Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
Lakehead University - 955 Oliver Road, Thunder Bay
Cover Sheet
LU CASESAddition +Renovation
A0.0
2015-74A
05-DEC-2016
SCV
Lakehead University - 955Oliver Road, Thunder Bay
CENTRE FOR ADVANCED STUDIES IN ENGINEERING AND SCIENCES (CASES)Lakehead University
Mechanical Sheet List
SheetNumber Sheet NameM0.0 Symbols, Legend & Drawing ScheduleM1.1 Crawlspace - Plumbing Demo PlanM1.2 Lower Level - Plumbing Demo PlanM1.3 Upper Level - Plumbing Demo PlanM2.1 Crawlspace - HVAC Demo PlanM2.2 Lower Level - HVAC Demo PlanM2.3 Upper Level - HVAC Demo PlanM2.4 Mechanical Room - HVAC Demo PlanM3.1 Crawlspace - Plumbing Reno PlanM3.2 Lower Level - Sanitary Reno PlanM3.3 Upper Level - Sanitary Reno PlanM3.4 Crawlspace - Domestic Water Piping Reno PlanM3.5 Lower Level - Domestic Water Piping Reno PlanM3.6 Upper Level - Domestic Reno PlanM4.1 Fire Protection Demo PlanM5.1 Crawlspace - HVAC Reno PlanM5.2 Lower Level - General Ventilation Reno PlanM5.3 Lower Level - Lab Supply Air & Exhaust Air Reno PlanM5.4 Upper Level - General Ventilation Reno PlanM5.5 Upper Level - Lab Supply Air & Exhaust Air Reno PlanM5.6 Roof - Mechanical Reno PlanM6.1 Lower Level - Hydronic Reno PlanM6.2 Enlarged Mechanical Room - Hydronic PipingM6.3 Upper Level - Hydronic Reno PlanM6.4 Roof Level - Hydronic Reno PlanM7.1 Lower Level - Enlarged Biomass Utilization Gas LayoutM7.2 Lower Level - Enlarged LU Instrumentation Lab Gas LayoutM7.3 Lower Level - Enlarged Community Ecology and Human Origins Lab Gas
LayoutM7.4 Lower Level - Human Origins Lab & Prototype Development Lab Gas
LayoutM7.5 Upper Level - Enlarged Nano Materials and Advanced Technologies
Innovation Centre Lab Gas LayoutM7.6 Roof - Mechanical Penthouse Lab Gas LayoutM8.1 Lower Level - Fire Protection Reno PlanM8.2 Upper Level - Fire Protection Reno PlanM8.3 Roof - Fire Protection Reno PlanM9.1 Mechanical DetailsM9.2 Mechanical DetailsM9.3 Mechanical DetailsM10.1 General System SchematicM10.2 Lab Exhaust Duct System SchematicM10.3 Lab Supply Duct System SchematicM10.4 Domestic Water SchematicME1.1 Mechanical and Electrical SchedulesME1.2 Mechanical and Electrical SchedulesME1.3 Mechanical and Electrical SchedulesME1.4 Mechanical and Electrical SchedulesME1.5 Mechanical and Electrical SchedulesME1.6 Mechanical and Electrical SchedulesME1.7 Mechanical and Electrical Schedules
Electrical Sheet List
SheetNumber Sheet Name
E1.0 Electrical Symbol Legend & Drawing ListE1.1 Electrical Site PlanEDL2.0 Crawlspace - Lighting Demo PlanEDL2.1 Lower Level - Lighting Demo PlanEDL2.2 Upper Level - Lighting Demo PlanEDL 2.3 Penthouse - Lighting Demo PlanEDP2.0 Crawlspace - Pwr & Sys Demolition PlanEDP2.1 Lower Level - Pwr & Sys Demolition PlanEDP2.2 Upper Level - Pwr & Sys Demolition PlanEDP2.3 Penthouse - Lighting & Renovation PlanE2.0 Crawlspace - Power Distribution Renovation PlanE2.1 Lower Level - Power Distribution Renovation PlanE2.2 Upper Level - Power Distribution Renovation PlanE2.3 Penthouse - Power Distribution Renovation PlanEL2.0 Crawlspace - Lighting Reno PlanEL2.1 Lower Level - Lighting Reno PlanEL2.2 Upper Level - Lighting Reno PlanEL2.3 Penthouse - Lighting Reno PlanEP2.0 Crawlspace - Pwr & Sys Reno PlanEP2.1 Lower Level - Pwr & Sys Reno PlanEP2.2 Upper Level - Pwr & Sys Reno PlanEP2.3 Penthouse - Pwr & Sys Reno PlanES2.0 Crawlspace - Security & Intrusion PlanES2.1 Lower Level - Security & Intrusion PlanES2.2 Upper Level - Security & Intrustion PlanES2.3 Penthouse - Security & Intrusion PlanE4.0 Single Line Distribution DiagramE5.0 Electrical SchedulesE5.1 Electrical SchedulesE5.2 Eelctrical SchedulesE6.0 Electrical Details
Structural Sheet List
SheetNumber Sheet Name
S1.0 Foundation Plan, Footing Schedule, Foundation NotesS1.1 Foundation SectionsS1.2 Foundation Elevations, Foundation Sections, Plan DetailsS2.0 Lower Floor Framing Plan, General Notes, Column ScheduleS3.0 Upper Framing Plan, Partial Framing & Slab Contour Plan, General
Notes, Column ScheduleS4.0 Roof Framing Plan, General Notes, Column ScheduleS4.1 Penthouse / Atrium Roof & Floor Framing Plan, Penthouse Floor
Framing & Slab Contour, General Notes, Column ScheduleS5.0 Structural Elevations, Structural SectionsS5.1 Column Schedule, Structural Sections, Structural ElevationsS6.0 Structural Sections, Structural DetailsS6.1 Penthouse, Structural Sections, Structural Details, Typical Base PlatesS7.0 Bridge Link, Structural Sections, Structural DetailsS7.1 Bridge Link, Structural Sections, Structural Details
Civil Sheet List
Sheet Number Sheet NameA1-351570-G1 Site ServicingA1-351570-G2 Site GradingA1-351570-P1 Sanitary, Storm Sewer and WatermainA1-351570-R1 Sanitary, Storm Sewer and Watermain
STRUCTURAL ENGINEER:
Peterson Design Consultants Inc.R.R. 13, 947 Blind CrescentThunder Bay, Ontario, P7B 5E4Tel: (807) 983-3330
MECHANICAL ENGINEER:
MCW/AGE Consulting Professional Engineers
ELECTRICAL ENGINEER:CIVIL ENGINEER:
HATCH
200 South Syndicate AvenueThunder Bay, Ontario, P7E 1C9Tel: (807) 623-3449Fax: (807) 623-5925www.hatch.ca
114 Hemlock PlaceThunder Bay, Ontario, P7C 1W4Tel: (807) 633-3295Fax: (204) 779-1119www.mcw.com
MCW/AGE Consulting Professional Engineers114 Hemlock PlaceThunder Bay, Ontario, P7C 1W4Tel: (807) 633-3295Fax: (204) 779-1119www.mcw.com
Architectural Sheet List
SheetNumber Sheet Name
A3.23 (Reserved) Upper Level Plan DetailsA3.24 (Reserved) Upper Level Plan DetailsA3.25 Ceiling Section DetailsA3.26 Penthouse Sections - Plan Detail & Section DetailsA3.27 Roof Access Ladder DetailsA3.28 Roof Section DetailsA3.29 Roof Section DetailsA3.30 (Reserved) Building Section DetailsA3.31 (Reserved) Building Section DetailsA3.32 (Reserved) Building Section DetailsA4.1 Existing Stair PlansA4.2 New Stairs PlansA4.3 New Stairs - Sections & 3D ViewA4.4 (Reserved) Stair DetailsA4.5 (Reserved) Stair DetailsA5.0 Shipping/Recieving Area & Community Ecology & Energetics Lab - Interior
ElevationsA5.1 Community Ecology & Integrated Freshwater Lab - Interior ElevationsA5.2 Integrated Freshwater Lab - Interior ElevationsA5.3 Integrated Freshwater Lab - Interior ElevationsA5.4 Community Ecology & Energetics Lab & Intergrated Freshwater Lab 3D
ViewsA5.5 LU Instrumentation Lab - Interior ElevationsA5.6 LU Instrumentation Lab - Interior ElevationsA5.7 LU Instrumentation Lab - Interior ElevationsA5.8 LU Instrumentation Lab - 3D ViewA5.9 Human Origins Lab & Prototype Developement Lab Space - Interior
ElevationsA5.10 Human Origins Lab & Prototype Developement Lab Space - Interior
ElevationsA5.11 Human Origins Lab & Prototype Development Lab Space - 3D ViewA5.12 Biomass Utilization Research Lab - Interior ElevationsA5.13 Biomass Utilization Research Lab - Interior ElevationsA5.14 Biomass Utilization Research Lab - Interior ElevationsA5.15 Biomass Utilization Research Lab - Interior ElevationsA5.16 Biomass Utilization Research Lab - Interior ElevationsA5.17 Biomass Utilization Research Lab - 3D ViewA5.18 Nano Materials & Advanced Technologies Innovation Centre - Interior
ElevationsA5.19 Nano Materials & Advanced Technologies Innovation Centre - Interior
ElevationsA5.20 Nano Materials & Advanced Technologies Innovation Centre - Interior
ElevationsA5.21 Nano Materials & Advanced Technologies Innovation Centre - Interior
ElevationsA5.23 Nano Materials & Advanced Technologies Innovation Centre - Interior
ElevationsA5.24 Nano Materials & Advanced Technologies Innovation Centre - 3D ViewA5.25 Atrium - Interior ElevationsA5.26 Existing & Unisex Washrooms - Interior ElevationsA5.27 Men's & Women's Washrooms - Interior ElevationsA5.28 Universal Washroom & Upper Level - Interior ElevationsA5.29 Upper Level - Interior ElevationsA6.1 Lab Casework LegendsA6.2 Millwork Section DetailsA7.0 Lower Level - Furniture PlanA7.1 Upper Level - Furniture PlanA7.2 Lower Level - Finish PlanA7.3 Upper Level - Finish PlanA7.4 Building Perspective ViewsA7.5 Building Perspective ViewsA7.6 Building Perspective ViewsA7.7 Structural Skeleton & New Building To Existing 3D Reference Views
Architectural Sheet List
SheetNumber Sheet Name
A0.0 Cover SheetA0.1 OBC & General NotesA0.2 Assemblies, Legends & DetailsA0.3 (Reserved) Existing Door Schedules, TypesA0.4 (Reserved) New Door Schedules, TypesA0.5 Room Finish SchedulesA0.6 (Reserved) Window & Curtain Wall Type LegendA0.7 (Reserved) Curtain Wall Type LegendA0.8 (Reserved) Screen Type LegendA0.9 (Reserved) Screen Type LegendA0.10 (Reserved) Screen Type LegendA0.11 (Reserved) Screen Type LegendA0.12 Washroom Accessory Legend & Mounting Heights, Barrier Free Design
StandardsA0.13 Barrier Free Design StandardsA1.0 Site Plan - Existing & DemolitionA1.1 Site Plan - NewA1.2 Site - Plan and Section DetailsA2.1 Demolition PlansA2.2 Demolition Reflected Ceiling PlansA2.3 Demolition Roof Plan & DetailsA2.4 Demolition Roof DetailsA2.5 Lower & Upper Level - Travel Distance PlanA2.6 Crawlspace PlanA2.7 Lower Level - Overall PlanA2.8 Upper Level - Overall PlanA2.9 Enlarged Lower Level - Existing RenovationA2.10 Enlarged Lower Level - New ConstructionA2.11 Enlarged Upper Level - Existing RenovationA2.12 Enlarged Upper Level - New ConstructionA2.13 Crawlspace - Renovated Reflected Ceiling PlanA2.14 Lower Level - Renovation Reflected Ceiling PlanA2.15 Upper Level - Renovation Reflected Ceiling PlanA2.16 Penthouse - Renovated Reflected Ceiling PlanA2.17 Penthouse Level PlanA2.18 Overall Roof PlanA2.19 Enlarged Community Ecology Lab, Integrated Freshwater Lab & Equipment
SchedulesA2.20 Enlarged LU Instrumentation LaboratoryA2.21 LU Instrumentation Laboratory Equipment ScheduleA2.22 Enlarged Human Origins & Prototype Development LabA2.23 Enlarged Biomass Utilization Research LabA2.24 Biomass Equipment ScheduleA2.25 Enlarged Nano Materials & Advanced Technologies Innovation CentreA2.26 Nano Materials Equipment ScheduleA2.27 Enlarged Washroom PlansA2.28 Elevations North + SouthA2.29 Elevations East + WestA3.1 Building Longitudinal SectionsA3.2 Building Cross SectionsA3.3 Bridge - Plan & 3D Framing ViewA3.4 Bridge - Cross & Longitudinal SectionsA3.5 Bridge - Plan DetailsA3.6 Bridge - Section DetailsA3.7 (Reserved) Building Section DetailsA3.8 Building Section DetailsA3.9 (Reserved) Building Section DetailsA3.10 Building Section DetailsA3.11 Building Section DetailsA3.12 Building Section DetailsA3.13 Building Section DetailsA3.14 (Reserved) Bulding Section DetailsA3.15 Building Section DetailsA3.16 (Reserved) Building Section DetailsA3.17 (Reserved) Building Section DetailsA3.18 (Reserved) Building Section DetailsA3.20 Lower Level Plan DetailsA3.21 Lower Level Plan DetailsA3.22 Lower Level Plan Details
PRIME CONSULTANT:
i4architecture12 St. Paul StreetThunder Bay, Ontario, P7A 4S5Tel: (807) 346.2277Fax: (855) 558.1459www.i4a.ca
LANDSCAPE ARCHITECT:
WERNER SCHWAR
P.O. Box 21048, 640 River StreetThunder Bay, Ontario, P7A 3S0Tel: (807) 346-0607Fax: (807) [email protected]
Landscape Sheet List
SheetNumber Sheet Name
L-1 Layout + Grading PlanL-2 Planting PlanL-3 DetailsL-4 Planting & Amenity Details
INTERIOR DESIGN:
Lisa Sandham Interior Design12 St. Paul StreetThunder Bay, Ontario, P7A 4S5Tel: (807) 627-3522www.lisasandham.com
Rev.No. Description Date
1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50%
CONSTRUCTION DOC'S18-OCT-2016
4 ISSUED FOR PERMIT 05-DEC-2016
# Pound OR Number& And@ AtAB Air BarrierACT Acoustic Ceiling TileAFF Above Finished FloorALUM AluminumANOD AnodizedAVB Air-Vapor BarrierBF Barrier FreeBSMT BasementBYND BeyondBOT BottomCHNL ChannelCIP Cast In PlaceCJ Control JointCLG CeilingCLR ClearCM Concrete Masonry UnitCOL ColumnCONC ConcreteCONT ContinuousCPT CarpetCR Card ReaderCT Ceramic TileDBL DoubleDEMO Demolish or DemolitionDGL Double GlazingDIA DiameterDIM DimensionDIMS DimensionsDN DownDWG DrawingEA EachEJ Expansion JointEL ElevationELEC ElectricalELEV ElevatorEPDM Ethylene Propylene Diene M-Class (Roofing / Membrane)EQ EqualEXIST'G ExistingEXT ExteriorFD Floor DrainFEC Fire Extinguisher CabinetFF Finished FaceFGL Fire Glass/Ceramic GlassFIXT FixtureFLR FloorFO Face OfFPA-R Fall Protection Anchor - Roof MountedFPA-W Fall Protection Anchor - Wall MountedFND FoundationG1S Good One SideGA GaugeGALV GalvanizedGWB Gypsum Wall BoardHC Hollow CoreHM Hollow MetalHR HourHVAC Heating, Ventilating, And Air ConditioningIGL Insulated GlassINSUL Insulated or InsulationINT InteriorLGL Laminated GlassMAX MaximumMO Masonry OpeningMECH MechanicalMEMBR MembraneMIN MinimumMTL MetalNIC Not In ContractNO NumberNOM NominalOC On CenterO/F Outside FacePCC Pre-Cast ConcretePGL Plain GlassPLUMB PlumbingPLYD PlywoodPTD Pressure TreatedPMF Pre-finished Metal FlashingPNT Paint or PaintedPWT Perimeter Weep TilePVC Polyvinyl ChlorideRBR RubberRCP Reflected Ceiling PlanRD Roof DrainREQD RequiredRM RoomSCW Solid Core WoodSGC Soil Gas ControlSD Scupper Drain (Roof)SIM SimilarSPEC Specified OR SpecificationSPK SpeakerS/S Stainless SteelSTC Sound Transmission CoefficientSTL SteelSTN Stained and SealedSTRUCT Structure or StructuralSWG Safety Wired GlassT&G Tongue And GrooveTELE TelephoneTLT ToiletTO Top OfTOC Top Of ConcreteTOS Top Of SteelTM Transition MembraneTPD Toilet Paper DispenserT/D Telephone/DataTYP TypicalU/S UndersideVIF Verify In FieldVP Vision PanelVB Vapor BarrierW/ WithWD Wood
Abbreviation Legend
ONTARIO'S 2012 BUILDING CODE DATA MATRIX PARTS 3 & 9
ITEM OBC REFERENCE
1 PROJECT DESCRIPTION: NEW
ADDITION
ALTERATIONCHANGE OF USE
PART 11 PART 3 PART 9
11.1 TO 11.4 1.1.2. [A] 1.1.2. [A] & 9.10.1.3.
2 MAJOR OCCUPANCY(S): 3.1.2.1.(1) 9.10.2
3 BUILDING AREA (metres square) 1.4.1.2. [A] 1.4.1.2. [A]EXISTING NEW TOTAL
4 GROSS AREA (metres square) 1.4.1.2. [A] 1.4.1.2. [A]EXISTING NEW TOTAL
5 NUMBER OF STOREYS 1.4.1.2. [A] & 3.2.1.1. 1.4.1.2.[A] & 9.10.4ABOVE GRADE BELOW GRADE
6 NUMBER OF STREETS/FIRE FIGHTER ACCESS: 3.2.2.10 & 3.2.5 9.10.20.
7 BUILDING CLASSIFICATION: 3.2.2.20-.83 9.10.2.
8 SPRINKLER SYSTEM PROPOSED 3.2.2.20-.83 9.10.8.2.ENTIRE BUILDING3.2.1.5SELECTED COMPARTMENTS3.2.2.17SELECTED FLOOR AREAS
NOT REQUIRED
9 STANDPIPE REQUIRED 3.2.9 N/AYES NO
10 FIRE ALARM REQUIRED 3.2.4 9.10.18.YES NO
11 WATER SERVICE/SUPPLY IS ADEQUATE 3.2.5.7 N/AYES NO
12 HIGH BUILDING 3.2.6 N/AYES NO
13 CONSTRUCTION RESTRICTIONS 3.2.2.20-.83 9.10.6NON-COMBUSTIBLEREQUIRED
COMBUSTIBLEPERMITTED
BOTH
ACTUAL CONSTRUCTIONNON-COMBUSTIBLECOMBUSTIBLE BOTH
14 MEZZANINE(S) AREA (metres square): 3.2.1.1.(3)-(8) 9.10.4.1
15 OCCUPANT LOAD BASED ON 3.1.17 9.9.1.3DESIGN OF BUILDINGAREA
1st FLOOR: LOADOCCUPANCY persons
2nd FLOOR: LOADOCCUPANCY persons
3rd FLOOR: LOADOCCUPANCY persons
4th FLOOR: LOADOCCUPANCY persons
FOR ADDITIONAL FLOORS (IF REQUIRED), REFER TO BELOW
16 BARRIER-FREE DESIGN 3.8 9.5.2YES NO (EXPLAIN)
17 HAZARDOUS SUBSTANCES 3.3.1.2 & 3.3.1.19 9.10.1.3(4)YES NO
18 REQUIRED 3.2.2.20-.83 & 3.2.1.4 9.10.8HORIZONTAL ASSEMBLIESFRR (HOURS)FIRE 9.10.9
RESISTANCE FLOORS HOURSRATING ROOF HOURS
(FRR)MEZZANINE HOURS
FRR OF SUPPORTING MEMBERSLISTED DESIGN NO.
OR DESCRIPTION (SG-2)
FLOORS HOURS
ROOF HOURS
MEZZANINE HOURS
19 SPATIAL SEPARATION - CONSTRUCTION OF EXTERIOR WALLS 3.2.3 9.10.14
WALL
NORTH
SOUTH
EAST
WEST
AREA OF EBF (m2)
L.D. (m)
L/H OR H/L
PROPOSED % OF OPENINGS
FRR (HOURS)
LISTED DESIGN OR
DESCRIPTION
COMB. CONST
COMB. CONSTR. NONC.
CLADDING
NON-COMB. CONSTR.
FOR ADDITIONAL WALLS (IF NECESSARY), REFER TO BELOW. ABOVE APPLIES TO NEW ADDITION ONLY.
20 PLUMBING FACILITIES: (OBC 3.7.4)
FIRM NAME:
CERTIFICATE OF PRACTICE NUMBER:
NAME OF PROJECT:
CORY R STECHYSHYN ARCHITECT INC - O/A I4ARCHITECTURE12 ST PAUL ST THUNDER BAY, ON CANADA, P7A 465T. 807 346 2277F. 855 558 1459i4a.ca
4394
LU - CENTRE FOR ADVANCED STUDIES IN ENGINEERING & SCIENCES
PROJECT LOCATION: 955 OLIVER ROAD, THUNDER BAY, ONTARIO
GROUP-A, DIVISION 2
1103 m2
TWO N/A
TWO
3.2.2.2.6 GROUP A, DIVISION 2, UP TO 2 STORIES, INCREASED AREA, SPRINKLERED
2 STAGE FIRE ALARM DESIGNED
N/A
XXX
XXX
0 HR.
N/A
0 HR.
NON-COMBUSTIBLE CONSTN.
NOT REQUIRED
References are to Division B unless noted[A] for Divison A or [C] for Division C.
INDEXBASEMENT IN LIEU OF ROOF RATING INDEX
LEGAL DESCRIPTION:
GROUP '2' XXX /m2
GROUP '2' XXX /m2
21
OCCUPANCY TYPE TABLE / CLAUSE REQ'D W/C OCCUPANCY COUNT REQUIRED WATER CLOSET COUNT PROVIDED
GROUP 'A' - DIV 2 OBC 3.7.4.3.(15) 75 FEMALE & 100 MALE 6 FEMALE W/C & 5 MALE W/C ( 2 URINALS IN LIEU OF MALE W/C's)
BARRIER FREE WASHROOMS: 5 TOTAL W/C(s) INCLUDED IN THE REQUIRED FIXTURE COUNT ABOVE HAVE BEEN DESIGNATED BARRIER FREE AND ARE WITHIN 45m TRAVEL DISTANCE TO ANY NON-BARRIER FREE WASHROOM ON THE SAME LEVEL UNLESS NOT REQUIRED UNDER OBC 3.8.2.3. ALL DESIGNATED BARRIER FREE WASHROOMS ARE DESIGNED TO MEET THE APPROPRIATE REQUIREMENTS IN ARTICLES 3.8.3.8. TO 3.8.3.12.
URINALS: WHERE MORE THAN 1 PROVIDED IN A ROOM, SHALL CONFORM TO 3.8.3.10.(2)
LAVATORY COUNTS: LAVATORY COUNTS ARE DESIGNED TO CONFORM TO OBC 3.7.4.2.(6)
OTHER - DESCRIBE:
Ontario's Building Code Data Matrix Parts 3 & 9
2204 m2
2117.6 m2
4413.2 m2
1014.6 m2
2029.2 m2
NON-COMBUSTIBLE CONSTN.
0 HR.
N/A
0 HR.
NON-COMBUSTIBLE CONSTN.
NOT REQUIRED
NON-COMBUSTIBLE CONSTN.
LISTED DESIGN NO.OR DESCRIPTION (SG-2)
GROUP 'A' - DIV 2 OBC 3.8.3.12 1 UNIVERSAL W/R 1 PROVIDED ON UPPER FLOOR LEVEL
PUBLIC CORRIDOR: ARE CORRIDORS USED BY THE PUBLICI AND TRAVEL DISTANCE IS WITHIN 45m, NO CORRIDOR FIRE SEPERATIONS REQ'D
INTERCONNECTED FLOOR SPACE
PERMITTED MAX % OF OPENINGS
EXISTING CONDITION
NO
T AP
PLIC
ABLE
22 ENERGY EFFICIENCY DESIGN - PART 3 BUILDING: (OBC SUPPLEMENTARY STANDARD SB-10) (EFFECTIVE DEC. 31, 2016)
CLIMATIC ZONE: THUNDER BAY - ZONE 7
YES NO
CLIMATIC ZONE BUILDING ENVELOPE TABLE: TABLE SB5.5-7 (IMPERIAL)
BUILDING ENERGY MODELLING:
OPAQUE ELEMENTS:
ROOFS:
ASSEMBLY MAXIMUM U VALUE:
U-0.028
INSULATION MINIMUM R-VALUE:
R35.0 ci
WALLS ABOVE GRADE: U-0.037 R18.8 ci
INSUL. ABOVE DECK
STEEL FRAMED
WALLS BELOW GRADE: C-0.050 R20.0 ciBELOW GRADE
FLOORS: N/A
SLAB ON GRADE FLOORS: F-0.300 R15.0 for 24" + R5.0 ci BELOWUNHEATED
ELEMENT TYPE:
OPAQUE DOORS: U-0.400 N/ASWINGING
BUILDING TYPE: NON-RESIDENTIAL
FENESTRATION:
VERTICAL FENESTRATION, 0% TO 40% OF WALL
ASSEMBLY MAXIMUM U VALUE: ASSEMBLY MAXIMUM SHGC:
NON-METAL FRAMING: ALL U-0.25 0.45
METAL FRAMING: CURTAIN WALL / STOREFRONT U-0.30 0.45
METAL FRAMING: ENTRANCE FRAME U-0.70 0.45
METAL FRAMING: ALL OTHER U-0.35 0.45
SKYLIGHT WITH CURB - GLASS, 0% TO 5% OF ROOF: U-0.67 0.46
SKYLIGHT WITH CURB - PLASTIC, 0% TO 5% OF ROOF: U-0.69 0.50
FENESTRATION CALCULATIONS:
GROSS WALL AREA:
TOTAL WINDOW AREA:
TOTAL EXTERIOR DOOR AREA:
RATIO TOTAL VERTICAL FENESTRATION AND DOOR AREA / TOTAL GROSS WALL AREA:
- GROSS ROOF AREA:
TOTAL SKYLIGHT AREA:
EXPOSED FLOOR AREA:
RATIO TOTAL SKYLIGHT AREA/ TOTAL GROSS ROOF AREA:
OTHER ENERGY EFFICIENCY REQUIREMENTS - DESCRIBE:
PROJECT IS TARGETING LEED GOLD CERTIFICATION , ENERGY MODELLING HAS BEEN UNDERTAKEN.
NOT REQUIRED - BUILDING ENERGY MODEL PERFORMED
-
-
-
-
-
-
-
SCREEN TAG SC??
XXXXXXXXX
Ref
101
XX
XXAX.XX AX.XX
Ref
SC??
DETAILS
BUILDING SECTION
STRUCTURAL GRID & BUBBLE
ROOM NAME & NUMBER TAG
ELEVATIONS/DATUMS
CEILING HEIGHT
DOOR NUMBER
INTERIOR/EXTERIOR WALL TYPE TAG
WINDOW/LOUVER TYPE TAG
LIGHT FIXTURE w/ TYPE TAG
CEILING MATERIAL
Symbol Legend
XXXXXXXXX
Ref DETAIL NUMBER
SHEET NUMBER WHEREDETAIL REFERENCE FOUND
SHEET NUMBER WHEREDETAIL IS DRAWN
EXTERIOR BUILDING ELEVATION
INTERIOR BUILDING ELEVATION
CEILING TAG
AX.XX XX
DETAIL NUMBERSHEET NUMBER WHERE DRAWN
Level NameElevation
PARTITION TYPEFIRE RATING DESIGNATION
XD
AX.XX XX
P?????
ACT 1' - 0"
Room name
101
ROOM NAME, ROOM AREA & NUMBER TAGRoom name
101
150 m2
DETAIL NUMBERSHEET NUMBER WHERE DRAWN
CURTAIN WALL TAG CW?
ARCHITECTURAL
COMPLETE RENOVATION OF EXISTING 2 STOREY BUILDING AND ADDITION OF 2 STORY BUILDING , INCLUDING SITE WORK, LANDSCAPING AND A BRIDGE LINK TO THE EXISITNG ADJACENT LIBRARY BUILDING.
STRUCTURAL
MECHANICAL
DEMOLITION IN THE EXISTING BUILDING WILL INCLUDE THE REMOVAL OF AIR HANDLING EQUIPMENT AND CIRCULATING PUMPS IN THE PENTHOUSE MECHANICAL ROOM, AND CIRCULATING PUMPS, HEAT EXCHANGERS AND ASSOCIATED PIPEWORK IN THE LOWER LEVEL MECHANICAL ROOM. THE EXISTING ROOF MOUNTED COOLING TOWER WILL BE REMOVED TOGETHER WITH EXISTING ROOF MOUNTED EXHAUST FANS, AND FUME HOOD EXHAUST DUCTWORK. SECTIONS OF THE LABORATORY SUPPLY DUCTWORK, GENERAL SUPPLY DUCTWORK AND GENERAL EXHAUST AIR DUCTWORK WILL BE REMOVED, AND THE MAJORITY OF LOCAL SUPPLY DUCTS FROM EXISTING HEAT PUMPS WILL ALSO BE REMOVED. ACID WASTE PIPEWORK AND ACID DILUTION TANKS WILL BE DISCONNECTED AND REMOVED, AND ALL SPRINKLER HEAD CONNECTIONS FROM THE EXISTING TRI-WATER SYSTEM AND EXISTING SPRINKLER HEADS WILL BE REMOVED.
RENOVATION OF THE EXISTING BUILDING WILL INCLUDE NEW AIR HANDLING UNITS FOR LABORATORY AND GENERAL SUPPLY SYSTEMS, WITH A NEW FUME HOOD EXHAUST SYSTEM AND GENERAL EXHAUST SYSTEM WITH HEAT RECOVERY. EXISTING HEAT PUMPS SHALL GENERALLY BE RETAINED IN THEIR EXISTING LOCATIONS, WITH SUPPLY AIR DISTRIBUTION DUCTS BEING REPLACED. HEAT EXCHANGE EQUIPMENT SHALL BE RENEWED, INCLUDING THE COOLING TOWER, TOGETHER WITH CIRCULATING PUMPS ASSOCIATED WITH HEATING AND COOLING SYSTEMS. NEW DOMESTIC HOT AND COLD WATER SYSTEMS SHALL SERVE NEW FIXTURES, AND NEW LABORATORY GAS AND SPRINKLER SYSTEMS SHALL BE INSTALLED. NEW ACID WASTE PIPEWORK FROM FIXTURES IN THE EXISTING WING SHALL CONNECT TO THE ACID WASTE SYSTEM IN THE NEW WING.
THE NEW ADDITION SHALL BE PROVIDED WITH NEW AIR HANDLING UNITS FOR LABORATORY AND GENERAL SUPPLY, WITH A NEW FUME HOOD EXHAUST SYSTEM AND GENERAL EXHAUST SYSTEM WITH HEAT RECOVERY. A NEW HEAT PUMP SYSTEM WITH LOW TEMPERATURE WATER CIRCULATION SHALL BE PROVIDED. EXHAUST SYSTEMS SHALL BE PROVIDED IN WASHROOMS, PRINT ROOMS, GAS BOTTLE STORES, ETC. NEW PIPED SERVICES SHALL INCLUDE DOMESTIC HOT AND COLD WATER SYSTEMS, SANITARY, ACID WASTE, LABORATORY GASES, AND SPRINKLER SERVICES. A NEW ACID DILUTION TANK SHALL BE PROVIDED IN THE CRAWLSPACE, AND THIS SHALL BE A SINGLE SOURCE FACILITY FOR BOTH THE RENOVATED AND NEW ADDITION. A NEW DDC AUTOMATIC CONTROL SYSTEM SHALL BE INSTALLED, AND THIS SHALL BE INTEGRATED WITH RETAINED CONTROLS WITHIN THE RENOVATED WING.
ELECTRICAL
DEMOLITION IN THE EXISTING BUILDING WILL INCLUDE THE REMOVAL OF ALL LUMINAIRES, SWITCHES AND EMERGENCY FIXTURES LOCATED ON THE LOWER AND UPPER LEVELS, BASEMENT AND PENTHOUSE LUMINAIRES WILL REMAIN THE SAME. ALL ELECTRICAL DISTRIBUTION SUB-PANELS, GENERAL POWER OUTLETS AND SPECIFIED MECHANICAL EQUIPMENT LOCATED ON THE LOWER AND UPPER LEVELS WILL BE REMOVED. ALL NETWORKING OUTLETS (VOICE/DATA) AND RACKS SHALL BE REMOVED ALL FIRE ALARM DEVICES WILL BE REMOVED INCLUDING THE FIRE ALARM CONTROL PANEL. ALL PUBLIC-ADDRESS SYSTEMS WILL BE REMOVED. ALL CABLING AND WIRING FOR THE ABOVE COMPONENTS WILL BE REMOVED BACK TO SOURCE. ELECTRICAL DISTRIBUTION CONSISTING OF 4160V SWITCHGEAR AND SPECIFIC DISTRIBUTION PANELS SHALL REMAIN.
RENOVATION OF THE EXISTING BUILDING AND THE ADDITION TO THE BUILDING SHALL INCLUDE NEW LUMINAIRES, SWITCHES AND OCCUPANCY SENSORS PER THE DESIGN LAYOUT. NEW LIFE SAFETY DEVICES. NEW ELECTRICAL DISTRIBUTION SUB-PANELS, RECEPTACLES AND CONTROLS FOR EXISTING AND NEW MECHANICAL EQUIPMENT. NEW NETWORK SYSTEM (VOICE/DATA) OUTLETS LOCATIONS ONLY WITH NEW RACKS (CABLING BY LU). NEW FIRE ALARM DEVICES INCLUDING NEW EDWARDS EST3 - FIRE ALARM CONTROL PANEL. NEW PUBLIC ADDRESS SYSTEMS. NEW SECURITY CAMERA SYSTEM. NEW CABLING AND WIRING THROUGHOUT. ELECTRICAL DISTRIBUTION CONSISTING OF 4160V SWITCHGEAR AND SPECIFIC DISTRIBUTION PANELS SHALL REMAIN AND NEW SUB-PANELS WILL CONNECT TO EXISTING DISTRIBUTION. NEW EMERGENCY POWER VIA CAMPUS EMERGENCY POWER SUPPLY SHALL BE ROUTING INTO THE BUILDING FOR USE BY REQUIRED EQUIPMENT.
IF THE 4160V ELECTRICAL SERVICES IS INCLUDED, PROVIDE THE FOLLOWING:NEW POWERHOUSE BLDG. SHALL BE ERECTED FOR FUTURE GROWTH OF THE LU CAMPUS, THIS WILL INCLUDE THE REMOVAL OF THE ABANDONED FEEDER, INSTALLATION OF NEW FEEDER AND RELOCATION OF EXISTING FEEDER. NEW 4160V SWITCHGEAR INSTALLED FOR CAPACITY OF THE LU CASES BLDG. AND FUTURE. DISCONNECT THE EXISTING CNFER BLDG. 4160V SWITCHGEAR FROM THE LIBRARY BLDG. AND RE-CONNECT THE LU CASES BLDG. TO THE NEW POWERHOUSE BLDG.
CIVIL
LANDSCAPE
THE LANDSCAPE SCOPE OF WORK INVOLVES BOTH ‘HARD ‘AND ‘SOFT’ LANDSCAPE ELEMENTS AND THE ROUGH GRADING AND SITE PREPARATION FOR BOTH. HARD LANDSCAPING IS TO INCLUDE POURED IN PLACE CONCRETE PLANTER AND FREESTANDING SEATWALLS, TERRACED BOULDER RETAINING WALLS AS WELL AS DECORATIVE PATTERNED UNIT PAVING PATIO AREAS AND CONCRETE SIDEWALKS. IN ADDITION, THE SUPPLY AND INSTALLATION OF SITE AMENITIES SUCH AS BENCHES AND ACCENT LIGHTING IS INCLUDED IN HARD-SCAPING. SOFT LANDSCAPING IS TO INCLUDE SODDING, TREE, SHRUB AND PERENNIAL PLANTING AND THE PREPARATION OF PLANTING BEDS AND ROCK GARDEN BOULDERS. LOW IMPACT DESIGN STORMWATER MANAGEMENT AREAS WILL BE CREATED INTEGRATING SOFT LANDSCAPE GRADING AND PLANTING WITH ENGINEERED SOIL AND GRANULAR MIXES AND SUBGRADE DRAINAGE STRUCTURES.
Scope of WorkTHIS OUTLINE IS PROVIDED AS GENERAL REFERENCE AND SHOULD BE READ IN CONJUNCTION WITH ALL DRAWINGS AND SPECIFICATIONS.
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
OBC & General Notes
LU CASESAddition +Renovation
A0.1
2015-74A
05-DEC-2016
SCV
Lakehead University - 955Oliver Road, Thunder Bay
Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
4 ISSUED FOR PERMIT 05-DEC-2016
Interior Partition Assemblies - Wood + Metal Stud - New Construction
TAG ASSEMBLY THICKNESS (5/8" / 16mm) NOTES
P1
M
SI
GYPSUM WALL BOARD41 METAL STUDS @ 400 O/CGYPSUM WALL BOARD
GYPSUM WALL BOARD1 5/8" METAL STUDS @ 16" O/CGYPSUM WALL BOARD
73
2-7/8"
P2
GYPSUM WALL BOARD64 METAL STUDS @ 400 O/CGYPSUM WALL BOARD
GYPSUM WALL BOARD2 1/2" METAL STUDS @ 16" O/CGYPSUM WALL BOARD
96
3-3/4"
P3
GYPSUM WALL BOARD92 METAL STUDS @ 400 O/CGYPSUM WALL BOARD
124
4-7/8"
P4
GYPSUM WALL BOARD152 METAL STUDS @ 400 O/CGYPSUM WALL BOARD
184
7-1/4"
P5
GYPSUM WALL BOARD203 METAL STUDS @ 400 O/CGYPSUM WALL BOARD
235
9-1/4"
GYPSUM WALL BOARD3-5/8" METAL STUDS @ 16" O/CGYPSUM WALL BOARD
GYPSUM WALL BOARD6" METAL STUDS @ 16" O/CGYPSUM WALL BOARD
GYPSUM WALL BOARD8" METAL STUDS @ 16" O/CGYPSUM WALL BOARD
-
-
-
-
76
3"
-
-
-
-
SOUND ATT.THICKNESS
P6
GYPSUM WALL BOARD250 METAL STUDS @ 400 O/CGYPSUM WALL BOARD
282
11-1/4"GYPSUM WALL BOARD10" METAL STUDS @ 16" O/CGYPSUM WALL BOARD
-
-
P7
GYPSUM WALL BOARD300 METAL STUDS @ 400 O/CGYPSUM WALL BOARD
GYPSUM WALL BOARD12" METAL STUDS @ 16" O/CGYPSUM WALL BOARD
-
-
1 HOUR FRR = ULC DESIGN #W407 STC = 51
NOTE: USE 16 GYPSUM WALL BOARD ALL ASSEMBLIES UNLESS OTHERWISE NOTED
UNITSVISUAL
336
12-3/4"
M
SI
M
SI
M
SI
M
SI
M
SI
M
SI
P8
GYPSUM WALL BOARD (1 SIDE)64 METAL STUDS @ 400 O/C
GYPSUM WALL BOARD (1 SIDE) 5/8" METAL STUDS @ 16" O/C
-
-
80M
SI
P9
GYPSUM WALL BOARD (1 SIDE)92 METAL STUDS @ 400 O/C
GYPSUM WALL BOARD (1 SIDE)2 1/2" METAL STUDS @ 16" O/C
-
-
108M
SI
P10
GYPSUM WALL BOARD (1 SIDE)152 METAL STUDS @ 400 O/C
GYPSUM WALL BOARD (1 SIDE)3 5/8" METAL STUDS @ 16" O/C
-
-
168M
SI
3-1/8"
4-1/4"
6-5/8"
P11
GYPSUM WALL BOARD 102 METAL STUDS @ 400 O/C
GYPSUM WALL BOARD (1 SIDE)4" METAL STUDS @ 16" O/C
-
-
134M
SI 5-1/4"
P11
25 SHAFTWALL GYPSUM LINER PANEL
64 CH STUDS16 TYPE-X GYPSUM BOARD
105M 45 MIN FRR
Exterior Wall Assemblies - Existing Construction
ASSEMBLY NOTESVISUALTAG
250 CONCRETE FOUNDATION WALL38 RIGID INSULATION'INSULCRETE' INSULATION PROTECTION COATING AT ABOVEGRADE LOCATIONS AND TO 300BELOW FINISH GRADE
Interior Partition Assemblies - Existing Construction
ASSEMBLYVISUALTAG
'INSULCRETE' INSULATION PROTECTIONCOATING AT ABOVE GRADE LOCATIONSAND TO 300 BELOW FINISH GRADE38 RIGID INSULATION250 CONCRETE FOUNDATION WALL152 METAL STUDS @ 400 O/C16 GYPSUM BOARD
16 GYPSUM BOARD22 FURRING CHANNELS @ 400 O/C HORIZONTALLY150 CONCRETE BLOCK
16 GYPSUM BOARD92 METAL STUDS @ 400 O/CNOISE STOP INSULATION16 GYPSUM BOARD
16 GYPSUM BOARD152 METAL STUDS @ 400 O/CNOISE STOP INSULATION16 GYPSUM BOARD
XW1
XW2
XW3
XW4
XW5
XW6
PREFINISHED METAL CLADDING38 RIGID INSULATIONAIR BARRIER MEMBRANE (TYVEK)16 GYPSUM BOARD SHEATHING 152 METAL STUDS @ 400 O/CBATT INSULATION R.S.I. 3.5VAPOUR BARRIER16 GYPSUM BOARD
100 BRICKMASONRY TIES @ 400 O/C VERTICALLYAND 600 O/C HORIZONTALLY16 GYPSUM BOARD92 METAL STUDS @ 400 O/C92 METAL STUDS @ 400 O/C16 GYPSUM BOARD
250 CONCRETE BLOCK
XP1
XP2
XP3
XP4
XP5
XP6
XP7
XP8
250 CONCRETE WALL
100 CONCRETE WALL
16 GYPSUM BOARD92 METAL STUDS @ 400 O/CNOISE STOP INSULATION92 METAL STUDS @ 400 O/C16 GYPSUM BOARD
16 GYPSUM BOARD92 METAL STUDS @ 400 O/CNOISE STOP INSULATION16 GYPSUM BORAD
100 BRICKAIR SPACEMASONRY TIES @ 400 O/C VERTICALLYAND 600 O/C HORIZONTALLY38 RIGID INSULATIONAIR BARRIER MEMBRANE (TYVEK)16 GYPSUM BOARD SHEATHING152 STUDS @ 400 O/CBATT INSULATION R.S.I. 3.5VAPOUR BARRIER16 GYPSUM BOARD
100 BRICKAIR SPACEMASONRY TIES @ 400 O/C VERTICALLYAND 600 HORIZONTALLY38 RIGID INSULATIONAIR BARRIER MEMBRANE16 GYPSUM BOARD SHEATHING152 METAL STUDS @ 400 O/CBATT INSULATION R.S.I. 3.5VAPOUR BARRIER16 GYPSUM BOARDMASONRY TIES @ 400 O/C VERTICALLYAND 600 O/C HORIZONTALLY100 CONCRETE BLOCK
NOTES
XP1412.5 G.I.S. PLYWOOD (PAINTED)38x89 WOOD STUDS @ 400 O/C
• All fire-rated partitions are to use type-x or firecode-C labelled gypsum board of thickness suitable to achieve fire-rating
• Non rated fire separations require, at a minimum:- Top of wall fire-stopping- Smoke sealing of all penetrations- Fire taping- Door closers
• Rated fire separation require fire rated closures, dampers in addition to above.• Submit ULC rated designs from chosen fire-stop material manufacturer prior to
performing related work.- Perform work in accordance with manufacturer's written instruction.
• Sound attenuation insulation in fire rated walls or partitions exceeding a 45-minute rating is to be mineral wool based, all insulation is to be rated for fire separations of their specified rating
• Firestopping is to be completed on both sides of partitions unless otherwise specifically designed to be one-sided, as in shaft wall construction.
• Electrical boxes cannot be located within same stud space on opposite sides of the partitions unless properly fire-stopped.
Fire Rated Wall and Partition Notes
• Refer to plans for partition tags, not all partition assemblies are used.
• Where a partition is shown without a tag, use partition type P3, full height with sound attenuation.
• Wall and partition type are followed by a letter designation indicating the following requirements where used (more than one letter may be used):
*All fire rated walls are full height, continuous
A = Non rated fire separationB = 30 minute fire separationC = 45 minute fire separationD = 60 minute (1 hr) fire separationE = 90 minute (1.5 hr) fire separationF = 120 minute (2 hr) fire separationG = 180 minute (3 hr) fire separationH = Full height partitionJ = Wall height to min. 150mm above ceilingsK = Wall to finish at u/s ceiling, tapeable L mold @
t-bar, tape @ GWBL = Load bearing wallM = Wall height to u/s floor/ceiling joistsN = Gypsum one side onlyP = Plumbing wallS = Sound attenuation acoustic seal top and
bottom track continuous
Wall and Partition Type Legend
Floor Assemblies - Existing
TAG ASSEMBLY
XF1 100 CONCRETE TOPPINGMTL DECK
CONSTRUCTION
F1 TYP. LOWER + UPPER FLOOR SLAB
100 CONCRETE SLAB38 MTL DECK
Floor Assemblies - New
TAG ASSEMBLYCONSTRUCTION
F2 PENTHOUSE FLOOR SLAB
150 CONCRETE SLAB76mm MTL DECK(SEE PLAN FOR HOUSEKEEPING PADS)
F3 CRAWLSPACE FLOOR
50 SAND LAYER15 MIL VAPOUR BARRIERGRANULAR-B FILL
Roof Assemblies - Existing
TAG ASSEMBLY
XR15 ROOF MEMBRANE13 PLYWOOD2 LAYERS 75 RIGID INSULATIONAIR/VAPOUR BARRIERSLOPED REINFORCED CONCRETE SLAB ON 38 MTL DECK
CONSTRUCTION
XR17 ROOF MEMBRANE13 PLYWOOD2 LAYERS 75 RIGID INSULATIONAIR/VAPOUR BARRIER16 EXTERIOR GYPSUM38 MTL DECK
R1
Roof Assemblies - New Construction
TAG ASSEMBLYCONSTRUCTION
WHITE EPDM FULLY ADHERED MEMBRANE13 HD BOARD50 ISOGUARD POLY ISO INSULATION MECHANICALLY FASTENED TO EXIST'G 13 PLYWOOD SHEATHINGPLYWOOD IS COVERING EXIST'G RIGID INSULATION ON MTL DECK OR CONC ON MTL DECK(SLICE OPEN EXIST'G EPDM AS NOTED)
R2
R3
WHITE EPDM FULLY ADHERED MEMBRANE76 ISOGUARD HD COMPOSITE POLYISO INSULATIONISO GL TAPERED INSULATION, MIN 13mm100 ISO GL POLY ISO INSULATIONV-FORCE VAPOR BARRIER MEMBRANE13 DENS DECK BOARD OVER METAL DECK38 METAL DECK (VERIFY W/ STRUCT. DWG'S)
MINIMUM R-VALUE
R40 + VALUE FROMTAPERED INSULULATION
R40 + VALUE FROMTAPERED INSULULATION
WHITE EPDM FULLY ADHERED MEMBRANE76 ISOGUARD HD COMPOSITE POLYISO INSULATIONISO GL TAPERED INSULATION, MIN 13mm100 ISO GL POLY ISO INSULATIONV-FORCE VAPOR BARRIER MEMBRANE13 DENS DECK BOARD OVER METAL DECK76 METAL DECK (VERIFY W/ STRUCT. DWG'S)
Exterior Wall Assemblies - New Construction
TAG ASSEMBLY
W1
VISUAL
FOUNDATION WALL
REINFORCED CONCRETE FOUNDATIONFOUNDATION WATERPOOFING MEMBRANE100 EXTERIOR RIGID EXPANDED POLYSTYRENE INSULATION (R20)13 CEMENT BOARD WITH CEMENT PARGING FINISH TO 300 BELOW GRADEFOUNDATION DRAINAGE MAT TO OUTSIDE FACE OF FOOTING
W2 EXTERIOR WALL (MASONRY) / STONE
100 MASONRY VENEER WITH TOP VENTS AND BOTTOM WEEPS25 AIR SPACE W/ MOTAR CONTROLR28 MINERAL WOOL INSULATION (150mm)MEMBRANE AIR-VAPOR BARRIER16 EXTERIOR GRADE GYPSUM WALL BOARD152 HEAVY GAUGE METAL STUDS @ 400 O/C W/ FOAM SILL GASGET16 GYPSUM WALL BOARD
W3 EXTERIOR WALL (VERTICAL SIDING)
PREFINISHED METAL SIDING (VERTICAL)RAIN SCREEN VENT SPACE (MIN. 10mm)R28 MINERAL WOOL INSULATION (150mm)22 HORIZ. HAT CHANNEL AT 400 O/CTHERMAL SPACERSMEMBRANE AIR VAPOR BARRIER16 EXTERIOR GRADE GYPSUM WALL BOARD152 HEAVY GAUGE METAL STUDS16 GYPSUM WALL BOARD
W4 EXTERIOR WALL (HORIZONTAL SIDING) (PENTHOUSE)
PREFINISHED METAL SIDING (VERTICAL)RAIN SCREEN VENT SPACE (MIN. 10mm)R28 MINERAL WOOL INSULATION (150mm)22 HORIZ. HAT CHANNEL AT 400 O/CTHERMAL SPACERSMEMBRANE AIR VAPOR BARRIER16 EXTERIOR GRADE GYPSUM WALL BOARD152 HEAVY GAUGE METAL STUDS16 GYPSUM WALL BOARD
W5 SPARE - PARAPET WALL @ BASE CLERESTOREY WINDOWS
W6EPDM ROOF MEMBRANE/FLASHING19 PLYWOOD SHEATHING 38x152 WOOD FRAMING @ 400 O/CR28 RIGID MINERAL WOOL INSULATION (150mm)SELF ADHERING AIR VAPOR BARRIER MEMBRANE (AVB)16 EXTERIOR GYPSUM SHEAHTING203 METAL STUDS @ 400 O/C16 GYPSUM WALL BOARD
W7 PARAPET WALL (HORIZONTAL SIDING)
PREFINISHED METAL HORIZONTAL CORRUGATED SIDING22mm VERT. Z-GIRTS LET INTO THERMAL SPACERSR28 RIGID MINERAL WOOLD INSULATION (150mm)MEMBRANE AIR VAPOR BARRIER16 EXTERIOR GRADE GYPSUM WALL BOARD38x148 WOOD STUDS @ 400 O/C150 MINERAL WOOL INSULATION19 PLYWOOD SHEATHINGROOF MEMBRANE FLASHING
- PROVIDE BLOCKING FOR ROOF MEMBRANE TERMINATION BAR ON VERTICAL SURFACE
W8PARAPET WALL @ TRANSITION OF NEW TO EXISTING (R34)
PREFINISHED HORIZONTAL CORRUGATED METAL SIDING22 VERT. Z-GIRTS @ 800 O/CR28 RIGID MINERAL WOOL INSULATION (150mm)AIR-VAPOR BARRIER MEMBRANE16 EXTERIOR GRADE GYPSUM WALL BOARD38x140 WOOD FRAMING @ 400 O/CR22 MINERAL WOOL INSULATION6 MIL POLY VAPOR BARRIER16 GYPSUM WALL BOARD
W9
R-VALUE
R20 ci
R30 ci
R30 ci
R30 ci
R30
R30
W10 PARAPET WALL @ BRICK / STONE VENEER
BRICK VENEER WITH CAVITY VENTS25 AIR SPACER28 MINERAL WOOL INSULATION (150mm)AIR VAPOR BARRIER MEMBRANE16 EXTERIOR GYPSUM SHEATHING38x148 WOOD STUD FRAMING @ 400 O/C19 PLYWOOD SHEATHINGROOF MEMBRANE - FLASHING
R30 ci
R30 ci
CURRENTLY NOT USED
Interior Partition Assemblies - Concrete Masonry Units - New Construction
TAG ASSEMBLYTHICKNESS (5/8" / 16mm) NOTES
P20M
SI
90 CONCRETE MASONRY UNITS
4" CONCRETE MASONRY UNITS
90
3-7/8"
(GENERIC - REFER TO PLANS FOR RELEVANT ASSEMBLIES USED IN THIS PROJECT)
UNITSVISUAL
P21M
SI
140 CONCRETE MASONRY UNITS
6" CONCRETE MASONRY UNITS
140
5-7/8"
P22M
SI
190 CONCRETE MASONRY UNITS
8" CONCRETE MASONRY UNITS
190
7-7/8"
P23M
SI
240 CONCRETE MASONRY UNITS
10" CONCRETE MASONRY UNITS
240
9-7/8"
P24M
SI
290 CONCRETE MASONRY UNITS
12" CONCRETE MASONRY UNITS
290
11-7/8"
EQUIVALENT FIRE RATING(NORMAL DENSITY)
3/4 HR
1 HR
1-1/2 HR
2 HR
3 HR
P25
M
SI
90 CONCRETE MASONRY UNITS16 GWB BONDED TO MASONRY
106 3 HR
P26
M
SI
140 CONCRETE MASONRY UNITS16 GWB BONDED TO MASONRY
156 3 HR
P27
M
SI
190 CONCRETE MASONRY UNITS16 GWB BONDED TO MASONRY
206 3 HR
STRIKE MORTAR FLUSHTO RECEIVE GYP. BD.
STRIKE MORTAR FLUSHTO RECEIVE GYP. BD.
STRIKE MORTAR FLUSHTO RECEIVE GYP. BD.
3 1/2" CONCRETE MASONRY UNITS5/8" GWB BONDED TO MASONRY
5 1/2" CONCRETE MASONRY UNITS5/8" GWB BONDED TO MASONRY
7 1/2" CONCRETE MASONRY UNITS5/8" GWB BONDED TO MASONRY
4-1/8"
6-1/8"
8-1/8"
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Assemblies, Legends& Details
LU CASESAddition +Renovation
A0.2
2015-74A
05-DEC-2016
SCV/TG/CRS
Lakehead University - 955Oliver Road, Thunder Bay
Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
4 ISSUED FOR PERMIT 05-DEC-2016
Room Finish Abbreviation Legend
ACL - ACOUSTICAL CLOUDSBR - BRICKCPT - CARPET TILERUB - RUBBER BASEACT - ACOUSTIC CEILING TILEGWB - GYPSUM WALL BOARDPT - PAINTEDPL - PLASTIC LAMINATEPFT - PORCELAIN FLOOR TILEEX - EXISTING
PWT - PORCELAIN WALL TILELAM - LAMINATESV - SHEET VINYLEP - EPOXYEPT - LATEX EPOXY PAINTEXP - EXPOSED CEILINGCT - CERAMIC TILEGL - GLAZEDGLAZ - GLAZINGWD - T&G WOOD
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
1 : 1
Room FinishSchedules
LU CASESAddition +Renovation
A0.5
2015-74A
05-DEC-2016
SCV/TG
Lakehead University - 955Oliver Road, Thunder Bay
Room Finish Schedule - Existing Lower
NO. ROOM NAME
Floor Walls Ceiling Millwork
CommentsMat'l Base
North East South WestMat'l Finish Height Counter Cabinets Mat'l Finish Mat'l Finish Mat'l Finish Mat'l Finish
1001 SERVICE ROOM EXIST EXIST EXIST - EXIST - EXIST - EXIST - EXIST -1002 JANITORS CLOSET SV RUB GWB PT EXIST PT EXIST PT EXIST PT ACT - 2800X1010 CORRIDOR SV RUB EXIST PT EXIST PT EXIST PT EXIST PT ACT/OPEN - 2800 SV PATTERN (4) COLOURS1004A VEST PFT PFT EXIST - EXIST - EXIST - EXIST - EXIST -1004 M WR PFT PFT CT GL CT GL CL GL CT GL ACT - 28001004B SHW EXIST EXIST EXIST - EXIST - EXIST - EXIST - EXIST -1003A VEST PFT PFT CT GL CT GL CT GL CT GL ACT - 28001003 W WR PFT PFT CT GL CT GL CT GL CT GL ACT - 28001003B SHW EXIST EXIST EXIST - EXIST - EXIST - EXIST - EXIST -X1002 STAIR B SV RUB EXIST PT EXIST PT EXIST PT EXIST PT EXIST - RUB SAFETY TREAD / RISER / LANDINGSX1003 STAIR A SV RUB EXIST PT EXIST PT EXIST PT EXIST PT EXIST - RUB SAFETY TREAD / RISER / LANDINGSX1009 ELEVATOR LOBBY SV RUB GWB PT - - GWB PT - - ACT/GB PT 2800 SV PATTERN (4) COLOURSX1012 CORRIDOR SV RUB GWB PT EXIST PT GWB PT EXIST PT ACT/GB PT 2800 SV PATTERN (4) COLOURS1018-1 LAB ENTRANCE SV RUB GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1021B GENERAL STORAGE EP EP EXIST EPT EXIST/GWB EPT EXIST PT EXIST/GWB EPT EXIST/EXP PT1005 HUMAN ORIGINS LAB SV RUB EXIST PT EXIST PT GWB EPT EXIST EPT ACT - 28001006 TECH GASES EP EP GWB EPT GWB EPT GWB EPT GWB PT EXP PT1008A OFFICE SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28001009B DIRTY LAB EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1009A ANALYTICAL LAB EP EP GWB EPT GWB EPT GWB EPT EXIST EPT EXP PT1011 BIOHAZARD LAB EP EP EXIST EPT GWB EPT GWB/EXIST EPT EXIST EPT EXP PT1010 TECH GASES EP EP GWB EPT GWB EPT GWB EPT EXIST EPT EXP PT1019 I/T ROOM SV RUB GWB PT GWB PT GWB PT EXIST PT ACT - 28001018 WORK SPACE SV RUB GWB PT GWB PT GWB PT GWB/EXIST PT ACT - 28001018B WET LAB (NEG) EP EP EXIST EPT GWB EPT GWB EPT GWB EPT EXP PT1018A ANALYTICAL LAB EP EP GWB EPT GWB EPT GWB EPT EXIST EPT EXP PT1021A TECH GASES EP EP EXIST EPT GWB EPT GWB EPT EXIST EPT EXP PT1007 PROTOYPE DEVELOPMENT LAB EP EP GWB EPT GWB EPT GWB EPT EXIST EPT EXP PT1008 LAB MANAGEMENT SV RUB GWB PT GWB PT EXIST PT EXIST PT ACT - 28001009 INTEGRATED FRESHWATER LAB EP EP GWB EPT EXIST EPT GWB EPT GWB EPT ACT - 2800X1011 CORRIDOR SV RUB EXIST PT EXIST PT EXIST PT EXIST PT ACT/GWB DT 28001021 SHIPPING/RECEIVING + RECYCLING EP EP EXIST/GWB PT EXIST/GWB PT EXIST PT EXIST PT EXP/EXIST PTX1004 CRAWLSPACE1022 CHAIR STORAGE SV - - - - - - - - - - -X1013 STORAGE EP EP GWB EPT GWB EPT GWB EPT GWB EPT ACT -
Room Finish Schedule - Existing Upper
NO. ROOM NAME
Floor Walls Ceiling Millwork
CommentsMat'l Base
North East South WestMat'l Finish Height Counter Cabinets Mat'l Finish Mat'l Finish Mat'l Finish Mat'l Finish
2020 UNIVERSAL W/R PFT PFT CT GL CT GL CT GL CT GL GWB PT 2800 SCHLUTER TILE PROTECTION MOLDING2021 UNISEX W/R PFT PFT CT GL CT GL CT GL CT GL GWB PT 2800 SCHLUTER TILE PROTECTION MOLDINGX2002 STAIR B PT-1 RUB EXIST PT EXIST PT EXIST PT EXIST PT EXIST PT2001 LOBBY PFT PFT GWB/EXIST PT EXIST PT GWB/EXIST PT EXIST PT ACT/GWB/
WOODPT 3000 SCHLUTER TILE PROTECTION MOLDING
2002 GRAD STUDENT LOUNGE CPT/SV RUB GWB/GLASS PT EXIST/GLASS PT MODART PT GLASS PT EXP PT ACOUSTICAL CLOUDS/EXPOSED CEILING2004J SPARE OFFICE - EDI CPT RUB GWB PT GWB PT GWB PT GWB PT ACT 28002005 BOARD RM CPT RUB EXIST/GWB PT EXIST PT EXIST PT GWB/EXIST PT ACT/GWB PT 30002007 RENTABLE OFFICE CPT RUB GWB PT GWB PT GWB PT EXIST PT ACT - 28002009 ENTREPRENEUR CENTRE CPT RUB GWB PT GWB/GLAZ PT GWB PT GWB/EXIST PT ACT - 2800 SV PATTERN2006 RENTABLE OFFICE CPT RUB EXIST PT EXIST PT GWB PT EXIST PT ACT - 28002018 ENTREPRENEUR CENTRE CPT RUB GWB PT EXIST PT GWB/EXIST PT GWB PT EXP/ACL PT ACOUSTICAL CLOUDS/EXPOSED CEILING2022 ENTREPRENEURSHIP LECTURE THEATRE CPT RUB EXIST PT EXIST PT GWB PT GWB PT ACT/GWB PT 2800 3000/28002008 ABORIGINAL MENTORSHIP PROGRAM CPT RUB GWB PT GWB PT GWB PT EXIST PT ACT - 2800X2009 CORRIDOR SV COV GWB/EXIST PT EXIST PT GWB/EXIST PT - PT ACT/GWB PT 28002004C OFFICE CPT RUB GWB PT GWB PT GWB PT EXIST PT ACT - 28002004D MEETING RM CPT RUB GWB PT GWB PT EXIST PT EXIST PT ACT - 28002004E CESME OFFICE CPT RUB GWB PT GWB PT EXIST PT GWB PT ACT - 28002004F CESME OFFICE CPT RUB GWB PT EXIST PT EXIST PT GWB PT ACT - 28002004G CHAIR OFFICE - ENTRE CENTRE CPT RUB GWB PT EXIST/GWB PT GWB PT GWB PT ACT - 28002004B OFFICE CPT RUB GWB PT GWB LAM GWB PT EXIST PT ACT - 28002004H OFFICE CPT RUB GWB PT EXIST PT GWB PT GWB PT ACT - 28002003 SHARED KITCHENETTE SV RUB GWB PT EXIST PT GWB PT GWB PT ACT - 2800 QUARTZ VENEER MILLWORK + COUNTERTOPX2016 BRIDGE LINK - - - - - - - - - - - -X2015 CORRIDOR PFT PFT EXIST PT GWB PT EXIST PT EXIST PT ACT/GWB PT 2800X2010 CORRIDOR SV COV - - GWB/EXIST PT EXIST PT GWB/EXIST PT ACT/GWB PT 2800 D. FEATURE WALL @ ATRIUM SV PATTERNX2012 CORRIDOR SV COV - - GWB/EXIST PT GWB PT GWB/EXIST PT ACT/GWB PT 2800X2014 CORRIDOR SV RUB GWB PT GWB PT GWB PT GWB PT ACT 28002018B STUDY RM CPT RUB GLAZ - GLAZ - GLAZ PT EXIST PT ACT - 2800 DRY ERASE PAINT WEST WALL2018A STUDY RM CPT RUB GLAZ - GLAZ - EXIST PT EXIST PT ACT - 2800 DRY ERASE PAINT WEST WALL2018D 3D PRINTER RM SV RUB GWB PT GWB/EXIST PT GWB/GL PT GWB PT ACT - 28002018C MEDIA RM SV RUB GWB MPT GWB PT GWB PT EXIST PT ACT - 2800 BLUE SCREEN PAINT2004-1 ARRIVAL SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002004A OFFICE CPT RUB GWB PT GWB PT GWB PT EXIST PT ACT 2800X2013 CORRIDOR SV RUB GWB PT GWB PT GWB PT GWB PTX2011 CORRIDOR SV COV EXIST/GWB PT GWB PT EXIST PT GWB PT ACT - 28002004 ADMINISTRATION EDI CPT RUB GWB PT GWB PT GWB PT EXIST PT ACT - 2800 MILLWORK + COUNTERTOP2023 IT RM SV RUB GWB PT GWB PT GWB PT GWB PT - -
Room Finish Schedule - New Lower
NO. ROOM NAME
Floor Walls Ceiling Millwork
CommentsMat'l Base
North East South WestMat'l Finish Height Counter Cabinets Mat'l Finish Mat'l Finish Mat'l Finish Mat'l Finish
1015 TECH GASES EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1014B FREEZER EP EP - - - - - - - - - -1014-3 SCALE EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1013 GRAD STUDENTS SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28001014F DIRTY LAB (NEG) EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1012 OFFICE SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 2800X1008 ATRIA 1 TER RUB GWB PT GWB PT GWB PT EXIST'G BR ACT / GWB - RUB. SAFETY STAIR TREAD / RISERSX1006 STAIR C TER RUB GWB PT GWB PT GWB PT GWB PT GWB PT RUB. SAFETY STAIR TREAD / RISERS / LAND.1014E CLEAN RM (POS) EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1014-1 LAB ENTRANCE EP EP GWB EPT GWB EPT - - GWB EPT EXP PT1014A STORAGE EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1014C LASER EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1014-2 CIRCULATION EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1014-4 ANALYSIS EP EP - - GWB EPT GWB EPT GWB EPT EXP PT1014 WET LAB EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1014D TECH OFFICE SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28001017G TECH OFFICE SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 2600X1007 CORRIDOR TER RUB GWB PT GWB PT GWB PT - - ACT -1017A OFFICE SV RUB GWB PT GWB PT GWB PT EXIST PT ACT - 28001017-3 SEM EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-2 WORK ROOM EP EP GWB PT GWB PT GWB PT GWB PT EXP PT1017G EXPANSION SPACE EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017C OFFICE SV RUB GWB PT GWB PT GWB PT EXIST PT ACT - 28001017E SEM PREP-ROOM EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017D TECH ROOM EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-K TRACE ANALYSIS (ICP's) EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-4 WEIGHING & CHNS EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-6 PREP ROOM CHROMOTOGRAPHY EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-L PREP ROOM (ICP's) EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-5 CHROMOTOGRAPHY EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-J WORKSHOP EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-8 LAB ENTRANCE 2 EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017B TECH-OFFICE SV RUB GWB PT GWB PT GWB PT EXIST PT ACT - 28001016 TECH GASES & CHILLERS EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017F BIOSAFETY LAB EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017-2 TEM EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017 MATERIAL ANALYSIS EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PTX1016 CORRIDOR EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT1017H SHARED OFFICE SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28001008A LOUNGE AREA TER RUB GWB PT GWB PT GWB PT EXIST'G BR - -
Room Finish Schedule - New Upper
NO. ROOM NAME
Floor Walls Ceiling Millwork
CommentsMat'l Base
North East South WestMat'l Finish Height Counter Cabinets Mat'l Finish Mat'l Finish Mat'l Finish Mat'l Finish
2024 JAN. SV RUB GWB PT GWB PT GWB PT GWB PT ACT - -2016 GRAD STUDENTS SV RUB GWB PT GWB PT GWB/GLAZ PT GWB PT ACT - 28002014-3 ADMIN CPT RUB PT GWB PT ACT 28002016D ELECTROCHEMISTRY EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT2016B BIOSAFETY (POS) EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT2016C SPECTROCOPY EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT2016A LASER RM EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT2015 TECH GAS STORAGE EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT2017 OFFICE SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014C OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014D OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014E OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014F OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011G OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011F OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011E OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011D OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014A OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014B OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011C OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011B OFFICE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002011 ADMIN CPT RUB GWB/GLAZ PT GWB PT - - GWB PT ACT - 28002011-2 ADMIN CPT RUB - - GWB PT - - GWB PT ACT - 28002014-2 ADMIN CPT RUB GWB PT GWB PT ACT - 28002014G PHOTOCOPY/ PRINTING SV RUB GWB PT GWB PT - - GWB PT ACT - 2800 QUARTZ VENEER MILLWORK + COUNTERTOP2014H OFFICE CPT RUB GWB PT DWP LAM GWB PT GWB PT ACT - 28002012 WOMENS W/C PFT PFT PWT MAT PWT MAT PWT MAT PWT MAT GWB PT 2800 QUARTZ VENEER SCHLUTER TILE PROTECTION MOLDING2013 MENS W/C PFT PFT PWT MAT PWT MAT PWT MAT PWT MAT GWB PT 2800 QUARTZ VENEER SCHLUTER TILE PROTECTION MOLDINGX2006 STAIR C SV RUB GWB PT GWB/GLAZ PT GWB PT GWB PT RUB. SAFETY STAIR TREAD / RISERS / LAND.2011-3 CIRCULATION SV RUB GWB PT GWB PT GWB PT ACT - 2800X2007 CORRIDOR TER TER GWB/GLAZ PT GWB PT GWB PT GWB PT FLOOR PATTERN (3) COLOURS2011-4 CIRCULATION SV RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014-1 CIRCULATION SV RUB GWB PT GWB LAM GWB VPT - - ACT - 28002011A MEETING RM CPT RUB GWB/GLAZ PT GWB PT GWB PT GWB PT ACT - 28002014J STORAGE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002014 ADMIN CPT RUB GWB/GLAZ PT - PT - - GWB PT ACT - 28002011J STORAGE CPT RUB GWB PT GWB PT GWB PT GWB PT ACT - 28002016E DRY LAB EP EP GWB EPT GWB EPT GWB EPT GWB PT EXP PT2016F AFM (POS) EP EP GWB EPT GWB EPT GWB EPT GWB EPT EXP PT2011H OFFICE CPT RUB GWB VPT GWB PT GWB PT GWB PT ACT - 28002011-1 WAITING AREA CPT RUB GWB PT GWB PT - - ACT - 2800X2008 ATRIUM 2 TER TER GWB PT GWB PT GLAZ - GWB/GLAZ PT GWB PT TER. PATTERN (4) COLOURSX2008 ATRIUM 1 TER TER - - GWB PT GLAZ - EXIST/GWB BR/PT - -
LOWER FLOOR UPPER FLOOR
1017J
1017K
1017I
1017K
1017L
1017J
Rev. Description Date1 ISSUED FOR CLASS 'C' 04-AUG-20162 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
3 ISSUED FOR PERMIT 05-DEC-2016
5) GENERAL MOUNTING HEIGHTS
FAC
E O
F W
ALL
730
610
1200
MAX
.
1200
MAX
.
1200
MAX
.
1200
MAX
.
1200
MAX
.
1200
MAX
.
0.9
MIN
1.1
MAX
VERTICAL WALL-MOUNTED ORFREE STANDING POWR DOOROPERATOR
BEYOND DOOR SWING
LOCATED 600mm TO 1500mm
400
1200
300
45 6
1011
22
238
20
21
TOILET TISSUE DISPENSER SINGLE ROLL
TOILET TISSUE DISPENSER DOUBLE ROLL
TOILET TISSUE DISPENSER AND SHELF
PAPER TOWEL DISPENSER
SOAP DISPENSER
HAND SANITIZER DISPENSER
FULLY RECESSED SOAP HOLDER
STAINLESS STEEL SHELF
SANITARY NAPKIN DISPOSAL (UNISEX/FEMALE WASHROOMS)
SINGLE COAT HOOK
MULTIPLE COAT HOOK
600mm HORIZONTAL GRAB BAR
900mm HORIZONTAL GRAB BAR
760mm x 760mm L-SHAPED GRAB BAR
900mm x 900mm L-SHAPED GRAB BAR
SWING UP GRAB BAR
MIRROR
MOP RAIL
BARRIER FREE SHOWER SEAT
HAND DRYER
WALL MOUNTED WASTE RECEPTACLE
FLOOR STANDING WASTE RECEPTACLE
BABY CHANGE TABLE
THERMOSTAT
INTERCOM
FIRE ALARM
SWITCH
OUTLET
WASHROOM ACCESSORY LEGEND:
(REFER TO SPECIFICATIONS FOR APPROVED MANUFACTURERS AND MODELS)
NOTE: THIS LEGEND SHOWS THE REQUIRED MOUNTING HEIGHTS AND CLEARANCES OF STANDARD WASHROOM ACCESSORIES. REFER TO PLANS AND ELEVATIONS FOR WASHROOM ACCESSORY LAYOUTS. IF CONFLICTS OCCUR, CONTACT PROJECT ARCHITECT.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
CLEARANCE UNDER SINK
460 MIN.
485
MAX
.
2a) LAVATORY PLAN
CLEAR SPACE
UNDER SINK
FAC
E O
F W
ALL
460 MIN.
840
MAX
.
760 CLEAR
2b) LAVATORY ELEVATION
735
CLE
AR
FAC
E O
F W
ALL
735
INSULATEDDRAIN PIPE
840
MO
UN
TIN
G H
EIG
HT
485 MAX.
685
205
280
430
2c) LAVATORY ELEVATION
2b
2c
1000
MAX
.
17
460 - 480 1020 MIN.
300
MAX
.
WAL
L O
R O
BSTR
UC
TIO
N
1a) WATER CLOSET PLAN
460 - 480
400
- 460
1b) TANKLESS WATER CLOSET ELEVATION
FAC
E O
F W
ALL
ABO
V E F
LOO
R
840
- 920
460 - 480
FAC
E O
F W
ALL
400
- 460
150 MAX.
600
MIN
.
300 MAX.
400
- 460
1c) TANKED WATER CLOSET ELEVATION
FAC
E O
F W
ALL
625
REF
ER T
O IN
STAL
LATI
ON
IN
STR
UC
TIO
NS
ABO
V E T
ANK
150
750
1d) TANKED WATER CLOSET ELEVATION
1c
1d
150
MAX
.
600
1400
1700
900 x 1500mmTRANSFER SPACE
WASHROOM CLEARENCES
940mm MAXIMUM
890 mm MINIMUM
810
L- SHAPED GRABBARS BOTH SIDESOF WATER CLOSET
WATER CLOSETCENTERED BETWEEN SIDE WALLS
LATCH SIDE CLEARANCENOT REQUIRED
DOOR PULL AT LATCH SIDE, BOTHSIDES OF DOOR
900 x 1500mmTRANSFER SPACE
480mm
460mm TO
1500mm DIA. WHEELCHAIRTURNING CIRCLE
MIN
.
1500
FORWARD APPROACHSPACE AT LAVATORY
SPACE FOR ADULT-SIZECHANGE TABLE
900 x 1500mmTRANSFER SPACE
CLE
A R
860
810
1830
FOLD DOWNGRAB BAR
460 460
CL CL
16
29
1
12
14
12
12
14
14 14
14
12
920 x 1370mm MIN.FORWARD APPROACH
500m
m M
AX.
1500
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Washroom AccessoryLegend & MountingHeights, Barrier FreeDesign Standards
LU CASESAddition +Renovation
A0.12
2015-74A
05-DEC-2016
SCV
Lakehead University - 955Oliver Road, Thunder Bay
1 : 25
BF Accessory Mounting Heights
1 : 25
BF Lavatory Legend
1 : 25
BF Toilets and Grab Bar Legend
Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
4 ISSUED FOR PERMIT 05-DEC-2016
CLE
A R
860
600
1525
CLE
A R
2' -
9 3/
4"1'
- 11
1/2
"
B-F
P ATH
3' -
7 1/
4"
CLEAR
2' - 9 3/4"
INAWRD SWINGINGDOOR
BATHROOM
BEDROOM
1' - 11 1/2"2' - 9 3/4"
B-F PATH
3' - 7 1/4"
OUTWARD SWINGINGDOOR
B-F PATH
3' - 7 1/4"
INWARD SWINGINGDOOR
CLEAR
2' - 9 3/4" 11 3/4"
MIN
1' - 11 1/2"2' - 9 3/4"
11 3/4"
MIN
11 3/4"
SLIDING DOOR
2' - 9 3/4"
MIN
11 3/4"
MIN
1' - 11 1/2"
CLEAR
2' - 9 3/4"
RAM
P
LANDING1' - 11 1/2"
MIN.
5' - 5 3/4"
MIN
.
5' -
5 3/
4"
LANDING
MIN.
5' - 5 3/4"
MIN
.
5' -
5 3/
4"
RAMPMIN.
11 3/4"
TACTILE ATTENTION INDICATORAT TOP OF STAIRS AND CERTAINLANDINGS
COLOR CONTRASTSTRIP
DEPTH OFONE TREAD
RISER
TREAD
300mm
-600mm
1980
680
400
- 460
1a) WATER CLOSET FRONT ELEVATION
750
- 900
760
1c) WATER CLOSET SIDE ELEVATION
760 165
925
970
TO 8
40
1062
900
850
1a) SHOWER/TUB SIDE ELEVATION
2x8 WOOD BLOCKINGBETWEEN WALL STUDS(TYP)
3-3 1/2" SPIRAL NAILSOR SCREWS BOTH SIDES (TYP)
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
1 : 25
Barrier Free DesignStandards
LU CASESAddition +Renovation
A0.13
2015-74A
05-DEC-2016
SCV/NCM
Lakehead University - 955Oliver Road, Thunder Bay
1 : 25
BF Latch Side Clearances
1 : 25
BF Stairs 1 : 25
Stud Wall Reinforcement
Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
4 ISSUED FOR PERMIT 05-DEC-2016
XA
XA
XD
XD
X1
X9
CHANCELLOR PATERSON LIBRARY BUILDING
3990
0
EXISTING PEDESTRIAN SIDEWALK
MAINENTRANCE
UN
IVER
SITY
SE
RVI
CE
R
OAD
EXISTING CONCRETE WALL AND GUARD RAIL
2119
1
EXISTINGSIDEWALK
LAKEHEAD UNIVERSITY DRIVE
FIR
E A
CC
ESS
RO
UTE
EXISTING REMOVABLEBOLLARDS
EXISTING EMERGENCYCALL STATION
AREA OF WORK/LEED PROJECT BOUNDARY
EXISTING HYDRONIC - 2-250 HEATING LINE - FIELD VERIFY LOCATION SUPPLY
RETURN
SUPPLY
RETURN
EXISTING BIKE PARKING
EXISTINGASPHALT PAVING
95850
95800
95800
95850
95650
9980099700
97850
97750
95850
95800
9585095850
EXISTING GRASS AREA
24000
EXISTING FENCE
EXISTING FENCE
EXISTING FENCE
EXISTING VEGETATION
CASES BUILDING A -
EXISTING
MAIN FLOOR
96000/204.205
EXISTING ELECTRICALINDOOR SUBSTATION
EXISTING GAS SERVICE
EXIS
TING S
ANIT
ARY
EXIS
TING W
ATER
MAIN
EXISTI
NG STO
RMWATE
R
EXISTING SHED
AREA OF WORK/LEED PROJECT BOUNDARY
AREA
OF
WO
RK/
LEED
PR
OJE
CT
BOU
ND
ARY
AREA
OF
WO
RK/
LEED
PR
OJE
CT
BOU
ND
ARY
STMH
SANMH
SANMH
CB
CB
CB
CB
SANMH
CB
STMH
EX STMH
CB
EXISTING GRASS AREA
EXISTING GRASS AREA
EXISTING GRASS AREA
AREA OF NEW WORK
CASES ADDITION & RENOVATION
SITE SERVICES UPGRADES
EXIS
TING
FO
REST
RY
BUIL
DING
XA
XA
XD
XD
X1
X9
CHANCELLOR PATERSON LIBRARY BUILDING
3990
0
EXISTING PEDESTRIAN SIDEWALK
MAINENTRANCE
UN
IVER
SITY
SE
RVI
CE
R
OAD
EXISTING CONCRETE WALL AND GUARD RAIL TO REMAIN
2119
1
EXISTING GRASS AREA
EXSTGSIDEWALK
LAKEHEAD UNIVERSITY DRIVE
FIR
E A
CC
ESS
RO
UTE
EXISTING REMOVABLEBOLLARDS
EXISTING EMERGENCYCALL STATION
EXISTING HYDRONIC - 2-250HEATING LINES - FIELD VERIFY
SUPPLYRETURN
SUPPLYRETURN
99800
97850
95850
9585095850
24000
EXISTING VEGETATION
CASES BUILDING A EXISTING
MAIN FLOOR
96000/204.25
DN-S1
DN-S1DN-S1
DN-S1
DN-S1
DN-S2
DN-S2
DN-S2
DN-S2
DN-S3
DN-S3
DN-S3
DN-S3
DN-S4
DN-S4
DN-S4
DN-S4
DN-S5DN-S6
DN-S7
DN-S8
DN-S14
DN-S16
DN
-S16
DN-S9
DN
-S3
DN-S3
DN-S10
LOCATION OF CONSTRUCTION
SIGNAGE
LOCATION OF CONSTRUCTION
SIGNAGE
DN-S
16
DN-S15
DN-S15
DN-S15
AREA OF WORK/LEED PROJECT BOUNDARY
AREA OF WORK/LEED PROJECT BOUNDARY
AREA
OF
WO
RK/
LEED
PR
OJE
CT
BOU
ND
ARY
AREA
OF
WO
RK/
LEED
PR
OJE
CT
BOU
ND
ARY
DN-S15
DN-S15
DN-S11
DN-S11
DN-S11
DN-S11
SANMH
EXIS
TING S
ANIT
ARY
EXIS
TING W
ATER
MAIN -
REMOVE
D
EXISTI
NG STO
RMWATE
R
STMH
SANMH
CB
CB
CB
CB
CB
STMH
EX STMH
DN-S11
DN-S
11
DN-S11
DN-S11
DN-S11
DN-S11
DN-S10
LOCA
TION
OF
CONS
TRUC
TION
SIGN
AGE
LIMIT OF STORM REMOVAL
LIMIT OF STORM REMOVAL DN-S11
DN-S11
DN-S11 LIMIT OF SANITARY REMOVAL
DN-S11
LIMIT OF SANITARY REMOVAL
DN-S12
DN-S10
DN-S12
DN-S13
DN-S0
DN-S3 DN-S3
DN-S15
EXITS
ELECTRICAL
SANITARY
STORMWATER
WATERMAIN
CATCH BASIN
MANHOLE
SITE PLAN NOTES -EXISTING AND DEMOLITION:
DEMOLITION NOTEDN - SXX
1800
ROADWAY/GRADE
CONSTRUCTION FENCEBY GENERAL CONTRACTOR
MIN
900
GEOTEXTILE FILTER FABRICAFFIX TO FENCE USING STAPLESMIN 25 IN LENGTH OR WIRE
AREA TO BE PROTECTEDAREA UNDER CONSTRUCTION
PEA GRAVEL FILLEDSAND BAGS AT SUPPORTS
NOTES:INSPECT FENCE ONCE EACH WEEK AND FOLLOWING ANY SIGNIFICANT STORM EVENT. INSPECT FOR SEDIMENT, TEARS, LOOSE FABRIC ATTACHMENT. REMOVE SEDIMENT WHEN IT REACHES 200 ABOVE BASE.
IMPERVIOUS SURFACE
STRAW BALES BETWEEN SUPPORTS
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Site Plan - Existing &Demolition
LU CASESAddition +Renovation
A1.0
2015-74A
05-DEC-2016
Author
Lakehead University - 955Oliver Road, Thunder Bay
1 : 300
Site - Existing2
TRU
E
CONS
TRUC
TION
1 : 75000
Key Plan1
1 : 300
Site - Demolition3
Demolition Notes (DN) - SITE (S)
Mark DescriptionDN-S0 REMOVE EXISTING BOULDERS FOR RELOCATION.DN-S1 REMOVE EXISTING VEGETATION.DN-S2 REMOVE EXISTING TOPSOIL. REFER TO LANDSCAPE DRAWINGS FOR NEW GRADING.DN-S3 REMOVE EXISTING CURB.DN-S4 REMOVE EXISTING FENCING. RETURN TO OWNER.DN-S5 BREAK UP AND REMOVE EXISTING CONCRETE WALK.DN-S6 SALVAGE STONE BICYCLE PAD AND INCLUDING BICYCLE RACKS. RETURN STONE TO OWNER. RETAIN FOR
REUSE EXISTING BICYCLE RACKS.DN-S7 REMOVE AND DISPOSE OF EXISTING SHED.DN-S8 BREAK UP AND DISPOSE OF EXISTING CONCRETE AT EXISTING ENTRANCE.DN-S9 REMOVE EXISTING STAIR TO READY FOR NEW STAIR.DN-S10 REMOVE EXISTING ASPHALT SURFACE TO READY FOR EXCAVATION REQUIRED FOR REROUTING OF
SERVICES AND FOUNDATION WORK FOR CASES BUILDING B NEW.DN-S11 REMOVE EXISTING SERVICE - REFER TO CIVIL. - ALL SEWERS, WATERMAINS, CATCH BASINS AND MANHOLES
WITHIN PROPOSED BUILDING FOOT PRINT TO BE REMOVED AND DISPOSED OF OFF SITE.DN-S12 LIMIT OF ASPHALT REMOVAL.DN-S13 REMOVE EXISTING GATE.DN-S14 LEED EROSION AND SEDIMENT CONTROL - STABILIZED CONSTRUCTION ENTRANCE. SEE CIVIL MUD CONTROL
MAT DETAIL.DN-S15 LEED EROSION AND SEDIMENT CONTROL - INLET PROTECTION - SEE CIVIL SITE GRADING SHEET FOR DETAILDN-S16 LEED EROSION AND SEDIMENT CONTROL - SILT FENCE - SEE DETAIL 4/A1.0
1 : 25
SILT FENCE DETAIL4
Rev. Description Date1 ISSUED FOR PERMIT 05-DEC-2016
DN
x
x
x
x
x xx x x
x
x
xx
x
x
x
x
x
x
x
x
x
x
x
xx
xx
xx
xx
XA
XA
XD
XD
X1
X9
1
7
CHANCELOR PATERSON LIBRARY BUILDING
CASES BUILDING A -
EXISTING CASES BUILDING B -
ADDITION
3990
0
EXISTING PEDESTRIAN SIDEWALK
MAINENTRANCE
UN
IVER
SITY
SE
RVI
CE
R
OAD
BFI BINS
SHIPPING + RECEIVING AREA
ASPH
ALT
DR
IVEW
AY
EXISTING CONCRETE WALL AND GUARD RAIL
1013
1
5150 33200
COVERED BIKE PARKING AREA
BRIDGE / LINK TO LIBRARY
RIVER BED ROCKGARDEN AREA
REFER TO LANDSCAPING
NEW
TR
EE P
LAN
TIN
G
AN
D L
AN
DSC
API
NG
NEW TREE PLANTING AND LANDSCAPING(STORM WATER MANAGEMENT AREA)
PLANTING BEDS ALONG BUILDING PERIMETERREFER TO LANDSCAPING
1500
AC
CES
SIBL
E SI
DEW
ALK
1500 SIDEWALK
1500 SIDEWALK
NEW GRASS AREA
NEW CONCRETESIDEWALK
CURBING - TYP.
LAKEHEAD UNIVERSITY DRIVE
FIR
E A
CC
ESS
RO
UTE
GRAD STUDENT PLAZA AREA
STO
RM
WAT
ER M
ANAG
EMEN
T AR
EA
STORM WATER MANAGEMENT AREA
STORM WATER MANAGEMENT AREA
LANDSCAPING
TRAN
SITI
ON
RO
OF
TRAN
SITI
ON
RO
OF
B
B
H
H
EXISTING REMOVEABLE
BOLLARDS
REFER TO LANDSCAPING
EXISTING HYDRONIC HEATING LINES
SUPPLYRETURN
SUPPLY
RETURN
STORMWATER MANAGEMENT BIORETENTION/INFILTRATION AREA
1500
SID
EWAL
K
MAIN FLOOR
96.000 (204.205)
PEDESTRIAN CROSSING
2%
2%
2%
ACCESSIBLE RAMP1:12 MAX SLOPE
ACCESSIBLE RAMP1:12 MAX SLOPE
SOD SOD
1:20
ROCK GARDEN PLANTING
ROCK GARDEN BOULDERS
BOULDER SEATWALL
NEW STRIP DRAIN - SEE ENGINEERIGN DWGS
PLANTING BED
PLANTING BED
BOULDER TERRACE WALL
PLANTINGBEDS
RAISED CONCRETE SEAT WALL PLANTER
LITTER AND RECYCLING
PLANTING BED
NEW CONCRETE STAIR
METAL BENCHES
NEW CONCRETE UPSTAND WALL
NEW CONCRETE SIDEWALK
STRIP DRAIN(SEE LANDSCAPE)
RIP RAP MAX SLOP 3:1
SWALE MIN 2.5%
DRAIN INV. 203.55/95.345
AREA OF WORK/LEED PROJECT BOUNDARY
AREA OF WORK/LEED PROJECT BOUNDARY
AREA
OF
WO
RK/
LEED
PR
OJE
CT
BOU
ND
ARY
AREA
OF
WO
RK/
LEED
PR
OJE
CT
BOU
ND
ARY
1A1.2A1.1
MAIN FLOOR
96.000 (204.205)
NEW 4160V POWER FEED
24000 5500 33200
EXIS
TING S
ANIT
ARY
EXISTI
NG STO
RMWATE
R
SANMH
CB
STMH
EX STMH
NEW SANITARY
NEW
SAN
ITAR
Y
NEW SANITARY
NEW STORM
NEW
STO
RM
NOTE:MAINTAIN3 m CLEAR FROM U/SLINK TO GRADE.
SEE SHEET A1.2
SEE CURB DETAILCIVIL SITE GRADING SHEET
SEE CIVIL SITE GRADING SHEETFOR LAKEHEAD UNIVERSITY DRIVE N CROSS SETION
SOCK PERFORATEDSUBDRAIN
BOULDER AND PEBBLEMULCH FOR DOWNSPOUT
CURB CUT TO COTB ENGINEERING DWGS
PAINTEDCROSSWALK
SOCK PERFORATEDSUBDRAIN
SODDED SERVICEACCESS 3m WIDE
SODDED SERVICEACCESS 3m WIDE
STRIP DRAINSEE ENGINEERING DWGS
204.73/96.525
SLOP MAX 3:1
2%typ
2%typ
1%
2%
2 % typ
1 %
3:1
MAX
2% T
YP
10%
ASPHALT DRIVEWAY
2%
PEFORATED SOCKED SUBDRAIN ININFILTRATION AREA
LIGHT BOLLARD (5) SEE ELECTRICAL
SOCKED PERFORATEDSUBDRAIN
RETAINING WALL WITH GUARD
SLOPED SIDEWALKENTRY POINT
RETAING WALL WITHOUT GUARDMAX 600 FROM SIDEWALK
5A1.1 A1.2
SITE PLAN NOTES - NEW:
REFER TO CIVIL FOR:1. BASE ELEVATION POINT - "BM701 TOP NUT OF FIRE HYDRANT ELEVATION 204.774"
2. ROAD GRADING3. SANITARY AND STORM SEWER4. WATERMAIN
REFER TO LANDSCAPING PLANS FOR:1. LAYOUT AND GRADING PLAD2. VEDGETATION3. DRAINAGE 4. STORMWATER MANAGEMENT
REFER TO ELECTRICAL FOR:1. TRANSFORMER LOCATIONS2. SITE LIGHTING
EXITS
ELECTRICAL
SANITARY
STORMWATER
WATERMAIN
CATCH BASIN
MANHOLE
x x CONSTRUCTION FENCE
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Site Plan - New
LU CASESAddition +Renovation
A1.1
2015-74A
05-DEC-2016
CRS/SCV
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 150A1.1A0.7
1 Site - New
APPLICABLE CITY OF THUNDER BAY STANDARD DRAWINGS
M-105-1 M-105-2R-109-1R-119
CONCRETE RETAINING WALL WITH FOOTING (SEE BELOW)CONCRETE RETAINING WALL ATTACHED TO CONCRETE SIDEWALK (SEE BELOW)ONE PIECE CONCRETE CURB AND GUTTERCONCRETE SIDEWALK
NOTE: ABOVE COTB STANDARD DRAWINGS SHOWN FOR REFERENCE ONLY. REFER TO CITY OF THUNDER BAYENGINEERING STANDARDS FOR ACCURACY.
Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 UPDATED FOR REFERENCE 20-JUL-20163 UPDATED FOR REFERENCE 28-JUL-20164 ISSUED FOR CLASS 'C' 04-AUG-20165 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
6 ISSUED FOR PERMIT 05-DEC-2016
6.0
3A1.2 A1.2
3000
EQEQ
HSS152.4X152.4X6.4
HSS152.4X152.4X6.4
HSS152.4X152.4X6.4
HS
S10
1.6X
101.
6X
4.8
LIN
E O
F R
OO
F AB
OVE
LIN
E O
F R
OO
F AB
OVE
A1.2
2
2.5
3.7
1850
EQ EQ
OFF
SET
0.6
0.9
0.9
1.8
TYP
MIN
0.9
3.0
3.0
ALL COLUMN LOCATIONS
ALL COLUMN LOCATIONS
SHELTER WALL FRAMING TYP
HSS101.6X101.6X6.4
HSS101.6X101.6X4.8
HS
S10
1.6X
101.
6X
6.4
HSS101.6X101.6X4.8
HSS101.6X101.6X6.4HSS101.6X101.6X4.8HSS101.6X101.6X6.4
HS
S10
1.6X
101.
6X
6.4
HS
S10
1.6X
101.
6X
4.8
MIN
610
0.7
0.7
LIN
E O
F R
OO
F AB
OVE
1.3 0.8 1.3
1.6
EXISTING STORM WATER MANHOLE
EQEQ
EQEQ
NOTE:PRECISE LAYOUT AND STYLE OF BICYCLE RACKS TO BE CONFIRMED.
-A1.2 ---
2.7
2.4
1.31.3
0.70.7
2.73.
0
0.3
0.3
112
112
-A1.2 ---
1X6 CEDAR BOARD (5)1X4 CEDAR BOARD (1)
SCREEN REPEATING PATTERN
4A1.2A1.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
W250x24 TYP
2X8 CEDAR BASEBOARD
T/O Lower Level
96000
Atrium Stair Landing
98095
Library Sill
97212
CORRUGATED METAL SIDINGSECURED ROOF STRUCTURE WITH GALVANIZED METAL STREWS C/W WASHER AND NEOPRENE GASKETS.
38X140 BLOCKING BETWEEN GLULAMS600 OC
79X305 GLULAM BEAMS 600 OCBOLTED TO SHOE WELDED TO W SECTION
W250x24
HSS152.4X152.4X6.4
WELD HSS TO W SECTION
L3X3X1/4 TOP AND BOTTOM WELDTO POST AND HORIZONTAL HSSTYP
L3X3X1/4 TOP AND BOTTOM WELDTO POST AND HORIZONTAL HSSTYP
- GALVANIZED
- GALVANIZED
2.1
4X3/4 DIA ANCHOR BOLTS WITH 3" HOOK AND LEVELING NUTS AND WASHERSEMBED 9"
16" SONOTUBE WITH BIGFOOT
FLAT BAR AT COLUMNS AND CENTRE SPANS ASSHOWN IN PLANFOR SECURING CEDAR BOARDS
MAX
1220
100
818
152
TOP OF CONCRETE RETAINIG WALL
1 1/2" PTDSTEEL PIPE RAILS
MAXOBC 100
ESTRUCHEON PLATESSECURED TO RETAININGWALL WITH MIN 3 TAPCON CONCRETE SCREWS
1070
38
13 S
TEEL
BEN
T R
OD
799
7562
410
1
EQEQ
EQ
GUARDRAIL PICKET
R 205 TYP
T/O Lower Level
96000
T/O Footing
94500
F
LASER
1014C
DX1006c
200
95100
MAX
1800
300
MIN 130 CONCRETE SIDEWALK TO 30 MPaWOOD FLOAT AND BROOM FINISHED2 % SLOPE TO ROADMIN 150 GRAN B BASEUNDER SIDEWALKS
EXPANSION JOINTS MIN12mm WHERE WALK MEETS CURBAND RETAINING WALL
REFER TO CIVIL AND COTB ENGINEERING STANDARDS FOR CURBS
DIA CIRCULAR BASE PLATE120
STEEL PIPE RAIL
METAL BASE PLATE
SECURE TO TOP OFRETAINING WALL WITH CONCRETE SCREWS (3)EMBED 50
100
MAX
1070
GU
ARD
HEI
GH
T
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Site - Plan andSection Details
LU CASESAddition +Renovation
A1.2
2015-74A
05-DEC-2016
Author
Lakehead University - 955Oliver Road, Thunder Bay
1 : 75
Site - New - Callout - bicycle shelter1
3D View bicycle shelter8
1 : 50
Section - Bicycle Shelter EW3
1 : 50
Bicycle Screen2
1 : 20
Bike Enclosure Section detail4
East Entry9
East Entry - Door Condition10
SITE
-3D
VIE
WS
-FO
R R
EFER
ENC
E O
NLY
GUARDRAIL
HANDRAIL - EXTEND300 AT ALL LANDINGS
SEE SECTION FORRETAINING WALL DETAILS
2200 SLOPING SIDEWALK
GUARDRAIL
CONCRETE STAIR
NEW CURB
1 : 20
Site Guardrail - Typ6
Rev. Description Date1 ISSUED FOR PERMIT 05-DEC-2016
1 : 50
Section At East Entry5 1 : 5
Top Mount Handrail7
RETAINING WALLS TO COTB M-105-1 - STRUCTURAL TO CONFIRMSIDEWALKS TO COTB M-119, SLOPES AND WIDTHS AS SHOWN ON ARCHITECTURAL
NOTE:STRUCTURAL TO CONFIRM SIZING AND OTHER
UP
9096
4648
4600
7443 4526 2376 9316
3192
4150
2400
3600
1512
5990
5196
4296 1476 5879 2376 5996 3196
2988
3300
1696
1476
1406
2376
2399
4040
0
2388 2921
3658
3150
5182
1696 8381499
3658
1092
5990
2200
1295
1169
2083
2832
2283
1829
2515
762
355614481448
8236
D1003B
D1003
D1003A
D1007a
X1003 D1018
D1015
D1015A
D1013A
D1013aD1013B
D1013b D1013c
D1011c D1011d
D1011b D1011A
D1009
X1007
DX1
002
DX1
001
D1001a
D1001Ab
D1001b
D1001B
D1001Aa
D1004 D1006Aa
D1006a
D1006d
D1006c
D1006b D1006B
D1006C
D1006D
D1006e
D1006Ab
D1010b
D1012b
D1012a
D1014
D1016
D1018Ac
D1020
D1010a
D1018Ab
D1018Aa
D1015Aa
X1003A 13
DN-10 DN-10DN-10
DN-10
DN-12
DN-12
DN-10
DN-10
DN-03
DN-10
DN-10
DN-03
DN-12
DN-12
DN-03
DN-03
DN-03
DN-03
DN-03
DN-12
DN-12
TYP.
DN-10 DN-10
DN-12
DN-10
DN-10
DN-14
DN-04
DN-04
DN-14
DN-03DN-13
DN-10
DN-10
DN-12
DN-12
DN-03
DN-03
DN-03
DN-03
DN-03
DN-03
DN-03
DN-13
DN-12
DN-03
DN-12
DN-23
DN-11
DN-12
DN-12
DN-12
DN-12
DN-12
DN-12
DN-12
DN-12
DN-05
DN-13
DN-03
DN-03
DN-03
DN-03
DN-20
9533 2200 9872 1996
2462581
9612
479
3771
2812
1199
6
24500
XW1 XW1
XW1
XW1
XW4
XW4
XW1XW1
XP8
XP8
XP8 XP8
XP14
XP14
XP8
XW4
XP8 XP9
XP8
XP8XP8
XP8
XP13
XP8
XP8
XP9
XP8
XW1XP8
XP8
XP6XP8
XP7
XP8
XP8
XP8 XP6
XP6
XP8
XP8 XP8
XP14 XP8
XP8
XP8
XP8XP8
XP8
XP8 XP8
XP6
XP6
XP8
XW2
XP6
XP12
XP6
XP8
XP8
XP8
XP14
XP8
XP6
XP8
XP8
XP7
XP8
XP9
XP8
XW4
XW4
XP8
XP11
XW2
XW2
XP9
XW4
DN-12
2825
G.L
.
G.L.
G.L. G.L.
DN-10
DN-17
3560
5060
DN-10
DN-10
G.L.G.L. G.L.
G.L
.
DX2001a
X1005
D1002Ba
D1002Bb
D1002Ab
D1002Aa
XF1
DN-23
DN-23
DN-23
DN-23
DN-23
DN-24
CONSTRUCTIONNORTH
(TO REMAIN)
4621 4571 2200 2552 2776 6416
6296
6626
6626
4876
4876
4876
4796
4650
3122
2976 2462
4826
4276
4276
2546
2526
2526
4276
4276
4276
4796
44164776
9352
6336
3076
1346
2501
2501
3836
3856
24500
8000
737 1702 1524 1359 1524 609
2358
3378
762
1295
1041
737
2438
2591
2988
5715
2591
1295
2616
2642
5181
3000
DX2001b
D2031
D2033
D2037
D2039A
D2039
D2002B
D2002A
D2002
DX2003a D2005 D2007 D2009
D2044
D2042
D2040
D2014a
D2016A
D2016
D2018
D2017
D2015D2014b
D2019
D2021
D2020
D2022
D2025
D2024
D2027
D2029
D2010
D2011
D2013
D2012
DX2003b
DN-01
DN-12
EXIST'GCHASE
DN-12
DN-12DN-12
DN-12
DN-12
DN-12
DN-10
DN-10
DN-10
4796
DN-12
DN-12
DN-12
DN-10DN-10 DN-10
2616
737
DN-12
4040
0
DN-12
DN-04
DN-04
DN-14
DN-04
DN-04
DN-14
DN-04
DN-04
DN-04
DN-04
DN-04
DN-04
DN-04
DN-14
DN-14
DN-14
DN-12
DN-12
DN-12
DN-12
DN-12
DN-12
DN-12
DN-12DN-12 DN-10
DN-12
24500
DN-12
DN-12
DN-12
DN-12
DN-12
4826
DN-12 DN-01
DN-10DN-10
DN-15
EXIS
T'G
FLO
OR
OPE
NIN
G
EXIS
T'G
FLO
OR
OPE
NIN
G
DN-14
DN-10
XW1
XW1
XP8
XP8
XW1
XW1
XW1
XP9
XW1
XW1
XP8
XP8
XP8
XP8
XP8
XP8XP8
XP8
XP8
XP8
XP8
XP8XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8 XP8
XW1
XP8
XP8
XP9
XP8P12CS
XP8XP8
XP8
XP8
XP8XP8
XP8
XP8
XP8
XP8
XP8
XW1
XP9
DN-10
DN-17
DN-17
G.L.
DN-16D2003b
DN-04
DN-14
8238
DN-04
DX2001bDX2001a
D2003a
DX2001a
D2035
2023
700 400 700 194692
DN-15
DN-15
DN-24
CONSTRUCTIONNORTH
DN-25
FROZENSTORAGE
1007A
FROZENSTORAGE
1007B
FROZENSTORAGE
1007C
MECHANICALROOM
1015
NECROPSYLABORATORY
1018A
DIGI-MIC
1012
CHEMISTRYLABORATORY
1014WOMENS W. RM
1013
MEN'S W. RM
1011
DRY STORAGE
1007
PLANT/SOILPREPARATIONLABORATORY
1003PLANT
1003A
SOIL
1003B
PHYSIOLOGYLABORATORY
1001
GROWINGCABINETS
1001A
GROWINGOFFICE
1001B
TOOL STORAGE
1006AROOT WASH
1004
BIN
1006B
BIN
1006C BIN
1006DS0IL MIXING
1006
WORKSHOP
1010
MACHINE ROOM
1008
?
?
REST
1013A
VEST.
1013B
SHOWER
1013C
SHOWER
1013D
SHOWER
1011B
SHOWER
1011C
VEST.
1011A
GROWTHCHAMBERS
1009ELEVATOR
X1008
LOCKERS
1016
GROWTHCHAMBERS
1002B
FROZENSTORAGE
1018B
STAIR
X1001
STAIR
X1003
CORRIDOR
X1004
CORRIDOR
X1006
GROWTHCHAMBERS
1005
CORRIDOR
X1007
GROWTHCHAMBERS
1002A
WILDLIFELABORATORY
1018
CRAWLSPACE
X1002
SENIORSCIENTIST
2027
LOBBY
2001
MEETING ROOM
2002PROJ.
2002A
STOR.
2002B
ADMIN WORK RM
2005
WILDLIFE ADMIN.
2007
LUNCHROOM
2009
WILDLIFETECHNICIAN
2010
WILDLIFESCIENTIST
2011
WILDLIFETECHNICIAN
2012
WILDLIFESCIENTIST
2013
CONTRACTTECHNICIANS
2014
FORESTRYTECHNICIAN
2015
DATA ENTRY
2016
FORESTRYTECHNICIAN
2017
STOR.
2018
FORESTRYTECHNICIAN
2019
SYSTEMSOFFICE
2021
FORESTRYTECHNICIAN
2020
VISITINGSCIENTIST
2022
FORESTRYSCIENTIST
2023
VISITINGSCIENTIST
2024
FORESTRYSCIENTIST
2025
FORESTRYSCIENTIST
2029
PROJECTLABORATORY
2031
PROJECTLABORATORY
2035
PROJECTLABORATORY
2037
LIBRARY
2039
WORK ROOM
2039A DATA STORAGE
2016A
JAN.
2040
W W/R
2042
M W/R
2044
VEST.
2001A
STAIR
x2003
CORRIDOR
X2005
CORRIDOR
X2006
CORRIDOR
X2007
PROJECTLABORATORY
2033
STAIR
X2001
ADMINISTRATION
2003
CORRIDOR
X2004
ARCHITECTURAL/STRUCTURAL:- REMOVE EXISTING SUSPENDED CEILINGS, FLOORING, PARTITIONS, MILLWORK, DOORS & FRAMES AS INDICATED- COORDINATE WITH EXISTING ITEMS THAT ARE TO REMAIN- REMOVE EXTERIOR DOORS AND WINDOWS AND FACADE WHERE NOTED TO FACILITATE NEW ADDITION AND BRIDGE LINK TO LIBRARY
GENERAL SCOPE OF DEMOLITION
(REFER TO DWG'S + SPECIFICATIONS)
MECHANICAL:- DEMOLITION IN THE EXISTING BUILDING WILL INCLUDE THE REMOVAL OF AIR HANDLING EQUIPMENT AND CIRCULATING PUMPS IN THE PENTHOUSE MECHANICAL ROOM, AND CIRCULATING PUMPS, HEAT EXCHANGERS AND ASSOCIATED PIPEWORK IN THE LOWER LEVEL MECHANICAL ROOM. THE EXISTING ROOF MOUNTED COOLING TOWER WILL BE REMOVED TOGETHER WITH EXISTING ROOF MOUNTED EXHAUST FANS, AND FUME HOOD EXHAUST DUCTWORK. SECTIONS OF THE LABORATORY SUPPLY DUCTWORK, GENERAL SUPPLY DUCTWORK AND GENERAL EXHAUST AIR DUCTWORK WILL BE REMOVED, AND THE MAJORITY OF LOCAL SUPPLY DUCTS FROM EXISTING HEAT PUMPS WILL ALSO BE REMOVED. ACID WASTE PIPEWORK AND ACID DILUTION TANKS WILL BE DISCONNECTED AND REMOVED, AND ALL SPRINKLER HEAD CONNECTIONS FROM THE EXISTING TRI-WATER SYSTEM AND EXISTING SPRINKLER HEADS WILL BE REMOVED.
- RENOVATION OF THE EXISTING BUILDING WILL INCLUDE NEW AIR HANDLING UNITS FOR LABORATORY AND GENERAL SUPPLY SYSTEMS, WITH A NEW FUME HOOD EXHAUST SYSTEM AND GENERAL EXHAUST SYSTEM WITH HEAT RECOVERY. EXISTING HEAT PUMPS SHALL GENERALLY BE RETAINED IN THEIR EXISTING LOCATIONS, WITH SUPPLY AIR DISTRIBUTION DUCTS BEING REPLACED. HEAT EXCHANGE EQUIPMENT SHALL BE RENEWED, INCLUDING THE COOLING TOWER, TOGETHER WITH CIRCULATING PUMPS ASSOCIATED WITH HEATING AND COOLING SYSTEMS. NEW DOMESTIC HOT AND COLD WATER SYSTEMS SHALL SERVE NEW FIXTURES, AND NEW LABORATORY GAS AND SPRINKLER SYSTEMS SHALL BE INSTALLED. NEW ACID WASTE PIPEWORK FROM FIXTURES IN THE EXISTING WING SHALL CONNECT TO THE ACID WASTE SYSTEM IN THE NEW WING.
- THE NEW ADDITION SHALL BE PROVIDED WITH NEW AIR HANDLING UNITS FOR LABORATORY AND GENERAL SUPPLY, WITH A NEW FUME HOOD EXHAUST SYSTEM AND GENERAL EXHAUST SYSTEM WITH HEAT RECOVERY. A NEW HEAT PUMP SYSTEM WITH LOW TEMPERATURE WATER CIRCULATION SHALL BE PROVIDED. EXHAUST SYSTEMS SHALL BE PROVIDED IN WASHROOMS, PRINT ROOMS, GAS BOTTLE STORES, ETC. NEW PIPED SERVICES SHALL INCLUDE DOMESTIC HOT AND COLD WATER SYSTEMS, SANITARY, ACID WASTE, LABORATORY GASES, AND SPRINKLER SERVICES. A NEW ACID DILUTION TANK SHALL BE PROVIDED IN THE CRAWLSPACE, AND THIS SHALL BE A SINGLE SOURCE FACILITY FOR BOTH THE RENOVATED AND NEW ADDITION. A NEW DDC AUTOMATIC CONTROL SYSTEM SHALL BE INSTALLED, AND THIS SHALL BE INTEGRATED WITH RETAINED CONTROLS WITHIN THE RENOVATED WING.
ELECTRICAL:- DEMOLITION IN THE EXISTING BUILDING WILL INCLUDE THE REMOVAL OF ALL LUMINAIRES, SWITCHES AND EMERGENCY FIXTURES LOCATED ON THE LOWER AND UPPER LEVELS, BASEMENT AND PENTHOUSE LUMINAIRES WILL REMAIN THE SAME. ALL ELECTRICAL DISTRIBUTION SUB-PANELS, GENERAL POWER OUTLETS AND SPECIFIED MECHANICAL EQUIPMENT LOCATED ON THE LOWER AND UPPER LEVELS WILL BE REMOVED. ALL NETWORKING OUTLETS (VOICE/DATA) AND RACKS SHALL BE REMOVED ALL FIRE ALARM DEVICES WILL BE REMOVED INCLUDING THE FIRE ALARM CONTROL PANEL.. ALL PUBLIC ADDRESS SYSTEMS WILL BE REMOVED. ALL CABLING AND WIRING FOR THE ABOVE COMPONENTS WILL BE REMOVED BACK TO SOURCE. ELECTRICAL DISTRIBUTION CONSISTING OF 4160V SWITCHGEAR AND SPECIFIC DISTRIBUTION PANELS SHALL REMAIN.
- RENOVATION OF THE EXISTING BUILDING AND THE ADDITION TO THE BUILDING SHALL INCLUDE NEW LUMINAIRES, SWITCHES AND OCCUPANCY SENSORS PER THE DESIGN LAYOUT. NEW LIFE SAFETY DEVICES. NEW ELECTRICAL DISTRIBUTION SUB-PANELS, RECEPTACLES AND CONTROLS FOR EXISTING AND NEW MECHANICAL EQUIPMENT. NEW NETWORK SYSTEM (VOICE/DATA) OUTLETS LOCATIONS ONLY WITH NEW RACKS (CABLING BY LU). NEW FIRE ALARM DEVICES INCLUDING NEW EDWARDS EST3 - FIRE ALARM CONTROL PANEL. NEW PUBLIC ADDRESS SYSTEMS. NEW SECURITY CAMERA SYSTEM. NEW CABLING AND WIRING THROUGHOUT. ELECTRICAL DISTRIBUTION CONSISTING OF 4160V SWITCHGEAR AND SPECIFIC DISTRIBUTION PANELS SHALL REMAIN AND NEW SUB-PANELS WILL CONNECT TO EXISTING DISTRIBUTION. NEW EMERGENCY POWER VIA CAMPUS EMERGENCY POWER SUPPLY SHALL BE ROUTING INTO THE BUILDING FOR USE BY REQUIRED EQUIPMENT.
- IF THE 4160V ELECTRICAL SERVICES IS INCLUDED, PROVIDE THE FOLLOWING:NEW POWERHOUSE BLDG. SHALL BE ERECTED FOR FUTURE GROWTH OF THE LU CAMPUS, THIS WILL INCLUDE THE REMOVAL OF THE ABANDONED FEEDER, INSTALLATION OF NEW FEEDER AND RELOCATION OF EXISTING FEEDER. NEW 4160V SWITCHGEAR INSTALLED FOR CAPACITY OF THE LU CASES BLDG. AND FUTURE. DISCONNECT THE EXISTING CNFER BLDG. 4160V SWITCHGEAR FROM THE LIBRARY BLDG. AND RE-CONNECT THE LU CASES BLDG. TO THE NEW POWERHOUSE BLDG.
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Demolition Plans
LU CASESAddition +Renovation
A2.1
2015-74A
05-DEC-2016
AJP/SCV/NCM
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 100A2.1A0.7
1 Level 1 - Lower Level - Demolition Planscale = 1 : 100A2.1A0.7
2 Level 2 - Upper Level - Demolition Plan
Demolition Notes
Mark DescriptionDN-01 REMOVE H.M. SCREEN, GLAZING AND DOORS (WHERE APPLICABLE), (NO SALVAGE).DN-03 REMOVE H.M. DOOR AND FRAME, (NO SALVAGE).DN-04 REMOVE EXTERIOR ALUMINUM WINDOW FRAME AND GLASS, (NO SALVAGE).DN-05 REMOVE EXTERIOR DOOR AND HINGES FROM FRAME. EXISTING DOOR OPENING TO BE
INFILLED, SEE DETAILS.DN-07 DEMOLISH EXISTIING T-BAR CEILING, COORDINATE REMOVAL OF LIGHTS, DIFFUSERS AND
EARLY WARNING DEVICES. PREVENT DAMAGE TO SPRINKLER HEADS.DN-08 DEMOLISH EXISTIING WOOD SLAT CEILING & BULKHEADS, COORDINATE REMOVAL OF
LIGHTS, DIFFUSERS AND EARLY WARNING DEVICES. PREVENT DAMAGE TO SPRINKLERHEADS.
DN-10 REMOVE EXISTING CASEWORK AND ASSOCIATED PLUMBING AND GAS LINES, REFER TOMECHANICAL DRAWINGS FOR PLUMBING WORK WHERE APPLICABLE, (NO SALVAGE).
DN-11 REMOVE EXISTING PRE-ENGINEERED WALK IN FREEZER AND ASSOCIATED EQUIPMENT ANDSERVICES, REFER TO MECHANICAL AND ELECTRICAL DRAWINGS, RETAIN FREEZER 1007C,USE SLAVAGED PANELS TO COMPLETE OUTSIDE CORNER , UPGRADE REFRIGERATION PERMECHANICAL DRAWINGS
DN-12 DEMOLISH EXISTING WALL IN ITS ENTIRETY. COORDINATE REMOVAL OF SERVICES WITHMECHINAL AND ELECTRICAL DRAWINGS. REMOVE EXISTING DOORS AND FRAMES WITHINWALL NOTED FOR DEMOLITION. REFER TO EXISTING DOOR SCHEDULE FOR DOORS TO BESALVAGED / RE-LOCATED.
DN-13 OPEN PORTION OF WALL TO FACILITATE NEW OPENING, REFER TO DRAWINGS FOR SIZE ANDLOCATION.
DN-14 OPEN EXISITNG EXTERIOR WALL TO FACILITATE NEW OPENINGS / EXPANSION OF BUILDING.REFER TO DRAWINGS AND DETAILS FOR EXTENT OF WORK.
DN-15 REMOVE EXISTING WOOD HAND RAILS/GLASS GUARDS/WOOD BASE SHOES IN ITS ENTIRETYDN-16 REMOVE EXISTING WOOD SIDING, (SALVAGE FOR RE-USE)DN-17 REMOVE EXISTING EXHAUST HOOD / SNORKEL EXHAUST AND ASSOCIATED DUCT WORK /
CONTROLS. REFER TO MECHANICAL AND ELECTRICAL DRAWINGSDN-20 REMOVE EXISTING EXTERIOR STAIR AND PORTION OF EXISTING HANDRAIL TO FACILITATE
REVISED NEW EXTERIOR EXIT STAIR, SEE DRAWINGS AND DETAILSDN-21 CUT OUT STRIPS OF EXISTING ROOF MEMEBRANE (600x3000) EVERY 320SF (30m²) AND
PREPARE ROOF FOR NEW ROOF MEMBRANE. MAKE GOOD ALL PENETRATIONS, VENTS ANDFLASHINGS, REFER TO DRAWINGS AND DETAILS.
DN-22 REMOVE EXISTING ROOFTOP EXHAUST FAN AND CURB, INFILL ROOF OPENING AND REBUILDROOF W/ NEW ROOFING SYSTEM, SEE MECHANICAL & ELECRICAL DRAWINGS
DN-23 REMOVE EXISTING FLOOR TILE IN ITS ENTIRETYDN-24 REMOVE EXISTING WOOD RAIL IN ITS ENTIRETYDN-25 REMOVE EXISTING PLUMBING FIXTURESDN-26 REMOVE EXISTING POT LIGHTS AND CEILING MTD HEATERDN-27 REMOVE EXISTING COOLING COIL SCREENS AND FRAMES INCLUDING BASE SHOES AND
SLEEPERS EMBEDDED IN EXISTING ROOF MEMBRANE. MAKE EXISTING ROOF LEVEL TORECEIVE NEW INSULATION LAYER AND EPDM MEMBRANE
DN-28 REMOVE EXISTING ROOF ACCESS HATCH AND PREPARE OPENING FOR NEW ROOF ACCESSHATCH. VERIFY EXISTING OPENING SIZE FOR NEW HATCH
DN-31 REMOVE EXISTING COOLING TOWER AND PREPARE CURB FOR NEW COOLING TOWER, SEEDETAIL
DN-32 REMOVE EXISTING ROOF DRAINS TO FACILITATE NEW ROOFING. INSTALL NEW DRAINS WITHEXTENSIONS, SEE MECHANICAl DRAWINGS
DN-33 REMOVE 600x600 PORTION OF EXISTING ROOFING TO OPEN WEB STEEL JOIST ON SOUTHHALF OR CONCRETE SLAB ON THE NORTH HALF OF EXISTING CFNER BUILDING TOFACILITATE INSTALLATION OF NEW ROOF ANCHORS, REPLACE ROOFING MATERIAL ASNECESSARY
Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
4 ISSUED FOR PERMIT 05-DEC-2016
EXIS
TIN
G F
LOO
R O
PEN
ING
ABO
VE
EXIS
TIN
GFL
OO
RO
PEN
ING
EXIS
TIN
G L
IGH
T VA
LAN
CE
DN-07
DN-07
DN-07
DN-07
DN-07
DN-07
EXPOSEDSTRUCTURE
EXPOSEDSTRUCTURE
EXPOSEDSTRUCTURE
EXPOSEDSTRUCTURE
EXPOSEDSTRUCTURE
EXPOSEDSTRUCTURE
XW4
XW1 XW3 XW1
XW1
XW1
XW1
XW1
XW1
XW1
XW1
XP11
XW4
XW4
XW4
XW4
XP9
XP8
XP8
XP8
XP9
XP8 XP14XP8
XP8
XP8
XP8
XP8
XP14 XP8
XP14
XP14
XP8
XP8XP9 XP9
XP8
XP8
XP8
XP6
XP6
XP6
XP8
XP8
XP6
XP8
XP6
XP6
XP7XP6
XP6XP8
XP8
XP8 XP8
XP8
XP8
XP8
XP8
XP8
XP7
XP8
XP13
XP8
XP8
XP8 XP8
XP8
XP8
XP8
XP9
XP8
XP7
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
DN-16
DN-16
DN-16
ACT 2800
ACT 2800
CONSTRUCTIONNORTH
(TO REMAIN)
EXIS
TIN
G L
IGH
T VA
LAN
CE
DN-28
DN-28
DN-28
DN-28
DN-08
DN-08
DN-07 DN-07 DN-07DN-07
DN-07
DN-07
DN-07
DN-07
DN-07
DN-07
DN-07
DN-07
DN-07
DN-07
DN-07
DN-07
DN-07
DN-07
DN-07
DN-16
DN-16
EXISTING SKYLIGHT ABOVE
DN-07
DN-07
DN-07
XW1 XW1
XW1
XW1
XW1XW1
XW1
XW1
XW1
XW1
XP8
XP8
XP9
XP8 XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP9
XP9
XP8
XP8
XP8
XP8
XP8
XP8XP8
XP8XP8
P12CS
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8
XP8 XP8
XP8XP8
XP8
XP8
XP8
XP8
XP8XP8
XP8
XP8
XP8
XP8
XP13
DN-07
XP8
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800
ACT 2800ACT 2800ACT 2800
DN-07
DN-07
CONSTRUCTIONNORTH
DN-26
DN-28
DN-28
DN-28
DN-28
DN
-28
DN
-28
XW3
FROZENSTORAGE
1007A
FROZENSTORAGE
1007BFROZEN
STORAGE
1007C
MECHANICALROOM
1015
NECROPSYLABORATORY
1018A
DIGI-MIC
1012
CHEMISTRYLABORATORY
1014
WOMENS W. RM
1013
MEN'S W. RM
1011
DRY STORAGE
1007
PLANT/SOILPREPARATIONLABORATORY
1003 PLANT
1003A
SOIL
1003B
PHYSIOLOGYLABORATORY
1001
GROWINGCABINETS
1001A
GROWINGOFFICE
1001B
TOOL STORAGE
1006A
ROOT WASH
1004
BIN
1006B
BIN
1006C
BIN
1006D
S0IL MIXING
1006
WORKSHOP
1010
MACHINE ROOM
1008
JANITOR
1015A
REST
1013A
VEST.
1013B
SHOWER
1013C
SHOWER
1013D
SHOWER
1011B
SHOWER
1011C
VEST.
1011A
GROWTHCHAMBERS
1009ELEVATOR
X1008
LOCKERS
1016
GROWTHCHAMBERS
1002B
FROZENSTORAGE
1018B
STAIR
X1001
STAIR
X1003
CORRIDOR
X1004
CORRIDOR
X1006
WILDLIFELABORATORY
1018
GROWTHCHAMBERS
1002A
GROWTHCHAMBERS
1005
SENIORSCIENTIST
2027
LOBBY
2001
MEETING ROOM
2002PROJ.
2002A
STOR.
2002B
ADMIN WORK RM
2005
WILDLIFE ADMIN.
2007
LUNCHROOM
2009
WILDLIFETECHNICIAN
2010
WILDLIFESCIENTIST
2011
WILDLIFETECHNICIAN
2012
WILDLIFESCIENTIST
2013
CONTRACTTECHNICIANS
2014
FORESTRYTECHNICIAN
2015
DATA ENTRY
2016
FORESTRYTECHNICIAN
2017
STOR.
2018
FORESTRYTECHNICIAN
2019
SYSTEMSOFFICE
2021
FORESTRYTECHNICIAN
2020
VISITINGSCIENTIST
2022
FORESTRYSCIENTIST
2023
VISITINGSCIENTIST
2024
FORESTRYSCIENTIST
2025
FORESTRYSCIENTIST
2029
PROJECTLABORATORY
2031
PROJECTLABORATORY
2035
PROJECTLABORATORY
2037
LIBRARY
2039
WORK ROOM
2039A DATA STORAGE
2016A
JAN.
2040
W W/R
2042
M W/R
2044
VEST.
2001A
STAIR
x2003
CORRIDOR
X2005
CORRIDOR
X2006
CORRIDOR
X2007
PROJECTLABORATORY
2033
STAIR
X2001
EXISTING CEILING PLAN SYMBOL LEGEND
INCANDESCANT LIGHT FIXTURE(RECESSED)
FLOURESCENT LIGHT FIXTURE
SUPPY AIR LOUVRE
RETURN AIR LOUVRE
INCANDESCANT LIGHT FIXTURE(SURFACE MOUNTED)
EXISTING GYPSUM BOARDGYP
EXISTING ACOUSTICAL CEILING TO REMAIN
ACT
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Demolition ReflectedCeiling Plans
LU CASESAddition +Renovation
A2.2
2015-74A
05-DEC-2016
SCV/NCM
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 100A2.2A0.7
1 Lower Level - Demolition Reflected Ceiling Planscale = 1 : 100A2.2A0.7
2 Upper Level - Demolition Reflected Ceiling Plan
Demolition Notes
Mark DescriptionDN-01 REMOVE H.M. SCREEN, GLAZING AND DOORS (WHERE APPLICABLE), (NO SALVAGE).DN-03 REMOVE H.M. DOOR AND FRAME, (NO SALVAGE).DN-04 REMOVE EXTERIOR ALUMINUM WINDOW FRAME AND GLASS, (NO SALVAGE).DN-05 REMOVE EXTERIOR DOOR AND HINGES FROM FRAME. EXISTING DOOR OPENING TO BE
INFILLED, SEE DETAILS.DN-07 DEMOLISH EXISTIING T-BAR CEILING, COORDINATE REMOVAL OF LIGHTS, DIFFUSERS AND
EARLY WARNING DEVICES. PREVENT DAMAGE TO SPRINKLER HEADS.DN-08 DEMOLISH EXISTIING WOOD SLAT CEILING & BULKHEADS, COORDINATE REMOVAL OF
LIGHTS, DIFFUSERS AND EARLY WARNING DEVICES. PREVENT DAMAGE TO SPRINKLERHEADS.
DN-10 REMOVE EXISTING CASEWORK AND ASSOCIATED PLUMBING AND GAS LINES, REFER TOMECHANICAL DRAWINGS FOR PLUMBING WORK WHERE APPLICABLE, (NO SALVAGE).
DN-11 REMOVE EXISTING PRE-ENGINEERED WALK IN FREEZER AND ASSOCIATED EQUIPMENT ANDSERVICES, REFER TO MECHANICAL AND ELECTRICAL DRAWINGS, RETAIN FREEZER 1007C,USE SLAVAGED PANELS TO COMPLETE OUTSIDE CORNER , UPGRADE REFRIGERATION PERMECHANICAL DRAWINGS
DN-12 DEMOLISH EXISTING WALL IN ITS ENTIRETY. COORDINATE REMOVAL OF SERVICES WITHMECHINAL AND ELECTRICAL DRAWINGS. REMOVE EXISTING DOORS AND FRAMES WITHINWALL NOTED FOR DEMOLITION. REFER TO EXISTING DOOR SCHEDULE FOR DOORS TO BESALVAGED / RE-LOCATED.
DN-13 OPEN PORTION OF WALL TO FACILITATE NEW OPENING, REFER TO DRAWINGS FOR SIZE ANDLOCATION.
DN-14 OPEN EXISITNG EXTERIOR WALL TO FACILITATE NEW OPENINGS / EXPANSION OF BUILDING.REFER TO DRAWINGS AND DETAILS FOR EXTENT OF WORK.
DN-15 REMOVE EXISTING WOOD HAND RAILS/GLASS GUARDS/WOOD BASE SHOES IN ITS ENTIRETYDN-16 REMOVE EXISTING WOOD SIDING, (SALVAGE FOR RE-USE)DN-17 REMOVE EXISTING EXHAUST HOOD / SNORKEL EXHAUST AND ASSOCIATED DUCT WORK /
CONTROLS. REFER TO MECHANICAL AND ELECTRICAL DRAWINGSDN-20 REMOVE EXISTING EXTERIOR STAIR AND PORTION OF EXISTING HANDRAIL TO FACILITATE
REVISED NEW EXTERIOR EXIT STAIR, SEE DRAWINGS AND DETAILSDN-21 CUT OUT STRIPS OF EXISTING ROOF MEMEBRANE (600x3000) EVERY 320SF (30m²) AND
PREPARE ROOF FOR NEW ROOF MEMBRANE. MAKE GOOD ALL PENETRATIONS, VENTS ANDFLASHINGS, REFER TO DRAWINGS AND DETAILS.
DN-22 REMOVE EXISTING ROOFTOP EXHAUST FAN AND CURB, INFILL ROOF OPENING AND REBUILDROOF W/ NEW ROOFING SYSTEM, SEE MECHANICAL & ELECRICAL DRAWINGS
DN-23 REMOVE EXISTING FLOOR TILE IN ITS ENTIRETYDN-24 REMOVE EXISTING WOOD RAIL IN ITS ENTIRETYDN-25 REMOVE EXISTING PLUMBING FIXTURESDN-26 REMOVE EXISTING POT LIGHTS AND CEILING MTD HEATERDN-27 REMOVE EXISTING COOLING COIL SCREENS AND FRAMES INCLUDING BASE SHOES AND
SLEEPERS EMBEDDED IN EXISTING ROOF MEMBRANE. MAKE EXISTING ROOF LEVEL TORECEIVE NEW INSULATION LAYER AND EPDM MEMBRANE
DN-28 REMOVE EXISTING ROOF ACCESS HATCH AND PREPARE OPENING FOR NEW ROOF ACCESSHATCH. VERIFY EXISTING OPENING SIZE FOR NEW HATCH
DN-31 REMOVE EXISTING COOLING TOWER AND PREPARE CURB FOR NEW COOLING TOWER, SEEDETAIL
DN-32 REMOVE EXISTING ROOF DRAINS TO FACILITATE NEW ROOFING. INSTALL NEW DRAINS WITHEXTENSIONS, SEE MECHANICAl DRAWINGS
DN-33 REMOVE 600x600 PORTION OF EXISTING ROOFING TO OPEN WEB STEEL JOIST ON SOUTHHALF OR CONCRETE SLAB ON THE NORTH HALF OF EXISTING CFNER BUILDING TOFACILITATE INSTALLATION OF NEW ROOF ANCHORS, REPLACE ROOFING MATERIAL ASNECESSARY
Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 ISSUED FOR CLASS 'C' 04-AUG-20163 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
4 ISSUED FOR PERMIT 05-DEC-2016
XA XD
X1
XB XC
X2
X3
X4
X5
X6
X7
X8
X9
X1A
(EXISTING)
24000
X2A
X2B
9500 5000 9500
4950
5000
5000
5000
5000
5000
1738
1737
1525
1525
3425
(EXI
S TIN
G) (
FIEL
D V
ERIF
Y)
7632
(EXI
S TIN
G)
3990
0
EXISTING ROOFEXISTING ROOF
4000
O/O
PAR
APET
8600 O/O PARAPET
EXIS
TIN
G S
KYLI
GH
T (A
TRIU
M S
PAC
E)SK
YLIG
HT
REM
AIN
S
CO
OLI
NG
TO
WER
SEE
MEC
H D
WG
S
NEW ROOFREPLACEMENTAS SPECIFIED
DN-21
762 x 914 EXISTROOF ACCESS HATCH
EXIST CONC PAVERWALKWAY
EXISTINGROOF DRAIN
RDRD
RD RD
RD
RD
EXISTING CHANCELOR PATERSON LIBRARY BUILDINGEXISTING CHANCELOR PATERSON LIBRARY BUILDING
NEW ROOFREPLACEMENTAS SPECIFIED
DN-21
EF3
EF4
EF6
EXIST ROOF INSULSLOPE LINES
EXIST ROOF INSULSLOPE LINES
EF7
DN-22
DN-22
DN-22
2A2.3 A2.3
5A2.3 A2.3
5A2.3 A2.3
SIM
5A2.3 A2.3
SIM
5A2.3 A2.4
5A2.3 A2.4
SIM
6A2.3 A2.4
3A2.3 A2.3
4A2.3 A2.4
4A2.3 A2.4
SIM
EXIST RAINSCREEN (TYP.)
2A2.3 A2.4
4A2.3 A2.3
4A2.3 A2.3
SIM
3A2.3 A2.4
1A2.3 A2.4
4A2.3 A2.3
SIM 4A2.3 A2.3
SIM
1A2.3 A2.4
SIM
5A2.3 A2.3
SIM
EXISTING ROOF CURBTO REMAIN
EXISTING ROOF CURBTO REMAIN
DN-32DN-32
DN-32
DN-32
DN-32
DN-32
DN-27DN-27
DN-28
DN-31
XL9
DN-33
DN-33DN-33
DN-33
DN-33
DN-33
DN-33
DN-33
T/O Steel @ Roof
103850
X1REMOVE EXIST'G PARAPET CAP FLASHING - NO SALVAGE
T/O Exist Parapet
104400
REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE
XR15REMOVE EXIST'G DRIP FLASHING - NO SALVAGE
EXIST'G METAL ROOF REMAINS
EXIST'G PENTHOUSE
T/O Steel @ Roof
103850
X1
REMOVE EXIST'G PARAPETCAP FLASHING
REMOVE EXIST'G DRIP FLASHING
T/O Exist Parapet
104400XR15
REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE
T/O Steel @ Roof
103850
XR15
REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE
EXIST'G METAL ROOF REMAINS
EXIST'G PENTHOUSE
T/O Steel @ Roof
103850
X9
XR17
REMOVE EXIST'G PARAPETCAP FLASHING
REMOVE EXIST'G DRIP FLASHING
T/O Exist Parapet
104400
REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Demolition Roof Plan& Details
LU CASESAddition +Renovation
A2.3
2015-74A
05-DEC-2016
NCM/SCV
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 100A2.3A0.7
1 Level 3-Roof Plan-Demo
scale = 1 : 10A2.3A2.3
2 Section Detail @ Existing Partial Penthouse Wall
scale = 1 : 10A2.3A2.3
5 Section Detail @ Existing Typical Parapet Cap Flashing
scale = 1 : 10A2.3A2.3
3 Section Detail @ Base of Exisitng Penthouse Wall
scale = 1 : 10A2.3A2.3
4 Section Detail @ Existing Typical Parapet Cap Flashing
Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
2 ISSUED FOR PERMIT 05-DEC-2016
T/O Steel @ Roof
103850
X5
REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE
EXIST'GATRIUM XR15
T/O Steel @ Roof
103850
XC
REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE
EXIST'GATRIUM XR17
T/O Steel @ Roof
103850
XR15XR15
REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE
REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE
T/O Steel at Penthouse
108000
XR15 REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE
T/O Steel at Penthouse
108000
REMOVE EXIST'GMETAL FLASHING
REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE
XR17
T/O Steel @ Roof
103850
X5
XR15
XR17
T/O Exist Parapet
104400
REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE
REMOVE PORTIONS OF EXIST'G RUBBER MEMBRANE
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
1 : 10
Demolition RoofDetails
LU CASESAddition +Renovation
A2.4
2015-74A
05-DEC-2016
NCM
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 10A2.4A2.3
2 Section Detail @ End of Existing Sloped Skylight
scale = 1 : 10A2.4A2.3
1 Section Detail @ Side of Existing Sloped Skylight
scale = 1 : 10A2.4A2.3
3 Section Detail @ Existing Cooling Tower Curb
scale = 1 : 10A2.4A2.3
6 Section Detail @ Existing Roof Hatchscale = 1 : 10A2.4A2.3
5 Section Detail @ Head of Existing Penthouse Wall
scale = 1 : 10A2.4A2.3
4 Section Detail @ Existing Roof Centre
Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
2 ISSUED FOR PERMIT 05-DEC-2016
UP
UP
DN
DN
UPDN
XA XD
X1
X9
1.0
1
4
7
29.2
10.3
5.7
NEW ADDITION AREA = 1033.3m²MAX TRAVEL DISTANCE = 48.3m
EXISTING RENOVATION AREA = 925.0m²MAX TRAVEL DISTANCE = 42.1m
8.7
8.6
10.1
12.0
1.7
EXIT STAIR
3.1
TRAVEL DISTANCE = 48.3m
H
EXITSTAIR
EXITSTAIR
TRAV
EL D
ISTA
NC
E =
37.1
m
CONSTRUCTIONNORTH
S2b
4545
4545
4545
454545
4545
45
4545
45
4545
4545
4545
4545
4545
45
4545
45
45
45
45
B
A
C
EXIST'G MACHINE ROOM (3/4 HR.)
EXIST'G ELEVATOR (3/4 HR.)
JANITORS CLOSET (0 HR.)
0 0
0 0 0
0 0 0
SERVICE CHASE (3/4 HR.)
4545
LOWER FLOOR AREA= 1958.3 m2 / 21078.9 SF
B2 C2D2
0 min FIRE RESISTANCE RATING (F.R.R.) ON WALL
30 min FIRE RESISTANCE RATING (F.R.R.) ON WALL
1 h FIRE RESISTANCE RATING (F.R.R.) ON WALL
FIRE SEPARATION LEGEND
TRAVEL DISTANCE (METRES)
EXIT LOCATION
45 min FIRE RESISTANCE RATING (F.R.R.) ON WALL
1.5 h FIRE RESISTANCE RATING (F.R.R.) ON WALL
2 h FIRE RESISTANCE RATING (F.R.R.) ON WALL30 30 3030
45 4545
60 6060 60
9090 90
120 120 120
XA XD
X1
X9
1
4
7
10.8
4.1
4.0
NEW ADDITION AREA = 1033.3m²MAX TRAVEL DISTANCE = 44.2m
9.4
10.3
EXIT STAIR
A
EXIT STAIR
C
13.0
2.5
2.4
EXISTING RENOVATION AREA = 925m²MAX TRAVEL DISTANCE = 37.6m
25.3
TRAV
EL D
ISTA
NC
E =
44.2
m
TRAV
EL D
ISTA
NC
E =
37.6
m
H
EXITSTAIR
B
CONSTRUCTIONNORTH
S2b
4545
4545
4545
454545
4545
45
4545
45
4545
4545
4545
4545
SERVICE CHASE (3/4 HR.)
450
45
45 45 45
NEW BRIDGE
45-MIN
ADJACENT LIBRARY
45 45
45-MIN
45
45
45
45
SERVICE CHASE (3/4 HR.)
SERVICE CHASE (3/4 HR.)45
45
45
45
SERVICE CHASE (3/4 HR.)
45 45
EXIST'G ELEVATOR 45-MIN
45
45
4545
SERVICE CHASE (3/4 HR.)
SERVICE CHASE (3/4 HR.)
4545
45 45
SERVICE CHASE (3/4 HR.)
45
45
45
45
45
45
45
45
SERVICE CHASE (3/4 HR.)
45 45
JANITORS CLOSET (0 HR.)
UPPER FLOOR AREA= 1958.3 m2 / 21078.9 SF
B2 C2 D2
XA XD
X1
X9
1
4
7
2
G
S2b
AREA B1 = 633.3 m2 AREA B2 = 432.9 m2
EXIT STAIR
C
EXIT FLOOR HATCH
AREA B1 = 482.8 m2
AREA B1 = 484.6 m2
EXIT FLOOR HATCH
EXISTING FIRE BLOCK TO BE RETAINED
45
45
4545
EXIST'G ELEV. FNDTN.
45
45
45
NEW FIRE BLOCK PARTITION ON CONCRETE FOOTING
P3A
B2 C2 D2
CONSTRUCTIONNORTH
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Lower & Upper Level -Travel Distance Plan
LU CASESAddition +Renovation
A2.5
2015-74A
05-DEC-2016
NCM/SCV/TNG
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 200A2.5A0.7
1 Level 1 - Lower Level - Travel Distance Planscale = 1 : 200A2.5A0.7
2 Level 2 - Upper Level - Travel Distance Plan
scale = 1 : 200A2.5A1.2
3 Crawlspace Fire Seperation & Compartmentalization Plan
Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
2 ISSUED FOR PERMIT 05-DEC-2016
UP
EPWT
EPWT
EPWT
EPWT
EPWT EPWT EPWT EPWTEPWT
EPWT
EPWT
EPWT
EPWT
EPWT
EPWT
EPWT
EPWT EPWT EPWT EPWT
EPWT EPWT EPWT EPWT
EPWT
EPWT
EPWT
EPWT PWT PWT PWT PWT
PWT
PWT
PWT
PWT
PWT
PWT
PWT
PWT
PWT
PWT
PWT
PWT
PWT PWT PWT PWT
PWT
PWT
PWT
PWT
PWT PWT PWT
EPWT EPWT EPWT
XA XD
X1
XB XC
X2
X3
X4
X5
X6
X7
X8
X9
X1A
X2A
X2B
A
1
3
4
5
6
7
2
B C D E F G
443
7902
6981
1421
7
385
35793
2992
8
CRAWSPACE ACCESS STAIR
EXISTING RENOVATION NEW ADDITION
EXISTING CRAWSPACE
EXISTING CRAWSPACE NEW ADDITION CRAWLSPACE
1A4.2A2.6
X002
EXIST'GCRAWLSPACE
001
CRAWLSPACE
001
H
EXISTING CRAWLSPACE ACCESS LADDER THRU HOLE IN FLOOR ABOVE
EXISTING SERVICE TUNNEL TO LIBRARY SUB-BASEMENT - SEE MECH & ELEC DWG'S FOR SERVICES
EXISTING PERIMETER WEEP TILE TO REMAIN INTACT AND FUNCTIONAL
EXISTING PERIMETER WEEPTILE TO REMAIN INTACT AND FUNCTIONAL
EXISTINGELEVATORPIT
EXISTING CRAWLSPACE ACCESS LADDER THRU HOLE IN FLOOR ABOVE
EXISTING ELEVATORPIT SUMP DRAIN
NEW ACCESS DOOR
NEW ACCESS DOOR
D002B
D002Ba
D002Bb
D002Bc
4950
5000
5000
5000
5000
5000
1738
1737
3050
3425
NEW PERIMETER WEEP TILE
NEW PERIMETER WEEP TILE
BRIDGELINK ABOVE
XP8
XW4
XW4XW4
XW4
XW4
XW4
XW4XW4
XW4
XW4
W1
W1
W1
W1
W1
CRAWLSPACE
002B
CRAWLSPACE
002A
XP8
P3A
NEW PERIMETER WEEP TILE
CRAWLSPACE - A
CRAWLSPACE - B
EXISTING SANITARY LINE
LEGEND
PERIMETER WEEP TILE
EXISTING PERIMETERWEEP TILE
9500 5000 9500 1900 3600 8000 8600 8600 5000 2000 1000
443350
350
1
A4.3
270
CONCRETE HOUSEKEEPING PAD
900 x 1000 OPENING
CONSTRUCTIONNORTH
S2b
EXIST'G SUMP PITS & PUMPS
EXIST'G STORM CONNECTION
EXIST'G FIRE STOP FOR CRAWLSPACE COMPARTMENTALIZATION
XW4 XW4
APPROX LOCATION OF NEW 4160 V POWER FEED, SEE ELEC
P3A
P3A
3500
CL.
DO
OR
DO
OR
1600
CL.
NEW SANITARYCONNECTION
S1
2850
2850
2645
505
3150
2500
2400
2400
2400
2400
2500
2500
S2
S4
S5
S6
DILUTION TANK
CN-01
CN-01
CN-02
CN-02
CN-03
CN-03
B2 C2 D2
5A1.1 A1.2
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
1 : 100
Crawlspace Plan
LU CASESAddition +Renovation
A2.6
2015-74A
05-DEC-2016
NCM/SCV
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 100A2.6A1.2
1 Crawlspase Plan
Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
2 ISSUED FOR PERMIT 05-DEC-2016
DN
UP
DN
A2.291
A2.29 2
A2.28
1
XA XD
X1
XB XC
X2
X3
X4
X5
X6
X7
X8
X9
X1A
375 9500 5000 9500 1900 3600 8000 8600 8600 5000 2000 1000
(EXISTING)
24000
X2A
X2B
A
1
3
4
5
6
7
SERVICE ROOM
1001
JANITORSCLOSET
1002
FREEZER
1014B
GRADSTUDENTS
1013
DIRTY LAB (NEG)
1014F
OFFICE
1012
ATRIA 1
X1008
CORRIDOR
X1010VEST
1004A
M WR
1004
SHW
1004B
VEST
1003AW WR
1003
SHW
1003B
STAIR B
X1002
STAIR A
X1003
1A2.7 A3.2
A2.28
2NEW BRIDGE OVERHEAD
ELEVATORLOBBY
X1009
CORRIDOR
X1012
4A2.7 A3.2
EXIT
2A2.7 A3.2
3A2.7 A3.2
1A2.7 A3.1
2A0.11 A3.1
EXISTING WALK-IN COOLER
BFI BINSTORAGE AREA
-
TECH GASES
1015
CLEAN RM (POS)
1014E
LAB ENTRANCE
1014-1STORAGE
1014A
LASER
1014C
CIRCULATION
1014-2
ANALYSIS
1014-4
WET LAB
1014
TECH OFFICE
1014D
SCALE
1014-3
2
350
5700
2645
3655
2500
4800
4800
5000
350
B C D E F G
LAB ENTRANCE
1018-1
GENERALSTORAGE
1021B
OFFICE
1008A
DIRTY LAB
1009B
ANALYTICAL LAB
1009A
BIOHAZARD LAB
1011
TECH GASES
1010
HUMAN ORIGINSLAB
1005
I/T ROOM
1019
WORK SPACE
1018
WET LAB (NEG)
1018B
ANALYTICAL LAB
1018A
TECH GASES
1021A
PROTOYPEDEVELOPMENT
LAB
1007
LABMANAGEMENT
1008
INTEGRATEDFRESHWATER
LAB
1009
CORRIDOR
X1007
CORRIDOR
X1011
OFFICE
1017A
EXPANSIONSPACE
1017G
OFFICE
1017C
SEMPREP-ROOM
1017E
TECH ROOM
1017D
SEM
1017-3
WEIGHING &CHNS
1017-4
CHROMOTOGRAPHY
1017-5
WORKSHOP
1017-J
LAB ENTRANCE 2
1017-8
TECH-OFFICE
1017B
SHIPPING/RECEIVING+ RECYCLING
1021
BIOSAFETY LAB
1017F
TEM
1017-2
MATERIALANALYSIS
1017
EXIST'GELEVATOR
X1005
EXIST'GMACHINE ROOM
1020
CRAWLSPACE
X1004
(NEW
AD
DIT
ION
)
2910
0
ROCK GARDEN
ROCK GARDEN
PLANTINGS
250
(NEW ADDITION)
37700
250
3425
1525
1525
1737
1738
5000
5000
5000
5000
5000
4950
250
(EXI
S TIN
G)
3990
0
NEW FREEZER
EXIST'GFREEZER
SER
VIC
ESH
AFT
PLANTINGS
PLAN
TIN
GS
PREP ROOMCHROMATOGRAPHY
1017-6
PREP ROOM(ICP's)
1017L
TRACEANALYSIS (ICP's)
1017K
WORKSHOP
1017J
SHARED OFFICE
1017H
TECH GASES &CHILLERS
1016
CHAIR STORAGE
1022
LOUNGE AREA
1008A
H
CONSTRUCTIONNORTH
1A2.10A2.7
ENLARGED PLAN
1A2.9A2.7
ENLARGED PLAN
BIOMASS UTILIZATION RESEARCH LABORATORY
LAKEHEAD UNIVERSITY INSTRUMENTATION LABORATORY COMMUNITY ECOLOGY +
ENERGETICS LABORATORY
LAB MANAGEMENT
INTEGRATED FRESHWATER SCIENCE LABORATORY
HUMAN ORIGINS LABORATORY
RECESSED MAT(1900 x 3000)
EXPO
SED
EXI
S'T
BRIC
K TH
IS W
ALL
EXPO
SED
EXI
S'T
BRIC
K TH
IS W
ALL
4A3.21A2.7
1A3.20A2.7
5A3.21A2.7
S2b
LINE OF FLOORABOVE
358
(REFER TO MECH& ELEC DRAWINGS)
B2 C2 D2
ATRIUM STAIRSEE DETAILS
DX1
006b
PAINTEXPOSEDCOL'S- TYP.
WHEELED-COVEREDRECYCLING BINS
EXIST'G SIAMESE CONNECTION
STAIR, RETAININGWALLS AND SLOPEDWALK - SEELANDSCAPE PLANAND DETAILS
TECH GASES
1006
EXISTING RENOVATION NEW ADDITION
5A1.1 A1.2
FLOOR AREAS
EXISTING = 1013.82 m² = 10912.66 SF
ADDITION = 1017.00 m² = 11915.65 SF
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
1 : 100
Lower Level - OverallPlan
LU CASESAddition +Renovation
A2.7
2015-74A
05-DEC-2016
SCV/AJP/NCM
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 100A2.7A0.7
1 Level 1 - Lower Level - Overall Plan
Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 RE-ISSUED FOR REVIEW 27-JUN-20163 UPDATED FOR REFERENCE 18-JUL-20164 UPDATED FOR REFERENCE 20-JUL-20165 UPDATED FOR REFERENCE 28-JUL-20166 ISSUED FOR CLASS 'C' 04-AUG-20167 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
8 ISSUED FOR PERMIT 05-DEC-2016
UP
A2.291
A2.29 2
A2.28
1
XA XD
X1
XB XC
X2
X3
X4
X5
X6
X7
X8
X9
X1A
EXIST'G ELEV
3376
2
X2A
X2B
PRINTER
A
1
3
4
5
6
7
ELECTROCHEMISTRY
2016D
BIOSAFETY(POS)
2016B
SPECTROCOPY
2016C
LASER RM
2016A
GRADSTUDENTS
2016
TECH GASSTORAGE
2015OFFICE
2017
GRAD STUDENTLOUNGE
2002
LOBBY
2001
UNISEX W/R
2021
OFFICE
2014C
OFFICE
2014D
OFFICE
2014E
OFFICE
2014F
OFFICE
2011G
OFFICE
2011F
OFFICE
2011E
OFFICE
2011D
OFFICE
2014A
OFFICE
2014B
OFFICE
2011C
OFFICE
2011B
ADMIN
2011-2
ADMIN
2014-2
PHOTOCOPY/PRINTING
2014G
OFFICE
2014H
WOMENS W/C
2012
MENS W/C
2013
ENTREPRENEURSHIPLECTURETHEATRE
2022
EXIS
TIN
G O
PEN
TO
BEL
OW
SKYL
IGH
T AB
OVE
EXISTING OPEN TO BELOW
ABORIGINALMENTORSHIP
PROGRAM
2008
RENTABLEOFFICE
2007
RENTABLEOFFICE
2006
ENTREPRENEURCENTRE
2009
BOARD RM
2005
ENTREPRENEURCENTRE
2018
STAIR C
X2006
CORRIDOR
X2009
OFFICE
2004C
MEETING RM
2004D
CESME OFFICE
2004E
CESME OFFICE
2004F
OFFICE
2004B
OFFICE
2004H
SHAREDKITCHENETTE
2003
BF STALL BF STALL
CORRIDOR
X2015
CORRIDOR
X2010
CORRIDOR
X2012
CIR
CU
LATI
ON
2011
-3
CORRIDOR
X2007
CIRCULATION
2011-4
CIR
CU
LATI
ON
2014
-1
SERVICESHAFT
SERVICE SHAFT
SER
VIC
E SH
AFT
SERVICE SHAFT
SER
VIC
E SH
AFT
RECESSED MAT
4950
5000
5000
5000
5000
5000
1738
1737
1525
1525
3425
9500 5000 9500
EXISTING CHANCELOR PATERSON LIBRARY BUILDING
STAIR B
X2002
1A2.7 A3.2
A2.28
2
4A2.7 A3.2
2A2.7 A3.2
3A2.7 A3.2
1A2.7 A3.1
2A0.11 A3.1
CORRIDOR
X2014
EXISTINGSKYLITATRIUM SPACE
GLU-LAM STRUCTURE
GLASS GUARD
GLU-LAM STRUCTURE
SER
VIC
E SH
AFT
1900
5500 6824 8817 7818
2
2500
4800
4800
5000
B C D E F G
MEETING RM
2011AADMIN
2011
ADMIN
2014-3
ADMIN
2014
DRY LAB
2016E
AFM (POS)
2016F
5700
MEDIA RM
2018C3D PRINTER RM
2018D
STUDY RM
2018B
STUDY RM
2018A
MO
VABL
E W
ALL
STANDING COMPUTER WORKSTATIONS (4)
PHOTOCOPIER / PRINTERS
LOUNGING SPACE
CO
MPU
TER
WO
RKS
TATI
ON
S (3
)
PRIN
TER
S &
STO
RAG
EOPEN STORAGE
WAITING AREA
2011-1
OFFICE
2011H
GLU-LAM STRUCTURE
ATRIUM 2
X2008
SERVICE SHAFT
IT S
HAF
T
SER
VIC
ESH
AFT
SER
VIC
ESH
AFT
VESTIBULE
X2001
CO
UN
TER
/ C
OPI
ER
AREA
OFFICE
2004A
CORRIDOR
X2013
CORRIDOR
X2011
ADMINISTRATIONEDI
2004
GLU-LAM STRUCTURESEE STRUCT DWGS AND DETAILS
OPE
NO
PEN
ATRIUM OPENTO BELOW
STORAGE
2014JSTORAGE
2011J
UNIVERSAL W/R
2020
JAN.
2024
(EXISITING)
24000
(NEW ADDITION)
37700
250 9500 5000 9500 1900 3600 8000 8600 8600 5000 2000 1000
250
(EXI
S TIN
G)
3990
0
(EXI
S TIN
G) (
FIEL
D V
ERIF
Y)
7632
(NEW
AD
DIT
ION
)
2910
0
5700
2645
3655
2500
4800
4800
5000
ENLARGED PLAN
ENLARGED PLAN
EXISTINGSTAIR
H
ARRIVAL
2004-1
IT RM
2023
CHAIR OFFICE -ENTRE CENTRE
2004G
PERCHLORIC EXHAUST CHASE TO ROOF
CONSTRUCTIONNORTH
2A2.12A2.8
1A2.11A2.8
-
OFFICE OF RESEARCH SERVICES
FACULTY OF GRADUATE STUDIES
NANO MATERIALS + ADVANCED TECHNOLOGIES INNOVATION CENTRE
ECONOMIC DEVELOPMENT + INNOVATION OFFICES
FACULTY OF GRADUATE STUDENTS
STUDENT ENTREPRENEUR
CENTRE
PARTNERS IN INNOVATION +
ENTREPENEURSHIP
EXIT STAIR BELOW
A5.28 8
XL9
BRIDGE LINK
X2016
S2b
SPARE OFFICE -EDI
2004J
B2 C2 D2
ATRIUM 1
X2008
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
1 : 100
Upper Level - OverallPlan
LU CASESAddition +Renovation
A2.8
2015-74A
05-DEC-2016
SCV/AJP/CRS
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 100A2.8A0.7
1 Level 2 - Upper Level - Overall Construction Plan
Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 UPDATED FOR REFERENCE 18-JUL-20163 UPDATED FOR REFERENCE 20-JUL-20164 UPDATED FOR REFERENCE 28-JUL-20165 ISSUED FOR CLASS 'C' 04-AUG-20166 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
7 ISSUED FOR PERMIT 05-DEC-2016
XA
XD
X1
XB
XC
X2X3X4X5X6X7X8X9 X1AX2AX2B
134567 2
(EXI
STIN
G)
2400
0
4898
2545
SERVICE ROOM
1001
JANITORSCLOSET
1002
CORRIDOR
X1010
VEST
1004A
M WR
1004
SHW
1004B
VEST
1003A
W WR
1003
SHW
1003B
STAIR B
X1002
STAIR A
X1003
ELEVATORLOBBY
X1009
CORRIDOR
X1012 EXIT
COMMUNITY ECOLOGY + ENERGETICS
LABORATORY 107m²
SHIPPING/ RECEIVING + RECYCLING
AREA
LAB ENTRANCE
1018-1
GENERALSTORAGE
1021B
S/S TABLE
PROTOTYPE DEVELOPMENT
LAB SPACE
STUDENT WORK SPACE
2261 1709 4352 3292 1621
LAB MANAGEMENT
OFFICE
1008A
4970462021293159
INTEGRATED FRESHWATER SCIENCE LABORATORY 138m²
DIRTY LAB
1009B
ANALYTICAL LAB
1009A
BIOHAZARD LAB
1011
TECH GASES
1010
HUMAN ORIGINSLAB
1005
I/T ROOM
1019
WORK SPACE
1018
WET LAB (NEG)
1018B
ANALYTICAL LAB
1018A
TECH GASES
1021A
PROTOYPEDEVELOPMENT
LAB
1007
LABMANAGEMENT
1008
INTEGRATEDFRESHWATER
LAB
1009
CORRIDOR
X1011
SHIPPING/RECEIVING+ RECYCLING
1021
EXIST'GELEVATOR
X1005
EXIST'GMACHINE ROOM
1020
CRAWLSPACE
X1004
25034251525152517371738500050005000500050004950250
(EXISTING)
39900
NEW FREEZER1021B
EXIST'G FREEZER1021A
CHAIR STORAGE
1022
HUMAN ORIGINS LABORATORY
9625
2354
2676
5200
2120
2058
9375
2563
2438
120581280067498109
9378
557144084894
1732
4529
3055
280
5438
XP11XW1 XW4
XW1
XW1
XW3
P3H
P3M
XP8
XP8
P3
P3M
P3
XP9 XP8
XP8
XP8
XP13XP8
P3H
XW1
XP6
XP8
P21P3M
XP9
XP8
P3H
P3M
P3H
P3
P3H
XP8
7443
4712
25642124
2646
3954
XP8
XP8
XP8
P3J
EXISTING ELECTRICAL SERVICE EQUIPMENT
EXIS
TIN
G P
ANEL
S
EXISTING R/OWATER PAK
2A2.19A2.9
1A2.19A2.9
1A2.22A2.9
2A2.22A2.9
D10
08
D10
08A
D1009A
D10
09
D10
10
D1011b
D1019
D10
20
D10
07
D10
06
D1018Bb
D1018A
D10
21a
D1022
D1021B
D10
15
D1002
D1021A
A5.0 1
1A2.27A2.9
4A3.21A2.7
1A3.20A2.7
5A3.21A2.7
1A4.1A2.9
3A4.1A2.9
ENLARGEDPLAN
ENLARGEDPLAN
ENLARGEDPLANS
ENLARGEDPLAN
ENLARGEDPLAN
A5.28
5
CONSTRUCTIONNORTH
375
9500
5000
9500
250
5A4.2A2.9
ENLARGEDPLAN
CN-07
NEW BRIDGE OVERHEAD
DX3017DX3019
D1004
DX2003b
X1003
X1003A
D10
03D
1003
A
DX1
013
X100
7
DX1002
DX1001
2001
g
ROLLING COVEREDRECYCLING BINS
STORAGE LOCKERS
EXIST'G SIAMESECONNECTION
NEW DOORS INEXIST'G OPENING
CN-04
CG1
CN-04
D10
04
STORAGE
X1013
SERVICE CHASE ABOVEMOP SINK
CN-05
(REFER TO MECH& ELEC DRAWINGS)
EXIST'G WALK-INCOOLER 1005
CN-06
CN-05
CN-05
SC3
SC4
CN-05
TECH GASES
1006
CN-05
CN-08
CN-09
NEW LANDING & STAIRS
6A3.22A2.9
2451 8449 4785 5389 3940
P3A
P3A
XP9
XP8
CN-05
XP8
XP8
P3J
P3
P20
P20
P3H
P3M
P3M
XP6
XP8
XP8
XP8
XP6
P3 P3P3XP8XP7
CN-05
P3M
P3J
P3H
P3M
P11
3374
1250
3250
2528
CN-05
XP8
5376
3850
3915
5044
4881 2919 2230 2300 2500 5028
XW4
XW4
XW4
XW4
XW1
XW1
9216
2939
P3M
P3M
P3M
XP8
P3M
CN-05P3
XP8
XP8
CG
1
CG1
CG1
SC1
SC2
D10
04A
D1013bD1011c
CN-06
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
1 : 75
Enlarged Lower Level -Existing Renovation
LU CASESAddition +Renovation
A2.9
2015-74A
05-DEC-2016
SCV/TNG
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 75A2.9A2.7
1 Level 1 - Lower Level - Enlarged Existing Renovation*VIEW ROTATED CLOCKWISE 90°
Construction Notes
Mark DescriptionCN-01 TIE-IN EXISTING AND PERIMETER WEEP TILE. PROVIDE PURPOSE MADE TEES TO COMPLETE TIE-IN. ABANDON BURIED SECTION OF WEEP TILE BETWEEN EXISTING FOUNDATION AND ADDITION.CN-02 NEW OPENINGS IN EXISTING FOUNDATION WALL TO FACILITATE INSTALLATION OF NEW HOLLOW METAL DOORS AND FRAMES (2 LOCATIONS). ANCHOR FRAMES TO EXISTING CONCRETE.CN-03 INSTALL 19x76 PRESSURE TREATED PLYWOOD STRIPS TO BOTH SIDES OF PARTITION TO FIX FLOOR VAPOR BARRIER IN PLACE PRIOR TO PLACING SAND FLOOR.CN-04 BUILD SLOPE TO DRAIN OVER EXISTING FLOOR USING LEVELLING COMPOUND. TAPER BACK AT CENTRE OF DOORS TO ADJACENT ROOMS. MAX RISE 19mm. UNDER CUT DOORS TO SUIT.CN-05 INFILL EXISTING DOOR OPENING WITH NEW FRAMING AND FINISH.CN-06 PROVIDE STAINLESS STEEL CLOSURE PIECE TO FINISH CORNER OF EXISTING WALK-IN COOLER, CUT FREEZER PANEL TO SUIT LEFT OVER WALL SECTION FOLLOWING REMOVAL OF ADJACENT EXISITNG WALK-IN
COOLER. (SEE MECH & ELEC FOR ADDITIONAL SCOPE OF WORK).CN-07 NEW STEEL STAIR, RAILINGS AND LANDING IN PLACE OF FORMER CONCRETE STAIR AND LANDING. SEE STRUCUTRAL DRAWINGS AND DETAILS.CN-08 EXISITNG HOLLOW METAL FRAMES TO RECIEVE NEW PAINT FINISH, TYPICAL THROUGHOUT STAIR-A. PAINT STAIR STRINGERS AND EXPOSED PAINTED STRUCTURAL STEEL WITHIN STAIR-A TOP TO BOTTOM. PAINT BOTH
SIDES WHERE EXPOSED TO AN INTERIOR CORRIDOR.CN-09 NEW SALVAGED BRICK INSTALLED TO FACE OF EXISTING WALL, SEE PLAN DETAILS.CN-10 NEW PRE-MANUFACTERED MECHANICAL EQUIPMENT SCREEN FASTENED TO NEW COOLING TOWER FRAME AND CURB. COORDINATE WITH EQUIPMENT SUPPLIER.CN-11 REINSTALL EXISTING PRECAST PAVERS OVER NEW ROOF MEMBRANE. SET PAVERS ON FOAM BLOCKS TO PROTECT MEMBRANE.CN-12 WALKWAY MEMBRANE FOR ROOF ACCESS. COORDINATE LOCATION WITH ROOF PLAN.CN-13 FPA-R: ROOF MOUNTED FALL PROTECTION ANCHORS WHERE INDICATED ON ROOF PLANS. REFER TO DETAILS FOR INSTALLATION INTO NEW AND EXISITNG ROOF. MANUFACTERER TO PROVIDE ENGINEERED SHOP
DRAWING. MAKE PROVISION FOR FILLING WITH SPRAY FOAM INSULATION AFTER INSTALLATION.CN-16 PAINT EXISTING HSS FRAME IN ITS ENTIRETYCN-17 PAINT EXISTING HOLLOW METAL WINDOW FRAME - BOTH SIDESCN-18 PAINT EXISTING HOLLOW METAL SCREEN ABOVE AND BELOW - BOTH SIDESCN-19 PAINT EXISTING STEEL CANOPY AND COLUMNS IN ITS ENTIRETYCN-20 MOVEABLE WALL TRACK - COORDINATE W/ STRUCTURAL
Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
2 ISSUED FOR PERMIT 05-DEC-2016
XD
X3
X4
X5
X6
X7
X8
X9
A
1
3
4
5
6
7
2
B C D E F G
A5.3
H
A5.25 12
A5.25
3
4
FREEZER
1014B
GRADSTUDENTS
1013
DIRTY LAB (NEG)
1014F
OFFICE
1012
ATRIA 1
X1008
STAIR C
X1006
EXIT
BIOMASS UTILIZATION RESEARCH LABORATORY
TECH GASES
1015
CLEAN RM (POS)
1014E
LAB ENTRANCE
1014-1
STORAGE
1014A
LASER
1014C
CIRCULATION
1014-2
ANALYSIS
1014-4
WET LAB
1014
TECH OFFICE
1014D
SCALE
1014-3
CORRIDOR
X1007
HO
USE
KEEP
ING
PAD
S
OFFICE
1017A
LAKEHEAD UNIVERSITY INSTRUMENTATION LABORATORY
EXPANSIONSPACE
1017G
OFFICE
1017C
SEMPREP-ROOM
1017ETECH ROOM
1017D
HO
USE
KEEP
ING
PAD
S
SEM
1017-3
WEIGHING &CHNS
1017-4
CHROMOTOGRAPHY
1017-5
LFH
WORKSHOP
1017-J
LAB ENTRANCE 2
1017-8
TECH-OFFICE
1017B
BIOSAFETY LAB
1017FTEM
1017-2
MATERIALANALYSIS
1017
LINE OF FLOOR ABOVE
ROCK GARDEN - SEE LANDSCAPE DWGS
ROCK GARDEN - SEE LANDSCAPE DWGS
SER
VIC
E SH
AFT
PREP ROOMCHROMATOGRAPHY
1017-6
PREP ROOM(ICP's)
1017L
TRACEANALYSIS (ICP's)
1017K
WORKSHOP
1017J
SHARED OFFICE
1017H
TECH GASES &CHILLERS
1016
LOUNGE AREA
1008A
D1017A
D1017B
D1017C
D10
17J
D10
17D
D10
17E
D10
17G
a
D10
17F
D10
16b
D10
17H
D10
17K
D10
16a
D1017L
D1017J
DX1006a
DX1
006c
DX1
006b
W2
P3H
P3J
P3H
P3H
W2
P3H P3
H P3H
P4H
P3H
P3H
P3H
P3H
P3H P3
HSP3HS
P3H
P3HS
P3C
P5HS
P5HS
P5HS
P3H
P3H
P3HS
P4JS
P4JS
P3HS
P3HS
P3H
P3H
P3H
P3H
P5HS
P4HS
P4HS
P3H
P3H
P3M
P3M
P3M
P3HS
P3HS
P3HS
P3HS
P3H
P4HS
P3HS
P3HS
P3HS
SC7
P11M
P3M
P3H
P3M
P3H
P2M
P2M
P2M
P2M
D10
12
D10
13b
D10
13c
D10
13d
D10
14E
D10
14
DX1
008
D1014F
D1014C
D1014D
D10
15
D1014A
(PRE-FABRICATEDFREEZER UNIT)
D10
13e
P4HS
SC7
XW1
PLANTINGS - SEE LANDSCAPE DWGS
PLAN
TIN
GS
-SEE
LAN
DSC
APE
DW
GS
EXTE
RIO
R W
ALK
-SEE
LA
ND
SCAP
E D
WG
S
1A2.20A2.10
1A2.23A2.10
ENLARGED PLAN
ENLARGED PLAN
CONSTRUCTIONNORTH
P9M
5372
969
619
2500
1881
394
119
CG1
2A4.2A2.10
2A3.21A2.10
4A3.21A2.7
3A3.21A2.10
1A3.20A2.7
5A3.21A2.7
2A3.20A2.10
4A3.20A2.10
6A3.21A2.10
5A3.20A2.10
7A3.20A2.10
PLANTINGS - SEE LANDSCAPE DWGS
----A2.10
3A3.20A2.10
TYPENLARGED PLAN
REFER TO DETAIL FOR WINDOW & DOOR INFILLS
WINDOW INFILLSEE DETAIL
1200
0
5139
CLE
AR
1493
5739
CLE
A R IN
SID
E
3007
CLE
A R
1637
16593
2562 1530
1850
1506
1406 1126 1126 1126
CLE
AR
1528
1536
4394 6398 3317 3317 4423 3762 3318 3318 5134
P5HS
P3HSP5
HSP5HS
2019 3317 3317 7638 3314 3354 3790 2361
3920
4035
1457
2398
D10
17-8
332
1617
4351
P3C
P3C
P3J
P9C
P27C
P27C
W2
3439 13161 5025 3523 2011 2965
4908 11692 3201 3142 4216 2965
3A3.22A2.10
S2b
P2M
CG1 CG1CG1
CG1
CG1
CG
1
CG1CG1CG1
CG2
CG2CG2
SC30
SC30
SC5 SC6
SC9
SC31
SC17
SC7
SC11SC10 SC12
B2 C2 D2
SC16SC15SC14SC13
P3HS
P3HS
738
2114
2260
6032
1617
4351
P3H
1390 1219 1219 1068
688 1219
915
P5H
F1
CYLINDERRACKS
P3M
2425
453
3131
2351
3865 W2
W2
W2
W2
W2
ROOF RWL
P3HS
P3HS
P4HS
P4HS P4
HS
2825
3616
5978
5000
4800
3038
3831
2931
P9M
P9M
P9M
P2M
P2M
P2M
P2M
P3HS
P3HS
2221 1742 1126 1742 1126 1740 1126 1742 2328
1468
1001
1760
4696
2343
1933
ATR
IUM
STA
IR U
P
EXIT TOTERRACE
WORK SPACE
1018
BIOHAZARD LAB
1011
INTEGRATEDFRESHWATER
LAB
1009
ANALYTICAL LAB
1009A
WET LAB (NEG)
1018B
2500
7159
5462
1979
CLEAR - VERIFY
5161
754
FIEL
D V
ERIF
Y
2030
335
RECESSED MAT
SEE STRUCT. DWGCONFIRM SIZE AND LOCATION
SEE STRUCT. DWGCONFIRM SIZE AND LOCATION
MOVABLE SCREENS
ROOF RWL
P9M
EXTERIOR NFHB - SEE MECH
5A1.1 A1.2
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
1 : 75
Enlarged Lower Level -New Construction
LU CASESAddition +Renovation
A2.10
2015-74A
05-DEC-2016
CRS / SCV
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 75A2.10A2.7
1 Level 1 - Lower Level - Enlarged New Construction
Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
2 ISSUED FOR PERMIT 05-DEC-2016
XA
XD
X1
XB
XC
X2X3X4X5X6X7X8X9 X1AX2AX2B
134567 2
EXIST'G ELEV
GRAD STUDENTLOUNGE
2002
LOBBY
2001
UNISEX W/R
2021
ENTREPRENEURSHIPLECTURETHEATRE
2022
EXISTING OPEN TO BELOWSKYLIGHT ABOVE
EXISTING OPEN TO BELOW
ABORIGINALMENTORSHIP
PROGRAM
2008
RENTABLEOFFICE
2007
RENTABLEOFFICE
2006
ENTREPRENEURCENTRE
2009
BOARD RM
2005
ENTREPRENEURCENTRE
2018
CORRIDOR
X2009
OFFICE
2004C
MEETING RM
2004D
CESME OFFICE
2004E
CESME OFFICE
2004F
OFFICE
2004B
OFFICE
2004H
SHAREDKITCHENETTE
2003
CORRIDOR
X2015
CORRIDOR
X2010
CORRIDOR
X2012
EXIS
T'G
SER
VIC
E SH
AFT
EXIST'G SERVICE SHAFT
SER
VIC
E SH
AFT
SERVICE SHAFT
REC
ESSE
D M
AT
STAIR B
X2002
CORRIDOR
X2014
EXISTINGSKYLITATRIUM SPACE
ECO
NO
MIC
DEV
ELO
PMEN
T +
INN
OVA
TIO
N O
FFIC
ES
FACULTY OF GRADUATE STUDENTS
STUDENT ENTREPENEUR CENTRE
PARTNERS IN INNOVATION +
ENTREPENEURSHIP
MEDIA RM
2018C
3D PRINTER RM
2018D
STUDY RM
2018B
STUDY RM
2018A
STAN
DIN
G C
OM
PUTE
R
WO
RKS
TATI
ON
S (4
)
PHO
TOC
OPI
ER /
PRIN
TER
S
LOUNGING SPACE
COUNTER
ATRIUM 2
X2008
SER
VIC
E SH
AFT
IT SHAFT
VESTIBULE
X2001
COPIER AREA
OFFICE
2004A
CORRIDOR
X2013
CORRIDOR
X2011
ADMINISTRATIONEDI
2004
SPARE OFFICE -EDI
2004J
UNIVERSAL W/R
2020
(EXI
S ITI
NG
)
2400
0
250
9500
5000
9500
250
(EXISTING)
39900
250 4950 5000 5000 5000 5000 5000 1738 1737 1525 1525 3425 250 7382 (FIELD VERIFY)
EXISTINGSTAIR
ARRIVAL
2004-1
IT RM
2023
CHAIR OFFICE -ENTRE CENTRE
2004G
700
400
700
1946
92
P3JS
P3JS
P3HS
P3JS
P3CS
P3JS
P3JS
P3JS
P3JS
P3JS
P3JS
P3JS P3
JS
92 4578 2918 3586 3776 5000 13410
3055 3241
9235
6229
0828
4692
3562
1637
4091
3173182430743362296861017753073
9290
92 4894 3298 3405 3169
9316
639 9295
2434
124
2408
9500
4439 7251
2584
9408
TYP
197
D20
04D
D20
04C
D20
04B
D20
04A
D20
04J
D20
04H
D20
04G
D2004E
D2004FD
2004
b
D20
04a
D20
03
D20
02b
D20
02c
2002a
D20
22b
D20
22a
D20
18b
D20
18A
D20
18B
D2023
D2018a
D20
09b
D20
09a
D20
24
D20
07
D20
06
D2005b
D20
05a
D2018C
2A2.27A2.11
2A4.1A2.11
4A4.1A2.11
ENLARGEDPLAN
A5.29 2
1
A5.293
A5.29
5
A5.29 4
A5.28
5
A5.296A5.29 7
A5.28 6
CONSTRUCTIONNORTH
PAN
ELS
2 EQ
. GLA
SS
9 EQ. GLASS PANELS 2369
CONT STANDOFFRAIL SYSTEM
1A3.3A2.11
XL9
WD1
WD1
SC31
SC33
SC32
BRIDGE LINK
X2016
X2016f X2016b
D20
40
D20
44
DX2
001b
DX2
001a
ATRIUM 1
X2008
CORRIDOR
X2009
650 3500 1008 3500 647
4010
XP8 P3JS
P3JS
XP8
P3HS
XP8
XP8
XP8
P11XP8
XP8
P3HS
P3HS
P3HS
P3C
XP8
P3JS
P3JS
P3HS
P3HSP3
HS
D2018D
P3HS
P4HS
XP8
P3CS
P12CS
P3CS
XP9
XW1
XW1
XW1 XW1
XW1
XP9
XP8
P5HS
XW3
CW13
CW13
FIEL
D V
ERIF
Y
1776
2670
7077
363
1078
752
DX2003a
XP8
XP8
P12CS
SC35
XP8XP8
SC34
PAINT EXISTING STEEL - REFER TO CLG PLAN
DX2001b
P3JS
P3JS
P3JS
P3JS
P3JS
XP8 XP8
XP8 XP8
XP8
XP8
P11
XP8
XP8
P3C
XF1
P4HS
P4HS
P3HS
2923
6393
1346
1346
9316
BRIDGE STRUCTURESEE STRUCTURAL ANDDETAILS
OPEN SHAFT TO FACILITATENEW WORK - REBUILDFIRE SEPARATION USING SHAFT WALL
2074
1300
4421
600
4269
P3HS
P12CS
P3CS
P3JS
P12CS
XF1
1401 XP8
3142 3198 1734 1833
P3HS
XP8
P3CS
XF1
P3HS
EXIST'G CLEAR
1551
GRAD STUDENT PATIO - SEE LANDSCAPE DRAWINGS
SC36
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
1 : 75
Enlarged Upper Level -Existing Renovation
LU CASESAddition +Renovation
A2.11
2015-74A
05-DEC-2016
SCV
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 75A2.11A2.8
1 Level 2 - Upper Level - Enlarged Existing Renovation*VIEW ROTATED CLOCKWISE 90°
Construction Notes
Mark DescriptionCN-01 TIE-IN EXISTING AND PERIMETER WEEP TILE. PROVIDE PURPOSE MADE TEES TO COMPLETE TIE-IN. ABANDON BURIED SECTION OF WEEP TILE BETWEEN EXISTING FOUNDATION AND ADDITION.CN-02 NEW OPENINGS IN EXISTING FOUNDATION WALL TO FACILITATE INSTALLATION OF NEW HOLLOW METAL DOORS AND FRAMES (2 LOCATIONS). ANCHOR FRAMES TO EXISTING CONCRETE.CN-03 INSTALL 19x76 PRESSURE TREATED PLYWOOD STRIPS TO BOTH SIDES OF PARTITION TO FIX FLOOR VAPOR BARRIER IN PLACE PRIOR TO PLACING SAND FLOOR.CN-04 BUILD SLOPE TO DRAIN OVER EXISTING FLOOR USING LEVELLING COMPOUND. TAPER BACK AT CENTRE OF DOORS TO ADJACENT ROOMS. MAX RISE 19mm. UNDER CUT DOORS TO SUIT.CN-05 INFILL EXISTING DOOR OPENING WITH NEW FRAMING AND FINISH.CN-06 PROVIDE STAINLESS STEEL CLOSURE PIECE TO FINISH CORNER OF EXISTING WALK-IN COOLER, CUT FREEZER PANEL TO SUIT LEFT OVER WALL SECTION FOLLOWING REMOVAL OF ADJACENT EXISITNG WALK-IN
COOLER. (SEE MECH & ELEC FOR ADDITIONAL SCOPE OF WORK).CN-07 NEW STEEL STAIR, RAILINGS AND LANDING IN PLACE OF FORMER CONCRETE STAIR AND LANDING. SEE STRUCUTRAL DRAWINGS AND DETAILS.CN-08 EXISITNG HOLLOW METAL FRAMES TO RECIEVE NEW PAINT FINISH, TYPICAL THROUGHOUT STAIR-A. PAINT STAIR STRINGERS AND EXPOSED PAINTED STRUCTURAL STEEL WITHIN STAIR-A TOP TO BOTTOM. PAINT BOTH
SIDES WHERE EXPOSED TO AN INTERIOR CORRIDOR.CN-09 NEW SALVAGED BRICK INSTALLED TO FACE OF EXISTING WALL, SEE PLAN DETAILS.CN-10 NEW PRE-MANUFACTERED MECHANICAL EQUIPMENT SCREEN FASTENED TO NEW COOLING TOWER FRAME AND CURB. COORDINATE WITH EQUIPMENT SUPPLIER.CN-11 REINSTALL EXISTING PRECAST PAVERS OVER NEW ROOF MEMBRANE. SET PAVERS ON FOAM BLOCKS TO PROTECT MEMBRANE.CN-12 WALKWAY MEMBRANE FOR ROOF ACCESS. COORDINATE LOCATION WITH ROOF PLAN.CN-13 FPA-R: ROOF MOUNTED FALL PROTECTION ANCHORS WHERE INDICATED ON ROOF PLANS. REFER TO DETAILS FOR INSTALLATION INTO NEW AND EXISITNG ROOF. MANUFACTERER TO PROVIDE ENGINEERED SHOP
DRAWING. MAKE PROVISION FOR FILLING WITH SPRAY FOAM INSULATION AFTER INSTALLATION.CN-16 PAINT EXISTING HSS FRAME IN ITS ENTIRETYCN-17 PAINT EXISTING HOLLOW METAL WINDOW FRAME - BOTH SIDESCN-18 PAINT EXISTING HOLLOW METAL SCREEN ABOVE AND BELOW - BOTH SIDESCN-19 PAINT EXISTING STEEL CANOPY AND COLUMNS IN ITS ENTIRETYCN-20 MOVEABLE WALL TRACK - COORDINATE W/ STRUCTURAL
Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
2 ISSUED FOR PERMIT 05-DEC-2016
XD
X3
X4
X5
X6
X7
X8
X9
A
1
3
4
5
6
7
-A2.12 ---
2
B C D E F G H
A5.25 12
A5.25
3
4
PRINTER
ELECTROCHEMISTRY
2016DBIOSAFETY
(POS)
2016B
SPECTROCOPY
2016C
LASER RM
2016A
GRADSTUDENTS
2016
TECH GASSTORAGE
2015
OFFICE
2017
OFFICE
2014C
OFFICE
2014D
OFFICE
2014E
OFFICE
2014F
OFFICE
2011G
OFFICE
2011F
OFFICE
2011E
OFFICE
2011D
OFFICE
2014A
OFFICE
2014B
OFFICE
2011C
OFFICE
2011B
ADMIN
2011-2
ADMIN
2014-2
PHOTOCOPY/PRINTING
2014GOFFICE
2014H
WOMENS W/C
2012
MENS W/C
2013
STAIR C
X2006
BF STALL BF STALL
CIRCULATION
2011-3
CORRIDOR
X2007
CIRCULATION
2011-4
CIRCULATION
2014-1
SERVICESHAFT
CLERESTORY GALLERYGLU-LAM STRUCTURE
GLASS GUARD RAILSYSTEM SEE DETAILS
SER
VIC
E SH
AFT
OFFICE OF RESEARCH SERVICES
FACULTY OF GRADUATE STUDIES
NANO MATERIALS + ADVANCED TECHNOLOGIES INNOVATION CENTRE
MEETING RM
2011A
ADMIN
2011
ADMIN
2014-3
ADMIN
2014
DRY LAB
2016E
AFM (POS)
2016F
CO
MPU
TER
W
OR
KSTA
TIO
NS
(3)
PRIN
TER
S &
STO
RAG
EOPEN STORAGE
WAITING AREA
2011-1
OFFICE
2011H
ATRIUM 2
X2008
SER
VIC
ESH
AFT
ATRIUM OPENTO BELOW
STORAGE
2014JSTORAGE
2011J
JAN.
2024
(NEW ADDITION)
37700
1900 3600 8000 8600 8600 5000 2000 1000
(NEW
AD
DIT
ION
)
2910
0
5700
2645
3655
2500
4800
4800
5000
350
PERCHLORIC EXHAUST CHASE TO ROOF
293
5500 6824 8817 7818
1898 4323 2380 4300
4000 4000 3776 3750 3312 3404 4513 3703
1254 1240
277
6512
2288
278
35082
9637
0425
0011
155
3445
1849
5781
4499
4320
2500
4800
1965
2835
1509
3970
3824
2951
2951
4874
P3H
P3
P3HS
P3JS
P12CS
P3C
W2
P3JS
P3JS
P3JS
P3JS
P3JS
P3JSP3
JS
P3JS
P3JS
P4JS
P11JS
P5HS
P3JS
P11JS
P3JS
P3JS
P3JS
P3JS
P4HS
P3HS
P12CS
P4HS
P11JS
P5HS
P11JS
P3JS
P3JS
P5HS
P3HS
P3JS
P3HS
P3HS
P3HS
P5HS
SC20
P3JS
W3
W3
D20
16b
D20
16c
D20
16E
D2011A
D2011B
D2011D
D20
11E
D20
11F
D20
11G
D20
14F
D20
14E
D20
14D
D2014C
D2014B
D2014A
D20
14A
DX2006
D20
15
D20
16a
D20
14H
D2014J
D20
11H
D2011C
D2016F
D2016D
D20
16d
D2016B
D2016A
5500 4000 5898
5030 5016 956 5851 3449
2A2.25A2.12
D2011J
D20
11
CONSTRUCTIONNORTH
3A2.27A2.12
3A4.2A2.12
7A3.23A2.12
5A3.23A2.12
ENLARGED PLAN
ENLARGED PLAN
ENLARGED PLAN
6A3.23A2.12
A5.28 8
A5.287
1100
1102
1009
8585
1190 10511248 1157
1200
S2b
4A3.22A2.12
A5.13
11
P3HS
SC25
SC18SC27
SC30
SC29
SC19SC22
SC28
SC24
MOP SINK
MOP SINK
B2 C2 D2
SC21
D20
17
P5HS
P3J
P3KS
P11CS
P3J
W2
W2
P3JS
P3JS
P11CS
P11JS
P3JS
P3J
P4CS
P5CS
P27C
P27C
W2
W2
W3W3W3W3W3
P5HS
P5HS
P3CS
P3CS
P5CS
P5CS
P4HS
P3HS
1816
P3CS
1262
1200
1262
1075
SIM
ROOFRWL
P11JS
P3JS
P3JS
P4JS
EXTERIOR CURTAIN WALL SYSTEM W/ HORIZ LATTICE - SEE ELEVATIONSCURTAIN WALL SYSTEM - SEE ELEVATIONS
GLASS GUARDTO WALL FACE
ATRIUM STAIR
MO
VABL
E W
ALL
SYST
EM S
EE D
ETAI
LS
MO
VABL
E W
ALL
SYST
EM S
EE D
ETAI
LS
P3HS
5567
2590
3844
P5HS
P5HS
4027 12573 3975 2885 3111 2182 1346
3720
3121
5158
P2M
P2M
F1
PAINTED STL.COLUMNS
PAINTED STL.COLUMNS
P4HS
SC23
SC30
SC30
P3HS
1740 1127 1740
2837
P2M
P2M
F1
2629
614
1288
P2M
P2M
F1
1016 1742 1140 1742 2001
2614
1855
4954
1479
448
2598
2598
1106
P11JS
STU
D67
1106
1727 1523 350
2441
2403
618
1979
588
3500
1008
3500
585
CORRIDOR
X2009 CORRIDOR
X2009
ATRIUM 1
X2008
ENTREPRENEURCENTRE
2018
ENTREPRENEURCENTRE
2009
SC26
D20
24P5CS
P5HS
P4HS
P4HS
F1
XW1
XW1
P5HS
800 1021 1214
1309
445
8500
535
1A3.24A2.12
2A3.24A2.12
1A3.23A2.12
3A3.24A2.12
4A3.24A2.12
6A3.21A2.10
SIM
2A3.21A2.10
SIM
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
1 : 75
Enlarged Upper Level -New Construction
LU CASESAddition +Renovation
A2.12
2015-74A
05-DEC-2016
SCV/NCM
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 75A2.12A2.8
2 Level 2 - Upper Level - Enlarged New Construction
Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
2 ISSUED FOR PERMIT 05-DEC-2016
XA XD
X1
X9
1
4
7
F
G
H
EXISTING TO REMAIN IN EXISTING CRAWL SPACE AREA
EXISTING TO REMAIN IN EXISTING CRAWL SPACE AREA
CONSTRUCTIONNORTH
CRAWLSPACE
002A
CRAWLSPACE
002B
CRAWLSPACE
001
EXIST'GCRAWLSPACE
001
CEILING PLAN SYMBOL LEGEND
EXPOSED STRUCTURE
ULTIMA - 24"x24" - HIGH NRCACT-1
SUPPLY AIR DIFFUSER
OPTIMA - 30"x60" & 6"x60" - TECH ZONE - TEGULARACT-2
OPTIMA - 48"x48" - TEGULARACT-3
SOUNDSHAPES ACOUSTICAL CLOUDSACT-4
FORMATIONSACT-5
SOUNDSHAPES ACOUSTICAL CANOPIES - HILL CANOPY - 461/2"x75"ACT-6
GYPSUM BOARDGYP
EXP
WOODWORKS CHANNELED PLANKWD-C
WOODWORKS LINEAR - 33/4" (W)WD-L
EXPOSED STRUCTURE PAINTEDEXP PT
EXISTING GYPSUM CEILING TO REMAINEX GYP
EXISTING ACOUSTICAL CEILING TO REMAINEX ACT
VINYL TILE - 24"x24"ACT-7
METAL WORKS - TEGULAR (PERFORATION M2) - WHITEACT-8
SUPPLY AIR DIFFUSER - LINEAR
RECESSED FIXTURE - 6" (W)
RETURN AIR GRILLE - LINEAR
CYLINDRICAL EXTERIOR WALL SCONCE
SQUARE RECESSED DOWNLIGHT
RECESSED SPRINKLER
TUBULAR SUSPENDED FIXTURE - 4" (W) 2800 AFF
CIRCULAR SUSPENDED FIXTURE - 2800 AFF
VALANCE LED STRIP
EXHAUST AIR
RECESSED FIXTURE - 24"x24"
WALL MOUNTED FIXTURE
CEILING FAN W/ LIGHT
CONTINUOUS RECESSED FIXTURE - 4" (W)
SUSPENDED FIXTURE
SURFACE MOUNTED FIXTURE
PROJECTOR
SPEAKER
RETURN AIR GRILLE
SUSPENDED SQUIGGLE FIXTURE - 2800 AFF
PENDENT SPRINKLER
CYLINDRICAL PENDENT FIXTURE - 3000 AFF
WALL PACK FIXTURE
SQUARE PENDENT FIXTURE
BOLLARD LIGHT FIXTURE
CIRCULAR PENDENT FIXTURE
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Crawlspace -Renovated ReflectedCeiling Plan
LU CASESAddition +Renovation
A2.13
2015-74A
05-DEC-2016
EMC
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 100A2.13A1.2
1 Crawlspace - Renovated Reflected Ceiling Plan
Rev. Description Date1 ISSUED FOR PERMIT 05-DEC-2016
XA XD
X1
X9
1
4
7
SERVICE ROOM
1001
JANITORSCLOSET
1002
VEST
1004A
M WR
1004
W WR
1003
STAIR B
X1002
SER
VIC
E SH
AFT
F
G
GRADSTUDENTS
1013
DIRTY LAB (NEG)
1014F
OFFICE
1012
ATRIA 1
X1008
CORRIDOR
X1010
SHW
1004B
VEST
1003A
SHW
1003B
STAIR C
X1006
STAIR A
X1003
ELEVATORLOBBY
X1009
CORRIDOR
X1012
TECH GASES
1015CLEAN RM (POS)
1014E
LAB ENTRANCE
1014-1
LASER
1014C
CIRCULATION
1014-2
ANALYSIS
1014-4
WET LAB
1014
TECH OFFICE
1014D
SCALE
1014-3
LAB ENTRANCE
1018-1
GENERALSTORAGE
1021B
OFFICE
1008A
DIRTY LAB
1009B
ANALYTICAL LAB
1009A
BIOHAZARD LAB
1011
TECH GASES
1010
HUMAN ORIGINSLAB
1005
I/T ROOM
1019
WORK SPACE
1018
WET LAB (NEG)
1018B
ANALYTICAL LAB
1018A
TECH GASES
1021A
PROTOYPEDEVELOPMENT
LAB
1007
LABMANAGEMENT
1008
INTEGRATEDFRESHWATER
LAB
1009
CORRIDOR
X1007
CORRIDOR
X1011
OFFICE
1017A
EXPANSIONSPACE
1017G
SEMPREP-ROOM
1017E
SEM
1017-3
WEIGHING &CHNS
1017-4
CHROMOTOGRAPHY
1017-5
WORKSHOP
1017-J LAB ENTRANCE 2
1017-8
TECH-OFFICE
1017B
SHIPPING/RECEIVING+ RECYCLING
1021
MATERIALANALYSIS
1017TEM
1017-2BIOSAFETY LAB
1017F
TECH ROOM
1017D
ACT-1 2800
ACT-1 2800
ACT-1 2440
ACT-1 2800
ACT-1 2800
ACT-1 2800
OFFICE
1017C
EX EXP
EXP
EXP PT
EXP PT
EXP PT
EXP PT
EXP PTEXP PT
EXP PT EXP PT
EXP PT
ACT-1 2800
EXP PT
EXP PT
STORAGE
1014A
FREEZER
1014B
EXP PT
EXP PT
EXP PT
EXP PT
EXP PT
EXP PT
EXP PT
EXP PT
H
CHAIR STORAGE
1022
EXIST'G ELEV
EXIS
T'G
SER
VIC
E SH
AFT
ACT-1 2800
OPEN ABOVE
EXIST'GMACHINE ROOM
1020
EX GYP
EX GYP
EX GYP
TECH GASES
1006
EXP PT
OPEN ABOVE
ACT-1 2800
EX EXP
ACT-1 2800
OPEN ABOVE
EXP PT
EXP PT
LOUNGE AREA
1008A
WD-L 3400
PREP ROOMCHROMATOGRAPHY
1017-6
PREP ROOM(ICP's)
1017L TRACEANALYSIS (ICP's)
1017K
EXP PT
CORRIDOR
X1016
SHARED OFFICE
1017H
TECH GASES &CHILLERS
1016
WORKSHOP
1017J
ACT-1 2800
8047
1267
6
4526
2176
197
1982
197
4739197
1460
3
EXP PT
7443
4846
12093
9316
2439
3097
4790
146
1209
197
197
1920
197
11716
2137
258420
00
4529 2993
3829
4558
29934
5650
3289
18061
197
1900
197
3930
2887
ACT-7 2440
CONSTRUCTIONNORTH
ACT-1 2800
2227
EXISTING FIXTURES TO REMAIN
STORAGE
X1013
CTS RECESSED FIXTURE
ACT-1 2800
ACT-1 2800
ACT-1 2800
ACT-1 2800
2244
3876
1936
2066 2276
4466
3876
1319
2276
2433
2433
1319
6625
2129
2815
CTS WALL RECESSED FIXTURE
CTS WALL RECESSED FIXTURE
CTS RECESSED FIXTURE
CTS RECESSED FIXTURE
PROJECTOR
9316
ACT-1 2800
4832
PROJECTOR
ACT-7 2800
4284
1670
2440
5354
CTS RECESSED FIXTURE
ACT-7 2800
ACT-1 2800
EXISTING FIXTURE TO REMAIN
EXP
PROJECTOR
ACT-1 28002552
9047
ACT-7 2800
WALL PACK FIXTURE
ACT-1 2800
WALL PACK FIXTURE
5076
3837
WALL PACK FIXTURE
WALL PACK FIXTURE
ACT-1 2800
37805306
3168
1497
2552
4966
ACT-7 2800
ACT-1 2800
ACT-1 2800
ACT-1 2800
4332
3742
3864
6274
7495
4171
2751 3193 3193
21455
738
1493
4406
1990 2935
2237
CTS RECESSED FIXTURE
36667514 32303190
5878
3193 3193 4272 3611 3194 3194 5056
5139
2783
EXP PT
3007
2753
2224
2887
PROJECTOR
8790
4649
3399
1887
5833
41293018
5066
3487
7044
14769
9902
4757
2135
2298
2298
2308
2288
2352
3227
4769
BOLLARD LIGHT FIXTURE - SEE LANDSCAPE PLAN FOR ALL LOCATIONS
EXP PT
CEILING PLAN SYMBOL LEGEND
EXPOSED STRUCTURE
ULTIMA - 24"x24" - HIGH NRCACT-1
SUPPLY AIR DIFFUSER
OPTIMA - 30"x60" & 6"x60" - TECH ZONE - TEGULARACT-2
OPTIMA - 48"x48" - TEGULARACT-3
SOUNDSHAPES ACOUSTICAL CLOUDSACT-4
FORMATIONSACT-5
SOUNDSHAPES ACOUSTICAL CANOPIES - HILL CANOPY - 461/2"x75"ACT-6
GYPSUM BOARDGYP
EXP
WOODWORKS CHANNELED PLANKWD-C
WOODWORKS LINEAR - 33/4" (W)WD-L
EXPOSED STRUCTURE PAINTEDEXP PT
EXISTING GYPSUM CEILING TO REMAINEX GYP
EXISTING ACOUSTICAL CEILING TO REMAINEX ACT
VINYL TILE - 24"x24"ACT-7
METAL WORKS - TEGULAR (PERFORATION M2) - WHITEACT-8
SUPPLY AIR DIFFUSER - LINEAR
RECESSED FIXTURE - 6" (W)
RETURN AIR GRILLE - LINEAR
CYLINDRICAL EXTERIOR WALL SCONCE
SQUARE RECESSED DOWNLIGHT
RECESSED SPRINKLER
TUBULAR SUSPENDED FIXTURE - 4" (W) 2800 AFF
CIRCULAR SUSPENDED FIXTURE - 2800 AFF
VALANCE LED STRIP
EXHAUST AIR
RECESSED FIXTURE - 24"x24"
WALL MOUNTED FIXTURE
CEILING FAN W/ LIGHT
CONTINUOUS RECESSED FIXTURE - 4" (W)
SUSPENDED FIXTURE
SURFACE MOUNTED FIXTURE
PROJECTOR
SPEAKER
RETURN AIR GRILLE
SUSPENDED SQUIGGLE FIXTURE - 2800 AFF
PENDENT SPRINKLER
CYLINDRICAL PENDENT FIXTURE - 3000 AFF
WALL PACK FIXTURE
SQUARE PENDENT FIXTURE
BOLLARD LIGHT FIXTURE
CIRCULAR PENDENT FIXTURE
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Lower Level -Renovation ReflectedCeiling Plan
LU CASESAddition +Renovation
A2.14
2015-74A
05-DEC-2016
SCV/AJP/EMC
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 100A2.14A0.7
1 Lower Level - Renovation Reflected Ceiling Plan
Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 UPDATED FOR REFERENCE 28-JUL-20163 ISSUED FOR CLASS 'C' 04-AUG-20164 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
5 ISSUED FOR PERMIT 05-DEC-2016
XA XD
X1
X9
1
4
7
OFFICE
2017
ELECTROCHEMISTRY
2016D
SPECTROCOPY
2016C
GRADSTUDENTS
2016
BIOSAFETY(POS)
2016B
LASER RM
2016A
TECH GASSTORAGE
2015
STAIR C
X2006
CORRIDOR
X2007
WOMENS W/C
2012
MENS W/C
2013
ADMIN
2014-2
ADMIN
2011CIRCULATION
2011-3
ADMIN
2011-2
OFFICE
2014H
PHOTOCOPY/PRINTING
2014G
ADMIN
2014-3
CIRCULATION
2011-4
CIRCULATION
2014-1
OFFICE
2014B
OFFICE
2014A
OFFICE
2014C
OFFICE
2014D
OFFICE
2014E
OFFICE
2014F
OFFICE
2011G
OFFICE
2011F
OFFICE
2011E
OFFICE
2011D
OFFICE
2011C
OFFICE
2011B
ENTREPRENEURSHIPLECTURETHEATRE
2022
ENTREPRENEURCENTRE
2018
CORRIDOR
X2009
BOARD RM
2005
ENTREPRENEURCENTRE
2009CO
RR
IDO
R
X201
2
RENTABLEOFFICE
2006
RENTABLEOFFICE
2007
ABORIGINALMENTORSHIP
PROGRAM
2008
STAIR B
X2002CORRIDOR
X2015
UNISEX W/R
2021
LOBBY
2001
GRAD STUDENTLOUNGE
2002
SHAREDKITCHENETTE
2003
OFFICE
2004H
OFFICE
2004B
OFFICE
2004C
MEETING RM
2004D
CESME OFFICE
2004E
CESME OFFICE
2004F
CORRIDOR
X2010
EXIST'G ELEV
SKYLIGHT ABOVE
SERVICESHAFT
SERVICE SHAFT
SER
VIC
E SH
AFT
EXP PT
F
G
ATRIUM 2
X2008
DRY LAB
2016E
AFM (POS)
2016F
MEDIA RM
2018C
3D PRINTER RM
2018D
OFFICE
2011H
EXP PT EXP PT
EXP PT
EXP PT
ACT-1 2800
ACT-1 2800
ACT-1 2800
MEETING RM
2011A
WAITING AREA
2011-1
OFFICE
2004A
ACT-1 2800
GYP 3000 GYP 3000
ACT-1 2800
ACT-1 2800
ACT-1 2800
ACT-1 2800 ACT-1 2800 ACT-1 2800 ACT-1 2800 ACT-1 2800 ACT-1 2800
ACT-1 2800
ACT-1 2800
ACT-1 2800
ACT-8 3000
ACT-1 3000
ACT-1 2800
ACT-1 2800
ACT-1 2800
ACT-4 2800
GYP 2800
ACT-1 2800
ACT-1 2800
ACT-1 2800
ACT-1 2800
ACT-1 2800 ACT-1 2800
ACT-1 2800
ACT-1 2800
ACT-1 2800
PROJECTOR
H
ACT-2 3000
GYP 2800
EXP PT
UNIVERSAL W/R
2020
EXP PT
ACT-1 2800
GYP 2440
GYP 2440
ACT-3 3000
IT RM
2023
STUDY RM
2018B
STUDY RM
2018A
SPARE OFFICE -EDI
2004J
CHAIR OFFICE -ENTRE CENTRE
2004G
ACT-1 2800ACT-1 2800
ACT-1 2800
ACT-1 2800
EXP PT
ACT-5 3000
ACT-5 2600
ACT-5 2800
SKYLIGHT ABOVE
ACT-1 2800
ACT-1 3000
ACT-1 2800
GYP 2800
CORRIDOR
X2011
WD
-C44
00
ATRIUM 1
X2008
EXP PT
EXIST'G SERVICE SHAFT
SERVICE SHAFT SERVICE SHAFT
IT S
HAF
T SERVICE SHAFT
JAN.
2024
SER
VIC
E SH
AFT
EXH
AUST
HO
OD
SH
AFT
ADMIN
2014
STORAGE
2014J
STORAGE
2011J
ACT-1 2800 ACT-1 2800
ACT-1 2800ACT-1 2800
GYP 2800
WD-C 2800 WD-C 2800
ACT-8 7200ACT-8 7200
GYP 3600
3055
3241
6296
445 8401 445197 2073197
2213
197
6099
ACT-7 2800
PERCHLORIC EXHAUST CHASE TO
ROOF
ACT-1 2440
ACT-1 2800
593
5996
600
1359
413
46
197 2068197
1601
3401
2168
2333
2861 6331
4315 42
88
197
1982
197
816
3107
3281
3174
3836
1376
3856
9937
9181
619
3595
619
758
7800
7583500 27842784
3007
4516
2794
3462
3652
4876
4368 4207
1513 4153
1700
2950
3238
619
2844
1012
716
65
2466
3664
3847
4775
16424
832 7754
8126
2987
3525
1293
1637
4183
4375
5539
32914389323432343626362638443816
1101
8
3202
1841
2716
1376
3691
902
5696 57311266 3640 3640 1266
4323
22626
2229 4144
3846 6903
5054
2308
ACT-6
CONSTRUCTIONNORTH
197
EXP
VESTIBULE
X2001
WD-C 3000
824 2551 5942
378
GYP 2800
STAIR A
X1003
EXTERIOR WALL SCONCE
EXTERIOR WALL SCONCE
EXTERIOR WALL SCONCE
EX GYP
TUBULAR SUSPENDED FIXTURE
RECESSED FIXTURE
CIRCULAR SUSPENDED FIXTURE
CTS RECESSED FIXTURE
187
9290
VALANCE LED STRIP
ADMINISTRATIONEDI
2004
3049
CORRIDOR
X2014
EXTERIOR WALL SCONCE
CTS RECESSED FIXTURE
CTS RECESSED FIXTURE
CORRIDOR
X2010
CTS RECESSED FIXTURE
CTS RECESSED FIXTURE
SUSPENDED FIXTURE
PROJECTOR
R 1525
R 1525
R 1220
3080
3074
3039000
701
GYP 2800
PROJECTOR
MOTORIZED SCREEN
648
1752 3381
PROJECTOR
ACT-6
EXTERIOR WALL SCONCE
MOTORIZED SCREEN
CTS RECESSED FIXTURE
EXP PT
TYP
1181
3816
3687
2827
2827
4628
VALANCE LED STRIP
CTS RECESSED FIXTURE
CTS RECESSED FIXTURE
1A2.15 A3.25
2A2.15 A3.25
3A2.15 A3.25
4A0.11 A3.25
5A2.15 A3.25
6A2.15 A3.25
TYP
2265
TYP
1200
5872
2761
CN-16
CN-16
CN-17
CN-17
CN-16
CN-17
CN-16
CN-17
CN-18
CN-16
CN-16
CN-18
CN-19
CN-20
CN-20
5413
6892
6645 8693 7694
1243
2067
CEILING PLAN SYMBOL LEGEND
EXPOSED STRUCTURE
ULTIMA - 24"x24" - HIGH NRCACT-1
SUPPLY AIR DIFFUSER
OPTIMA - 30"x60" & 6"x60" - TECH ZONE - TEGULARACT-2
OPTIMA - 48"x48" - TEGULARACT-3
SOUNDSHAPES ACOUSTICAL CLOUDSACT-4
FORMATIONSACT-5
SOUNDSHAPES ACOUSTICAL CANOPIES - HILL CANOPY - 461/2"x75"ACT-6
GYPSUM BOARDGYP
EXP
WOODWORKS CHANNELED PLANKWD-C
WOODWORKS LINEAR - 33/4" (W)WD-L
EXPOSED STRUCTURE PAINTEDEXP PT
EXISTING GYPSUM CEILING TO REMAINEX GYP
EXISTING ACOUSTICAL CEILING TO REMAINEX ACT
VINYL TILE - 24"x24"ACT-7
METAL WORKS - TEGULAR (PERFORATION M2) - WHITEACT-8
SUPPLY AIR DIFFUSER - LINEAR
RECESSED FIXTURE - 6" (W)
RETURN AIR GRILLE - LINEAR
CYLINDRICAL EXTERIOR WALL SCONCE
SQUARE RECESSED DOWNLIGHT
RECESSED SPRINKLER
TUBULAR SUSPENDED FIXTURE - 4" (W) 2800 AFF
CIRCULAR SUSPENDED FIXTURE - 2800 AFF
VALANCE LED STRIP
EXHAUST AIR
RECESSED FIXTURE - 24"x24"
WALL MOUNTED FIXTURE
CEILING FAN W/ LIGHT
CONTINUOUS RECESSED FIXTURE - 4" (W)
SUSPENDED FIXTURE
SURFACE MOUNTED FIXTURE
PROJECTOR
SPEAKER
RETURN AIR GRILLE
SUSPENDED SQUIGGLE FIXTURE - 2800 AFF
PENDENT SPRINKLER
CYLINDRICAL PENDENT FIXTURE - 3000 AFF
WALL PACK FIXTURE
SQUARE PENDENT FIXTURE
BOLLARD LIGHT FIXTURE
CIRCULAR PENDENT FIXTURE
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Upper Level -Renovation ReflectedCeiling Plan
LU CASESAddition +Renovation
A2.15
2015-74A
05-DEC-2016
SCV/AJP/EMC
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 100A2.15A0.7
1 Upper Level - Renovation Reflected Ceiling Plan
Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 UPDATED FOR REFERENCE 28-JUL-20163 ISSUED FOR CLASS 'C' 04-AUG-20164 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
5 ISSUED FOR PERMIT 05-DEC-2016
XA XD
X1
X9
1
4
7
F
G
H
PENTHOUSE
3001
STAIR "C"
X3006
EXP
CONSTRUCTIONNORTH
CORRIDOR
X2007
EXP PT
EXP PT
CEILING PLAN SYMBOL LEGEND
EXPOSED STRUCTURE
ULTIMA - 24"x24" - HIGH NRCACT-1
SUPPLY AIR DIFFUSER
OPTIMA - 30"x60" & 6"x60" - TECH ZONE - TEGULARACT-2
OPTIMA - 48"x48" - TEGULARACT-3
SOUNDSHAPES ACOUSTICAL CLOUDSACT-4
FORMATIONSACT-5
SOUNDSHAPES ACOUSTICAL CANOPIES - HILL CANOPY - 461/2"x75"ACT-6
GYPSUM BOARDGYP
EXP
WOODWORKS CHANNELED PLANKWD-C
WOODWORKS LINEAR - 33/4" (W)WD-L
EXPOSED STRUCTURE PAINTEDEXP PT
EXISTING GYPSUM CEILING TO REMAINEX GYP
EXISTING ACOUSTICAL CEILING TO REMAINEX ACT
VINYL TILE - 24"x24"ACT-7
METAL WORKS - TEGULAR (PERFORATION M2) - WHITEACT-8
SUPPLY AIR DIFFUSER - LINEAR
RECESSED FIXTURE - 6" (W)
RETURN AIR GRILLE - LINEAR
CYLINDRICAL EXTERIOR WALL SCONCE
SQUARE RECESSED DOWNLIGHT
RECESSED SPRINKLER
TUBULAR SUSPENDED FIXTURE - 4" (W) 2800 AFF
CIRCULAR SUSPENDED FIXTURE - 2800 AFF
VALANCE LED STRIP
EXHAUST AIR
RECESSED FIXTURE - 24"x24"
WALL MOUNTED FIXTURE
CEILING FAN W/ LIGHT
CONTINUOUS RECESSED FIXTURE - 4" (W)
SUSPENDED FIXTURE
SURFACE MOUNTED FIXTURE
PROJECTOR
SPEAKER
RETURN AIR GRILLE
SUSPENDED SQUIGGLE FIXTURE - 2800 AFF
PENDENT SPRINKLER
CYLINDRICAL PENDENT FIXTURE - 3000 AFF
WALL PACK FIXTURE
SQUARE PENDENT FIXTURE
BOLLARD LIGHT FIXTURE
CIRCULAR PENDENT FIXTURE
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
As indicated
Penthouse - RenovatedReflected Ceiling Plan
LU CASESAddition +Renovation
A2.16
2015-74A
05-DEC-2016
EMC
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 100A2.16A0.7
1 Penthouse - Renovated Reflected Ceiling Plan
Rev. Description Date1 ISSUED FOR PERMIT 05-DEC-2016
DN
XA XD
X1
XB XC
X2
X3
X4
X5
X6
X7
X8
X9
X1A
X2A
X2B
A
1
3
4
5
6
7
1A2.7 A3.2
4A2.7 A3.2
2A2.7 A3.2
3A2.7 A3.2
1A2.7 A3.1
2A0.11 A3.1
CLERESTORYGALLERY
NEW ROOF TOP
NEW ROOF TOP
EXISTING ROOFEXISTING ROOF
EXISTING PENTHOUSE ROOF
EXISTING SKYLIGHT
ATRIUM SPACE
LAB HOOD EXHAUSTSSEE MECH DWGS AND CURB DETAILS
CLERESTOREY WINDOWS ON ROOF CURB, SEE DETAILS
CLERESTOREY WINDOWS ON ROOF CURB, SEE DETAILS
CLERESTOREY WINDOWS ON ROOF CURB, SEE DETAILS
1900
5700
2645
3655
2500
4800
4800
5000
(EXISTING)
24000
(NEW ADDITION)
38700
(EXI
S TIN
G)
3990
0
(NEW
AD
ITIO
N)
2910
0
2
B C D E F G
6422
9500 5000 9500 1900 3600 8000 8600 8600 5000 2000 1000
4950
5000
5000
5000
5000
5000
1738
1737
1525
1525
3425
5000
1995
0
NEW ROOFREPLACEMENTAS SPECIFIED
ATRIUMSPACE
ATRIUMSPACE
LAB HOOD EXHAUSTSSEE MECH DWGS
PROVIDE STEP AT ROOF ACCESS DOOR TO ROOF PADS
W4
W4
W4
W4
W2
PHERCHLORIC HOODEXHAUST, SEE MECH.SEE CURB DETAIL
SHAFTOPENING
EXIST'G ROOF DRAIN REPLACE W/ NEW
RDRD
RD RD
RD
----A2.17
NEW ROOF TOP
H
4A4.2A2.17
NEW ROOFREPLACEMENTAS SPECIFIED
P3C
PROVIDE STEP AT ROOF ACCESS DOOR
P3
P3
22064
PENTHOUSE
3001
VESTIBULE
X3007
STAIR "C"
X3006
LOW
ER A
TRIU
M R
OO
F
D30
01a
D30
01b
DX3006
----A2.17
CONSTRUCTIONNORTH
S2b
B2 C2 D2
ATRIUMSPACE
NEW ROOF REPLACEMENT AS
SPECIFIED
EXIST'G ROOF
NEW ROOF REPLACEMENT AS
SPECIFIED
EXIST'G ROOF
EXIST'G ROOF DRAINS, REPLACE WITH NEW
NEW ROOF REPLACEMENT AS
SPECIFIED
NEW ROOF HATCH ON EXIST'G OPENING - SEE DETAIL
CONC. SPLASH PAD BELOW
SCUPPER DRAIN OUTLET
SCUPPER DRAIN AND RWL TO EXIST ROOF - CONC. SPLASH PAD BELOW
SCUPPER DRAIN OUTLET
CN
-10
CN-11
CN-11
EXIST'G ROOF DRAIN REPLACE W/ NEW
CURTAIN WALL SYSTEM -SEE ELEVATIONS
W4
W4 SEE DETAIL
W6
W6
W6
SEE DETAIL
ROOF OVERHANG AND FLASHING, SEE DETAILS
ROOF DRAIN ROOF DRAIN
ROOF DRAIN ROOF DRAIN
P26C
P26C
WALKWAY MEMBRANE
1500
1500LAB HOOD EXHAUSTS (SEE MECH DWG'S) SEE CURB DETAIL
CN-12
W2
FPA-W FPA-WFPA-WROOF ACCESS LADDER SEE DETAILS
D30
01b
CN-12
CN-13
1500
ELECTRICAL PANELS, SEE ELEC. DWG'S
REFER TO M+E DWG'S FOR EQUIPMENT
LOCATIONS & LAYOUT
D30
00
EXISTING CHANCELOR PATERSON LIBRARY BUILDING
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
1 : 100
Penthouse Level Plan
LU CASESAddition +Renovation
A2.17
2015-74A
05-DEC-2016
CRS/NCM/SCV
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 100A2.17A0.7
1 Level 3 - Penthouse Floor Level
Rev. Description Date1 ISSUED FOR COORDINATION 05-MAY-20162 UPDATED FOR REFERENCE 18-JUL-20163 UPDATED FOR REFERENCE 20-JUL-20164 UPDATED FOR REFERENCE 28-JUL-20165 ISSUED FOR CLASS 'C' 04-AUG-20166 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
7 ISSUED FOR PERMIT 05-DEC-2016
XA XD
X1
XB XC
X2
X3
X4
X5
X6
X7
X8
X9
X1A
X2A
X2B
A
1
3
4
5
6
7
1A2.7 A3.2
2A2.7 A3.2
3A2.7 A3.2
1A2.7 A3.1
2A0.11 A3.1
2
B C D E F G
(EXISITING)
24000
(NEW ADDITION)
37700
250 9500 5000 9500 1900 3600 8000 8600 8600 5000 2000 1000
250
(EXI
S TIN
G)
3990
0
250
4950
5000
5000
5000
5000
5000
1738
1737
1525
1525
3425
250
(EXI
S TIN
G) (
FIEL
D V
ERIF
Y)
7382
(NEW
AD
DIT
ION
)
2910
0
293
5700
6300
2500
4800
4800
5000
EXISTING ROOF - DEXISTING ROOF - C
4000
O/O
PAR
APET
8600 O/O PARAPET
EXIS
TIN
G S
KYLI
GH
T AT
RIU
M S
PAC
E
NEW BRIDGE LINK ROOF
NEW UPPERFLOOR ROOF - B
LAB HOOD EXHAUSTSSEE MECH DWGS
LAB HOOD EXHAUSTSSEE MECH DWGS
NEW COOLING TOWER ON EXIST'G BASE SEE MECH DWGS
NEW ROOFREPLACEMENTAS SPECIFIED
NEW ROOFREPLACEMENTAS SPECIFIED
EXISTING PENTHOUSEROOF
NEW ROOF HATCH W/ SAFETYRAIL IN EXIST'G OPENING
RD
RD
RD RD
RD
H
1A2.18 A3.28
8A2.18 A3.28
4A2.18 A3.29
2A2.18 A3.28
6A2.18 A3.28
7A2.18 A3.28
5A2.18 A3.28
3A2.18 A3.28
4A2.18 A3.28
8A2.18 A3.28
SIM
7A2.18 A3.28
SIM
4A2.18 A3.28
SIM 4A2.18 A3.28
SIM
4A2.18 A3.28
SIM
3A2.18 A3.28
SIM
NEW PENTHOUSE &CLERESTORY ROOF
FALL PROTECTION ROOF ANCHORSWHERE NOTEDSEE DETAILS
FPA-R
FPA-R
PHERCHLORIC HOODEXHAUST, SEE MECH.
ROOF SLOPE LINES
ROOF SLOPE LINES
NEW ROOF DRAINSREFER TO MECH. DWG'S
RDRD
RD RD
RD
RD RD
FPA-R
RD
RD RD
3A2.18 A3.16
-A2.18 ---
2A2.18 A3.16
1A2.18 A3.16
FPA-R
FPA-R FPA-R
SD
SD
FALL PROTECTION ROOF ANCHORSWHERE NOTED
RD
RD
ROOF SLOPE LINES
NEW ROOF DRAINS REFER TO MECH. DWG'S
CONSTRUCTIONNORTH
3A2.18 A3.11
FPA-R
FPA-W
XL9
6A2.15 A3.25
SD
SD
FPA-R
FPA-R
FPA-R
FPA-RFPA-R
1A2.18 A3.29
2A2.18 A3.29
3A2.18 A3.29
B2 C2 D2
CN
-10
ROOF ACCESS LADDERSEE DETAILS
CN-11
CN-11
NEW
ATR
IUM
RO
OF
-A
NEW
ATR
IUM
RO
OF
-B
EXIST'G ROOF DRAINREPLACE WITH NEW BODY TYPICALFPA-R
EXIST'G ROOF DRAINREPLACE WITH NEW BODY TYPICAL
FALL PROTECTION ANCHORWHERE NOTED SEE DETAILS
FALL PROTECTION ANCHORWHERE NOTED SEE DETAILS
EXISTING ROOF - BEXISTING ROOF - A
EXIST'G ROOF DRAINREPLACE WITH NEW BODY TYPICAL
EXIST'G ROOF DRAINREPLACE WITH NEW BODY TYPICAL
NEW UPPERFLOOR ROOF - A
FALL PROTECTION ANCHORWHERE NOTED SEE DETAILS
CONC. SPLASH PAD BELOW
SCUPPER DRAIN AND RWL TO EXIST ROOF - CONC. SPLASH PAD BELOW
SCUPPER DRAIN OUTLET
SCUPPER DRAIN AND RWL TO EXIST ROOF - CONC. SPLASH PAD BELOW
SCUPPER DRAIN OUTLET
LAB HOOD EXHAUSTSSEE MECH DWGS
EXISTING CHANCELOR PATERSON LIBRARY BUILDING
COPYRIGHT NOTICE:Copyright of this electronic document
belongs to Cory R. Stechyshyn Architect Inc o/a i4architecture. This electronic
document may not be forwarded to others, transmitted, downloaded or reproduced in
any format, whether print or electronic, without the express, written permission of
the copyright owner.
Scale
Drawn by
Date
Project No.
12 St. Paul StreetThunder Bay, ON, CAP7A 4S5
807.346.2277 (office)8555.558.1459 (fax)i4a.ca
Project Name
Project Address
Sheet Name
Sheet Number
Professional Seal
DRAWINGS ARE NOT TO BE USED FOR CONSTRUCTION UNLESS ARCHITECTS SEAL IS AFFIXED, SIGNED AND DATED.
1 : 100
Overall Roof Plan
LU CASESAddition +Renovation
A2.18
2015-74A
05-DEC-2016
NCM/SCV
Lakehead University - 955Oliver Road, Thunder Bay
scale = 1 : 100A2.18A0.7
1 Overall Roof Plan
Rev. Description Date1 ISSUED FOR CLASS 'B' 50% CONSTRUCTION
DOC'S18-OCT-2016
2 ISSUED FOR PERMIT 05-DEC-2016