINERAL WOOL INSULATION (150mm)MEMBRANE AIR-VAPOR BARRIER16 EXTERIOR GRADE GYPSUM WALL BOARD152 HEAVY GAUGE METAL STUDS @ 400 O/C W/ FOAM SILL GASGET16 GYPSUM WALL BOARD

W3 EXTERIOR WALL (VERTICAL SIDING)

PREFINISHED METAL SIDING (VERTICAL)RAIN SCREEN VENT SPACE (MIN. 10mm)R28 MINERAL WOOL INSULATION (150mm)22 HORIZ. HAT CHANNEL AT 400 O/CTHERMAL SPACERSMEMBRANE AIR VAPOR BARRIER16 EXTERIOR GRADE GYPSUM WALL BOARD152 HEAVY GAUGE METAL STUDS16 GYPSUM WALL BOARD

W4 EXTERIOR WALL (HORIZONTAL SIDING) (PENTHOUSE)

PREFINISHED METAL SIDING (VERTICAL)RAIN SCREEN VENT SPACE (MIN. 10mm)R28 MINERAL WOOL INSULATION (150mm)22 HORIZ. HAT CHANNEL AT 400 O/CTHERMAL SPACERSMEMBRANE AIR VAPOR BARRIER16 EXTERIOR GRADE GYPSUM WALL BOARD152 HEAVY GAUGE METAL STUDS16 GYPSUM WALL BOARD

W5 SPARE - PARAPET WALL @ BASE CLERESTOREY WINDOWS

W6EPDM ROOF MEMBRANE/FLASHING19 PLYWOOD SHEATHING 38x152 WOOD FRAMING @ 400 O/CR28 RIGID MINERAL WOOL INSULATION (150mm)SELF ADHERING AIR VAPOR BARRIER MEMBRANE (AVB)16 EXTERIOR GYPSUM SHEAHTING203 METAL STUDS @ 400 O/C16 GYPSUM WALL BOARD

W7 PARAPET WALL (HORIZONTAL SIDING)

PREFINISHED METAL HORIZONTAL CORRUGATED SIDING22mm VERT. Z-GIRTS LET INTO THERMAL SPACERSR28 RIGID MINERAL WOOLD INSULATION (150mm)MEMBRANE AIR VAPOR BARRIER16 EXTERIOR GRADE GYPSUM WALL BOARD38x148 WOOD STUDS @ 400 O/C150 MINERAL WOOL INSULATION19 PLYWOOD SHEATHINGROOF MEMBRANE FLASHING

- PROVIDE BLOCKING FOR ROOF MEMBRANE TERMINATION BAR ON VERTICAL SURFACE

W8PARAPET WALL @ TRANSITION OF NEW TO EXISTING (R34)

PREFINISHED HORIZONTAL CORRUGATED METAL SIDING22 VERT. Z-GIRTS @ 800 O/CR28 RIGID MINERAL WOOL INSULATION (150mm)AIR-VAPOR BARRIER MEMBRANE16 EXTERIOR GRADE GYPSUM WALL BOARD38x140 WOOD FRAMING @ 400 O/CR22 MINERAL WOOL INSULATION6 MIL POLY VAPOR BARRIER16 GYPSUM WALL BOARD

W9

R-VALUE

R20 ci

R30 ci

R30 ci

R30 ci

R30

R30

W10 PARAPET WALL @ BRICK / STONE VENEER

BRICK VENEER WITH CAVITY VENTS25 AIR SPACER28 MINERAL WOOL INSULATION (150mm)AIR VAPOR BARRIER MEMBRANE16 EXTERIOR GYPSUM SHEATHING38x148 WOOD STUD FRAMING @ 400 O/C19 PLYWOOD SHEATHINGROOF MEMBRANE - FLASHING

R30 ci

R30 ci

CURRENTLY NOT USED

Interior Partition Assemblies - Concrete Masonry Units - New Construction

TAG ASSEMBLYTHICKNESS (5/8" / 16mm) NOTES

P20M

SI

90 CONCRETE MASONRY UNITS

4" CONCRETE MASONRY UNITS

90

3-7/8"

(GENERIC - REFER TO PLANS FOR RELEVANT ASSEMBLIES USED IN THIS PROJECT)

UNITSVISUAL

P21M

SI

140 CONCRETE MASONRY UNITS

6" CONCRETE MASONRY UNITS

140

5-7/8"

P22M

SI

190 CONCRETE MASONRY UNITS

8" CONCRETE MASONRY UNITS

190

7-7/8"

P23M

SI

240 CONCRETE MASONRY UNITS

10" CONCRETE MASONRY UNITS

240

9-7/8"

P24M

SI

290 CONCRETE MASONRY UNITS

12" CONCRETE MASONRY UNITS

290

11-7/8"

EQUIVALENT FIRE RATING(NORMAL DENSITY)

3/4 HR

1 HR

1-1/2 HR

2 HR

3 HR

P25

M

SI

90 CONCRETE MASONRY UNITS16 GWB BONDED TO MASONRY

106 3 HR

P26

M

SI

140 CONCRETE MASONRY UNITS16 GWB BONDED TO MASONRY

156 3 HR

P27

M

SI

190 CONCRETE MASONRY UNITS16 GWB BONDED TO MASONRY

206 3 HR

STRIKE MORTAR FLUSHTO RECEIVE GYP. BD.

STRIKE MORTAR FLUSHTO RECEIVE GYP. BD.

STRIKE MORTAR FLUSHTO RECEIVE GYP. BD.

3 1/2" CONCRETE MASONRY UNITS5/8" GWB BONDED TO MASONRY

5 1/2" CONCRETE MASONRY UNITS5/8" GWB BONDED TO MASONRY

7 1/2" CONCRETE MASONRY UNITS5/8" GWB BONDED TO MASONRY

4-1/8"

6-1/8"

8-1/8"

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Assemblies, Legends& Details

LU CASESAddition +Renovation

A0.2

2015-74A

05-DEC-2016

SCV/TG/CRS

Lakehead University - 955Oliver Road, Thunder Bay

Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

4 ISSUED FOR PERMIT 05-DEC-2016

Page 4: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

Room Finish Abbreviation Legend

ACL - ACOUSTICAL CLOUDSBR - BRICKCPT - CARPET TILERUB - RUBBER BASEACT - ACOUSTIC CEILING TILEGWB - GYPSUM WALL BOARDPT - PAINTEDPL - PLASTIC LAMINATEPFT - PORCELAIN FLOOR TILEEX - EXISTING

PWT - PORCELAIN WALL TILELAM - LAMINATESV - SHEET VINYLEP - EPOXYEPT - LATEX EPOXY PAINTEXP - EXPOSED CEILINGCT - CERAMIC TILEGL - GLAZEDGLAZ - GLAZINGWD - T&G WOOD

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

1 : 1

Room FinishSchedules

LU CASESAddition +Renovation

A0.5

2015-74A

05-DEC-2016

SCV/TG

Lakehead University - 955Oliver Road, Thunder Bay

Room Finish Schedule - Existing Lower

NO. ROOM NAME

Floor Walls Ceiling Millwork

CommentsMat'l Base

North East South WestMat'l Finish Height Counter Cabinets Mat'l Finish Mat'l Finish Mat'l Finish Mat'l Finish

1001 SERVICE ROOM EXIST EXIST EXIST - EXIST - EXIST - EXIST - EXIST -1002 JANITORS CLOSET SV RUB GWB PT EXIST PT EXIST PT EXIST PT ACT - 2800X1010 CORRIDOR SV RUB EXIST PT EXIST PT EXIST PT EXIST PT ACT/OPEN - 2800 SV PATTERN (4) COLOURS1004A VEST PFT PFT EXIST - EXIST - EXIST - EXIST - EXIST -1004 M WR PFT PFT CT GL CT GL CL GL CT GL ACT - 28001004B SHW EXIST EXIST EXIST - EXIST - EXIST - EXIST - EXIST -1003A VEST PFT PFT CT GL CT GL CT GL CT GL ACT - 28001003 W WR PFT PFT CT GL CT GL CT GL CT GL ACT - 28001003B SHW EXIST EXIST EXIST - EXIST - EXIST - EXIST - EXIST -X1002 STAIR B SV RUB EXIST PT EXIST PT EXIST PT EXIST PT EXIST - RUB SAFETY TREAD / RISER / LANDINGSX1003 STAIR A SV RUB EXIST PT EXIST PT EXIST PT EXIST PT EXIST - RUB SAFETY TREAD / RISER / LANDINGSX1009 ELEVATOR LOBBY SV RUB GWB PT - - GWB PT - - ACT/GB PT 2800 SV PATTERN (4) COLOURSX1012 CORRIDOR SV RUB GWB PT EXIST PT GWB PT EXIST PT ACT/GB PT 2800 SV PATTERN (4) COLOURS1018-1 LAB ENTRANCE SV RUB GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1021B GENERAL STORAGE EP EP EXIST EPT EXIST/GWB EPT EXIST PT EXIST/GWB EPT EXIST/EXP PT1005 HUMAN ORIGINS LAB SV RUB EXIST PT EXIST PT GWB EPT EXIST EPT ACT - 28001006 TECH GASES EP EP GWB EPT GWB EPT GWB EPT GWB PT EXP PT1008A OFFICE SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28001009B DIRTY LAB EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1009A ANALYTICAL LAB EP EP GWB EPT GWB EPT GWB EPT EXIST EPT EXP PT1011 BIOHAZARD LAB EP EP EXIST EPT GWB EPT GWB/EXIST EPT EXIST EPT EXP PT1010 TECH GASES EP EP GWB EPT GWB EPT GWB EPT EXIST EPT EXP PT1019 I/T ROOM SV RUB GWB PT GWB PT GWB PT EXIST PT ACT - 28001018 WORK SPACE SV RUB GWB PT GWB PT GWB PT GWB/EXIST PT ACT - 28001018B WET LAB (NEG) EP EP EXIST EPT GWB EPT GWB EPT GWB EPT EXP PT1018A ANALYTICAL LAB EP EP GWB EPT GWB EPT GWB EPT EXIST EPT EXP PT1021A TECH GASES EP EP EXIST EPT GWB EPT GWB EPT EXIST EPT EXP PT1007 PROTOYPE DEVELOPMENT LAB EP EP GWB EPT GWB EPT GWB EPT EXIST EPT EXP PT1008 LAB MANAGEMENT SV RUB GWB PT GWB PT EXIST PT EXIST PT ACT - 28001009 INTEGRATED FRESHWATER LAB EP EP GWB EPT EXIST EPT GWB EPT GWB EPT ACT - 2800X1011 CORRIDOR SV RUB EXIST PT EXIST PT EXIST PT EXIST PT ACT/GWB DT 28001021 SHIPPING/RECEIVING + RECYCLING EP EP EXIST/GWB PT EXIST/GWB PT EXIST PT EXIST PT EXP/EXIST PTX1004 CRAWLSPACE1022 CHAIR STORAGE SV - - - - - - - - - - -X1013 STORAGE EP EP GWB EPT GWB EPT GWB EPT GWB EPT ACT -

Room Finish Schedule - Existing Upper

NO. ROOM NAME

Floor Walls Ceiling Millwork

CommentsMat'l Base

North East South WestMat'l Finish Height Counter Cabinets Mat'l Finish Mat'l Finish Mat'l Finish Mat'l Finish

2020 UNIVERSAL W/R PFT PFT CT GL CT GL CT GL CT GL GWB PT 2800 SCHLUTER TILE PROTECTION MOLDING2021 UNISEX W/R PFT PFT CT GL CT GL CT GL CT GL GWB PT 2800 SCHLUTER TILE PROTECTION MOLDINGX2002 STAIR B PT-1 RUB EXIST PT EXIST PT EXIST PT EXIST PT EXIST PT2001 LOBBY PFT PFT GWB/EXIST PT EXIST PT GWB/EXIST PT EXIST PT ACT/GWB/

WOODPT 3000 SCHLUTER TILE PROTECTION MOLDING

2002 GRAD STUDENT LOUNGE CPT/SV RUB GWB/GLASS PT EXIST/GLASS PT MODART PT GLASS PT EXP PT ACOUSTICAL CLOUDS/EXPOSED CEILING2004J SPARE OFFICE - EDI CPT RUB GWB PT GWB PT GWB PT GWB PT ACT 28002005 BOARD RM CPT RUB EXIST/GWB PT EXIST PT EXIST PT GWB/EXIST PT ACT/GWB PT 30002007 RENTABLE OFFICE CPT RUB GWB PT GWB PT GWB PT EXIST PT ACT - 28002009 ENTREPRENEUR CENTRE CPT RUB GWB PT GWB/GLAZ PT GWB PT GWB/EXIST PT ACT - 2800 SV PATTERN2006 RENTABLE OFFICE CPT RUB EXIST PT EXIST PT GWB PT EXIST PT ACT - 28002018 ENTREPRENEUR CENTRE CPT RUB GWB PT EXIST PT GWB/EXIST PT GWB PT EXP/ACL PT ACOUSTICAL CLOUDS/EXPOSED CEILING2022 ENTREPRENEURSHIP LECTURE THEATRE CPT RUB EXIST PT EXIST PT GWB PT GWB PT ACT/GWB PT 2800 3000/28002008 ABORIGINAL MENTORSHIP PROGRAM CPT RUB GWB PT GWB PT GWB PT EXIST PT ACT - 2800X2009 CORRIDOR SV COV GWB/EXIST PT EXIST PT GWB/EXIST PT - PT ACT/GWB PT 28002004C OFFICE CPT RUB GWB PT GWB PT GWB PT EXIST PT ACT - 28002004D MEETING RM CPT RUB GWB PT GWB PT EXIST PT EXIST PT ACT - 28002004E CESME OFFICE CPT RUB GWB PT GWB PT EXIST PT GWB PT ACT - 28002004F CESME OFFICE CPT RUB GWB PT EXIST PT EXIST PT GWB PT ACT - 28002004G CHAIR OFFICE - ENTRE CENTRE CPT RUB GWB PT EXIST/GWB PT GWB PT GWB PT ACT - 28002004B OFFICE CPT RUB GWB PT GWB LAM GWB PT EXIST PT ACT - 28002004H OFFICE CPT RUB GWB PT EXIST PT GWB PT GWB PT ACT - 28002003 SHARED KITCHENETTE SV RUB GWB PT EXIST PT GWB PT GWB PT ACT - 2800 QUARTZ VENEER MILLWORK + COUNTERTOPX2016 BRIDGE LINK - - - - - - - - - - - -X2015 CORRIDOR PFT PFT EXIST PT GWB PT EXIST PT EXIST PT ACT/GWB PT 2800X2010 CORRIDOR SV COV - - GWB/EXIST PT EXIST PT GWB/EXIST PT ACT/GWB PT 2800 D. FEATURE WALL @ ATRIUM SV PATTERNX2012 CORRIDOR SV COV - - GWB/EXIST PT GWB PT GWB/EXIST PT ACT/GWB PT 2800X2014 CORRIDOR SV RUB GWB PT GWB PT GWB PT GWB PT ACT 28002018B STUDY RM CPT RUB GLAZ - GLAZ - GLAZ PT EXIST PT ACT - 2800 DRY ERASE PAINT WEST WALL2018A STUDY RM CPT RUB GLAZ - GLAZ - EXIST PT EXIST PT ACT - 2800 DRY ERASE PAINT WEST WALL2018D 3D PRINTER RM SV RUB GWB PT GWB/EXIST PT GWB/GL PT GWB PT ACT - 28002018C MEDIA RM SV RUB GWB MPT GWB PT GWB PT EXIST PT ACT - 2800 BLUE SCREEN PAINT2004-1 ARRIVAL SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002004A OFFICE CPT RUB GWB PT GWB PT GWB PT EXIST PT ACT 2800X2013 CORRIDOR SV RUB GWB PT GWB PT GWB PT GWB PTX2011 CORRIDOR SV COV EXIST/GWB PT GWB PT EXIST PT GWB PT ACT - 28002004 ADMINISTRATION EDI CPT RUB GWB PT GWB PT GWB PT EXIST PT ACT - 2800 MILLWORK + COUNTERTOP2023 IT RM SV RUB GWB PT GWB PT GWB PT GWB PT - -

Room Finish Schedule - New Lower

NO. ROOM NAME

Floor Walls Ceiling Millwork

CommentsMat'l Base

North East South WestMat'l Finish Height Counter Cabinets Mat'l Finish Mat'l Finish Mat'l Finish Mat'l Finish

1015 TECH GASES EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1014B FREEZER EP EP - - - - - - - - - -1014-3 SCALE EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1013 GRAD STUDENTS SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28001014F DIRTY LAB (NEG) EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1012 OFFICE SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 2800X1008 ATRIA 1 TER RUB GWB PT GWB PT GWB PT EXIST'G BR ACT / GWB - RUB. SAFETY STAIR TREAD / RISERSX1006 STAIR C TER RUB GWB PT GWB PT GWB PT GWB PT GWB PT RUB. SAFETY STAIR TREAD / RISERS / LAND.1014E CLEAN RM (POS) EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1014-1 LAB ENTRANCE EP EP GWB EPT GWB EPT - - GWB EPT EXP PT1014A STORAGE EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1014C LASER EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1014-2 CIRCULATION EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1014-4 ANALYSIS EP EP - - GWB EPT GWB EPT GWB EPT EXP PT1014 WET LAB EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1014D TECH OFFICE SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28001017G TECH OFFICE SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 2600X1007 CORRIDOR TER RUB GWB PT GWB PT GWB PT - - ACT -1017A OFFICE SV RUB GWB PT GWB PT GWB PT EXIST PT ACT - 28001017-3 SEM EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-2 WORK ROOM EP EP GWB PT GWB PT GWB PT GWB PT EXP PT1017G EXPANSION SPACE EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017C OFFICE SV RUB GWB PT GWB PT GWB PT EXIST PT ACT - 28001017E SEM PREP-ROOM EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017D TECH ROOM EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-K TRACE ANALYSIS (ICP's) EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-4 WEIGHING & CHNS EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-6 PREP ROOM CHROMOTOGRAPHY EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-L PREP ROOM (ICP's) EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-5 CHROMOTOGRAPHY EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-J WORKSHOP EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-8 LAB ENTRANCE 2 EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017B TECH-OFFICE SV RUB GWB PT GWB PT GWB PT EXIST PT ACT - 28001016 TECH GASES & CHILLERS EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017F BIOSAFETY LAB EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-2 TEM EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017 MATERIAL ANALYSIS EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PTX1016 CORRIDOR EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017H SHARED OFFICE SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28001008A LOUNGE AREA TER RUB GWB PT GWB PT GWB PT EXIST'G BR - -

Room Finish Schedule - New Upper

NO. ROOM NAME

Floor Walls Ceiling Millwork

CommentsMat'l Base

North East South WestMat'l Finish Height Counter Cabinets Mat'l Finish Mat'l Finish Mat'l Finish Mat'l Finish

2024 JAN. SV RUB GWB PT GWB PT GWB PT GWB PT ACT - -2016 GRAD STUDENTS SV RUB GWB PT GWB PT GWB/GLAZ PT GWB PT ACT - 28002014-3 ADMIN CPT RUB PT GWB PT ACT 28002016D ELECTROCHEMISTRY EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT2016B BIOSAFETY (POS) EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT2016C SPECTROCOPY EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT2016A LASER RM EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT2015 TECH GAS STORAGE EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT2017 OFFICE SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014C OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014D OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014E OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014F OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011G OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011F OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011E OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011D OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014A OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014B OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011C OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011B OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011 ADMIN CPT RUB GWB/GLAZ PT GWB PT - - GWB PT ACT - 28002011-2 ADMIN CPT RUB - - GWB PT - - GWB PT ACT - 28002014-2 ADMIN CPT RUB GWB PT GWB PT ACT - 28002014G PHOTOCOPY/ PRINTING SV RUB GWB PT GWB PT - - GWB PT ACT - 2800 QUARTZ VENEER MILLWORK + COUNTERTOP2014H OFFICE CPT RUB GWB PT DWP LAM GWB PT GWB PT ACT - 28002012 WOMENS W/C PFT PFT PWT MAT PWT MAT PWT MAT PWT MAT GWB PT 2800 QUARTZ VENEER SCHLUTER TILE PROTECTION MOLDING2013 MENS W/C PFT PFT PWT MAT PWT MAT PWT MAT PWT MAT GWB PT 2800 QUARTZ VENEER SCHLUTER TILE PROTECTION MOLDINGX2006 STAIR C SV RUB GWB PT GWB/GLAZ PT GWB PT GWB PT RUB. SAFETY STAIR TREAD / RISERS / LAND.2011-3 CIRCULATION SV RUB GWB PT GWB PT GWB PT ACT - 2800X2007 CORRIDOR TER TER GWB/GLAZ PT GWB PT GWB PT GWB PT FLOOR PATTERN (3) COLOURS2011-4 CIRCULATION SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014-1 CIRCULATION SV RUB GWB PT GWB LAM GWB VPT - - ACT - 28002011A MEETING RM CPT RUB GWB/GLAZ PT GWB PT GWB PT GWB PT ACT - 28002014J STORAGE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014 ADMIN CPT RUB GWB/GLAZ PT - PT - - GWB PT ACT - 28002011J STORAGE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002016E DRY LAB EP EP GWB EPT GWB EPT GWB EPT GWB PT EXP PT2016F AFM (POS) EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT2011H OFFICE CPT RUB GWB VPT GWB PT GWB PT GWB PT ACT - 28002011-1 WAITING AREA CPT RUB GWB PT GWB PT - - ACT - 2800X2008 ATRIUM 2 TER TER GWB PT GWB PT GLAZ - GWB/GLAZ PT GWB PT TER. PATTERN (4) COLOURSX2008 ATRIUM 1 TER TER - - GWB PT GLAZ - EXIST/GWB BR/PT - -

LOWER FLOOR UPPER FLOOR

1017J

1017K

1017I

1017K

1017L

1017J

Rev. Description Date1 ISSUED FOR CLASS 'C' 04-AUG-20162 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

3 ISSUED FOR PERMIT 05-DEC-2016

Page 5: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

5) GENERAL MOUNTING HEIGHTS

FAC

E O

F W

ALL

730

610

1200

MAX

.

1200

MAX

.

1200

MAX

.

1200

MAX

.

1200

MAX

.

1200

MAX

.

0.9

MIN

1.1

MAX

VERTICAL WALL-MOUNTED ORFREE STANDING POWR DOOROPERATOR

BEYOND DOOR SWING

LOCATED 600mm TO 1500mm

400

1200

300

45 6

1011

22

238

20

21

TOILET TISSUE DISPENSER SINGLE ROLL

TOILET TISSUE DISPENSER DOUBLE ROLL

TOILET TISSUE DISPENSER AND SHELF

PAPER TOWEL DISPENSER

SOAP DISPENSER

HAND SANITIZER DISPENSER

FULLY RECESSED SOAP HOLDER

STAINLESS STEEL SHELF

SANITARY NAPKIN DISPOSAL (UNISEX/FEMALE WASHROOMS)

SINGLE COAT HOOK

MULTIPLE COAT HOOK

600mm HORIZONTAL GRAB BAR

900mm HORIZONTAL GRAB BAR

760mm x 760mm L-SHAPED GRAB BAR

900mm x 900mm L-SHAPED GRAB BAR

SWING UP GRAB BAR

MIRROR

MOP RAIL

BARRIER FREE SHOWER SEAT

HAND DRYER

WALL MOUNTED WASTE RECEPTACLE

FLOOR STANDING WASTE RECEPTACLE

BABY CHANGE TABLE

THERMOSTAT

INTERCOM

FIRE ALARM

SWITCH

OUTLET

WASHROOM ACCESSORY LEGEND:

(REFER TO SPECIFICATIONS FOR APPROVED MANUFACTURERS AND MODELS)

NOTE: THIS LEGEND SHOWS THE REQUIRED MOUNTING HEIGHTS AND CLEARANCES OF STANDARD WASHROOM ACCESSORIES. REFER TO PLANS AND ELEVATIONS FOR WASHROOM ACCESSORY LAYOUTS. IF CONFLICTS OCCUR, CONTACT PROJECT ARCHITECT.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

CLEARANCE UNDER SINK

460 MIN.

485

MAX

.

2a) LAVATORY PLAN

CLEAR SPACE

UNDER SINK

FAC

E O

F W

ALL

460 MIN.

840

MAX

.

760 CLEAR

2b) LAVATORY ELEVATION

735

CLE

AR

FAC

E O

F W

ALL

735

INSULATEDDRAIN PIPE

840

MO

UN

TIN

G H

EIG

HT

485 MAX.

685

205

280

430

2c) LAVATORY ELEVATION

2b

2c

1000

MAX

.

17

460 - 480 1020 MIN.

300

MAX

.

WAL

L O

R O

BSTR

UC

TIO

N

1a) WATER CLOSET PLAN

460 - 480

400

- 460

1b) TANKLESS WATER CLOSET ELEVATION

FAC

E O

F W

ALL

ABO

V E F

LOO

R

840

- 920

460 - 480

FAC

E O

F W

ALL

400

- 460

150 MAX.

600

MIN

.

300 MAX.

400

- 460

1c) TANKED WATER CLOSET ELEVATION

FAC

E O

F W

ALL

625

REF

ER T

O IN

STAL

LATI

ON

IN

STR

UC

TIO

NS

ABO

V E T

ANK

150

750

1d) TANKED WATER CLOSET ELEVATION

1c

1d

150

MAX

.

600

1400

1700

900 x 1500mmTRANSFER SPACE

WASHROOM CLEARENCES

940mm MAXIMUM

890 mm MINIMUM

810

L- SHAPED GRABBARS BOTH SIDESOF WATER CLOSET

WATER CLOSETCENTERED BETWEEN SIDE WALLS

LATCH SIDE CLEARANCENOT REQUIRED

DOOR PULL AT LATCH SIDE, BOTHSIDES OF DOOR

900 x 1500mmTRANSFER SPACE

480mm

460mm TO

1500mm DIA. WHEELCHAIRTURNING CIRCLE

MIN

.

1500

FORWARD APPROACHSPACE AT LAVATORY

SPACE FOR ADULT-SIZECHANGE TABLE

900 x 1500mmTRANSFER SPACE

CLE

A R

860

810

1830

FOLD DOWNGRAB BAR

460 460

CL CL

16

29

1

12

14

12

12

14

14 14

14

12

920 x 1370mm MIN.FORWARD APPROACH

500m

m M

AX.

1500

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Washroom AccessoryLegend & MountingHeights, Barrier FreeDesign Standards

LU CASESAddition +Renovation

A0.12

2015-74A

05-DEC-2016

SCV

Lakehead University - 955Oliver Road, Thunder Bay

1 : 25

BF Accessory Mounting Heights

1 : 25

BF Lavatory Legend

1 : 25

BF Toilets and Grab Bar Legend

Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

4 ISSUED FOR PERMIT 05-DEC-2016

Page 6: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

CLE

A R

860

600

1525

CLE

A R

2' -

9 3/

4"1'

- 11

1/2

"

B-F

P ATH

3' -

7 1/

4"

CLEAR

2' - 9 3/4"

INAWRD SWINGINGDOOR

BATHROOM

BEDROOM

1' - 11 1/2"2' - 9 3/4"

B-F PATH

3' - 7 1/4"

OUTWARD SWINGINGDOOR

B-F PATH

3' - 7 1/4"

INWARD SWINGINGDOOR

CLEAR

2' - 9 3/4" 11 3/4"

MIN

1' - 11 1/2"2' - 9 3/4"

11 3/4"

MIN

11 3/4"

SLIDING DOOR

2' - 9 3/4"

MIN

11 3/4"

MIN

1' - 11 1/2"

CLEAR

2' - 9 3/4"

RAM

P

LANDING1' - 11 1/2"

MIN.

5' - 5 3/4"

MIN

.

5' -

5 3/

4"

LANDING

MIN.

5' - 5 3/4"

MIN

.

5' -

5 3/

4"

RAMPMIN.

11 3/4"

TACTILE ATTENTION INDICATORAT TOP OF STAIRS AND CERTAINLANDINGS

COLOR CONTRASTSTRIP

DEPTH OFONE TREAD

RISER

TREAD

300mm

-600mm

1980

680

400

- 460

1a) WATER CLOSET FRONT ELEVATION

750

- 900

760

1c) WATER CLOSET SIDE ELEVATION

760 165

925

970

TO 8

40

1062

900

850

1a) SHOWER/TUB SIDE ELEVATION

2x8 WOOD BLOCKINGBETWEEN WALL STUDS(TYP)

3-3 1/2" SPIRAL NAILSOR SCREWS BOTH SIDES (TYP)

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

1 : 25

Barrier Free DesignStandards

LU CASESAddition +Renovation

A0.13

2015-74A

05-DEC-2016

SCV/NCM

Lakehead University - 955Oliver Road, Thunder Bay

1 : 25

BF Latch Side Clearances

1 : 25

BF Stairs 1 : 25

Stud Wall Reinforcement

Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

4 ISSUED FOR PERMIT 05-DEC-2016

Page 7: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

XA

XA

XD

XD

X1

X9

CHANCELLOR PATERSON LIBRARY BUILDING

3990

0

EXISTING PEDESTRIAN SIDEWALK

MAINENTRANCE

UN

IVER

SITY

SE

RVI

CE

R

OAD

EXISTING CONCRETE WALL AND GUARD RAIL

2119

1

EXISTINGSIDEWALK

LAKEHEAD UNIVERSITY DRIVE

FIR

E A

CC

ESS

RO

UTE

EXISTING REMOVABLEBOLLARDS

EXISTING EMERGENCYCALL STATION

AREA OF WORK/LEED PROJECT BOUNDARY

EXISTING HYDRONIC - 2-250 HEATING LINE - FIELD VERIFY LOCATION SUPPLY

RETURN

SUPPLY

RETURN

EXISTING BIKE PARKING

EXISTINGASPHALT PAVING

95850

95800

95800

95850

95650

9980099700

97850

97750

95850

95800

9585095850

EXISTING GRASS AREA

24000

EXISTING FENCE

EXISTING FENCE

EXISTING FENCE

EXISTING VEGETATION

CASES BUILDING A -

EXISTING

MAIN FLOOR

96000/204.205

EXISTING ELECTRICALINDOOR SUBSTATION

EXISTING GAS SERVICE

EXIS

TING S

ANIT

ARY

EXIS

TING W

ATER

MAIN

EXISTI

NG STO

RMWATE

R

EXISTING SHED

AREA OF WORK/LEED PROJECT BOUNDARY

AREA

OF

WO

RK/

LEED

PR

OJE

CT

BOU

ND

ARY

AREA

OF

WO

RK/

LEED

PR

OJE

CT

BOU

ND

ARY

STMH

SANMH

SANMH

CB

CB

CB

CB

SANMH

CB

STMH

EX STMH

CB

EXISTING GRASS AREA

EXISTING GRASS AREA

EXISTING GRASS AREA

AREA OF NEW WORK

CASES ADDITION & RENOVATION

SITE SERVICES UPGRADES

EXIS

TING

FO

REST

RY

BUIL

DING

XA

XA

XD

XD

X1

X9

CHANCELLOR PATERSON LIBRARY BUILDING

3990

0

EXISTING PEDESTRIAN SIDEWALK

MAINENTRANCE

UN

IVER

SITY

SE

RVI

CE

R

OAD

EXISTING CONCRETE WALL AND GUARD RAIL TO REMAIN

2119

1

EXISTING GRASS AREA

EXSTGSIDEWALK

LAKEHEAD UNIVERSITY DRIVE

FIR

E A

CC

ESS

RO

UTE

EXISTING REMOVABLEBOLLARDS

EXISTING EMERGENCYCALL STATION

EXISTING HYDRONIC - 2-250HEATING LINES - FIELD VERIFY

SUPPLYRETURN

SUPPLYRETURN

99800

97850

95850

9585095850

24000

EXISTING VEGETATION

CASES BUILDING A EXISTING

MAIN FLOOR

96000/204.25

DN-S1

DN-S1DN-S1

DN-S1

DN-S1

DN-S2

DN-S2

DN-S2

DN-S2

DN-S3

DN-S3

DN-S3

DN-S3

DN-S4

DN-S4

DN-S4

DN-S4

DN-S5DN-S6

DN-S7

DN-S8

DN-S14

DN-S16

DN

-S16

DN-S9

DN

-S3

DN-S3

DN-S10

LOCATION OF CONSTRUCTION

SIGNAGE

LOCATION OF CONSTRUCTION

SIGNAGE

DN-S

16

DN-S15

DN-S15

DN-S15

AREA OF WORK/LEED PROJECT BOUNDARY

AREA OF WORK/LEED PROJECT BOUNDARY

AREA

OF

WO

RK/

LEED

PR

OJE

CT

BOU

ND

ARY

AREA

OF

WO

RK/

LEED

PR

OJE

CT

BOU

ND

ARY

DN-S15

DN-S15

DN-S11

DN-S11

DN-S11

DN-S11

SANMH

EXIS

TING S

ANIT

ARY

EXIS

TING W

ATER

MAIN -

REMOVE

D

EXISTI

NG STO

RMWATE

R

STMH

SANMH

CB

CB

CB

CB

CB

STMH

EX STMH

DN-S11

DN-S

11

DN-S11

DN-S11

DN-S11

DN-S11

DN-S10

LOCA

TION

OF

CONS

TRUC

TION

SIGN

AGE

LIMIT OF STORM REMOVAL

LIMIT OF STORM REMOVAL DN-S11

DN-S11

DN-S11 LIMIT OF SANITARY REMOVAL

DN-S11

LIMIT OF SANITARY REMOVAL

DN-S12

DN-S10

DN-S12

DN-S13

DN-S0

DN-S3 DN-S3

DN-S15

EXITS

ELECTRICAL

SANITARY

STORMWATER

WATERMAIN

CATCH BASIN

MANHOLE

SITE PLAN NOTES -EXISTING AND DEMOLITION:

DEMOLITION NOTEDN - SXX

1800

ROADWAY/GRADE

CONSTRUCTION FENCEBY GENERAL CONTRACTOR

MIN

900

GEOTEXTILE FILTER FABRICAFFIX TO FENCE USING STAPLESMIN 25 IN LENGTH OR WIRE

AREA TO BE PROTECTEDAREA UNDER CONSTRUCTION

PEA GRAVEL FILLEDSAND BAGS AT SUPPORTS

NOTES:INSPECT FENCE ONCE EACH WEEK AND FOLLOWING ANY SIGNIFICANT STORM EVENT. INSPECT FOR SEDIMENT, TEARS, LOOSE FABRIC ATTACHMENT. REMOVE SEDIMENT WHEN IT REACHES 200 ABOVE BASE.

IMPERVIOUS SURFACE

STRAW BALES BETWEEN SUPPORTS

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Site Plan - Existing &Demolition

LU CASESAddition +Renovation

A1.0

2015-74A

05-DEC-2016

Author

Lakehead University - 955Oliver Road, Thunder Bay

1 : 300

Site - Existing2

TRU

E

CONS

TRUC

TION

1 : 75000

Key Plan1

1 : 300

Site - Demolition3

Demolition Notes (DN) - SITE (S)

Mark DescriptionDN-S0 REMOVE EXISTING BOULDERS FOR RELOCATION.DN-S1 REMOVE EXISTING VEGETATION.DN-S2 REMOVE EXISTING TOPSOIL. REFER TO LANDSCAPE DRAWINGS FOR NEW GRADING.DN-S3 REMOVE EXISTING CURB.DN-S4 REMOVE EXISTING FENCING. RETURN TO OWNER.DN-S5 BREAK UP AND REMOVE EXISTING CONCRETE WALK.DN-S6 SALVAGE STONE BICYCLE PAD AND INCLUDING BICYCLE RACKS. RETURN STONE TO OWNER. RETAIN FOR

REUSE EXISTING BICYCLE RACKS.DN-S7 REMOVE AND DISPOSE OF EXISTING SHED.DN-S8 BREAK UP AND DISPOSE OF EXISTING CONCRETE AT EXISTING ENTRANCE.DN-S9 REMOVE EXISTING STAIR TO READY FOR NEW STAIR.DN-S10 REMOVE EXISTING ASPHALT SURFACE TO READY FOR EXCAVATION REQUIRED FOR REROUTING OF

SERVICES AND FOUNDATION WORK FOR CASES BUILDING B NEW.DN-S11 REMOVE EXISTING SERVICE - REFER TO CIVIL. - ALL SEWERS, WATERMAINS, CATCH BASINS AND MANHOLES

WITHIN PROPOSED BUILDING FOOT PRINT TO BE REMOVED AND DISPOSED OF OFF SITE.DN-S12 LIMIT OF ASPHALT REMOVAL.DN-S13 REMOVE EXISTING GATE.DN-S14 LEED EROSION AND SEDIMENT CONTROL - STABILIZED CONSTRUCTION ENTRANCE. SEE CIVIL MUD CONTROL

MAT DETAIL.DN-S15 LEED EROSION AND SEDIMENT CONTROL - INLET PROTECTION - SEE CIVIL SITE GRADING SHEET FOR DETAILDN-S16 LEED EROSION AND SEDIMENT CONTROL - SILT FENCE - SEE DETAIL 4/A1.0

1 : 25

SILT FENCE DETAIL4

Rev. Description Date1 ISSUED FOR PERMIT 05-DEC-2016

Page 8: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

DN

x

x

x

x

x xx x x

x

x

xx

x

x

x

x

x

x

x

x

x

x

x

xx

xx

xx

xx

XA

XA

XD

XD

X1

X9

1

7

CHANCELOR PATERSON LIBRARY BUILDING

CASES BUILDING A -

EXISTING CASES BUILDING B -

ADDITION

3990

0

EXISTING PEDESTRIAN SIDEWALK

MAINENTRANCE

UN

IVER

SITY

SE

RVI

CE

R

OAD

BFI BINS

SHIPPING + RECEIVING AREA

ASPH

ALT

DR

IVEW

AY

EXISTING CONCRETE WALL AND GUARD RAIL

1013

1

5150 33200

COVERED BIKE PARKING AREA

BRIDGE / LINK TO LIBRARY

RIVER BED ROCKGARDEN AREA

REFER TO LANDSCAPING

NEW

TR

EE P

LAN

TIN

G

AN

D L

AN

DSC

API

NG

NEW TREE PLANTING AND LANDSCAPING(STORM WATER MANAGEMENT AREA)

PLANTING BEDS ALONG BUILDING PERIMETERREFER TO LANDSCAPING

1500

AC

CES

SIBL

E SI

DEW

ALK

1500 SIDEWALK

1500 SIDEWALK

NEW GRASS AREA

NEW CONCRETESIDEWALK

CURBING - TYP.

LAKEHEAD UNIVERSITY DRIVE

FIR

E A

CC

ESS

RO

UTE

GRAD STUDENT PLAZA AREA

STO

RM

WAT

ER M

ANAG

EMEN

T AR

EA

STORM WATER MANAGEMENT AREA

STORM WATER MANAGEMENT AREA

LANDSCAPING

TRAN

SITI

ON

RO

OF

TRAN

SITI

ON

RO

OF

B

B

H

H

EXISTING REMOVEABLE

BOLLARDS

REFER TO LANDSCAPING

EXISTING HYDRONIC HEATING LINES

SUPPLYRETURN

SUPPLY

RETURN

STORMWATER MANAGEMENT BIORETENTION/INFILTRATION AREA

1500

SID

EWAL

K

MAIN FLOOR

96.000 (204.205)

PEDESTRIAN CROSSING

2%

2%

2%

ACCESSIBLE RAMP1:12 MAX SLOPE

ACCESSIBLE RAMP1:12 MAX SLOPE

SOD SOD

1:20

ROCK GARDEN PLANTING

ROCK GARDEN BOULDERS

BOULDER SEATWALL

NEW STRIP DRAIN - SEE ENGINEERIGN DWGS

PLANTING BED

PLANTING BED

BOULDER TERRACE WALL

PLANTINGBEDS

RAISED CONCRETE SEAT WALL PLANTER

LITTER AND RECYCLING

PLANTING BED

NEW CONCRETE STAIR

METAL BENCHES

NEW CONCRETE UPSTAND WALL

NEW CONCRETE SIDEWALK

STRIP DRAIN(SEE LANDSCAPE)

RIP RAP MAX SLOP 3:1

SWALE MIN 2.5%

DRAIN INV. 203.55/95.345

AREA OF WORK/LEED PROJECT BOUNDARY

AREA OF WORK/LEED PROJECT BOUNDARY

AREA

OF

WO

RK/

LEED

PR

OJE

CT

BOU

ND

ARY

AREA

OF

WO

RK/

LEED

PR

OJE

CT

BOU

ND

ARY

1A1.2A1.1

MAIN FLOOR

96.000 (204.205)

NEW 4160V POWER FEED

24000 5500 33200

EXIS

TING S

ANIT

ARY

EXISTI

NG STO

RMWATE

R

SANMH

CB

STMH

EX STMH

NEW SANITARY

NEW

SAN

ITAR

Y

NEW SANITARY

NEW STORM

NEW

STO

RM

NOTE:MAINTAIN3 m CLEAR FROM U/SLINK TO GRADE.

SEE SHEET A1.2

SEE CURB DETAILCIVIL SITE GRADING SHEET

SEE CIVIL SITE GRADING SHEETFOR LAKEHEAD UNIVERSITY DRIVE N CROSS SETION

SOCK PERFORATEDSUBDRAIN

BOULDER AND PEBBLEMULCH FOR DOWNSPOUT

CURB CUT TO COTB ENGINEERING DWGS

PAINTEDCROSSWALK

SOCK PERFORATEDSUBDRAIN

SODDED SERVICEACCESS 3m WIDE

SODDED SERVICEACCESS 3m WIDE

STRIP DRAINSEE ENGINEERING DWGS

204.73/96.525

SLOP MAX 3:1

2%typ

2%typ

1%

2%

2 % typ

1 %

3:1

MAX

2% T

YP

10%

ASPHALT DRIVEWAY

2%

PEFORATED SOCKED SUBDRAIN ININFILTRATION AREA

LIGHT BOLLARD (5) SEE ELECTRICAL

SOCKED PERFORATEDSUBDRAIN

RETAINING WALL WITH GUARD

SLOPED SIDEWALKENTRY POINT

RETAING WALL WITHOUT GUARDMAX 600 FROM SIDEWALK

5A1.1 A1.2

SITE PLAN NOTES - NEW:

REFER TO CIVIL FOR:1. BASE ELEVATION POINT - "BM701 TOP NUT OF FIRE HYDRANT ELEVATION 204.774"

2. ROAD GRADING3. SANITARY AND STORM SEWER4. WATERMAIN

REFER TO LANDSCAPING PLANS FOR:1. LAYOUT AND GRADING PLAD2. VEDGETATION3. DRAINAGE 4. STORMWATER MANAGEMENT

REFER TO ELECTRICAL FOR:1. TRANSFORMER LOCATIONS2. SITE LIGHTING

EXITS

ELECTRICAL

SANITARY

STORMWATER

WATERMAIN

CATCH BASIN

MANHOLE

x x CONSTRUCTION FENCE

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Site Plan - New

LU CASESAddition +Renovation

A1.1

2015-74A

05-DEC-2016

CRS/SCV

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 150A1.1A0.7

1 Site - New

APPLICABLE CITY OF THUNDER BAY STANDARD DRAWINGS

M-105-1 M-105-2R-109-1R-119

CONCRETE RETAINING WALL WITH FOOTING (SEE BELOW)CONCRETE RETAINING WALL ATTACHED TO CONCRETE SIDEWALK (SEE BELOW)ONE PIECE CONCRETE CURB AND GUTTERCONCRETE SIDEWALK

NOTE: ABOVE COTB STANDARD DRAWINGS SHOWN FOR REFERENCE ONLY. REFER TO CITY OF THUNDER BAYENGINEERING STANDARDS FOR ACCURACY.

Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 UPDATED FOR REFERENCE 20-JUL-20163 UPDATED FOR REFERENCE 28-JUL-20164 ISSUED FOR CLASS 'C' 04-AUG-20165 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

6 ISSUED FOR PERMIT 05-DEC-2016

Page 9: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

6.0

3A1.2 A1.2

3000

EQEQ

HSS152.4X152.4X6.4

HSS152.4X152.4X6.4

HSS152.4X152.4X6.4

HS

S10

1.6X

101.

6X

4.8

LIN

E O

F R

OO

F AB

OVE

LIN

E O

F R

OO

F AB

OVE

A1.2

2

2.5

3.7

1850

EQ EQ

OFF

SET

0.6

0.9

0.9

1.8

TYP

MIN

0.9

3.0

3.0

ALL COLUMN LOCATIONS

ALL COLUMN LOCATIONS

SHELTER WALL FRAMING TYP

HSS101.6X101.6X6.4

HSS101.6X101.6X4.8

HS

S10

1.6X

101.

6X

6.4

HSS101.6X101.6X4.8

HSS101.6X101.6X6.4HSS101.6X101.6X4.8HSS101.6X101.6X6.4

HS

S10

1.6X

101.

6X

6.4

HS

S10

1.6X

101.

6X

4.8

MIN

610

0.7

0.7

LIN

E O

F R

OO

F AB

OVE

1.3 0.8 1.3

1.6

EXISTING STORM WATER MANHOLE

EQEQ

EQEQ

NOTE:PRECISE LAYOUT AND STYLE OF BICYCLE RACKS TO BE CONFIRMED.

-A1.2 ---

2.7

2.4

1.31.3

0.70.7

2.73.

0

0.3

0.3

112

112

-A1.2 ---

1X6 CEDAR BOARD (5)1X4 CEDAR BOARD (1)

SCREEN REPEATING PATTERN

4A1.2A1.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.2

W250x24 TYP

2X8 CEDAR BASEBOARD

T/O Lower Level

96000

Atrium Stair Landing

98095

Library Sill

97212

CORRUGATED METAL SIDINGSECURED ROOF STRUCTURE WITH GALVANIZED METAL STREWS C/W WASHER AND NEOPRENE GASKETS.

38X140 BLOCKING BETWEEN GLULAMS600 OC

79X305 GLULAM BEAMS 600 OCBOLTED TO SHOE WELDED TO W SECTION

W250x24

HSS152.4X152.4X6.4

WELD HSS TO W SECTION

L3X3X1/4 TOP AND BOTTOM WELDTO POST AND HORIZONTAL HSSTYP

L3X3X1/4 TOP AND BOTTOM WELDTO POST AND HORIZONTAL HSSTYP

- GALVANIZED

- GALVANIZED

2.1

4X3/4 DIA ANCHOR BOLTS WITH 3" HOOK AND LEVELING NUTS AND WASHERSEMBED 9"

16" SONOTUBE WITH BIGFOOT

FLAT BAR AT COLUMNS AND CENTRE SPANS ASSHOWN IN PLANFOR SECURING CEDAR BOARDS

MAX

1220

100

818

152

TOP OF CONCRETE RETAINIG WALL

1 1/2" PTDSTEEL PIPE RAILS

MAXOBC 100

ESTRUCHEON PLATESSECURED TO RETAININGWALL WITH MIN 3 TAPCON CONCRETE SCREWS

1070

38

13 S

TEEL

BEN

T R

OD

799

7562

410

1

EQEQ

EQ

GUARDRAIL PICKET

R 205 TYP

T/O Lower Level

96000

T/O Footing

94500

F

LASER

1014C

DX1006c

200

95100

MAX

1800

300

MIN 130 CONCRETE SIDEWALK TO 30 MPaWOOD FLOAT AND BROOM FINISHED2 % SLOPE TO ROADMIN 150 GRAN B BASEUNDER SIDEWALKS

EXPANSION JOINTS MIN12mm WHERE WALK MEETS CURBAND RETAINING WALL

REFER TO CIVIL AND COTB ENGINEERING STANDARDS FOR CURBS

DIA CIRCULAR BASE PLATE120

STEEL PIPE RAIL

METAL BASE PLATE

SECURE TO TOP OFRETAINING WALL WITH CONCRETE SCREWS (3)EMBED 50

100

MAX

1070

GU

ARD

HEI

GH

T

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Site - Plan andSection Details

LU CASESAddition +Renovation

A1.2

2015-74A

05-DEC-2016

Author

Lakehead University - 955Oliver Road, Thunder Bay

1 : 75

Site - New - Callout - bicycle shelter1

3D View bicycle shelter8

1 : 50

Section - Bicycle Shelter EW3

1 : 50

Bicycle Screen2

1 : 20

Bike Enclosure Section detail4

East Entry9

East Entry - Door Condition10

SITE

-3D

VIE

WS

-FO

R R

EFER

ENC

E O

NLY

GUARDRAIL

HANDRAIL - EXTEND300 AT ALL LANDINGS

SEE SECTION FORRETAINING WALL DETAILS

2200 SLOPING SIDEWALK

GUARDRAIL

CONCRETE STAIR

NEW CURB

1 : 20

Site Guardrail - Typ6

Rev. Description Date1 ISSUED FOR PERMIT 05-DEC-2016

1 : 50

Section At East Entry5 1 : 5

Top Mount Handrail7

RETAINING WALLS TO COTB M-105-1 - STRUCTURAL TO CONFIRMSIDEWALKS TO COTB M-119, SLOPES AND WIDTHS AS SHOWN ON ARCHITECTURAL

NOTE:STRUCTURAL TO CONFIRM SIZING AND OTHER

Page 10: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

UP

9096

4648

4600

7443 4526 2376 9316

3192

4150

2400

3600

1512

5990

5196

4296 1476 5879 2376 5996 3196

2988

3300

1696

1476

1406

2376

2399

4040

0

2388 2921

3658

3150

5182

1696 8381499

3658

1092

5990

2200

1295

1169

2083

2832

2283

1829

2515

762

355614481448

8236

D1003B

D1003

D1003A

D1007a

X1003 D1018

D1015

D1015A

D1013A

D1013aD1013B

D1013b D1013c

D1011c D1011d

D1011b D1011A

D1009

X1007

DX1

002

DX1

001

D1001a

D1001Ab

D1001b

D1001B

D1001Aa

D1004 D1006Aa

D1006a

D1006d

D1006c

D1006b D1006B

D1006C

D1006D

D1006e

D1006Ab

D1010b

D1012b

D1012a

D1014

D1016

D1018Ac

D1020

D1010a

D1018Ab

D1018Aa

D1015Aa

X1003A 13

DN-10 DN-10DN-10

DN-10

DN-12

DN-12

DN-10

DN-10

DN-03

DN-10

DN-10

DN-03

DN-12

DN-12

DN-03

DN-03

DN-03

DN-03

DN-03

DN-12

DN-12

TYP.

DN-10 DN-10

DN-12

DN-10

DN-10

DN-14

DN-04

DN-04

DN-14

DN-03DN-13

DN-10

DN-10

DN-12

DN-12

DN-03

DN-03

DN-03

DN-03

DN-03

DN-03

DN-03

DN-13

DN-12

DN-03

DN-12

DN-23

DN-11

DN-12

DN-12

DN-12

DN-12

DN-12

DN-12

DN-12

DN-12

DN-05

DN-13

DN-03

DN-03

DN-03

DN-03

DN-20

9533 2200 9872 1996

2462581

9612

479

3771

2812

1199

6

24500

XW1 XW1

XW1

XW1

XW4

XW4

XW1XW1

XP8

XP8

XP8 XP8

XP14

XP14

XP8

XW4

XP8 XP9

XP8

XP8XP8

XP8

XP13

XP8

XP8

XP9

XP8

XW1XP8

XP8

XP6XP8

XP7

XP8

XP8

XP8 XP6

XP6

XP8

XP8 XP8

XP14 XP8

XP8

XP8

XP8XP8

XP8

XP8 XP8

XP6

XP6

XP8

XW2

XP6

XP12

XP6

XP8

XP8

XP8

XP14

XP8

XP6

XP8

XP8

XP7

XP8

XP9

XP8

XW4

XW4

XP8

XP11

XW2

XW2

XP9

XW4

DN-12

2825

G.L

.

G.L.

G.L. G.L.

DN-10

DN-17

3560

5060

DN-10

DN-10

G.L.G.L. G.L.

G.L

.

DX2001a

X1005

D1002Ba

D1002Bb

D1002Ab

D1002Aa

XF1

DN-23

DN-23

DN-23

DN-23

DN-23

DN-24

CONSTRUCTIONNORTH

(TO REMAIN)

4621 4571 2200 2552 2776 6416

6296

6626

6626

4876

4876

4876

4796

4650

3122

2976 2462

4826

4276

4276

2546

2526

2526

4276

4276

4276

4796

44164776

9352

6336

3076

1346

2501

2501

3836

3856

24500

8000

737 1702 1524 1359 1524 609

2358

3378

762

1295

1041

737

2438

2591

2988

5715

2591

1295

2616

2642

5181

3000

DX2001b

D2031

D2033

D2037

D2039A

D2039

D2002B

D2002A

D2002

DX2003a D2005 D2007 D2009

D2044

D2042

D2040

D2014a

D2016A

D2016

D2018

D2017

D2015D2014b

D2019

D2021

D2020

D2022

D2025

D2024

D2027

D2029

D2010

D2011

D2013

D2012

DX2003b

DN-01

DN-12

EXIST'GCHASE

DN-12

DN-12DN-12

DN-12

DN-12

DN-12

DN-10

DN-10

DN-10

4796

DN-12

DN-12

DN-12

DN-10DN-10 DN-10

2616

737

DN-12

4040

0

DN-12

DN-04

DN-04

DN-14

DN-04

DN-04

DN-14

DN-04

DN-04

DN-04

DN-04

DN-04

DN-04

DN-04

DN-14

DN-14

DN-14

DN-12

DN-12

DN-12

DN-12

DN-12

DN-12

DN-12

DN-12DN-12 DN-10

DN-12

24500

DN-12

DN-12

DN-12

DN-12

DN-12

4826

DN-12 DN-01

DN-10DN-10

DN-15

EXIS

T'G

FLO

OR

OPE

NIN

G

EXIS

T'G

FLO

OR

OPE

NIN

G

DN-14

DN-10

XW1

XW1

XP8

XP8

XW1

XW1

XW1

XP9

XW1

XW1

XP8

XP8

XP8

XP8

XP8

XP8XP8

XP8

XP8

XP8

XP8

XP8XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8 XP8

XW1

XP8

XP8

XP9

XP8P12CS

XP8XP8

XP8

XP8

XP8XP8

XP8

XP8

XP8

XP8

XP8

XW1

XP9

DN-10

DN-17

DN-17

G.L.

DN-16D2003b

DN-04

DN-14

8238

DN-04

DX2001bDX2001a

D2003a

DX2001a

D2035

2023

700 400 700 194692

DN-15

DN-15

DN-24

CONSTRUCTIONNORTH

DN-25

FROZENSTORAGE

1007A

FROZENSTORAGE

1007B

FROZENSTORAGE

1007C

MECHANICALROOM

1015

NECROPSYLABORATORY

1018A

DIGI-MIC

1012

CHEMISTRYLABORATORY

1014WOMENS W. RM

1013

MEN'S W. RM

1011

DRY STORAGE

1007

PLANT/SOILPREPARATIONLABORATORY

1003PLANT

1003A

SOIL

1003B

PHYSIOLOGYLABORATORY

1001

GROWINGCABINETS

1001A

GROWINGOFFICE

1001B

TOOL STORAGE

1006AROOT WASH

1004

BIN

1006B

BIN

1006C BIN

1006DS0IL MIXING

1006

WORKSHOP

1010

MACHINE ROOM

1008

?

?

REST

1013A

VEST.

1013B

SHOWER

1013C

SHOWER

1013D

SHOWER

1011B

SHOWER

1011C

VEST.

1011A

GROWTHCHAMBERS

1009ELEVATOR

X1008

LOCKERS

1016

GROWTHCHAMBERS

1002B

FROZENSTORAGE

1018B

STAIR

X1001

STAIR

X1003

CORRIDOR

X1004

CORRIDOR

X1006

GROWTHCHAMBERS

1005

CORRIDOR

X1007

GROWTHCHAMBERS

1002A

WILDLIFELABORATORY

1018

CRAWLSPACE

X1002

SENIORSCIENTIST

2027

LOBBY

2001

MEETING ROOM

2002PROJ.

2002A

STOR.

2002B

ADMIN WORK RM

2005

WILDLIFE ADMIN.

2007

LUNCHROOM

2009

WILDLIFETECHNICIAN

2010

WILDLIFESCIENTIST

2011

WILDLIFETECHNICIAN

2012

WILDLIFESCIENTIST

2013

CONTRACTTECHNICIANS

2014

FORESTRYTECHNICIAN

2015

DATA ENTRY

2016

FORESTRYTECHNICIAN

2017

STOR.

2018

FORESTRYTECHNICIAN

2019

SYSTEMSOFFICE

2021

FORESTRYTECHNICIAN

2020

VISITINGSCIENTIST

2022

FORESTRYSCIENTIST

2023

VISITINGSCIENTIST

2024

FORESTRYSCIENTIST

2025

FORESTRYSCIENTIST

2029

PROJECTLABORATORY

2031

PROJECTLABORATORY

2035

PROJECTLABORATORY

2037

LIBRARY

2039

WORK ROOM

2039A DATA STORAGE

2016A

JAN.

2040

W W/R

2042

M W/R

2044

VEST.

2001A

STAIR

x2003

CORRIDOR

X2005

CORRIDOR

X2006

CORRIDOR

X2007

PROJECTLABORATORY

2033

STAIR

X2001

ADMINISTRATION

2003

CORRIDOR

X2004

ARCHITECTURAL/STRUCTURAL:- REMOVE EXISTING SUSPENDED CEILINGS, FLOORING, PARTITIONS, MILLWORK, DOORS & FRAMES AS INDICATED- COORDINATE WITH EXISTING ITEMS THAT ARE TO REMAIN- REMOVE EXTERIOR DOORS AND WINDOWS AND FACADE WHERE NOTED TO FACILITATE NEW ADDITION AND BRIDGE LINK TO LIBRARY

GENERAL SCOPE OF DEMOLITION

(REFER TO DWG'S + SPECIFICATIONS)

MECHANICAL:- DEMOLITION IN THE EXISTING BUILDING WILL INCLUDE THE REMOVAL OF AIR HANDLING EQUIPMENT AND CIRCULATING PUMPS IN THE PENTHOUSE MECHANICAL ROOM, AND CIRCULATING PUMPS, HEAT EXCHANGERS AND ASSOCIATED PIPEWORK IN THE LOWER LEVEL MECHANICAL ROOM. THE EXISTING ROOF MOUNTED COOLING TOWER WILL BE REMOVED TOGETHER WITH EXISTING ROOF MOUNTED EXHAUST FANS, AND FUME HOOD EXHAUST DUCTWORK. SECTIONS OF THE LABORATORY SUPPLY DUCTWORK, GENERAL SUPPLY DUCTWORK AND GENERAL EXHAUST AIR DUCTWORK WILL BE REMOVED, AND THE MAJORITY OF LOCAL SUPPLY DUCTS FROM EXISTING HEAT PUMPS WILL ALSO BE REMOVED. ACID WASTE PIPEWORK AND ACID DILUTION TANKS WILL BE DISCONNECTED AND REMOVED, AND ALL SPRINKLER HEAD CONNECTIONS FROM THE EXISTING TRI-WATER SYSTEM AND EXISTING SPRINKLER HEADS WILL BE REMOVED.

- RENOVATION OF THE EXISTING BUILDING WILL INCLUDE NEW AIR HANDLING UNITS FOR LABORATORY AND GENERAL SUPPLY SYSTEMS, WITH A NEW FUME HOOD EXHAUST SYSTEM AND GENERAL EXHAUST SYSTEM WITH HEAT RECOVERY. EXISTING HEAT PUMPS SHALL GENERALLY BE RETAINED IN THEIR EXISTING LOCATIONS, WITH SUPPLY AIR DISTRIBUTION DUCTS BEING REPLACED. HEAT EXCHANGE EQUIPMENT SHALL BE RENEWED, INCLUDING THE COOLING TOWER, TOGETHER WITH CIRCULATING PUMPS ASSOCIATED WITH HEATING AND COOLING SYSTEMS. NEW DOMESTIC HOT AND COLD WATER SYSTEMS SHALL SERVE NEW FIXTURES, AND NEW LABORATORY GAS AND SPRINKLER SYSTEMS SHALL BE INSTALLED. NEW ACID WASTE PIPEWORK FROM FIXTURES IN THE EXISTING WING SHALL CONNECT TO THE ACID WASTE SYSTEM IN THE NEW WING.

- THE NEW ADDITION SHALL BE PROVIDED WITH NEW AIR HANDLING UNITS FOR LABORATORY AND GENERAL SUPPLY, WITH A NEW FUME HOOD EXHAUST SYSTEM AND GENERAL EXHAUST SYSTEM WITH HEAT RECOVERY. A NEW HEAT PUMP SYSTEM WITH LOW TEMPERATURE WATER CIRCULATION SHALL BE PROVIDED. EXHAUST SYSTEMS SHALL BE PROVIDED IN WASHROOMS, PRINT ROOMS, GAS BOTTLE STORES, ETC. NEW PIPED SERVICES SHALL INCLUDE DOMESTIC HOT AND COLD WATER SYSTEMS, SANITARY, ACID WASTE, LABORATORY GASES, AND SPRINKLER SERVICES. A NEW ACID DILUTION TANK SHALL BE PROVIDED IN THE CRAWLSPACE, AND THIS SHALL BE A SINGLE SOURCE FACILITY FOR BOTH THE RENOVATED AND NEW ADDITION. A NEW DDC AUTOMATIC CONTROL SYSTEM SHALL BE INSTALLED, AND THIS SHALL BE INTEGRATED WITH RETAINED CONTROLS WITHIN THE RENOVATED WING.

ELECTRICAL:- DEMOLITION IN THE EXISTING BUILDING WILL INCLUDE THE REMOVAL OF ALL LUMINAIRES, SWITCHES AND EMERGENCY FIXTURES LOCATED ON THE LOWER AND UPPER LEVELS, BASEMENT AND PENTHOUSE LUMINAIRES WILL REMAIN THE SAME. ALL ELECTRICAL DISTRIBUTION SUB-PANELS, GENERAL POWER OUTLETS AND SPECIFIED MECHANICAL EQUIPMENT LOCATED ON THE LOWER AND UPPER LEVELS WILL BE REMOVED. ALL NETWORKING OUTLETS (VOICE/DATA) AND RACKS SHALL BE REMOVED ALL FIRE ALARM DEVICES WILL BE REMOVED INCLUDING THE FIRE ALARM CONTROL PANEL.. ALL PUBLIC ADDRESS SYSTEMS WILL BE REMOVED. ALL CABLING AND WIRING FOR THE ABOVE COMPONENTS WILL BE REMOVED BACK TO SOURCE. ELECTRICAL DISTRIBUTION CONSISTING OF 4160V SWITCHGEAR AND SPECIFIC DISTRIBUTION PANELS SHALL REMAIN.

- RENOVATION OF THE EXISTING BUILDING AND THE ADDITION TO THE BUILDING SHALL INCLUDE NEW LUMINAIRES, SWITCHES AND OCCUPANCY SENSORS PER THE DESIGN LAYOUT. NEW LIFE SAFETY DEVICES. NEW ELECTRICAL DISTRIBUTION SUB-PANELS, RECEPTACLES AND CONTROLS FOR EXISTING AND NEW MECHANICAL EQUIPMENT. NEW NETWORK SYSTEM (VOICE/DATA) OUTLETS LOCATIONS ONLY WITH NEW RACKS (CABLING BY LU). NEW FIRE ALARM DEVICES INCLUDING NEW EDWARDS EST3 - FIRE ALARM CONTROL PANEL. NEW PUBLIC ADDRESS SYSTEMS. NEW SECURITY CAMERA SYSTEM. NEW CABLING AND WIRING THROUGHOUT. ELECTRICAL DISTRIBUTION CONSISTING OF 4160V SWITCHGEAR AND SPECIFIC DISTRIBUTION PANELS SHALL REMAIN AND NEW SUB-PANELS WILL CONNECT TO EXISTING DISTRIBUTION. NEW EMERGENCY POWER VIA CAMPUS EMERGENCY POWER SUPPLY SHALL BE ROUTING INTO THE BUILDING FOR USE BY REQUIRED EQUIPMENT.

- IF THE 4160V ELECTRICAL SERVICES IS INCLUDED, PROVIDE THE FOLLOWING:NEW POWERHOUSE BLDG. SHALL BE ERECTED FOR FUTURE GROWTH OF THE LU CAMPUS, THIS WILL INCLUDE THE REMOVAL OF THE ABANDONED FEEDER, INSTALLATION OF NEW FEEDER AND RELOCATION OF EXISTING FEEDER. NEW 4160V SWITCHGEAR INSTALLED FOR CAPACITY OF THE LU CASES BLDG. AND FUTURE. DISCONNECT THE EXISTING CNFER BLDG. 4160V SWITCHGEAR FROM THE LIBRARY BLDG. AND RE-CONNECT THE LU CASES BLDG. TO THE NEW POWERHOUSE BLDG.

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Demolition Plans

LU CASESAddition +Renovation

A2.1

2015-74A

05-DEC-2016

AJP/SCV/NCM

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 100A2.1A0.7

1 Level 1 - Lower Level - Demolition Planscale = 1 : 100A2.1A0.7

2 Level 2 - Upper Level - Demolition Plan

Demolition Notes

Mark DescriptionDN-01 REMOVE H.M. SCREEN, GLAZING AND DOORS (WHERE APPLICABLE), (NO SALVAGE).DN-03 REMOVE H.M. DOOR AND FRAME, (NO SALVAGE).DN-04 REMOVE EXTERIOR ALUMINUM WINDOW FRAME AND GLASS, (NO SALVAGE).DN-05 REMOVE EXTERIOR DOOR AND HINGES FROM FRAME. EXISTING DOOR OPENING TO BE

INFILLED, SEE DETAILS.DN-07 DEMOLISH EXISTIING T-BAR CEILING, COORDINATE REMOVAL OF LIGHTS, DIFFUSERS AND

EARLY WARNING DEVICES. PREVENT DAMAGE TO SPRINKLER HEADS.DN-08 DEMOLISH EXISTIING WOOD SLAT CEILING & BULKHEADS, COORDINATE REMOVAL OF

LIGHTS, DIFFUSERS AND EARLY WARNING DEVICES. PREVENT DAMAGE TO SPRINKLERHEADS.

DN-10 REMOVE EXISTING CASEWORK AND ASSOCIATED PLUMBING AND GAS LINES, REFER TOMECHANICAL DRAWINGS FOR PLUMBING WORK WHERE APPLICABLE, (NO SALVAGE).

DN-11 REMOVE EXISTING PRE-ENGINEERED WALK IN FREEZER AND ASSOCIATED EQUIPMENT ANDSERVICES, REFER TO MECHANICAL AND ELECTRICAL DRAWINGS, RETAIN FREEZER 1007C,USE SLAVAGED PANELS TO COMPLETE OUTSIDE CORNER , UPGRADE REFRIGERATION PERMECHANICAL DRAWINGS

DN-12 DEMOLISH EXISTING WALL IN ITS ENTIRETY. COORDINATE REMOVAL OF SERVICES WITHMECHINAL AND ELECTRICAL DRAWINGS. REMOVE EXISTING DOORS AND FRAMES WITHINWALL NOTED FOR DEMOLITION. REFER TO EXISTING DOOR SCHEDULE FOR DOORS TO BESALVAGED / RE-LOCATED.

DN-13 OPEN PORTION OF WALL TO FACILITATE NEW OPENING, REFER TO DRAWINGS FOR SIZE ANDLOCATION.

DN-14 OPEN EXISITNG EXTERIOR WALL TO FACILITATE NEW OPENINGS / EXPANSION OF BUILDING.REFER TO DRAWINGS AND DETAILS FOR EXTENT OF WORK.

DN-15 REMOVE EXISTING WOOD HAND RAILS/GLASS GUARDS/WOOD BASE SHOES IN ITS ENTIRETYDN-16 REMOVE EXISTING WOOD SIDING, (SALVAGE FOR RE-USE)DN-17 REMOVE EXISTING EXHAUST HOOD / SNORKEL EXHAUST AND ASSOCIATED DUCT WORK /

CONTROLS. REFER TO MECHANICAL AND ELECTRICAL DRAWINGSDN-20 REMOVE EXISTING EXTERIOR STAIR AND PORTION OF EXISTING HANDRAIL TO FACILITATE

REVISED NEW EXTERIOR EXIT STAIR, SEE DRAWINGS AND DETAILSDN-21 CUT OUT STRIPS OF EXISTING ROOF MEMEBRANE (600x3000) EVERY 320SF (30m²) AND

PREPARE ROOF FOR NEW ROOF MEMBRANE. MAKE GOOD ALL PENETRATIONS, VENTS ANDFLASHINGS, REFER TO DRAWINGS AND DETAILS.

DN-22 REMOVE EXISTING ROOFTOP EXHAUST FAN AND CURB, INFILL ROOF OPENING AND REBUILDROOF W/ NEW ROOFING SYSTEM, SEE MECHANICAL & ELECRICAL DRAWINGS

DN-23 REMOVE EXISTING FLOOR TILE IN ITS ENTIRETYDN-24 REMOVE EXISTING WOOD RAIL IN ITS ENTIRETYDN-25 REMOVE EXISTING PLUMBING FIXTURESDN-26 REMOVE EXISTING POT LIGHTS AND CEILING MTD HEATERDN-27 REMOVE EXISTING COOLING COIL SCREENS AND FRAMES INCLUDING BASE SHOES AND

SLEEPERS EMBEDDED IN EXISTING ROOF MEMBRANE. MAKE EXISTING ROOF LEVEL TORECEIVE NEW INSULATION LAYER AND EPDM MEMBRANE

DN-28 REMOVE EXISTING ROOF ACCESS HATCH AND PREPARE OPENING FOR NEW ROOF ACCESSHATCH. VERIFY EXISTING OPENING SIZE FOR NEW HATCH

DN-31 REMOVE EXISTING COOLING TOWER AND PREPARE CURB FOR NEW COOLING TOWER, SEEDETAIL

DN-32 REMOVE EXISTING ROOF DRAINS TO FACILITATE NEW ROOFING. INSTALL NEW DRAINS WITHEXTENSIONS, SEE MECHANICAl DRAWINGS

DN-33 REMOVE 600x600 PORTION OF EXISTING ROOFING TO OPEN WEB STEEL JOIST ON SOUTHHALF OR CONCRETE SLAB ON THE NORTH HALF OF EXISTING CFNER BUILDING TOFACILITATE INSTALLATION OF NEW ROOF ANCHORS, REPLACE ROOFING MATERIAL ASNECESSARY

Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

4 ISSUED FOR PERMIT 05-DEC-2016

Page 11: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

EXIS

TIN

G F

LOO

R O

PEN

ING

ABO

VE

EXIS

TIN

GFL

OO

RO

PEN

ING

EXIS

TIN

G L

IGH

T VA

LAN

CE

DN-07

DN-07

DN-07

DN-07

DN-07

DN-07

EXPOSEDSTRUCTURE

EXPOSEDSTRUCTURE

EXPOSEDSTRUCTURE

EXPOSEDSTRUCTURE

EXPOSEDSTRUCTURE

EXPOSEDSTRUCTURE

XW4

XW1 XW3 XW1

XW1

XW1

XW1

XW1

XW1

XW1

XW1

XP11

XW4

XW4

XW4

XW4

XP9

XP8

XP8

XP8

XP9

XP8 XP14XP8

XP8

XP8

XP8

XP8

XP14 XP8

XP14

XP14

XP8

XP8XP9 XP9

XP8

XP8

XP8

XP6

XP6

XP6

XP8

XP8

XP6

XP8

XP6

XP6

XP7XP6

XP6XP8

XP8

XP8 XP8

XP8

XP8

XP8

XP8

XP8

XP7

XP8

XP13

XP8

XP8

XP8 XP8

XP8

XP8

XP8

XP9

XP8

XP7

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

DN-16

DN-16

DN-16

ACT 2800

ACT 2800

CONSTRUCTIONNORTH

(TO REMAIN)

EXIS

TIN

G L

IGH

T VA

LAN

CE

DN-28

DN-28

DN-28

DN-28

DN-08

DN-08

DN-07 DN-07 DN-07DN-07

DN-07

DN-07

DN-07

DN-07

DN-07

DN-07

DN-07

DN-07

DN-07

DN-07

DN-07

DN-07

DN-07

DN-07

DN-07

DN-16

DN-16

EXISTING SKYLIGHT ABOVE

DN-07

DN-07

DN-07

XW1 XW1

XW1

XW1

XW1XW1

XW1

XW1

XW1

XW1

XP8

XP8

XP9

XP8 XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP9

XP9

XP8

XP8

XP8

XP8

XP8

XP8XP8

XP8XP8

P12CS

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8

XP8 XP8

XP8XP8

XP8

XP8

XP8

XP8

XP8XP8

XP8

XP8

XP8

XP8

XP13

DN-07

XP8

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800

ACT 2800ACT 2800ACT 2800

DN-07

DN-07

CONSTRUCTIONNORTH

DN-26

DN-28

DN-28

DN-28

DN-28

DN

-28

DN

-28

XW3

FROZENSTORAGE

1007A

FROZENSTORAGE

1007BFROZEN

STORAGE

1007C

MECHANICALROOM

1015

NECROPSYLABORATORY

1018A

DIGI-MIC

1012

CHEMISTRYLABORATORY

1014

WOMENS W. RM

1013

MEN'S W. RM

1011

DRY STORAGE

1007

PLANT/SOILPREPARATIONLABORATORY

1003 PLANT

1003A

SOIL

1003B

PHYSIOLOGYLABORATORY

1001

GROWINGCABINETS

1001A

GROWINGOFFICE

1001B

TOOL STORAGE

1006A

ROOT WASH

1004

BIN

1006B

BIN

1006C

BIN

1006D

S0IL MIXING

1006

WORKSHOP

1010

MACHINE ROOM

1008

JANITOR

1015A

REST

1013A

VEST.

1013B

SHOWER

1013C

SHOWER

1013D

SHOWER

1011B

SHOWER

1011C

VEST.

1011A

GROWTHCHAMBERS

1009ELEVATOR

X1008

LOCKERS

1016

GROWTHCHAMBERS

1002B

FROZENSTORAGE

1018B

STAIR

X1001

STAIR

X1003

CORRIDOR

X1004

CORRIDOR

X1006

WILDLIFELABORATORY

1018

GROWTHCHAMBERS

1002A

GROWTHCHAMBERS

1005

SENIORSCIENTIST

2027

LOBBY

2001

MEETING ROOM

2002PROJ.

2002A

STOR.

2002B

ADMIN WORK RM

2005

WILDLIFE ADMIN.

2007

LUNCHROOM

2009

WILDLIFETECHNICIAN

2010

WILDLIFESCIENTIST

2011

WILDLIFETECHNICIAN

2012

WILDLIFESCIENTIST

2013

CONTRACTTECHNICIANS

2014

FORESTRYTECHNICIAN

2015

DATA ENTRY

2016

FORESTRYTECHNICIAN

2017

STOR.

2018

FORESTRYTECHNICIAN

2019

SYSTEMSOFFICE

2021

FORESTRYTECHNICIAN

2020

VISITINGSCIENTIST

2022

FORESTRYSCIENTIST

2023

VISITINGSCIENTIST

2024

FORESTRYSCIENTIST

2025

FORESTRYSCIENTIST

2029

PROJECTLABORATORY

2031

PROJECTLABORATORY

2035

PROJECTLABORATORY

2037

LIBRARY

2039

WORK ROOM

2039A DATA STORAGE

2016A

JAN.

2040

W W/R

2042

M W/R

2044

VEST.

2001A

STAIR

x2003

CORRIDOR

X2005

CORRIDOR

X2006

CORRIDOR

X2007

PROJECTLABORATORY

2033

STAIR

X2001

EXISTING CEILING PLAN SYMBOL LEGEND

INCANDESCANT LIGHT FIXTURE(RECESSED)

FLOURESCENT LIGHT FIXTURE

SUPPY AIR LOUVRE

RETURN AIR LOUVRE

INCANDESCANT LIGHT FIXTURE(SURFACE MOUNTED)

EXISTING GYPSUM BOARDGYP

EXISTING ACOUSTICAL CEILING TO REMAIN

ACT

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Demolition ReflectedCeiling Plans

LU CASESAddition +Renovation

A2.2

2015-74A

05-DEC-2016

SCV/NCM

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 100A2.2A0.7

1 Lower Level - Demolition Reflected Ceiling Planscale = 1 : 100A2.2A0.7

2 Upper Level - Demolition Reflected Ceiling Plan

Demolition Notes

Mark DescriptionDN-01 REMOVE H.M. SCREEN, GLAZING AND DOORS (WHERE APPLICABLE), (NO SALVAGE).DN-03 REMOVE H.M. DOOR AND FRAME, (NO SALVAGE).DN-04 REMOVE EXTERIOR ALUMINUM WINDOW FRAME AND GLASS, (NO SALVAGE).DN-05 REMOVE EXTERIOR DOOR AND HINGES FROM FRAME. EXISTING DOOR OPENING TO BE

INFILLED, SEE DETAILS.DN-07 DEMOLISH EXISTIING T-BAR CEILING, COORDINATE REMOVAL OF LIGHTS, DIFFUSERS AND

EARLY WARNING DEVICES. PREVENT DAMAGE TO SPRINKLER HEADS.DN-08 DEMOLISH EXISTIING WOOD SLAT CEILING & BULKHEADS, COORDINATE REMOVAL OF

LIGHTS, DIFFUSERS AND EARLY WARNING DEVICES. PREVENT DAMAGE TO SPRINKLERHEADS.

DN-10 REMOVE EXISTING CASEWORK AND ASSOCIATED PLUMBING AND GAS LINES, REFER TOMECHANICAL DRAWINGS FOR PLUMBING WORK WHERE APPLICABLE, (NO SALVAGE).

DN-11 REMOVE EXISTING PRE-ENGINEERED WALK IN FREEZER AND ASSOCIATED EQUIPMENT ANDSERVICES, REFER TO MECHANICAL AND ELECTRICAL DRAWINGS, RETAIN FREEZER 1007C,USE SLAVAGED PANELS TO COMPLETE OUTSIDE CORNER , UPGRADE REFRIGERATION PERMECHANICAL DRAWINGS

DN-12 DEMOLISH EXISTING WALL IN ITS ENTIRETY. COORDINATE REMOVAL OF SERVICES WITHMECHINAL AND ELECTRICAL DRAWINGS. REMOVE EXISTING DOORS AND FRAMES WITHINWALL NOTED FOR DEMOLITION. REFER TO EXISTING DOOR SCHEDULE FOR DOORS TO BESALVAGED / RE-LOCATED.

DN-13 OPEN PORTION OF WALL TO FACILITATE NEW OPENING, REFER TO DRAWINGS FOR SIZE ANDLOCATION.

DN-14 OPEN EXISITNG EXTERIOR WALL TO FACILITATE NEW OPENINGS / EXPANSION OF BUILDING.REFER TO DRAWINGS AND DETAILS FOR EXTENT OF WORK.

DN-15 REMOVE EXISTING WOOD HAND RAILS/GLASS GUARDS/WOOD BASE SHOES IN ITS ENTIRETYDN-16 REMOVE EXISTING WOOD SIDING, (SALVAGE FOR RE-USE)DN-17 REMOVE EXISTING EXHAUST HOOD / SNORKEL EXHAUST AND ASSOCIATED DUCT WORK /

CONTROLS. REFER TO MECHANICAL AND ELECTRICAL DRAWINGSDN-20 REMOVE EXISTING EXTERIOR STAIR AND PORTION OF EXISTING HANDRAIL TO FACILITATE

REVISED NEW EXTERIOR EXIT STAIR, SEE DRAWINGS AND DETAILSDN-21 CUT OUT STRIPS OF EXISTING ROOF MEMEBRANE (600x3000) EVERY 320SF (30m²) AND

PREPARE ROOF FOR NEW ROOF MEMBRANE. MAKE GOOD ALL PENETRATIONS, VENTS ANDFLASHINGS, REFER TO DRAWINGS AND DETAILS.

DN-22 REMOVE EXISTING ROOFTOP EXHAUST FAN AND CURB, INFILL ROOF OPENING AND REBUILDROOF W/ NEW ROOFING SYSTEM, SEE MECHANICAL & ELECRICAL DRAWINGS

DN-23 REMOVE EXISTING FLOOR TILE IN ITS ENTIRETYDN-24 REMOVE EXISTING WOOD RAIL IN ITS ENTIRETYDN-25 REMOVE EXISTING PLUMBING FIXTURESDN-26 REMOVE EXISTING POT LIGHTS AND CEILING MTD HEATERDN-27 REMOVE EXISTING COOLING COIL SCREENS AND FRAMES INCLUDING BASE SHOES AND

SLEEPERS EMBEDDED IN EXISTING ROOF MEMBRANE. MAKE EXISTING ROOF LEVEL TORECEIVE NEW INSULATION LAYER AND EPDM MEMBRANE

DN-28 REMOVE EXISTING ROOF ACCESS HATCH AND PREPARE OPENING FOR NEW ROOF ACCESSHATCH. VERIFY EXISTING OPENING SIZE FOR NEW HATCH

DN-31 REMOVE EXISTING COOLING TOWER AND PREPARE CURB FOR NEW COOLING TOWER, SEEDETAIL

DN-32 REMOVE EXISTING ROOF DRAINS TO FACILITATE NEW ROOFING. INSTALL NEW DRAINS WITHEXTENSIONS, SEE MECHANICAl DRAWINGS

DN-33 REMOVE 600x600 PORTION OF EXISTING ROOFING TO OPEN WEB STEEL JOIST ON SOUTHHALF OR CONCRETE SLAB ON THE NORTH HALF OF EXISTING CFNER BUILDING TOFACILITATE INSTALLATION OF NEW ROOF ANCHORS, REPLACE ROOFING MATERIAL ASNECESSARY

Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

4 ISSUED FOR PERMIT 05-DEC-2016

Page 12: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

XA XD

X1

XB XC

X2

X3

X4

X5

X6

X7

X8

X9

X1A

(EXISTING)

24000

X2A

X2B

9500 5000 9500

4950

5000

5000

5000

5000

5000

1738

1737

1525

1525

3425

(EXI

S TIN

G) (

FIEL

D V

ERIF

Y)

7632

(EXI

S TIN

G)

3990

0

EXISTING ROOFEXISTING ROOF

4000

O/O

PAR

APET

8600 O/O PARAPET

EXIS

TIN

G S

KYLI

GH

T (A

TRIU

M S

PAC

E)SK

YLIG

HT

REM

AIN

S

CO

OLI

NG

TO

WER

SEE

MEC

H D

WG

S

NEW ROOFREPLACEMENTAS SPECIFIED

DN-21

762 x 914 EXISTROOF ACCESS HATCH

EXIST CONC PAVERWALKWAY

EXISTINGROOF DRAIN

RDRD

RD RD

RD

RD

EXISTING CHANCELOR PATERSON LIBRARY BUILDINGEXISTING CHANCELOR PATERSON LIBRARY BUILDING

NEW ROOFREPLACEMENTAS SPECIFIED

DN-21

EF3

EF4

EF6

EXIST ROOF INSULSLOPE LINES

EXIST ROOF INSULSLOPE LINES

EF7

DN-22

DN-22

DN-22

2A2.3 A2.3

5A2.3 A2.3

5A2.3 A2.3

SIM

5A2.3 A2.3

SIM

5A2.3 A2.4

5A2.3 A2.4

SIM

6A2.3 A2.4

3A2.3 A2.3

4A2.3 A2.4

4A2.3 A2.4

SIM

EXIST RAINSCREEN (TYP.)

2A2.3 A2.4

4A2.3 A2.3

4A2.3 A2.3

SIM

3A2.3 A2.4

1A2.3 A2.4

4A2.3 A2.3

SIM 4A2.3 A2.3

SIM

1A2.3 A2.4

SIM

5A2.3 A2.3

SIM

EXISTING ROOF CURBTO REMAIN

EXISTING ROOF CURBTO REMAIN

DN-32DN-32

DN-32

DN-32

DN-32

DN-32

DN-27DN-27

DN-28

DN-31

XL9

DN-33

DN-33DN-33

DN-33

DN-33

DN-33

DN-33

DN-33

T/O Steel @ Roof

103850

X1REMOVE EXIST'G PARAPET CAP FLASHING - NO SALVAGE

T/O Exist Parapet

104400

REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE

XR15REMOVE EXIST'G DRIP FLASHING - NO SALVAGE

EXIST'G METAL ROOF REMAINS

EXIST'G PENTHOUSE

T/O Steel @ Roof

103850

X1

REMOVE EXIST'G PARAPETCAP FLASHING

REMOVE EXIST'G DRIP FLASHING

T/O Exist Parapet

104400XR15

REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE

T/O Steel @ Roof

103850

XR15

REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE

EXIST'G METAL ROOF REMAINS

EXIST'G PENTHOUSE

T/O Steel @ Roof

103850

X9

XR17

REMOVE EXIST'G PARAPETCAP FLASHING

REMOVE EXIST'G DRIP FLASHING

T/O Exist Parapet

104400

REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Demolition Roof Plan& Details

LU CASESAddition +Renovation

A2.3

2015-74A

05-DEC-2016

NCM/SCV

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 100A2.3A0.7

1 Level 3-Roof Plan-Demo

scale = 1 : 10A2.3A2.3

2 Section Detail @ Existing Partial Penthouse Wall

scale = 1 : 10A2.3A2.3

5 Section Detail @ Existing Typical Parapet Cap Flashing

scale = 1 : 10A2.3A2.3

3 Section Detail @ Base of Exisitng Penthouse Wall

scale = 1 : 10A2.3A2.3

4 Section Detail @ Existing Typical Parapet Cap Flashing

Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

2 ISSUED FOR PERMIT 05-DEC-2016

Page 13: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

T/O Steel @ Roof

103850

X5

REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE

EXIST'GATRIUM XR15

T/O Steel @ Roof

103850

XC

REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE

EXIST'GATRIUM XR17

T/O Steel @ Roof

103850

XR15XR15

REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE

REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE

T/O Steel at Penthouse

108000

XR15 REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE

T/O Steel at Penthouse

108000

REMOVE EXIST'GMETAL FLASHING

REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE

XR17

T/O Steel @ Roof

103850

X5

XR15

XR17

T/O Exist Parapet

104400

REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE

REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

1 : 10

Demolition RoofDetails

LU CASESAddition +Renovation

A2.4

2015-74A

05-DEC-2016

NCM

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 10A2.4A2.3

2 Section Detail @ End of Existing Sloped Skylight

scale = 1 : 10A2.4A2.3

1 Section Detail @ Side of Existing Sloped Skylight

scale = 1 : 10A2.4A2.3

3 Section Detail @ Existing Cooling Tower Curb

scale = 1 : 10A2.4A2.3

6 Section Detail @ Existing Roof Hatchscale = 1 : 10A2.4A2.3

5 Section Detail @ Head of Existing Penthouse Wall

scale = 1 : 10A2.4A2.3

4 Section Detail @ Existing Roof Centre

Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

2 ISSUED FOR PERMIT 05-DEC-2016

Page 14: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

UP

UP

DN

DN

UPDN

XA XD

X1

X9

1.0

1

4

7

29.2

10.3

5.7

NEW ADDITION AREA = 1033.3m²MAX TRAVEL DISTANCE = 48.3m

EXISTING RENOVATION AREA = 925.0m²MAX TRAVEL DISTANCE = 42.1m

8.7

8.6

10.1

12.0

1.7

EXIT STAIR

3.1

TRAVEL DISTANCE = 48.3m

H

EXITSTAIR

EXITSTAIR

TRAV

EL D

ISTA

NC

E =

37.1

m

CONSTRUCTIONNORTH

S2b

4545

4545

4545

454545

4545

45

4545

45

4545

4545

4545

4545

4545

45

4545

45

45

45

45

B

A

C

EXIST'G MACHINE ROOM (3/4 HR.)

EXIST'G ELEVATOR (3/4 HR.)

JANITORS CLOSET (0 HR.)

0 0

0 0 0

0 0 0

SERVICE CHASE (3/4 HR.)

4545

LOWER FLOOR AREA= 1958.3 m2 / 21078.9 SF

B2 C2D2

0 min FIRE RESISTANCE RATING (F.R.R.) ON WALL

30 min FIRE RESISTANCE RATING (F.R.R.) ON WALL

1 h FIRE RESISTANCE RATING (F.R.R.) ON WALL

FIRE SEPARATION LEGEND

TRAVEL DISTANCE (METRES)

EXIT LOCATION

45 min FIRE RESISTANCE RATING (F.R.R.) ON WALL

1.5 h FIRE RESISTANCE RATING (F.R.R.) ON WALL

2 h FIRE RESISTANCE RATING (F.R.R.) ON WALL30 30 3030

45 4545

60 6060 60

9090 90

120 120 120

XA XD

X1

X9

1

4

7

10.8

4.1

4.0

NEW ADDITION AREA = 1033.3m²MAX TRAVEL DISTANCE = 44.2m

9.4

10.3

EXIT STAIR

A

EXIT STAIR

C

13.0

2.5

2.4

EXISTING RENOVATION AREA = 925m²MAX TRAVEL DISTANCE = 37.6m

25.3

TRAV

EL D

ISTA

NC

E =

44.2

m

TRAV

EL D

ISTA

NC

E =

37.6

m

H

EXITSTAIR

B

CONSTRUCTIONNORTH

S2b

4545

4545

4545

454545

4545

45

4545

45

4545

4545

4545

4545

SERVICE CHASE (3/4 HR.)

450

45

45 45 45

NEW BRIDGE

45-MIN

ADJACENT LIBRARY

45 45

45-MIN

45

45

45

45

SERVICE CHASE (3/4 HR.)

SERVICE CHASE (3/4 HR.)45

45

45

45

SERVICE CHASE (3/4 HR.)

45 45

EXIST'G ELEVATOR 45-MIN

45

45

4545

SERVICE CHASE (3/4 HR.)

SERVICE CHASE (3/4 HR.)

4545

45 45

SERVICE CHASE (3/4 HR.)

45

45

45

45

45

45

45

45

SERVICE CHASE (3/4 HR.)

45 45

JANITORS CLOSET (0 HR.)

UPPER FLOOR AREA= 1958.3 m2 / 21078.9 SF

B2 C2 D2

XA XD

X1

X9

1

4

7

2

G

S2b

AREA B1 = 633.3 m2 AREA B2 = 432.9 m2

EXIT STAIR

C

EXIT FLOOR HATCH

AREA B1 = 482.8 m2

AREA B1 = 484.6 m2

EXIT FLOOR HATCH

EXISTING FIRE BLOCK TO BE RETAINED

45

45

4545

EXIST'G ELEV. FNDTN.

45

45

45

NEW FIRE BLOCK PARTITION ON CONCRETE FOOTING

P3A

B2 C2 D2

CONSTRUCTIONNORTH

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Lower & Upper Level -Travel Distance Plan

LU CASESAddition +Renovation

A2.5

2015-74A

05-DEC-2016

NCM/SCV/TNG

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 200A2.5A0.7

1 Level 1 - Lower Level - Travel Distance Planscale = 1 : 200A2.5A0.7

2 Level 2 - Upper Level - Travel Distance Plan

scale = 1 : 200A2.5A1.2

3 Crawlspace Fire Seperation & Compartmentalization Plan

Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

2 ISSUED FOR PERMIT 05-DEC-2016

Page 15: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

UP

EPWT

EPWT

EPWT

EPWT

EPWT EPWT EPWT EPWTEPWT

EPWT

EPWT

EPWT

EPWT

EPWT

EPWT

EPWT

EPWT EPWT EPWT EPWT

EPWT EPWT EPWT EPWT

EPWT

EPWT

EPWT

EPWT PWT PWT PWT PWT

PWT

PWT

PWT

PWT

PWT

PWT

PWT

PWT

PWT

PWT

PWT

PWT

PWT PWT PWT PWT

PWT

PWT

PWT

PWT

PWT PWT PWT

EPWT EPWT EPWT

XA XD

X1

XB XC

X2

X3

X4

X5

X6

X7

X8

X9

X1A

X2A

X2B

A

1

3

4

5

6

7

2

B C D E F G

443

7902

6981

1421

7

385

35793

2992

8

CRAWSPACE ACCESS STAIR

EXISTING RENOVATION NEW ADDITION

EXISTING CRAWSPACE

EXISTING CRAWSPACE NEW ADDITION CRAWLSPACE

1A4.2A2.6

X002

EXIST'GCRAWLSPACE

001

CRAWLSPACE

001

H

EXISTING CRAWLSPACE ACCESS LADDER THRU HOLE IN FLOOR ABOVE

EXISTING SERVICE TUNNEL TO LIBRARY SUB-BASEMENT - SEE MECH & ELEC DWG'S FOR SERVICES

EXISTING PERIMETER WEEP TILE TO REMAIN INTACT AND FUNCTIONAL

EXISTING PERIMETER WEEPTILE TO REMAIN INTACT AND FUNCTIONAL

EXISTINGELEVATORPIT

EXISTING CRAWLSPACE ACCESS LADDER THRU HOLE IN FLOOR ABOVE

EXISTING ELEVATORPIT SUMP DRAIN

NEW ACCESS DOOR

NEW ACCESS DOOR

D002B

D002Ba

D002Bb

D002Bc

4950

5000

5000

5000

5000

5000

1738

1737

3050

3425

NEW PERIMETER WEEP TILE

NEW PERIMETER WEEP TILE

BRIDGELINK ABOVE

XP8

XW4

XW4XW4

XW4

XW4

XW4

XW4XW4

XW4

XW4

W1

W1

W1

W1

W1

CRAWLSPACE

002B

CRAWLSPACE

002A

XP8

P3A

NEW PERIMETER WEEP TILE

CRAWLSPACE - A

CRAWLSPACE - B

EXISTING SANITARY LINE

LEGEND

PERIMETER WEEP TILE

EXISTING PERIMETERWEEP TILE

9500 5000 9500 1900 3600 8000 8600 8600 5000 2000 1000

443350

350

1

A4.3

270

CONCRETE HOUSEKEEPING PAD

900 x 1000 OPENING

CONSTRUCTIONNORTH

S2b

EXIST'G SUMP PITS & PUMPS

EXIST'G STORM CONNECTION

EXIST'G FIRE STOP FOR CRAWLSPACE COMPARTMENTALIZATION

XW4 XW4

APPROX LOCATION OF NEW 4160 V POWER FEED, SEE ELEC

P3A

P3A

3500

CL.

DO

OR

DO

OR

1600

CL.

NEW SANITARYCONNECTION

S1

2850

2850

2645

505

3150

2500

2400

2400

2400

2400

2500

2500

S2

S4

S5

S6

DILUTION TANK

CN-01

CN-01

CN-02

CN-02

CN-03

CN-03

B2 C2 D2

5A1.1 A1.2

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

1 : 100

Crawlspace Plan

LU CASESAddition +Renovation

A2.6

2015-74A

05-DEC-2016

NCM/SCV

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 100A2.6A1.2

1 Crawlspase Plan

Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

2 ISSUED FOR PERMIT 05-DEC-2016

Page 16: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

DN

UP

DN

A2.291

A2.29 2

A2.28

1

XA XD

X1

XB XC

X2

X3

X4

X5

X6

X7

X8

X9

X1A

375 9500 5000 9500 1900 3600 8000 8600 8600 5000 2000 1000

(EXISTING)

24000

X2A

X2B

A

1

3

4

5

6

7

SERVICE ROOM

1001

JANITORSCLOSET

1002

FREEZER

1014B

GRADSTUDENTS

1013

DIRTY LAB (NEG)

1014F

OFFICE

1012

ATRIA 1

X1008

CORRIDOR

X1010VEST

1004A

M WR

1004

SHW

1004B

VEST

1003AW WR

1003

SHW

1003B

STAIR B

X1002

STAIR A

X1003

1A2.7 A3.2

A2.28

2NEW BRIDGE OVERHEAD

ELEVATORLOBBY

X1009

CORRIDOR

X1012

4A2.7 A3.2

EXIT

2A2.7 A3.2

3A2.7 A3.2

1A2.7 A3.1

2A0.11 A3.1

EXISTING WALK-IN COOLER

BFI BINSTORAGE AREA

-

TECH GASES

1015

CLEAN RM (POS)

1014E

LAB ENTRANCE

1014-1STORAGE

1014A

LASER

1014C

CIRCULATION

1014-2

ANALYSIS

1014-4

WET LAB

1014

TECH OFFICE

1014D

SCALE

1014-3

2

350

5700

2645

3655

2500

4800

4800

5000

350

B C D E F G

LAB ENTRANCE

1018-1

GENERALSTORAGE

1021B

OFFICE

1008A

DIRTY LAB

1009B

ANALYTICAL LAB

1009A

BIOHAZARD LAB

1011

TECH GASES

1010

HUMAN ORIGINSLAB

1005

I/T ROOM

1019

WORK SPACE

1018

WET LAB (NEG)

1018B

ANALYTICAL LAB

1018A

TECH GASES

1021A

PROTOYPEDEVELOPMENT

LAB

1007

LABMANAGEMENT

1008

INTEGRATEDFRESHWATER

LAB

1009

CORRIDOR

X1007

CORRIDOR

X1011

OFFICE

1017A

EXPANSIONSPACE

1017G

OFFICE

1017C

SEMPREP-ROOM

1017E

TECH ROOM

1017D

SEM

1017-3

WEIGHING &CHNS

1017-4

CHROMOTOGRAPHY

1017-5

WORKSHOP

1017-J

LAB ENTRANCE 2

1017-8

TECH-OFFICE

1017B

SHIPPING/RECEIVING+ RECYCLING

1021

BIOSAFETY LAB

1017F

TEM

1017-2

MATERIALANALYSIS

1017

EXIST'GELEVATOR

X1005

EXIST'GMACHINE ROOM

1020

CRAWLSPACE

X1004

(NEW

AD

DIT

ION

)

2910

0

ROCK GARDEN

ROCK GARDEN

PLANTINGS

250

(NEW ADDITION)

37700

250

3425

1525

1525

1737

1738

5000

5000

5000

5000

5000

4950

250

(EXI

S TIN

G)

3990

0

NEW FREEZER

EXIST'GFREEZER

SER

VIC

ESH

AFT

PLANTINGS

PLAN

TIN

GS

PREP ROOMCHROMATOGRAPHY

1017-6

PREP ROOM(ICP's)

1017L

TRACEANALYSIS (ICP's)

1017K

WORKSHOP

1017J

SHARED OFFICE

1017H

TECH GASES &CHILLERS

1016

CHAIR STORAGE

1022

LOUNGE AREA

1008A

H

CONSTRUCTIONNORTH

1A2.10A2.7

ENLARGED PLAN

1A2.9A2.7

ENLARGED PLAN

BIOMASS UTILIZATION RESEARCH LABORATORY

LAKEHEAD UNIVERSITY INSTRUMENTATION LABORATORY COMMUNITY ECOLOGY +

ENERGETICS LABORATORY

LAB MANAGEMENT

INTEGRATED FRESHWATER SCIENCE LABORATORY

HUMAN ORIGINS LABORATORY

RECESSED MAT(1900 x 3000)

EXPO

SED

EXI

S'T

BRIC

K TH

IS W

ALL

EXPO

SED

EXI

S'T

BRIC

K TH

IS W

ALL

4A3.21A2.7

1A3.20A2.7

5A3.21A2.7

S2b

LINE OF FLOORABOVE

358

(REFER TO MECH& ELEC DRAWINGS)

B2 C2 D2

ATRIUM STAIRSEE DETAILS

DX1

006b

PAINTEXPOSEDCOL'S- TYP.

WHEELED-COVEREDRECYCLING BINS

EXIST'G SIAMESE CONNECTION

STAIR, RETAININGWALLS AND SLOPEDWALK - SEELANDSCAPE PLANAND DETAILS

TECH GASES

1006

EXISTING RENOVATION NEW ADDITION

5A1.1 A1.2

FLOOR AREAS

EXISTING = 1013.82 m² = 10912.66 SF

ADDITION = 1017.00 m² = 11915.65 SF

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

1 : 100

Lower Level - OverallPlan

LU CASESAddition +Renovation

A2.7

2015-74A

05-DEC-2016

SCV/AJP/NCM

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 100A2.7A0.7

1 Level 1 - Lower Level - Overall Plan

Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 RE-ISSUED FOR REVIEW 27-JUN-20163 UPDATED FOR REFERENCE 18-JUL-20164 UPDATED FOR REFERENCE 20-JUL-20165 UPDATED FOR REFERENCE 28-JUL-20166 ISSUED FOR CLASS 'C' 04-AUG-20167 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

8 ISSUED FOR PERMIT 05-DEC-2016

Page 17: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

UP

A2.291

A2.29 2

A2.28

1

XA XD

X1

XB XC

X2

X3

X4

X5

X6

X7

X8

X9

X1A

EXIST'G ELEV

3376

2

X2A

X2B

PRINTER

A

1

3

4

5

6

7

ELECTROCHEMISTRY

2016D

BIOSAFETY(POS)

2016B

SPECTROCOPY

2016C

LASER RM

2016A

GRADSTUDENTS

2016

TECH GASSTORAGE

2015OFFICE

2017

GRAD STUDENTLOUNGE

2002

LOBBY

2001

UNISEX W/R

2021

OFFICE

2014C

OFFICE

2014D

OFFICE

2014E

OFFICE

2014F

OFFICE

2011G

OFFICE

2011F

OFFICE

2011E

OFFICE

2011D

OFFICE

2014A

OFFICE

2014B

OFFICE

2011C

OFFICE

2011B

ADMIN

2011-2

ADMIN

2014-2

PHOTOCOPY/PRINTING

2014G

OFFICE

2014H

WOMENS W/C

2012

MENS W/C

2013

ENTREPRENEURSHIPLECTURETHEATRE

2022

EXIS

TIN

G O

PEN

TO

BEL

OW

SKYL

IGH

T AB

OVE

EXISTING OPEN TO BELOW

ABORIGINALMENTORSHIP

PROGRAM

2008

RENTABLEOFFICE

2007

RENTABLEOFFICE

2006

ENTREPRENEURCENTRE

2009

BOARD RM

2005

ENTREPRENEURCENTRE

2018

STAIR C

X2006

CORRIDOR

X2009

OFFICE

2004C

MEETING RM

2004D

CESME OFFICE

2004E

CESME OFFICE

2004F

OFFICE

2004B

OFFICE

2004H

SHAREDKITCHENETTE

2003

BF STALL BF STALL

CORRIDOR

X2015

CORRIDOR

X2010

CORRIDOR

X2012

CIR

CU

LATI

ON

2011

-3

CORRIDOR

X2007

CIRCULATION

2011-4

CIR

CU

LATI

ON

2014

-1

SERVICESHAFT

SERVICE SHAFT

SER

VIC

E SH

AFT

SERVICE SHAFT

SER

VIC

E SH

AFT

RECESSED MAT

4950

5000

5000

5000

5000

5000

1738

1737

1525

1525

3425

9500 5000 9500

EXISTING CHANCELOR PATERSON LIBRARY BUILDING

STAIR B

X2002

1A2.7 A3.2

A2.28

2

4A2.7 A3.2

2A2.7 A3.2

3A2.7 A3.2

1A2.7 A3.1

2A0.11 A3.1

CORRIDOR

X2014

EXISTINGSKYLITATRIUM SPACE

GLU-LAM STRUCTURE

GLASS GUARD

GLU-LAM STRUCTURE

SER

VIC

E SH

AFT

1900

5500 6824 8817 7818

2

2500

4800

4800

5000

B C D E F G

MEETING RM

2011AADMIN

2011

ADMIN

2014-3

ADMIN

2014

DRY LAB

2016E

AFM (POS)

2016F

5700

MEDIA RM

2018C3D PRINTER RM

2018D

STUDY RM

2018B

STUDY RM

2018A

MO

VABL

E W

ALL

STANDING COMPUTER WORKSTATIONS (4)

PHOTOCOPIER / PRINTERS

LOUNGING SPACE

CO

MPU

TER

WO

RKS

TATI

ON

S (3

)

PRIN

TER

S &

STO

RAG

EOPEN STORAGE

WAITING AREA

2011-1

OFFICE

2011H

GLU-LAM STRUCTURE

ATRIUM 2

X2008

SERVICE SHAFT

IT S

HAF

T

SER

VIC

ESH

AFT

SER

VIC

ESH

AFT

VESTIBULE

X2001

CO

UN

TER

/ C

OPI

ER

AREA

OFFICE

2004A

CORRIDOR

X2013

CORRIDOR

X2011

ADMINISTRATIONEDI

2004

GLU-LAM STRUCTURESEE STRUCT DWGS AND DETAILS

OPE

NO

PEN

ATRIUM OPENTO BELOW

STORAGE

2014JSTORAGE

2011J

UNIVERSAL W/R

2020

JAN.

2024

(EXISITING)

24000

(NEW ADDITION)

37700

250 9500 5000 9500 1900 3600 8000 8600 8600 5000 2000 1000

250

(EXI

S TIN

G)

3990

0

(EXI

S TIN

G) (

FIEL

D V

ERIF

Y)

7632

(NEW

AD

DIT

ION

)

2910

0

5700

2645

3655

2500

4800

4800

5000

ENLARGED PLAN

ENLARGED PLAN

EXISTINGSTAIR

H

ARRIVAL

2004-1

IT RM

2023

CHAIR OFFICE -ENTRE CENTRE

2004G

PERCHLORIC EXHAUST CHASE TO ROOF

CONSTRUCTIONNORTH

2A2.12A2.8

1A2.11A2.8

-

OFFICE OF RESEARCH SERVICES

FACULTY OF GRADUATE STUDIES

NANO MATERIALS + ADVANCED TECHNOLOGIES INNOVATION CENTRE

ECONOMIC DEVELOPMENT + INNOVATION OFFICES

FACULTY OF GRADUATE STUDENTS

STUDENT ENTREPRENEUR

CENTRE

PARTNERS IN INNOVATION +

ENTREPENEURSHIP

EXIT STAIR BELOW

A5.28 8

XL9

BRIDGE LINK

X2016

S2b

SPARE OFFICE -EDI

2004J

B2 C2 D2

ATRIUM 1

X2008

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

1 : 100

Upper Level - OverallPlan

LU CASESAddition +Renovation

A2.8

2015-74A

05-DEC-2016

SCV/AJP/CRS

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 100A2.8A0.7

1 Level 2 - Upper Level - Overall Construction Plan

Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 UPDATED FOR REFERENCE 18-JUL-20163 UPDATED FOR REFERENCE 20-JUL-20164 UPDATED FOR REFERENCE 28-JUL-20165 ISSUED FOR CLASS 'C' 04-AUG-20166 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

7 ISSUED FOR PERMIT 05-DEC-2016

Page 18: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

XA

XD

X1

XB

XC

X2X3X4X5X6X7X8X9 X1AX2AX2B

134567 2

(EXI

STIN

G)

2400

0

4898

2545

SERVICE ROOM

1001

JANITORSCLOSET

1002

CORRIDOR

X1010

VEST

1004A

M WR

1004

SHW

1004B

VEST

1003A

W WR

1003

SHW

1003B

STAIR B

X1002

STAIR A

X1003

ELEVATORLOBBY

X1009

CORRIDOR

X1012 EXIT

COMMUNITY ECOLOGY + ENERGETICS

LABORATORY 107m²

SHIPPING/ RECEIVING + RECYCLING

AREA

LAB ENTRANCE

1018-1

GENERALSTORAGE

1021B

S/S TABLE

PROTOTYPE DEVELOPMENT

LAB SPACE

STUDENT WORK SPACE

2261 1709 4352 3292 1621

LAB MANAGEMENT

OFFICE

1008A

4970462021293159

INTEGRATED FRESHWATER SCIENCE LABORATORY 138m²

DIRTY LAB

1009B

ANALYTICAL LAB

1009A

BIOHAZARD LAB

1011

TECH GASES

1010

HUMAN ORIGINSLAB

1005

I/T ROOM

1019

WORK SPACE

1018

WET LAB (NEG)

1018B

ANALYTICAL LAB

1018A

TECH GASES

1021A

PROTOYPEDEVELOPMENT

LAB

1007

LABMANAGEMENT

1008

INTEGRATEDFRESHWATER

LAB

1009

CORRIDOR

X1011

SHIPPING/RECEIVING+ RECYCLING

1021

EXIST'GELEVATOR

X1005

EXIST'GMACHINE ROOM

1020

CRAWLSPACE

X1004

25034251525152517371738500050005000500050004950250

(EXISTING)

39900

NEW FREEZER1021B

EXIST'G FREEZER1021A

CHAIR STORAGE

1022

HUMAN ORIGINS LABORATORY

9625

2354

2676

5200

2120

2058

9375

2563

2438

120581280067498109

9378

557144084894

1732

4529

3055

280

5438

XP11XW1 XW4

XW1

XW1

XW3

P3H

P3M

XP8

XP8

P3

P3M

P3

XP9 XP8

XP8

XP8

XP13XP8

P3H

XW1

XP6

XP8

P21P3M

XP9

XP8

P3H

P3M

P3H

P3

P3H

XP8

7443

4712

25642124

2646

3954

XP8

XP8

XP8

P3J

EXISTING ELECTRICAL SERVICE EQUIPMENT

EXIS

TIN

G P

ANEL

S

EXISTING R/OWATER PAK

2A2.19A2.9

1A2.19A2.9

1A2.22A2.9

2A2.22A2.9

D10

08

D10

08A

D1009A

D10

09

D10

10

D1011b

D1019

D10

20

D10

07

D10

06

D1018Bb

D1018A

D10

21a

D1022

D1021B

D10

15

D1002

D1021A

A5.0 1

1A2.27A2.9

4A3.21A2.7

1A3.20A2.7

5A3.21A2.7

1A4.1A2.9

3A4.1A2.9

ENLARGEDPLAN

ENLARGEDPLAN

ENLARGEDPLANS

ENLARGEDPLAN

ENLARGEDPLAN

A5.28

5

CONSTRUCTIONNORTH

375

9500

5000

9500

250

5A4.2A2.9

ENLARGEDPLAN

CN-07

NEW BRIDGE OVERHEAD

DX3017DX3019

D1004

DX2003b

X1003

X1003A

D10

03D

1003

A

DX1

013

X100

7

DX1002

DX1001

2001

g

ROLLING COVEREDRECYCLING BINS

STORAGE LOCKERS

EXIST'G SIAMESECONNECTION

NEW DOORS INEXIST'G OPENING

CN-04

CG1

CN-04

D10

04

STORAGE

X1013

SERVICE CHASE ABOVEMOP SINK

CN-05

(REFER TO MECH& ELEC DRAWINGS)

EXIST'G WALK-INCOOLER 1005

CN-06

CN-05

CN-05

SC3

SC4

CN-05

TECH GASES

1006

CN-05

CN-08

CN-09

NEW LANDING & STAIRS

6A3.22A2.9

2451 8449 4785 5389 3940

P3A

P3A

XP9

XP8

CN-05

XP8

XP8

P3J

P3

P20

P20

P3H

P3M

P3M

XP6

XP8

XP8

XP8

XP6

P3 P3P3XP8XP7

CN-05

P3M

P3J

P3H

P3M

P11

3374

1250

3250

2528

CN-05

XP8

5376

3850

3915

5044

4881 2919 2230 2300 2500 5028

XW4

XW4

XW4

XW4

XW1

XW1

9216

2939

P3M

P3M

P3M

XP8

P3M

CN-05P3

XP8

XP8

CG

1

CG1

CG1

SC1

SC2

D10

04A

D1013bD1011c

CN-06

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

1 : 75

Enlarged Lower Level -Existing Renovation

LU CASESAddition +Renovation

A2.9

2015-74A

05-DEC-2016

SCV/TNG

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 75A2.9A2.7

1 Level 1 - Lower Level - Enlarged Existing Renovation*VIEW ROTATED CLOCKWISE 90°

Construction Notes

Mark DescriptionCN-01 TIE-IN EXISTING AND PERIMETER WEEP TILE. PROVIDE PURPOSE MADE TEES TO COMPLETE TIE-IN. ABANDON BURIED SECTION OF WEEP TILE BETWEEN EXISTING FOUNDATION AND ADDITION.CN-02 NEW OPENINGS IN EXISTING FOUNDATION WALL TO FACILITATE INSTALLATION OF NEW HOLLOW METAL DOORS AND FRAMES (2 LOCATIONS). ANCHOR FRAMES TO EXISTING CONCRETE.CN-03 INSTALL 19x76 PRESSURE TREATED PLYWOOD STRIPS TO BOTH SIDES OF PARTITION TO FIX FLOOR VAPOR BARRIER IN PLACE PRIOR TO PLACING SAND FLOOR.CN-04 BUILD SLOPE TO DRAIN OVER EXISTING FLOOR USING LEVELLING COMPOUND. TAPER BACK AT CENTRE OF DOORS TO ADJACENT ROOMS. MAX RISE 19mm. UNDER CUT DOORS TO SUIT.CN-05 INFILL EXISTING DOOR OPENING WITH NEW FRAMING AND FINISH.CN-06 PROVIDE STAINLESS STEEL CLOSURE PIECE TO FINISH CORNER OF EXISTING WALK-IN COOLER, CUT FREEZER PANEL TO SUIT LEFT OVER WALL SECTION FOLLOWING REMOVAL OF ADJACENT EXISITNG WALK-IN

COOLER. (SEE MECH & ELEC FOR ADDITIONAL SCOPE OF WORK).CN-07 NEW STEEL STAIR, RAILINGS AND LANDING IN PLACE OF FORMER CONCRETE STAIR AND LANDING. SEE STRUCUTRAL DRAWINGS AND DETAILS.CN-08 EXISITNG HOLLOW METAL FRAMES TO RECIEVE NEW PAINT FINISH, TYPICAL THROUGHOUT STAIR-A. PAINT STAIR STRINGERS AND EXPOSED PAINTED STRUCTURAL STEEL WITHIN STAIR-A TOP TO BOTTOM. PAINT BOTH

SIDES WHERE EXPOSED TO AN INTERIOR CORRIDOR.CN-09 NEW SALVAGED BRICK INSTALLED TO FACE OF EXISTING WALL, SEE PLAN DETAILS.CN-10 NEW PRE-MANUFACTERED MECHANICAL EQUIPMENT SCREEN FASTENED TO NEW COOLING TOWER FRAME AND CURB. COORDINATE WITH EQUIPMENT SUPPLIER.CN-11 REINSTALL EXISTING PRECAST PAVERS OVER NEW ROOF MEMBRANE. SET PAVERS ON FOAM BLOCKS TO PROTECT MEMBRANE.CN-12 WALKWAY MEMBRANE FOR ROOF ACCESS. COORDINATE LOCATION WITH ROOF PLAN.CN-13 FPA-R: ROOF MOUNTED FALL PROTECTION ANCHORS WHERE INDICATED ON ROOF PLANS. REFER TO DETAILS FOR INSTALLATION INTO NEW AND EXISITNG ROOF. MANUFACTERER TO PROVIDE ENGINEERED SHOP

DRAWING. MAKE PROVISION FOR FILLING WITH SPRAY FOAM INSULATION AFTER INSTALLATION.CN-16 PAINT EXISTING HSS FRAME IN ITS ENTIRETYCN-17 PAINT EXISTING HOLLOW METAL WINDOW FRAME - BOTH SIDESCN-18 PAINT EXISTING HOLLOW METAL SCREEN ABOVE AND BELOW - BOTH SIDESCN-19 PAINT EXISTING STEEL CANOPY AND COLUMNS IN ITS ENTIRETYCN-20 MOVEABLE WALL TRACK - COORDINATE W/ STRUCTURAL

Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

2 ISSUED FOR PERMIT 05-DEC-2016

Page 19: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

XD

X3

X4

X5

X6

X7

X8

X9

A

1

3

4

5

6

7

2

B C D E F G

A5.3

H

A5.25 12

A5.25

3

4

FREEZER

1014B

GRADSTUDENTS

1013

DIRTY LAB (NEG)

1014F

OFFICE

1012

ATRIA 1

X1008

STAIR C

X1006

EXIT

BIOMASS UTILIZATION RESEARCH LABORATORY

TECH GASES

1015

CLEAN RM (POS)

1014E

LAB ENTRANCE

1014-1

STORAGE

1014A

LASER

1014C

CIRCULATION

1014-2

ANALYSIS

1014-4

WET LAB

1014

TECH OFFICE

1014D

SCALE

1014-3

CORRIDOR

X1007

HO

USE

KEEP

ING

PAD

S

OFFICE

1017A

LAKEHEAD UNIVERSITY INSTRUMENTATION LABORATORY

EXPANSIONSPACE

1017G

OFFICE

1017C

SEMPREP-ROOM

1017ETECH ROOM

1017D

HO

USE

KEEP

ING

PAD

S

SEM

1017-3

WEIGHING &CHNS

1017-4

CHROMOTOGRAPHY

1017-5

LFH

WORKSHOP

1017-J

LAB ENTRANCE 2

1017-8

TECH-OFFICE

1017B

BIOSAFETY LAB

1017FTEM

1017-2

MATERIALANALYSIS

1017

LINE OF FLOOR ABOVE

ROCK GARDEN - SEE LANDSCAPE DWGS

ROCK GARDEN - SEE LANDSCAPE DWGS

SER

VIC

E SH

AFT

PREP ROOMCHROMATOGRAPHY

1017-6

PREP ROOM(ICP's)

1017L

TRACEANALYSIS (ICP's)

1017K

WORKSHOP

1017J

SHARED OFFICE

1017H

TECH GASES &CHILLERS

1016

LOUNGE AREA

1008A

D1017A

D1017B

D1017C

D10

17J

D10

17D

D10

17E

D10

17G

a

D10

17F

D10

16b

D10

17H

D10

17K

D10

16a

D1017L

D1017J

DX1006a

DX1

006c

DX1

006b

W2

P3H

P3J

P3H

P3H

W2

P3H P3

H P3H

P4H

P3H

P3H

P3H

P3H

P3H P3

HSP3HS

P3H

P3HS

P3C

P5HS

P5HS

P5HS

P3H

P3H

P3HS

P4JS

P4JS

P3HS

P3HS

P3H

P3H

P3H

P3H

P5HS

P4HS

P4HS

P3H

P3H

P3M

P3M

P3M

P3HS

P3HS

P3HS

P3HS

P3H

P4HS

P3HS

P3HS

P3HS

SC7

P11M

P3M

P3H

P3M

P3H

P2M

P2M

P2M

P2M

D10

12

D10

13b

D10

13c

D10

13d

D10

14E

D10

14

DX1

008

D1014F

D1014C

D1014D

D10

15

D1014A

(PRE-FABRICATEDFREEZER UNIT)

D10

13e

P4HS

SC7

XW1

PLANTINGS - SEE LANDSCAPE DWGS

PLAN

TIN

GS

-SEE

LAN

DSC

APE

DW

GS

EXTE

RIO

R W

ALK

-SEE

LA

ND

SCAP

E D

WG

S

1A2.20A2.10

1A2.23A2.10

ENLARGED PLAN

ENLARGED PLAN

CONSTRUCTIONNORTH

P9M

5372

969

619

2500

1881

394

119

CG1

2A4.2A2.10

2A3.21A2.10

4A3.21A2.7

3A3.21A2.10

1A3.20A2.7

5A3.21A2.7

2A3.20A2.10

4A3.20A2.10

6A3.21A2.10

5A3.20A2.10

7A3.20A2.10

PLANTINGS - SEE LANDSCAPE DWGS

----A2.10

3A3.20A2.10

TYPENLARGED PLAN

REFER TO DETAIL FOR WINDOW & DOOR INFILLS

WINDOW INFILLSEE DETAIL

1200

0

5139

CLE

AR

1493

5739

CLE

A R IN

SID

E

3007

CLE

A R

1637

16593

2562 1530

1850

1506

1406 1126 1126 1126

CLE

AR

1528

1536

4394 6398 3317 3317 4423 3762 3318 3318 5134

P5HS

P3HSP5

HSP5HS

2019 3317 3317 7638 3314 3354 3790 2361

3920

4035

1457

2398

D10

17-8

332

1617

4351

P3C

P3C

P3J

P9C

P27C

P27C

W2

3439 13161 5025 3523 2011 2965

4908 11692 3201 3142 4216 2965

3A3.22A2.10

S2b

P2M

CG1 CG1CG1

CG1

CG1

CG

1

CG1CG1CG1

CG2

CG2CG2

SC30

SC30

SC5 SC6

SC9

SC31

SC17

SC7

SC11SC10 SC12

B2 C2 D2

SC16SC15SC14SC13

P3HS

P3HS

738

2114

2260

6032

1617

4351

P3H

1390 1219 1219 1068

688 1219

915

P5H

F1

CYLINDERRACKS

P3M

2425

453

3131

2351

3865 W2

W2

W2

W2

W2

ROOF RWL

P3HS

P3HS

P4HS

P4HS P4

HS

2825

3616

5978

5000

4800

3038

3831

2931

P9M

P9M

P9M

P2M

P2M

P2M

P2M

P3HS

P3HS

2221 1742 1126 1742 1126 1740 1126 1742 2328

1468

1001

1760

4696

2343

1933

ATR

IUM

STA

IR U

P

EXIT TOTERRACE

WORK SPACE

1018

BIOHAZARD LAB

1011

INTEGRATEDFRESHWATER

LAB

1009

ANALYTICAL LAB

1009A

WET LAB (NEG)

1018B

2500

7159

5462

1979

CLEAR - VERIFY

5161

754

FIEL

D V

ERIF

Y

2030

335

RECESSED MAT

SEE STRUCT. DWGCONFIRM SIZE AND LOCATION

SEE STRUCT. DWGCONFIRM SIZE AND LOCATION

MOVABLE SCREENS

ROOF RWL

P9M

EXTERIOR NFHB - SEE MECH

5A1.1 A1.2

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

1 : 75

Enlarged Lower Level -New Construction

LU CASESAddition +Renovation

A2.10

2015-74A

05-DEC-2016

CRS / SCV

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 75A2.10A2.7

1 Level 1 - Lower Level - Enlarged New Construction

Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

2 ISSUED FOR PERMIT 05-DEC-2016

Page 20: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

XA

XD

X1

XB

XC

X2X3X4X5X6X7X8X9 X1AX2AX2B

134567 2

EXIST'G ELEV

GRAD STUDENTLOUNGE

2002

LOBBY

2001

UNISEX W/R

2021

ENTREPRENEURSHIPLECTURETHEATRE

2022

EXISTING OPEN TO BELOWSKYLIGHT ABOVE

EXISTING OPEN TO BELOW

ABORIGINALMENTORSHIP

PROGRAM

2008

RENTABLEOFFICE

2007

RENTABLEOFFICE

2006

ENTREPRENEURCENTRE

2009

BOARD RM

2005

ENTREPRENEURCENTRE

2018

CORRIDOR

X2009

OFFICE

2004C

MEETING RM

2004D

CESME OFFICE

2004E

CESME OFFICE

2004F

OFFICE

2004B

OFFICE

2004H

SHAREDKITCHENETTE

2003

CORRIDOR

X2015

CORRIDOR

X2010

CORRIDOR

X2012

EXIS

T'G

SER

VIC

E SH

AFT

EXIST'G SERVICE SHAFT

SER

VIC

E SH

AFT

SERVICE SHAFT

REC

ESSE

D M

AT

STAIR B

X2002

CORRIDOR

X2014

EXISTINGSKYLITATRIUM SPACE

ECO

NO

MIC

DEV

ELO

PMEN

T +

INN

OVA

TIO

N O

FFIC

ES

FACULTY OF GRADUATE STUDENTS

STUDENT ENTREPENEUR CENTRE

PARTNERS IN INNOVATION +

ENTREPENEURSHIP

MEDIA RM

2018C

3D PRINTER RM

2018D

STUDY RM

2018B

STUDY RM

2018A

STAN

DIN

G C

OM

PUTE

R

WO

RKS

TATI

ON

S (4

)

PHO

TOC

OPI

ER /

PRIN

TER

S

LOUNGING SPACE

COUNTER

ATRIUM 2

X2008

SER

VIC

E SH

AFT

IT SHAFT

VESTIBULE

X2001

COPIER AREA

OFFICE

2004A

CORRIDOR

X2013

CORRIDOR

X2011

ADMINISTRATIONEDI

2004

SPARE OFFICE -EDI

2004J

UNIVERSAL W/R

2020

(EXI

S ITI

NG

)

2400

0

250

9500

5000

9500

250

(EXISTING)

39900

250 4950 5000 5000 5000 5000 5000 1738 1737 1525 1525 3425 250 7382 (FIELD VERIFY)

EXISTINGSTAIR

ARRIVAL

2004-1

IT RM

2023

CHAIR OFFICE -ENTRE CENTRE

2004G

700

400

700

1946

92

P3JS

P3JS

P3HS

P3JS

P3CS

P3JS

P3JS

P3JS

P3JS

P3JS

P3JS

P3JS P3

JS

92 4578 2918 3586 3776 5000 13410

3055 3241

9235

6229

0828

4692

3562

1637

4091

3173182430743362296861017753073

9290

92 4894 3298 3405 3169

9316

639 9295

2434

124

2408

9500

4439 7251

2584

9408

TYP

197

D20

04D

D20

04C

D20

04B

D20

04A

D20

04J

D20

04H

D20

04G

D2004E

D2004FD

2004

b

D20

04a

D20

03

D20

02b

D20

02c

2002a

D20

22b

D20

22a

D20

18b

D20

18A

D20

18B

D2023

D2018a

D20

09b

D20

09a

D20

24

D20

07

D20

06

D2005b

D20

05a

D2018C

2A2.27A2.11

2A4.1A2.11

4A4.1A2.11

ENLARGEDPLAN

A5.29 2

1

A5.293

A5.29

5

A5.29 4

A5.28

5

A5.296A5.29 7

A5.28 6

CONSTRUCTIONNORTH

PAN

ELS

2 EQ

. GLA

SS

9 EQ. GLASS PANELS 2369

CONT STANDOFFRAIL SYSTEM

1A3.3A2.11

XL9

WD1

WD1

SC31

SC33

SC32

BRIDGE LINK

X2016

X2016f X2016b

D20

40

D20

44

DX2

001b

DX2

001a

ATRIUM 1

X2008

CORRIDOR

X2009

650 3500 1008 3500 647

4010

XP8 P3JS

P3JS

XP8

P3HS

XP8

XP8

XP8

P11XP8

XP8

P3HS

P3HS

P3HS

P3C

XP8

P3JS

P3JS

P3HS

P3HSP3

HS

D2018D

P3HS

P4HS

XP8

P3CS

P12CS

P3CS

XP9

XW1

XW1

XW1 XW1

XW1

XP9

XP8

P5HS

XW3

CW13

CW13

FIEL

D V

ERIF

Y

1776

2670

7077

363

1078

752

DX2003a

XP8

XP8

P12CS

SC35

XP8XP8

SC34

PAINT EXISTING STEEL - REFER TO CLG PLAN

DX2001b

P3JS

P3JS

P3JS

P3JS

P3JS

XP8 XP8

XP8 XP8

XP8

XP8

P11

XP8

XP8

P3C

XF1

P4HS

P4HS

P3HS

2923

6393

1346

1346

9316

BRIDGE STRUCTURESEE STRUCTURAL ANDDETAILS

OPEN SHAFT TO FACILITATENEW WORK - REBUILDFIRE SEPARATION USING SHAFT WALL

2074

1300

4421

600

4269

P3HS

P12CS

P3CS

P3JS

P12CS

XF1

1401 XP8

3142 3198 1734 1833

P3HS

XP8

P3CS

XF1

P3HS

EXIST'G CLEAR

1551

GRAD STUDENT PATIO - SEE LANDSCAPE DRAWINGS

SC36

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

1 : 75

Enlarged Upper Level -Existing Renovation

LU CASESAddition +Renovation

A2.11

2015-74A

05-DEC-2016

SCV

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 75A2.11A2.8

1 Level 2 - Upper Level - Enlarged Existing Renovation*VIEW ROTATED CLOCKWISE 90°

Construction Notes

Mark DescriptionCN-01 TIE-IN EXISTING AND PERIMETER WEEP TILE. PROVIDE PURPOSE MADE TEES TO COMPLETE TIE-IN. ABANDON BURIED SECTION OF WEEP TILE BETWEEN EXISTING FOUNDATION AND ADDITION.CN-02 NEW OPENINGS IN EXISTING FOUNDATION WALL TO FACILITATE INSTALLATION OF NEW HOLLOW METAL DOORS AND FRAMES (2 LOCATIONS). ANCHOR FRAMES TO EXISTING CONCRETE.CN-03 INSTALL 19x76 PRESSURE TREATED PLYWOOD STRIPS TO BOTH SIDES OF PARTITION TO FIX FLOOR VAPOR BARRIER IN PLACE PRIOR TO PLACING SAND FLOOR.CN-04 BUILD SLOPE TO DRAIN OVER EXISTING FLOOR USING LEVELLING COMPOUND. TAPER BACK AT CENTRE OF DOORS TO ADJACENT ROOMS. MAX RISE 19mm. UNDER CUT DOORS TO SUIT.CN-05 INFILL EXISTING DOOR OPENING WITH NEW FRAMING AND FINISH.CN-06 PROVIDE STAINLESS STEEL CLOSURE PIECE TO FINISH CORNER OF EXISTING WALK-IN COOLER, CUT FREEZER PANEL TO SUIT LEFT OVER WALL SECTION FOLLOWING REMOVAL OF ADJACENT EXISITNG WALK-IN

COOLER. (SEE MECH & ELEC FOR ADDITIONAL SCOPE OF WORK).CN-07 NEW STEEL STAIR, RAILINGS AND LANDING IN PLACE OF FORMER CONCRETE STAIR AND LANDING. SEE STRUCUTRAL DRAWINGS AND DETAILS.CN-08 EXISITNG HOLLOW METAL FRAMES TO RECIEVE NEW PAINT FINISH, TYPICAL THROUGHOUT STAIR-A. PAINT STAIR STRINGERS AND EXPOSED PAINTED STRUCTURAL STEEL WITHIN STAIR-A TOP TO BOTTOM. PAINT BOTH

SIDES WHERE EXPOSED TO AN INTERIOR CORRIDOR.CN-09 NEW SALVAGED BRICK INSTALLED TO FACE OF EXISTING WALL, SEE PLAN DETAILS.CN-10 NEW PRE-MANUFACTERED MECHANICAL EQUIPMENT SCREEN FASTENED TO NEW COOLING TOWER FRAME AND CURB. COORDINATE WITH EQUIPMENT SUPPLIER.CN-11 REINSTALL EXISTING PRECAST PAVERS OVER NEW ROOF MEMBRANE. SET PAVERS ON FOAM BLOCKS TO PROTECT MEMBRANE.CN-12 WALKWAY MEMBRANE FOR ROOF ACCESS. COORDINATE LOCATION WITH ROOF PLAN.CN-13 FPA-R: ROOF MOUNTED FALL PROTECTION ANCHORS WHERE INDICATED ON ROOF PLANS. REFER TO DETAILS FOR INSTALLATION INTO NEW AND EXISITNG ROOF. MANUFACTERER TO PROVIDE ENGINEERED SHOP

DRAWING. MAKE PROVISION FOR FILLING WITH SPRAY FOAM INSULATION AFTER INSTALLATION.CN-16 PAINT EXISTING HSS FRAME IN ITS ENTIRETYCN-17 PAINT EXISTING HOLLOW METAL WINDOW FRAME - BOTH SIDESCN-18 PAINT EXISTING HOLLOW METAL SCREEN ABOVE AND BELOW - BOTH SIDESCN-19 PAINT EXISTING STEEL CANOPY AND COLUMNS IN ITS ENTIRETYCN-20 MOVEABLE WALL TRACK - COORDINATE W/ STRUCTURAL

Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

2 ISSUED FOR PERMIT 05-DEC-2016

Page 21: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

XD

X3

X4

X5

X6

X7

X8

X9

A

1

3

4

5

6

7

-A2.12 ---

2

B C D E F G H

A5.25 12

A5.25

3

4

PRINTER

ELECTROCHEMISTRY

2016DBIOSAFETY

(POS)

2016B

SPECTROCOPY

2016C

LASER RM

2016A

GRADSTUDENTS

2016

TECH GASSTORAGE

2015

OFFICE

2017

OFFICE

2014C

OFFICE

2014D

OFFICE

2014E

OFFICE

2014F

OFFICE

2011G

OFFICE

2011F

OFFICE

2011E

OFFICE

2011D

OFFICE

2014A

OFFICE

2014B

OFFICE

2011C

OFFICE

2011B

ADMIN

2011-2

ADMIN

2014-2

PHOTOCOPY/PRINTING

2014GOFFICE

2014H

WOMENS W/C

2012

MENS W/C

2013

STAIR C

X2006

BF STALL BF STALL

CIRCULATION

2011-3

CORRIDOR

X2007

CIRCULATION

2011-4

CIRCULATION

2014-1

SERVICESHAFT

CLERESTORY GALLERYGLU-LAM STRUCTURE

GLASS GUARD RAILSYSTEM SEE DETAILS

SER

VIC

E SH

AFT

OFFICE OF RESEARCH SERVICES

FACULTY OF GRADUATE STUDIES

NANO MATERIALS + ADVANCED TECHNOLOGIES INNOVATION CENTRE

MEETING RM

2011A

ADMIN

2011

ADMIN

2014-3

ADMIN

2014

DRY LAB

2016E

AFM (POS)

2016F

CO

MPU

TER

W

OR

KSTA

TIO

NS

(3)

PRIN

TER

S &

STO

RAG

EOPEN STORAGE

WAITING AREA

2011-1

OFFICE

2011H

ATRIUM 2

X2008

SER

VIC

ESH

AFT

ATRIUM OPENTO BELOW

STORAGE

2014JSTORAGE

2011J

JAN.

2024

(NEW ADDITION)

37700

1900 3600 8000 8600 8600 5000 2000 1000

(NEW

AD

DIT

ION

)

2910

0

5700

2645

3655

2500

4800

4800

5000

350

PERCHLORIC EXHAUST CHASE TO ROOF

293

5500 6824 8817 7818

1898 4323 2380 4300

4000 4000 3776 3750 3312 3404 4513 3703

1254 1240

277

6512

2288

278

35082

9637

0425

0011

155

3445

1849

5781

4499

4320

2500

4800

1965

2835

1509

3970

3824

2951

2951

4874

P3H

P3

P3HS

P3JS

P12CS

P3C

W2

P3JS

P3JS

P3JS

P3JS

P3JS

P3JSP3

JS

P3JS

P3JS

P4JS

P11JS

P5HS

P3JS

P11JS

P3JS

P3JS

P3JS

P3JS

P4HS

P3HS

P12CS

P4HS

P11JS

P5HS

P11JS

P3JS

P3JS

P5HS

P3HS

P3JS

P3HS

P3HS

P3HS

P5HS

SC20

P3JS

W3

W3

D20

16b

D20

16c

D20

16E

D2011A

D2011B

D2011D

D20

11E

D20

11F

D20

11G

D20

14F

D20

14E

D20

14D

D2014C

D2014B

D2014A

D20

14A

DX2006

D20

15

D20

16a

D20

14H

D2014J

D20

11H

D2011C

D2016F

D2016D

D20

16d

D2016B

D2016A

5500 4000 5898

5030 5016 956 5851 3449

2A2.25A2.12

D2011J

D20

11

CONSTRUCTIONNORTH

3A2.27A2.12

3A4.2A2.12

7A3.23A2.12

5A3.23A2.12

ENLARGED PLAN

ENLARGED PLAN

ENLARGED PLAN

6A3.23A2.12

A5.28 8

A5.287

1100

1102

1009

8585

1190 10511248 1157

1200

S2b

4A3.22A2.12

A5.13

11

P3HS

SC25

SC18SC27

SC30

SC29

SC19SC22

SC28

SC24

MOP SINK

MOP SINK

B2 C2 D2

SC21

D20

17

P5HS

P3J

P3KS

P11CS

P3J

W2

W2

P3JS

P3JS

P11CS

P11JS

P3JS

P3J

P4CS

P5CS

P27C

P27C

W2

W2

W3W3W3W3W3

P5HS

P5HS

P3CS

P3CS

P5CS

P5CS

P4HS

P3HS

1816

P3CS

1262

1200

1262

1075

SIM

ROOFRWL

P11JS

P3JS

P3JS

P4JS

EXTERIOR CURTAIN WALL SYSTEM W/ HORIZ LATTICE - SEE ELEVATIONSCURTAIN WALL SYSTEM - SEE ELEVATIONS

GLASS GUARDTO WALL FACE

ATRIUM STAIR

MO

VABL

E W

ALL

SYST

EM S

EE D

ETAI

LS

MO

VABL

E W

ALL

SYST

EM S

EE D

ETAI

LS

P3HS

5567

2590

3844

P5HS

P5HS

4027 12573 3975 2885 3111 2182 1346

3720

3121

5158

P2M

P2M

F1

PAINTED STL.COLUMNS

PAINTED STL.COLUMNS

P4HS

SC23

SC30

SC30

P3HS

1740 1127 1740

2837

P2M

P2M

F1

2629

614

1288

P2M

P2M

F1

1016 1742 1140 1742 2001

2614

1855

4954

1479

448

2598

2598

1106

P11JS

STU

D67

1106

1727 1523 350

2441

2403

618

1979

588

3500

1008

3500

585

CORRIDOR

X2009 CORRIDOR

X2009

ATRIUM 1

X2008

ENTREPRENEURCENTRE

2018

ENTREPRENEURCENTRE

2009

SC26

D20

24P5CS

P5HS

P4HS

P4HS

F1

XW1

XW1

P5HS

800 1021 1214

1309

445

8500

535

1A3.24A2.12

2A3.24A2.12

1A3.23A2.12

3A3.24A2.12

4A3.24A2.12

6A3.21A2.10

SIM

2A3.21A2.10

SIM

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

1 : 75

Enlarged Upper Level -New Construction

LU CASESAddition +Renovation

A2.12

2015-74A

05-DEC-2016

SCV/NCM

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 75A2.12A2.8

2 Level 2 - Upper Level - Enlarged New Construction

Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

2 ISSUED FOR PERMIT 05-DEC-2016

Page 22: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

XA XD

X1

X9

1

4

7

F

G

H

EXISTING TO REMAIN IN EXISTING CRAWL SPACE AREA

EXISTING TO REMAIN IN EXISTING CRAWL SPACE AREA

CONSTRUCTIONNORTH

CRAWLSPACE

002A

CRAWLSPACE

002B

CRAWLSPACE

001

EXIST'GCRAWLSPACE

001

CEILING PLAN SYMBOL LEGEND

EXPOSED STRUCTURE

ULTIMA - 24"x24" - HIGH NRCACT-1

SUPPLY AIR DIFFUSER

OPTIMA - 30"x60" & 6"x60" - TECH ZONE - TEGULARACT-2

OPTIMA - 48"x48" - TEGULARACT-3

SOUNDSHAPES ACOUSTICAL CLOUDSACT-4

FORMATIONSACT-5

SOUNDSHAPES ACOUSTICAL CANOPIES - HILL CANOPY - 461/2"x75"ACT-6

GYPSUM BOARDGYP

EXP

WOODWORKS CHANNELED PLANKWD-C

WOODWORKS LINEAR - 33/4" (W)WD-L

EXPOSED STRUCTURE PAINTEDEXP PT

EXISTING GYPSUM CEILING TO REMAINEX GYP

EXISTING ACOUSTICAL CEILING TO REMAINEX ACT

VINYL TILE - 24"x24"ACT-7

METAL WORKS - TEGULAR (PERFORATION M2) - WHITEACT-8

SUPPLY AIR DIFFUSER - LINEAR

RECESSED FIXTURE - 6" (W)

RETURN AIR GRILLE - LINEAR

CYLINDRICAL EXTERIOR WALL SCONCE

SQUARE RECESSED DOWNLIGHT

RECESSED SPRINKLER

TUBULAR SUSPENDED FIXTURE - 4" (W) 2800 AFF

CIRCULAR SUSPENDED FIXTURE - 2800 AFF

VALANCE LED STRIP

EXHAUST AIR

RECESSED FIXTURE - 24"x24"

WALL MOUNTED FIXTURE

CEILING FAN W/ LIGHT

CONTINUOUS RECESSED FIXTURE - 4" (W)

SUSPENDED FIXTURE

SURFACE MOUNTED FIXTURE

PROJECTOR

SPEAKER

RETURN AIR GRILLE

SUSPENDED SQUIGGLE FIXTURE - 2800 AFF

PENDENT SPRINKLER

CYLINDRICAL PENDENT FIXTURE - 3000 AFF

WALL PACK FIXTURE

SQUARE PENDENT FIXTURE

BOLLARD LIGHT FIXTURE

CIRCULAR PENDENT FIXTURE

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Crawlspace -Renovated ReflectedCeiling Plan

LU CASESAddition +Renovation

A2.13

2015-74A

05-DEC-2016

EMC

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 100A2.13A1.2

1 Crawlspace - Renovated Reflected Ceiling Plan

Rev. Description Date1 ISSUED FOR PERMIT 05-DEC-2016

Page 23: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

XA XD

X1

X9

1

4

7

SERVICE ROOM

1001

JANITORSCLOSET

1002

VEST

1004A

M WR

1004

W WR

1003

STAIR B

X1002

SER

VIC

E SH

AFT

F

G

GRADSTUDENTS

1013

DIRTY LAB (NEG)

1014F

OFFICE

1012

ATRIA 1

X1008

CORRIDOR

X1010

SHW

1004B

VEST

1003A

SHW

1003B

STAIR C

X1006

STAIR A

X1003

ELEVATORLOBBY

X1009

CORRIDOR

X1012

TECH GASES

1015CLEAN RM (POS)

1014E

LAB ENTRANCE

1014-1

LASER

1014C

CIRCULATION

1014-2

ANALYSIS

1014-4

WET LAB

1014

TECH OFFICE

1014D

SCALE

1014-3

LAB ENTRANCE

1018-1

GENERALSTORAGE

1021B

OFFICE

1008A

DIRTY LAB

1009B

ANALYTICAL LAB

1009A

BIOHAZARD LAB

1011

TECH GASES

1010

HUMAN ORIGINSLAB

1005

I/T ROOM

1019

WORK SPACE

1018

WET LAB (NEG)

1018B

ANALYTICAL LAB

1018A

TECH GASES

1021A

PROTOYPEDEVELOPMENT

LAB

1007

LABMANAGEMENT

1008

INTEGRATEDFRESHWATER

LAB

1009

CORRIDOR

X1007

CORRIDOR

X1011

OFFICE

1017A

EXPANSIONSPACE

1017G

SEMPREP-ROOM

1017E

SEM

1017-3

WEIGHING &CHNS

1017-4

CHROMOTOGRAPHY

1017-5

WORKSHOP

1017-J LAB ENTRANCE 2

1017-8

TECH-OFFICE

1017B

SHIPPING/RECEIVING+ RECYCLING

1021

MATERIALANALYSIS

1017TEM

1017-2BIOSAFETY LAB

1017F

TECH ROOM

1017D

ACT-1 2800

ACT-1 2800

ACT-1 2440

ACT-1 2800

ACT-1 2800

ACT-1 2800

OFFICE

1017C

EX EXP

EXP

EXP PT

EXP PT

EXP PT

EXP PT

EXP PTEXP PT

EXP PT EXP PT

EXP PT

ACT-1 2800

EXP PT

EXP PT

STORAGE

1014A

FREEZER

1014B

EXP PT

EXP PT

EXP PT

EXP PT

EXP PT

EXP PT

EXP PT

EXP PT

H

CHAIR STORAGE

1022

EXIST'G ELEV

EXIS

T'G

SER

VIC

E SH

AFT

ACT-1 2800

OPEN ABOVE

EXIST'GMACHINE ROOM

1020

EX GYP

EX GYP

EX GYP

TECH GASES

1006

EXP PT

OPEN ABOVE

ACT-1 2800

EX EXP

ACT-1 2800

OPEN ABOVE

EXP PT

EXP PT

LOUNGE AREA

1008A

WD-L 3400

PREP ROOMCHROMATOGRAPHY

1017-6

PREP ROOM(ICP's)

1017L TRACEANALYSIS (ICP's)

1017K

EXP PT

CORRIDOR

X1016

SHARED OFFICE

1017H

TECH GASES &CHILLERS

1016

WORKSHOP

1017J

ACT-1 2800

8047

1267

6

4526

2176

197

1982

197

4739197

1460

3

EXP PT

7443

4846

12093

9316

2439

3097

4790

146

1209

197

197

1920

197

11716

2137

258420

00

4529 2993

3829

4558

29934

5650

3289

18061

197

1900

197

3930

2887

ACT-7 2440

CONSTRUCTIONNORTH

ACT-1 2800

2227

EXISTING FIXTURES TO REMAIN

STORAGE

X1013

CTS RECESSED FIXTURE

ACT-1 2800

ACT-1 2800

ACT-1 2800

ACT-1 2800

2244

3876

1936

2066 2276

4466

3876

1319

2276

2433

2433

1319

6625

2129

2815

CTS WALL RECESSED FIXTURE

CTS WALL RECESSED FIXTURE

CTS RECESSED FIXTURE

CTS RECESSED FIXTURE

PROJECTOR

9316

ACT-1 2800

4832

PROJECTOR

ACT-7 2800

4284

1670

2440

5354

CTS RECESSED FIXTURE

ACT-7 2800

ACT-1 2800

EXISTING FIXTURE TO REMAIN

EXP

PROJECTOR

ACT-1 28002552

9047

ACT-7 2800

WALL PACK FIXTURE

ACT-1 2800

WALL PACK FIXTURE

5076

3837

WALL PACK FIXTURE

WALL PACK FIXTURE

ACT-1 2800

37805306

3168

1497

2552

4966

ACT-7 2800

ACT-1 2800

ACT-1 2800

ACT-1 2800

4332

3742

3864

6274

7495

4171

2751 3193 3193

21455

738

1493

4406

1990 2935

2237

CTS RECESSED FIXTURE

36667514 32303190

5878

3193 3193 4272 3611 3194 3194 5056

5139

2783

EXP PT

3007

2753

2224

2887

PROJECTOR

8790

4649

3399

1887

5833

41293018

5066

3487

7044

14769

9902

4757

2135

2298

2298

2308

2288

2352

3227

4769

BOLLARD LIGHT FIXTURE - SEE LANDSCAPE PLAN FOR ALL LOCATIONS

EXP PT

CEILING PLAN SYMBOL LEGEND

EXPOSED STRUCTURE

ULTIMA - 24"x24" - HIGH NRCACT-1

SUPPLY AIR DIFFUSER

OPTIMA - 30"x60" & 6"x60" - TECH ZONE - TEGULARACT-2

OPTIMA - 48"x48" - TEGULARACT-3

SOUNDSHAPES ACOUSTICAL CLOUDSACT-4

FORMATIONSACT-5

SOUNDSHAPES ACOUSTICAL CANOPIES - HILL CANOPY - 461/2"x75"ACT-6

GYPSUM BOARDGYP

EXP

WOODWORKS CHANNELED PLANKWD-C

WOODWORKS LINEAR - 33/4" (W)WD-L

EXPOSED STRUCTURE PAINTEDEXP PT

EXISTING GYPSUM CEILING TO REMAINEX GYP

EXISTING ACOUSTICAL CEILING TO REMAINEX ACT

VINYL TILE - 24"x24"ACT-7

METAL WORKS - TEGULAR (PERFORATION M2) - WHITEACT-8

SUPPLY AIR DIFFUSER - LINEAR

RECESSED FIXTURE - 6" (W)

RETURN AIR GRILLE - LINEAR

CYLINDRICAL EXTERIOR WALL SCONCE

SQUARE RECESSED DOWNLIGHT

RECESSED SPRINKLER

TUBULAR SUSPENDED FIXTURE - 4" (W) 2800 AFF

CIRCULAR SUSPENDED FIXTURE - 2800 AFF

VALANCE LED STRIP

EXHAUST AIR

RECESSED FIXTURE - 24"x24"

WALL MOUNTED FIXTURE

CEILING FAN W/ LIGHT

CONTINUOUS RECESSED FIXTURE - 4" (W)

SUSPENDED FIXTURE

SURFACE MOUNTED FIXTURE

PROJECTOR

SPEAKER

RETURN AIR GRILLE

SUSPENDED SQUIGGLE FIXTURE - 2800 AFF

PENDENT SPRINKLER

CYLINDRICAL PENDENT FIXTURE - 3000 AFF

WALL PACK FIXTURE

SQUARE PENDENT FIXTURE

BOLLARD LIGHT FIXTURE

CIRCULAR PENDENT FIXTURE

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Lower Level -Renovation ReflectedCeiling Plan

LU CASESAddition +Renovation

A2.14

2015-74A

05-DEC-2016

SCV/AJP/EMC

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 100A2.14A0.7

1 Lower Level - Renovation Reflected Ceiling Plan

Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 UPDATED FOR REFERENCE 28-JUL-20163 ISSUED FOR CLASS 'C' 04-AUG-20164 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

5 ISSUED FOR PERMIT 05-DEC-2016

Page 24: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

XA XD

X1

X9

1

4

7

OFFICE

2017

ELECTROCHEMISTRY

2016D

SPECTROCOPY

2016C

GRADSTUDENTS

2016

BIOSAFETY(POS)

2016B

LASER RM

2016A

TECH GASSTORAGE

2015

STAIR C

X2006

CORRIDOR

X2007

WOMENS W/C

2012

MENS W/C

2013

ADMIN

2014-2

ADMIN

2011CIRCULATION

2011-3

ADMIN

2011-2

OFFICE

2014H

PHOTOCOPY/PRINTING

2014G

ADMIN

2014-3

CIRCULATION

2011-4

CIRCULATION

2014-1

OFFICE

2014B

OFFICE

2014A

OFFICE

2014C

OFFICE

2014D

OFFICE

2014E

OFFICE

2014F

OFFICE

2011G

OFFICE

2011F

OFFICE

2011E

OFFICE

2011D

OFFICE

2011C

OFFICE

2011B

ENTREPRENEURSHIPLECTURETHEATRE

2022

ENTREPRENEURCENTRE

2018

CORRIDOR

X2009

BOARD RM

2005

ENTREPRENEURCENTRE

2009CO

RR

IDO

R

X201

2

RENTABLEOFFICE

2006

RENTABLEOFFICE

2007

ABORIGINALMENTORSHIP

PROGRAM

2008

STAIR B

X2002CORRIDOR

X2015

UNISEX W/R

2021

LOBBY

2001

GRAD STUDENTLOUNGE

2002

SHAREDKITCHENETTE

2003

OFFICE

2004H

OFFICE

2004B

OFFICE

2004C

MEETING RM

2004D

CESME OFFICE

2004E

CESME OFFICE

2004F

CORRIDOR

X2010

EXIST'G ELEV

SKYLIGHT ABOVE

SERVICESHAFT

SERVICE SHAFT

SER

VIC

E SH

AFT

EXP PT

F

G

ATRIUM 2

X2008

DRY LAB

2016E

AFM (POS)

2016F

MEDIA RM

2018C

3D PRINTER RM

2018D

OFFICE

2011H

EXP PT EXP PT

EXP PT

EXP PT

ACT-1 2800

ACT-1 2800

ACT-1 2800

MEETING RM

2011A

WAITING AREA

2011-1

OFFICE

2004A

ACT-1 2800

GYP 3000 GYP 3000

ACT-1 2800

ACT-1 2800

ACT-1 2800

ACT-1 2800 ACT-1 2800 ACT-1 2800 ACT-1 2800 ACT-1 2800 ACT-1 2800

ACT-1 2800

ACT-1 2800

ACT-1 2800

ACT-8 3000

ACT-1 3000

ACT-1 2800

ACT-1 2800

ACT-1 2800

ACT-4 2800

GYP 2800

ACT-1 2800

ACT-1 2800

ACT-1 2800

ACT-1 2800

ACT-1 2800 ACT-1 2800

ACT-1 2800

ACT-1 2800

ACT-1 2800

PROJECTOR

H

ACT-2 3000

GYP 2800

EXP PT

UNIVERSAL W/R

2020

EXP PT

ACT-1 2800

GYP 2440

GYP 2440

ACT-3 3000

IT RM

2023

STUDY RM

2018B

STUDY RM

2018A

SPARE OFFICE -EDI

2004J

CHAIR OFFICE -ENTRE CENTRE

2004G

ACT-1 2800ACT-1 2800

ACT-1 2800

ACT-1 2800

EXP PT

ACT-5 3000

ACT-5 2600

ACT-5 2800

SKYLIGHT ABOVE

ACT-1 2800

ACT-1 3000

ACT-1 2800

GYP 2800

CORRIDOR

X2011

WD

-C44

00

ATRIUM 1

X2008

EXP PT

EXIST'G SERVICE SHAFT

SERVICE SHAFT SERVICE SHAFT

IT S

HAF

T SERVICE SHAFT

JAN.

2024

SER

VIC

E SH

AFT

EXH

AUST

HO

OD

SH

AFT

ADMIN

2014

STORAGE

2014J

STORAGE

2011J

ACT-1 2800 ACT-1 2800

ACT-1 2800ACT-1 2800

GYP 2800

WD-C 2800 WD-C 2800

ACT-8 7200ACT-8 7200

GYP 3600

3055

3241

6296

445 8401 445197 2073197

2213

197

6099

ACT-7 2800

PERCHLORIC EXHAUST CHASE TO

ROOF

ACT-1 2440

ACT-1 2800

593

5996

600

1359

413

46

197 2068197

1601

3401

2168

2333

2861 6331

4315 42

88

197

1982

197

816

3107

3281

3174

3836

1376

3856

9937

9181

619

3595

619

758

7800

7583500 27842784

3007

4516

2794

3462

3652

4876

4368 4207

1513 4153

1700

2950

3238

619

2844

1012

716

65

2466

3664

3847

4775

16424

832 7754

8126

2987

3525

1293

1637

4183

4375

5539

32914389323432343626362638443816

1101

8

3202

1841

2716

1376

3691

902

5696 57311266 3640 3640 1266

4323

22626

2229 4144

3846 6903

5054

2308

ACT-6

CONSTRUCTIONNORTH

197

EXP

VESTIBULE

X2001

WD-C 3000

824 2551 5942

378

GYP 2800

STAIR A

X1003

EXTERIOR WALL SCONCE

EXTERIOR WALL SCONCE

EXTERIOR WALL SCONCE

EX GYP

TUBULAR SUSPENDED FIXTURE

RECESSED FIXTURE

CIRCULAR SUSPENDED FIXTURE

CTS RECESSED FIXTURE

187

9290

VALANCE LED STRIP

ADMINISTRATIONEDI

2004

3049

CORRIDOR

X2014

EXTERIOR WALL SCONCE

CTS RECESSED FIXTURE

CTS RECESSED FIXTURE

CORRIDOR

X2010

CTS RECESSED FIXTURE

CTS RECESSED FIXTURE

SUSPENDED FIXTURE

PROJECTOR

R 1525

R 1525

R 1220

3080

3074

3039000

701

GYP 2800

PROJECTOR

MOTORIZED SCREEN

648

1752 3381

PROJECTOR

ACT-6

EXTERIOR WALL SCONCE

MOTORIZED SCREEN

CTS RECESSED FIXTURE

EXP PT

TYP

1181

3816

3687

2827

2827

4628

VALANCE LED STRIP

CTS RECESSED FIXTURE

CTS RECESSED FIXTURE

1A2.15 A3.25

2A2.15 A3.25

3A2.15 A3.25

4A0.11 A3.25

5A2.15 A3.25

6A2.15 A3.25

TYP

2265

TYP

1200

5872

2761

CN-16

CN-16

CN-17

CN-17

CN-16

CN-17

CN-16

CN-17

CN-18

CN-16

CN-16

CN-18

CN-19

CN-20

CN-20

5413

6892

6645 8693 7694

1243

2067

CEILING PLAN SYMBOL LEGEND

EXPOSED STRUCTURE

ULTIMA - 24"x24" - HIGH NRCACT-1

SUPPLY AIR DIFFUSER

OPTIMA - 30"x60" & 6"x60" - TECH ZONE - TEGULARACT-2

OPTIMA - 48"x48" - TEGULARACT-3

SOUNDSHAPES ACOUSTICAL CLOUDSACT-4

FORMATIONSACT-5

SOUNDSHAPES ACOUSTICAL CANOPIES - HILL CANOPY - 461/2"x75"ACT-6

GYPSUM BOARDGYP

EXP

WOODWORKS CHANNELED PLANKWD-C

WOODWORKS LINEAR - 33/4" (W)WD-L

EXPOSED STRUCTURE PAINTEDEXP PT

EXISTING GYPSUM CEILING TO REMAINEX GYP

EXISTING ACOUSTICAL CEILING TO REMAINEX ACT

VINYL TILE - 24"x24"ACT-7

METAL WORKS - TEGULAR (PERFORATION M2) - WHITEACT-8

SUPPLY AIR DIFFUSER - LINEAR

RECESSED FIXTURE - 6" (W)

RETURN AIR GRILLE - LINEAR

CYLINDRICAL EXTERIOR WALL SCONCE

SQUARE RECESSED DOWNLIGHT

RECESSED SPRINKLER

TUBULAR SUSPENDED FIXTURE - 4" (W) 2800 AFF

CIRCULAR SUSPENDED FIXTURE - 2800 AFF

VALANCE LED STRIP

EXHAUST AIR

RECESSED FIXTURE - 24"x24"

WALL MOUNTED FIXTURE

CEILING FAN W/ LIGHT

CONTINUOUS RECESSED FIXTURE - 4" (W)

SUSPENDED FIXTURE

SURFACE MOUNTED FIXTURE

PROJECTOR

SPEAKER

RETURN AIR GRILLE

SUSPENDED SQUIGGLE FIXTURE - 2800 AFF

PENDENT SPRINKLER

CYLINDRICAL PENDENT FIXTURE - 3000 AFF

WALL PACK FIXTURE

SQUARE PENDENT FIXTURE

BOLLARD LIGHT FIXTURE

CIRCULAR PENDENT FIXTURE

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Upper Level -Renovation ReflectedCeiling Plan

LU CASESAddition +Renovation

A2.15

2015-74A

05-DEC-2016

SCV/AJP/EMC

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 100A2.15A0.7

1 Upper Level - Renovation Reflected Ceiling Plan

Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 UPDATED FOR REFERENCE 28-JUL-20163 ISSUED FOR CLASS 'C' 04-AUG-20164 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

5 ISSUED FOR PERMIT 05-DEC-2016

Page 25: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

XA XD

X1

X9

1

4

7

F

G

H

PENTHOUSE

3001

STAIR "C"

X3006

EXP

CONSTRUCTIONNORTH

CORRIDOR

X2007

EXP PT

EXP PT

CEILING PLAN SYMBOL LEGEND

EXPOSED STRUCTURE

ULTIMA - 24"x24" - HIGH NRCACT-1

SUPPLY AIR DIFFUSER

OPTIMA - 30"x60" & 6"x60" - TECH ZONE - TEGULARACT-2

OPTIMA - 48"x48" - TEGULARACT-3

SOUNDSHAPES ACOUSTICAL CLOUDSACT-4

FORMATIONSACT-5

SOUNDSHAPES ACOUSTICAL CANOPIES - HILL CANOPY - 461/2"x75"ACT-6

GYPSUM BOARDGYP

EXP

WOODWORKS CHANNELED PLANKWD-C

WOODWORKS LINEAR - 33/4" (W)WD-L

EXPOSED STRUCTURE PAINTEDEXP PT

EXISTING GYPSUM CEILING TO REMAINEX GYP

EXISTING ACOUSTICAL CEILING TO REMAINEX ACT

VINYL TILE - 24"x24"ACT-7

METAL WORKS - TEGULAR (PERFORATION M2) - WHITEACT-8

SUPPLY AIR DIFFUSER - LINEAR

RECESSED FIXTURE - 6" (W)

RETURN AIR GRILLE - LINEAR

CYLINDRICAL EXTERIOR WALL SCONCE

SQUARE RECESSED DOWNLIGHT

RECESSED SPRINKLER

TUBULAR SUSPENDED FIXTURE - 4" (W) 2800 AFF

CIRCULAR SUSPENDED FIXTURE - 2800 AFF

VALANCE LED STRIP

EXHAUST AIR

RECESSED FIXTURE - 24"x24"

WALL MOUNTED FIXTURE

CEILING FAN W/ LIGHT

CONTINUOUS RECESSED FIXTURE - 4" (W)

SUSPENDED FIXTURE

SURFACE MOUNTED FIXTURE

PROJECTOR

SPEAKER

RETURN AIR GRILLE

SUSPENDED SQUIGGLE FIXTURE - 2800 AFF

PENDENT SPRINKLER

CYLINDRICAL PENDENT FIXTURE - 3000 AFF

WALL PACK FIXTURE

SQUARE PENDENT FIXTURE

BOLLARD LIGHT FIXTURE

CIRCULAR PENDENT FIXTURE

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

As indicated

Penthouse - RenovatedReflected Ceiling Plan

LU CASESAddition +Renovation

A2.16

2015-74A

05-DEC-2016

EMC

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 100A2.16A0.7

1 Penthouse - Renovated Reflected Ceiling Plan

Rev. Description Date1 ISSUED FOR PERMIT 05-DEC-2016

Page 26: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

DN

XA XD

X1

XB XC

X2

X3

X4

X5

X6

X7

X8

X9

X1A

X2A

X2B

A

1

3

4

5

6

7

1A2.7 A3.2

4A2.7 A3.2

2A2.7 A3.2

3A2.7 A3.2

1A2.7 A3.1

2A0.11 A3.1

CLERESTORYGALLERY

NEW ROOF TOP

NEW ROOF TOP

EXISTING ROOFEXISTING ROOF

EXISTING PENTHOUSE ROOF

EXISTING SKYLIGHT

ATRIUM SPACE

LAB HOOD EXHAUSTSSEE MECH DWGS AND CURB DETAILS

CLERESTOREY WINDOWS ON ROOF CURB, SEE DETAILS

CLERESTOREY WINDOWS ON ROOF CURB, SEE DETAILS

CLERESTOREY WINDOWS ON ROOF CURB, SEE DETAILS

1900

5700

2645

3655

2500

4800

4800

5000

(EXISTING)

24000

(NEW ADDITION)

38700

(EXI

S TIN

G)

3990

0

(NEW

AD

ITIO

N)

2910

0

2

B C D E F G

6422

9500 5000 9500 1900 3600 8000 8600 8600 5000 2000 1000

4950

5000

5000

5000

5000

5000

1738

1737

1525

1525

3425

5000

1995

0

NEW ROOFREPLACEMENTAS SPECIFIED

ATRIUMSPACE

ATRIUMSPACE

LAB HOOD EXHAUSTSSEE MECH DWGS

PROVIDE STEP AT ROOF ACCESS DOOR TO ROOF PADS

W4

W4

W4

W4

W2

PHERCHLORIC HOODEXHAUST, SEE MECH.SEE CURB DETAIL

SHAFTOPENING

EXIST'G ROOF DRAIN REPLACE W/ NEW

RDRD

RD RD

RD

----A2.17

NEW ROOF TOP

H

4A4.2A2.17

NEW ROOFREPLACEMENTAS SPECIFIED

P3C

PROVIDE STEP AT ROOF ACCESS DOOR

P3

P3

22064

PENTHOUSE

3001

VESTIBULE

X3007

STAIR "C"

X3006

LOW

ER A

TRIU

M R

OO

F

D30

01a

D30

01b

DX3006

----A2.17

CONSTRUCTIONNORTH

S2b

B2 C2 D2

ATRIUMSPACE

NEW ROOF REPLACEMENT AS

SPECIFIED

EXIST'G ROOF

NEW ROOF REPLACEMENT AS

SPECIFIED

EXIST'G ROOF

EXIST'G ROOF DRAINS, REPLACE WITH NEW

NEW ROOF REPLACEMENT AS

SPECIFIED

NEW ROOF HATCH ON EXIST'G OPENING - SEE DETAIL

CONC. SPLASH PAD BELOW

SCUPPER DRAIN OUTLET

SCUPPER DRAIN AND RWL TO EXIST ROOF - CONC. SPLASH PAD BELOW

SCUPPER DRAIN OUTLET

CN

-10

CN-11

CN-11

EXIST'G ROOF DRAIN REPLACE W/ NEW

CURTAIN WALL SYSTEM -SEE ELEVATIONS

W4

W4 SEE DETAIL

W6

W6

W6

SEE DETAIL

ROOF OVERHANG AND FLASHING, SEE DETAILS

ROOF DRAIN ROOF DRAIN

ROOF DRAIN ROOF DRAIN

P26C

P26C

WALKWAY MEMBRANE

1500

1500LAB HOOD EXHAUSTS (SEE MECH DWG'S) SEE CURB DETAIL

CN-12

W2

FPA-W FPA-WFPA-WROOF ACCESS LADDER SEE DETAILS

D30

01b

CN-12

CN-13

1500

ELECTRICAL PANELS, SEE ELEC. DWG'S

REFER TO M+E DWG'S FOR EQUIPMENT

LOCATIONS & LAYOUT

D30

00

EXISTING CHANCELOR PATERSON LIBRARY BUILDING

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

1 : 100

Penthouse Level Plan

LU CASESAddition +Renovation

A2.17

2015-74A

05-DEC-2016

CRS/NCM/SCV

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 100A2.17A0.7

1 Level 3 - Penthouse Floor Level

Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 UPDATED FOR REFERENCE 18-JUL-20163 UPDATED FOR REFERENCE 20-JUL-20164 UPDATED FOR REFERENCE 28-JUL-20165 ISSUED FOR CLASS 'C' 04-AUG-20166 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

7 ISSUED FOR PERMIT 05-DEC-2016

Page 27: CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND … · 2016. 12. 6. · A5.25 Atrium - Interior Elevations A5.26 Existing & Unisex Washrooms - Interior Elevations A5.27 Men's & Women's

XA XD

X1

XB XC

X2

X3

X4

X5

X6

X7

X8

X9

X1A

X2A

X2B

A

1

3

4

5

6

7

1A2.7 A3.2

2A2.7 A3.2

3A2.7 A3.2

1A2.7 A3.1

2A0.11 A3.1

2

B C D E F G

(EXISITING)

24000

(NEW ADDITION)

37700

250 9500 5000 9500 1900 3600 8000 8600 8600 5000 2000 1000

250

(EXI

S TIN

G)

3990

0

250

4950

5000

5000

5000

5000

5000

1738

1737

1525

1525

3425

250

(EXI

S TIN

G) (

FIEL

D V

ERIF

Y)

7382

(NEW

AD

DIT

ION

)

2910

0

293

5700

6300

2500

4800

4800

5000

EXISTING ROOF - DEXISTING ROOF - C

4000

O/O

PAR

APET

8600 O/O PARAPET

EXIS

TIN

G S

KYLI

GH

T AT

RIU

M S

PAC

E

NEW BRIDGE LINK ROOF

NEW UPPERFLOOR ROOF - B

LAB HOOD EXHAUSTSSEE MECH DWGS

LAB HOOD EXHAUSTSSEE MECH DWGS

NEW COOLING TOWER ON EXIST'G BASE SEE MECH DWGS

NEW ROOFREPLACEMENTAS SPECIFIED

NEW ROOFREPLACEMENTAS SPECIFIED

EXISTING PENTHOUSEROOF

NEW ROOF HATCH W/ SAFETYRAIL IN EXIST'G OPENING

RD

RD

RD RD

RD

H

1A2.18 A3.28

8A2.18 A3.28

4A2.18 A3.29

2A2.18 A3.28

6A2.18 A3.28

7A2.18 A3.28

5A2.18 A3.28

3A2.18 A3.28

4A2.18 A3.28

8A2.18 A3.28

SIM

7A2.18 A3.28

SIM

4A2.18 A3.28

SIM 4A2.18 A3.28

SIM

4A2.18 A3.28

SIM

3A2.18 A3.28

SIM

NEW PENTHOUSE &CLERESTORY ROOF

FALL PROTECTION ROOF ANCHORSWHERE NOTEDSEE DETAILS

FPA-R

FPA-R

PHERCHLORIC HOODEXHAUST, SEE MECH.

ROOF SLOPE LINES

ROOF SLOPE LINES

NEW ROOF DRAINSREFER TO MECH. DWG'S

RDRD

RD RD

RD

RD RD

FPA-R

RD

RD RD

3A2.18 A3.16

-A2.18 ---

2A2.18 A3.16

1A2.18 A3.16

FPA-R

FPA-R FPA-R

SD

SD

FALL PROTECTION ROOF ANCHORSWHERE NOTED

RD

RD

ROOF SLOPE LINES

NEW ROOF DRAINS REFER TO MECH. DWG'S

CONSTRUCTIONNORTH

3A2.18 A3.11

FPA-R

FPA-W

XL9

6A2.15 A3.25

SD

SD

FPA-R

FPA-R

FPA-R

FPA-RFPA-R

1A2.18 A3.29

2A2.18 A3.29

3A2.18 A3.29

B2 C2 D2

CN

-10

ROOF ACCESS LADDERSEE DETAILS

CN-11

CN-11

NEW

ATR

IUM

RO

OF

-A

NEW

ATR

IUM

RO

OF

-B

EXIST'G ROOF DRAINREPLACE WITH NEW BODY TYPICALFPA-R

EXIST'G ROOF DRAINREPLACE WITH NEW BODY TYPICAL

FALL PROTECTION ANCHORWHERE NOTED SEE DETAILS

FALL PROTECTION ANCHORWHERE NOTED SEE DETAILS

EXISTING ROOF - BEXISTING ROOF - A

EXIST'G ROOF DRAINREPLACE WITH NEW BODY TYPICAL

EXIST'G ROOF DRAINREPLACE WITH NEW BODY TYPICAL

NEW UPPERFLOOR ROOF - A

FALL PROTECTION ANCHORWHERE NOTED SEE DETAILS

CONC. SPLASH PAD BELOW

SCUPPER DRAIN AND RWL TO EXIST ROOF - CONC. SPLASH PAD BELOW

SCUPPER DRAIN OUTLET

SCUPPER DRAIN AND RWL TO EXIST ROOF - CONC. SPLASH PAD BELOW

SCUPPER DRAIN OUTLET

LAB HOOD EXHAUSTSSEE MECH DWGS

EXISTING CHANCELOR PATERSON LIBRARY BUILDING

COPYRIGHT NOTICE:Copyright of this electronic document

belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic

document may not be forwarded to others, transmitted, downloaded or reproduced in

any format, whether print or electronic, without the express, written permission of

the copyright owner.

Scale

Drawn by

Date

Project No.

12 St. Paul StreetThunder Bay, ON, CAP7A 4S5

807.346.2277 (office)8555.558.1459 (fax)i4a.ca

Project Name

Project Address

Sheet Name

Sheet Number

Professional Seal

DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.

1 : 100

Overall Roof Plan

LU CASESAddition +Renovation

A2.18

2015-74A

05-DEC-2016

NCM/SCV

Lakehead University - 955Oliver Road, Thunder Bay

scale = 1 : 100A2.18A0.7

1 Overall Roof Plan

Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION

DOC'S18-OCT-2016

2 ISSUED FOR PERMIT 05-DEC-2016