26
In th Petit Appr Tran Com Acce for g Mea And In the Powe 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 11 12 13 14 15 16 17 Order in Pe he matter o tion under roval for nsmission U mmission (G ess to Inter- grant of reg surement ( e matter of er Grid Corp Bihar Sta West Ben Grid Corp Damodar Power De Jharkhan Assam St Meghalay Govt. Of A 0. Power & 1. Electricity 2. Departme 3. Tripura S 4. Rajasthan 5. Ajmer Vid 6. Jaipur Vid 7. Jodhpur V CENTR tition No.129 of: Central El Execution Utility) Reg Grant of Co -State trans ulatory app URTDSM). f: poration of te Electricit ngal State E poration of O r Valley Cor eptt., Govt. d State Ele tate Electric ya State Ele Arunachal P Electricity D y Deptt., Go ent of Powe tate Electri n Rajya Vid dyut Vitran dyut Vitran Vidyut Vitra RAL ELEC 9/MP/2012 Petition with I.A Coram: Shri V.S Shri M. Date of Date of ectricity Re of Inter- ulations, 20 onnectivity, smission sy proval for ex . India ltd., G Vs ty Board, P Electricity B Orissa Ltd. rporation, K of Sikkim, ectricity Boa city Board, ectricity Boa Pradesh, It Deptt., Gov ovt. of Man er, Govt. of city Corpor dyut Prasar Nigam Ltd. Nigam Ltd. an Nigam Lt TRICITY R NEW n No. 129/M A. 18/2012 S. Verma, M Deena Day Hearing: Order : egulatory C -State Tra 010 read w Long Term ystem and r xecution of Gurgaon Patna Board, Kolka , Bhubanes Kolkata Gangtok ard, Ranchi Guwahati ard, Shillon anagar vt. of Mizora nipur, Imph Nagaland, ration Ltd., A an Nigam L , Ajmer ., Jaipur td, Jodhpur REGULATO DELHI MP/2012 Member yalan, Mem 9.4.2013 6.9.2013 Commission ansmission with Centra m Access a related mat f Unified Re ata swar ng am, Aizwal hal Kohima Agartala Ltd., Jaipur r ORY COMM mber n (Grant o Scheme al Electricity and Medium tters) Regu eal Time Dy …. MISSION Page 1 of of Regulato to Centr y Regulato m term Ope lations, 200 ynamic Sta Petitioner 26 ory ral ory en 09 ate

CENTRAL ELECTRICITY REGULATO RY COMM ISSION ...ning progr ata Conce locations i tions. Nod a cluster. Stage-II, P tation of U unication s and in co e stage-wis ogrammes /MP/2012 ransmissio

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  •  

    In thPetitApprTranComAccefor gMea

    And In thePowe

    1.2.3.4.5.6.7.8.9.1011121314151617

    Order in Pe

    he matter otion under roval for nsmission Ummission (Gess to Inter-grant of regsurement (

    e matter ofer Grid Corp

    Bihar Sta West Ben Grid Corp Damodar Power De Jharkhan Assam St Meghalay Govt. Of A

    0. Power & 1. Electricity2. Departme3. Tripura S4. Rajasthan5. Ajmer Vid6. Jaipur Vid7. Jodhpur V

    CENTR

    tition No.129

    of: Central ElExecution

    Utility) RegGrant of Co-State transulatory appURTDSM).

    f: poration of

    te Electricit

    ngal State Eporation of Or Valley Coreptt., Govt. d State Eletate Electricya State EleArunachal PElectricity D

    y Deptt., Goent of Powetate Electrin Rajya Viddyut Vitran dyut Vitran Vidyut Vitra

    RAL ELEC

    9/MP/2012    

    Petitionwith I.A Coram:Shri V.SShri M.

    Date of Date of

    ectricity Reof Inter-

    ulations, 20onnectivity, smission syproval for ex.

    India ltd., G Vs

    ty Board, PElectricity BOrissa Ltd.rporation, Kof Sikkim,

    ectricity Boacity Board, ectricity BoaPradesh, ItDeptt., Govovt. of Maner, Govt. of city Corpor

    dyut PrasarNigam Ltd.Nigam Ltd.

    an Nigam Lt

    TRICITY RNEW

                           

    n No. 129/MA. 18/2012

    S. Verma, MDeena Day

    Hearing: Order :

    egulatory C-State Tra010 read wLong Term

    ystem and rxecution of

    Gurgaon

    Patna Board, Kolka, Bhubanes

    Kolkata Gangtok ard, RanchiGuwahatiard, Shillonanagar

    vt. of Mizoranipur, Imph

    Nagaland, ration Ltd., Aran Nigam L, Ajmer ., Jaipur td, Jodhpur

    REGULATODELHI

                           

    MP/2012

    Member yalan, Mem

    9.4.2013 6.9.2013

    Commissionansmission with Centram Access arelated matf Unified Re

    ata swar

    ng

    am, Aizwalhal

    Kohima Agartala Ltd., Jaipur

    r

    ORY COMM

                           

    mber

    n (Grant oScheme

    al Electricityand Mediumtters) Regueal Time Dy

    ….

    MISSION

         Page 1 of 

    of Regulatoto Centr

    y Regulatom term Opelations, 200ynamic Sta

    Petitioner

      

    26 

    ory ral ory en 09 ate

  •  

    181920212223242526272829303132333435363738

    3940414243444546474849505152

    Partie

    1.2.3.4.5.

    Order in Pe

    8. Himachal9. Punjab St0. Haryana 1. Power De2. UP Powe3. Delhi Tra4. Chandiga5. Uttarakha6. BSES Ya7. BSES Ra8. North Del9. New Delh0. North Cen1. Karnataka2. Bangalore3. Gulbarga4. Hubli Elec5. Mangalor6. Chamund7. Transmis8. Eastern

    Visakhap9. Southern 0. Central P1. Northern 2. Kerala St3. Tamil Nad4. Electricity5. Electricity6. Madhya P7. MP Audyo8. Maharash9. Gujarat U0. Electricity1. Electricity2. Chhattisg

    es Present Shri Y.K. Shri Subi Shri Sanj Shri R.B. Shri S. Va

    tition No.129

    l Pradesh State ElectricPower Purcevelopmenter Corporatinsco Ltd., D

    arh Adminisand Power amuna Powajdhani Powlhi Power Lhi Municipantral Railwaa Power Tre Electricity Electricity ctricity Supre Electricitydeshwari Elsion CorpoPower D

    atnam Power Dis

    Power DistriPower Dist

    tate Electricdu Electriciy Deptt., Goy Deptt., GoPradesh Traogik Kendrhtra State E

    Urja Vikas Ny Deptt., Day Deptt., Dagarh State E

    t: Sehgal, PGr Sen, PGCeev Singh, Sharma, A

    allinayagam

    9/MP/2012    

    State Electrcity Board, chase Centt Deptt., Goon Ltd., LuDelhi stration, Ch

    Corporatiower Ltd., Dewer Ltd., DeLtd., Delhi l Corporatioay, Allahabransmissiony Supply CoSupply Comply Compay Supply Clectricity Su

    oration of AnDistribution

    tribution Cobution Comtribution Cocity Board, Tty Board, C

    ovt. of Pudovt. of Goa,adeco, Jaba Vikas Nig

    Electricity DNigam Ltd.,aman & Diuadra Nagar Electricity B

    GCIL CIL

    PGCIL Advocate, Bm, Advocate

                           

    ricity Board,Patiala

    tre, Panchkovt. of Jammcknow

    andigarh on Ltd., Dehlhi

    elhi

    on, New Dead

    n Corporatioompany Ltdmpany Ltd.

    any Ltd., Huompany Ltd

    upply Corpondhra Prad Compan

    ompany of mpany of Anompany of AThiruvanan

    Chennai ducherry, P, Goa

    balpur gam Limited

    Distribution CBaroda

    u, Daman Haveli, Silv

    Board, Raip

    BRPL e, TANTRA

                           

    , Shimla

    kula mu and Kas

    hradun

    elhi

    on Ltd., Bad., Bangalo., Gulbargaubli d., Mangalooration Ltd.esh Ltd., H

    ny of An

    Andhra Prandhra PradAndhra Pranthapuram

    Puducherry

    d, Indore Co. Ltd, Mu

    vasa ur

    ANSCO

                           

    shmir, Srina

    ngalore re

    ore , Mysore

    Hyderabad ndhra Pra

    adesh Ltd., esh Ltd., H

    adesh Ltd.,

    umbai

    ...........Re

         Page 2 of 

    agar

    adesh Ltd

    Tirupati Hyderabad

    Warangal

    espondents

      

    26 

    d.,

    s

  •  

    for gr

    (Gran

    to Ce

    Regu

    term

    Regu

    and '

    Dyna

    2.

    amon

    Order in Pe

    The petitio

    rant of regu

    nt of Regula

    entral Tran

    latory Com

    Open Acc

    lations, 20

    Connectivit

    mic State M

    Power Grid

    ng others:

    "(a) Grant Dynamic S (b) Grant charges amethodologtime; (c) Grant aby CERC; (d) Approvpetition filiRegulationand other e

    tition No.129

    ner, Power

    ulatory app

    atory Appro

    nsmission U

    mmission (G

    cess to In

    009 (herein

    ty Regulati

    Measureme

    d Corporatio

    RegulatorState Measu

    approval fore to be gy or any o

    approval for

    ve the reiming fee, a 42 of CEexpenditure

    9/MP/2012    

    O

    r Grid Corp

    proval unde

    oval for Ex

    Utility) Reg

    Grant of Co

    nter-State

    after referr

    ons' respe

    ent scheme

    on of India

    ry approvaurement (U

    or inclusionrecovered

    other sharin

    r inclusion o

    mbursementnd publishRC (Termse (if any) in

                           

    ORDER

    poration of I

    er Central E

    xecution of

    gulations, 2

    onnectivity,

    transmissio

    red to as '

    ctively) fo

    e.

    Limited (P

    al for impleRTDSM) S

    n of the athrough th

    ng mechani

    of system u

    t of expendhing of nos and Condrelation to

                           

    India Limite

    Electricity R

    Inter-State

    2010 read

    Long Term

    on system

    Regulatory

    or execution

    GCIL) has

    ementation cheme;

    assets for whe Point oism notified

    under Sched

    diture by thotices in n

    itions of Tathe filing of

                           

    ed has filed

    Regulatory

    e Transmiss

    with Centr

    m Access

    and relat

    y Approval

    n of Unified

    made follow

    of Unified

    which the of Connectd by CERC

    dule 2 of TS

    e beneficiaewspapersariff) Regulaf petition;”

         Page 3 of 

    d this petitio

    Commissio

    sion Schem

    ral Electrici

    and Mediu

    ted matter

    Regulation

    d Real Tim

    wing praye

    d Real Tim

    transmissiotion charge from time

    SA approve

    aries towards in term ations, 200

      

    26 

    on

    on

    me

    ity

    um

    rs)

    ns'

    me

    ers

    me

    on es to

    ed

    ds of

    09,

  •  

    3.

    of ne

    execu

    in the

    4.

    Meas

    Order in Pe

    The petitio

    cessary ord

    ution of the

    e main petit

    The scope

    surement sc

    (a) Installat

    STUs and

    switchyard

    (b) Installa

    network at

    (c) Installa

    NLDC, NT

    Nodal leve

    (d) Installa

    and four (4

    tition No.129

    ner has als

    der on urge

    Agreemen

    ion.

    e of work

    cheme (UR

    tion of Pha

    ISTS netw

    ;

    ation of PM

    400 kV and

    ation of Pha

    TAMC (Nat

    l in various

    ation of Rem

    4) NER Stat

    9/MP/2012    

    so filed an I

    ent basis p

    nt for implem

    covered

    TDSM sche

    sor Measu

    work at 400

    MU on 3199

    d above lev

    asor Data

    tional Tran

    States (59

    mote Cons

    tes (16 nos

                           

    nterlocutory

    permitting th

    mentation o

    under Unif

    eme) is as u

    rement Uni

    kV and ab

    9 transmis

    vel, and 220

    Concentrat

    nsmission A

    9 nos.);

    soles at eac

    .);

                           

    y Applicatio

    he petitione

    of the propo

    fied Real

    under:

    it (PMU) at

    bove level,

    sion lines

    0 kV genera

    tor (PDC)

    Asset Man

    ch RPC, U

                           

    on No.18/20

    er to go ah

    osed schem

    Time Dyn

    581 sub-st

    and 220 kV

    under STU

    ation switch

    at each S

    nagement

    UTs, CEA,

         Page 4 of 

    012 for issu

    head with th

    me as praye

    namic Sta

    tations und

    V generatio

    Us and IST

    hyard;

    LDC, RLDC

    Centre) an

    CTU, Sikki

      

    26 

    ue

    he

    ed

    ate

    er

    on

    TS

    C,

    nd

    im

  •  

    5.

    real t

    taking

    impro

    comp

    gener

    meas

    involv

    unifie

    analy

    efficie

    cost o

    five y

    6.

    in the

    Syste

    Electr

    would

    Order in Pe

    (e) Insta

    equipment

    cable).

    The petiti

    ime measu

    g preventive

    oved efficie

    plexity in In

    ration into

    surement of

    ving applica

    ed manner

    ysis, control

    ency of ava

    of the sche

    years as Rs

    The petiti

    e Joint Me

    em Planning

    ricity autho

    d be implem

    tition No.129

    llation of

    on various

    ioner has s

    urement, m

    e/corrective

    ency. The

    ndian powe

    grid as w

    f the entire

    ation of syn

    would help

    l and comm

    ailable reso

    me as Rs.5

    .147 crore

    ioner has s

    eeting of a

    g held on 5

    ority. In the

    mented by

    9/MP/2012    

    fibre optic

    s STU/ISTS

    submitted t

    monitoring a

    e control ac

    proposed

    r system, f

    ell as optim

    grid being

    nchrophaso

    p in inclusiv

    munication

    ources. Th

    500 crore a

    per annum

    submitted th

    all the five

    5.3.2012 wh

    said meeti

    PGCIL as s

                           

    c communi

    S transmiss

    hat the obj

    and visualiz

    ctions in the

    d scheme

    facilitate inc

    mal utilizat

    the need o

    or technolo

    ve and inte

    capabilities

    he petitione

    and the esti

    .

    hat the sch

    Regional

    hich was co

    ing, it was

    system stre

                           

    cation link

    ion corridor

    jective of th

    zation of po

    e regime of

    would als

    creased pe

    tion of reso

    of the hour.

    ogy at STU

    lligent mea

    s in order to

    er initially i

    imated imp

    heme was d

    Standing

    onvened un

    agreed tha

    engthening

                           

    ks along w

    rs (5000 km

    he URTDSM

    ower system

    f grid mana

    so address

    enetration o

    ources, rea

    . The URTD

    s and ISTS

    asurements

    o improve r

    ndicated th

    pact on tarif

    discussed

    Committee

    der the aeg

    at the URTD

    and cost th

         Page 5 of 

    with termin

    m Fibre Opt

    M scheme

    m as well a

    agement wi

    s increasin

    of renewab

    al time sta

    DSM schem

    S levels in

    s, monitorin

    reliability an

    he estimate

    ff for the ne

    and finalize

    es on Pow

    gis of Centr

    DSM schem

    hereof wou

      

    26 

    nal

    tic

    is

    as

    ith

    ng

    ble

    ate

    me

    a

    ng,

    nd

    ed

    ext

    ed

    wer

    ral

    me

    uld

  •  

    be ad

    Desig

    Electr

    Regu

    follow

    Order in Pe

    dded to the

    gnated IST

    ricity Regul

    lations, 20

    wing manne

    (a) In

    optic com

    under m

    strengthe

    Phaser D

    strategic

    other loca

    PMUs in

    (b) In

    implemen

    with comm

    institution

    STUs.

    (c) Th

    per the pr

    tition No.129

    e National T

    TS custom

    latory Com

    10. The sc

    er:

    n Stage-I, P

    mmunication

    microwave

    ening progr

    Data Conce

    locations i

    ations. Nod

    a cluster.

    Stage-II, P

    ntation of U

    munication

    ns and in co

    he stage-wis

    rogrammes

    9/MP/2012    

    Transmissio

    ers as pe

    mission (Sh

    cheme was

    PMUs wou

    n links are

    frequenc

    ramme by

    entrator (PD

    in States,

    dal PDC sh

    PMUs wou

    URTDSM sc

    links. Anal

    onsultation

    se deploym

    s indicated i

                           

    on Pool ac

    er the PoC

    haring of T

    s agreed to

    uld be plac

    either avai

    cy vacatin

    the year 2

    DCs) at all

    remote co

    all be prov

    ld be insta

    cheme in a

    lytics would

    with POSO

    ment of PMU

    in Table-1 a

                           

    ccount and

    C mechanis

    ransmissio

    o be implem

    ed at those

    ilable or wo

    ng progra

    2014-15 alo

    SLDCs, R

    nsoles at

    vided for co

    alled at rem

    association

    d be develo

    OCO, CEA ,

    Us and PD

    and Table 2

                           

    would be s

    sm under

    n Charges

    mented by P

    e locations

    ould be ma

    amme an

    ong with in

    RLDCs, NLD

    RPCs, CEA

    ollection of d

    maining loc

    with premi

    oped in par

    , RPCs and

    DCs would b

    2 below:

         Page 6 of 

    shared by a

    the Centr

    and Losse

    PGCIL in th

    s where fib

    ade availab

    nd region

    nstallation

    DC, NTAMC

    A, CTU an

    data from 4

    cations alon

    ier academ

    rallel with th

    d some of th

    be carried a

      

    26 

    all

    ral

    es)

    he

    re

    ble

    nal

    of

    C,

    nd

    40

    ng

    mic

    he

    he

    as

  •  

    T

    Order in Pe

    Region

    IS

    NR

    WR

    ER

    SR

    NER

    Total 2

    Table-2: St

    (d) Thunder:

    S No.

    1

    1.1 P

    1.2 PD

    R

    Wo

    Region

    NR

    WR ER

    SR NER Total

    tition No.129

    Table-1: SSub-

    stations

    STS STU

    74 42

    49 18

    51 31

    57 16

    9 5

    240 111

    351

    tage-II Imp

    he details o

    It

    MU includingfor moun

    Nodal PDCDC(25) and SRLDC, 2No P

    Back up NLorkstation, O

    Sub-statioISTS S

    9

    11 -

    3 9

    32 1230

    9/MP/2012    

    Stage-I ImplTransmis

    Lines

    ISTS S

    394

    456

    395

    338

    69

    1652

    2274

    plementatio

    of cost esti

    em

    g GPS & Panting PMU

    C (27), MasteSuper PDC (PDC at MainLDC includinOperator con

    ons TranSTU ISTS55 40

    58 6413 -

    55 1017 26

    198 140

                           

    lementationsion

    s PM

    STU ISTS

    224 206

    135 234

    149 202

    90 178

    24 36

    622 856

    1

    on Program

    imates for

    Unit

    Phasanel 1

    er (5) at n & g

    nsole

    nsmission LS ST

    21

    2850

    1945

    0 78925

                           

    n ProgrammMUs No

    P

    S STU

    120

    71 1

    79

    47

    13

    330 2

    186

    mme (Tent

    the above

    t (Nos.) U

    se-1

    186

    59

    Lines TU

    1

    80 0

    99 5

    85

                           

    me (Tentativodal DC

    MastePDC

    6 9

    11 4

    4 5

    6 4

    0 3

    27 25

    57

    ative)

    scope of

    (Rs inUnit Rate

    0.1

    0.15

    PMUsISTS 21

    33 -

    5 14 73

    483

         Page 7 of 

    ve) er

    C Super PDC

    1

    1

    1

    1

    1

    5

    work are a

    n crore) Estimated

    Cost

    118.6

    8.85

    s STU 111

    145 26

    105 23

    410

      

    26 

    Main & B/U NLDC

    2

    as

  •  

    (e) C

    Rs.35

    7.

    the fo

    Order in Pe

    1.3 D

    sto

    1.4 Crou

    1.5

    1.6

    1.7 Ca

    1.8

    2

    2.1 P

    2.2 C

    2.3 2.4 2.5

    2.6

    FO- Fibre

    Considering

    5 crore, tota

    In the RoP

    ollowing info

    (a) Copy o

    tition No.129

    & PrinterData archivinrage & Reco

    visualizatiCommunicatuters/switch Advanced F

    intrusionMiscellaneo

    Remoteapacity build

    Centrautilities/o

    Conti

    MU includingfor moun

    Communicatrouters/swi

    FO length-OSTM-16 SD

    Miscel

    Conti

    Optic, STM-

    the broad

    al cost of th

    for the hea

    ormation:

    of the schem

    9/MP/2012    

    rs, Panels. ng server wiovery serveron softwaretion interface and misc iteFire wall and

    n detection ous includinge Console ding –Traininl & State operators

    ngency

    g GPS & Panting PMU tion interfacetch and misc

    OPGW (in kmDH (2 Gpbs)laneous

    ngency

    - Synchrono

    estimated

    he URTDSM

    aring on 17

    me approve

                           

    ith r and

    es, ems 4

    d

    g L

    ng of L

    10%

    Phasanel 4

    es, c 2

    m) 10) 2

    L

    10%

    Gus Transpor

    Hierarchy

    cost of dev

    M scheme w

    .5.2012, th

    ed by Regio

                           

    59

    410

    59

    L.S.

    L.S.

    S

    % of (a) T

    se-2

    483

    230

    0000 230 L.S.

    S

    % of (c ) T

    Grand Total rt Module, Sy

    velopment o

    was pegged

    e petitioner

    onal Power

                           

    0.25

    0.01

    0.01

    Sub-total (a)

    Total (b)

    0.1

    0.01

    0.02 0.07

    Sub-total

    (c)

    Total (d) (b+d)

    SDH-Synchro

    of analytica

    d at Rs. 500

    r was direct

    r Committee

         Page 8 of 

    14.75

    4.1

    0.59

    2.5

    5.0

    154.39

    15.43 169.82

    48.3

    2.3

    200 16.1

    2

    268.7

    26.87 295.57 465.39

    onous Digita

    l software a

    0 crore.

    ted to subm

    e;

      

    26 

    al

    as

    mit

  •  

    8.

    replie

    Order in Pe

    (b) Results

    (c) Cost-be

    (d) Wheth

    Commissio

    approval o

    additional c

    The petiti

    es as under

    (a) Th

    the joint m

    Planning h

    Committee

    (b) As re

    synchropha

    through a

    been place

    The PMUs

    real time a

    tition No.129

    s of the pilot

    enefit analy

    her the pre

    on in variou

    of fees and

    capital expe

    ioner in its

    r:

    he URTDSM

    eeting of a

    held on 5.3

    es, STU/SLD

    egards the r

    aser techn

    pilot projec

    ed in some

    s located in

    and post di

    9/MP/2012    

    t schemes

    sis of the w

    esent prop

    us petitions

    d charges

    enditure for

    affidavit da

    M scheme w

    ll the Regio

    .2012 whe

    DC, NLDC

    results of th

    ology at in

    ct in Northe

    e selected

    different re

    ispatch app

                           

    already app

    whole schem

    posed sch

    filed by Re

    of the RL

    r installation

    ated 15.6.2

    was discus

    onal Standi

    rein the me

    and RLDC

    he Pilot Sc

    nter-State

    ern Region

    stations in

    egions are

    plications. T

                           

    proved by t

    me; and

    eme woul

    egional Loa

    LDCs has

    n of PMUs.

    2012 has s

    ssed, delibe

    ing Commit

    embers of

    s participat

    hemes, it h

    level was

    n. Subsequ

    Southern

    presently b

    The experi

                           

    the Commis

    d be feas

    ad Despatch

    already a

    ubmitted th

    erated and

    ttees on Po

    all the Reg

    ted.

    has been su

    introduced

    ently, PMU

    and Weste

    being utilize

    ences gain

         Page 9 of 

    ssion;

    sible as th

    h Centers f

    approved th

    he point-wis

    firmed up

    ower Syste

    gional Pow

    ubmitted th

    d in 2011-1

    Us have als

    ern Region

    ed for certa

    ned from th

      

    26 

    he

    for

    he

    se

    in

    em

    er

    at

    12

    so

    ns.

    ain

    he

  •  Order in Peti

    project hav

    Initiative in

    features a

    identificatio

    analysis, a

    (c) As rega

    that URTD

    grid param

    transfer to

    and facilita

    into the gr

    capability i

    economy in

    the scheme

    "FocorbassimMWtheonlpow(85 If wsidIn chawh

    ition No.129/

    ve been co

    n India” w

    available i

    on of the a

    nd itemizat

    ards the cos

    SM schem

    meters acro

    control cen

    ate integratio

    rid. The sc

    in a more

    n cost of po

    e with the h

    or example, rridors by 20sed upon v

    mulation studW. On implee Total Tranly, additionawer shall tra50X0.40X87

    we consider de then the toother wordsarges is of R

    hose cost is o

    /MP/2012      

    ompiled by

    which includ

    in present

    pplications

    tion of case

    st benefit a

    e would en

    oss the wi

    ntres for re

    on of the in

    cheme wou

    realistic w

    ower supply

    help of the f

    the cumulat012 is arounvoltage/angudies declareementation onsfer Capabal 850 MWanslate into a60)/103].

    cheapest raotal annual es, the subjecRs. 147 Cr. of the order

                           

    POSOCO

    des such

    t projects

    available a

    e studies for

    analysis of t

    nable synch

    idely sprea

    liable, secu

    ntermittent a

    uld also fa

    way to bring

    y. The petit

    following ex

    tive transmisnd 28,000 Mular stabilityed in the Mof URTDSMbility is incre

    power canannual energ

    ate of energyenergy cost ct scheme wshall enableof Rs. 595 C

                           

    in a report

    aspects a

    installed

    and used i

    r each appl

    the scheme

    hronous me

    ad grid wit

    ure and eco

    and variable

    acilitate est

    g efficiency

    tioner has e

    xample:-

    ssion capacMW. Howeve

    y consideraonth of Mar

    M scheme, coeased on th be exchangy of about

    y at Rs. 2 pecomes out t

    whose annuae the grid to Cr.

                           

    titled “Syn

    as the enu

    in differe

    n real time

    lications.

    e, it has bee

    easuremen

    th low late

    onomical g

    e renewabl

    imation of

    y in grid op

    explained t

    ity of all theer, the Tranation as werch, 2012 isonservative he inter-regionged. Such2978 MU [E

    er unit on theto be about Ral estimatedhandle add

       Page 10 of 

    nchrophase

    umeration

    ent region

    e and off lin

    en submitte

    t of real tim

    ency in da

    rid operatio

    le generatio

    the transf

    peration an

    the benefit

    inter-regionsfer capabilell as off-lins about 8,50side if 10% onal corridoh quantum

    Energy in MU

    e conservativRs. 595 Crsd transmissioditional energ

      

    26 

    ers

    of

    ns,

    ne

    ed

    me

    ata

    on

    on

    fer

    nd

    of

    nal ity ne 00 of

    ors of

    U=

    ve . on gy

  •  

    9.

    (BRP

    12.7.2

    of the

    Order in Peti

    Hepoiope

    (d) As rega

    installation

    that the P

    Commissio

    scheme.

    Replies to

    PL) and Bih

    2012 respe

    e submissio

    (a) The o

    monitoring

    preventive/

    and grid ef

    availability

    the transm

    The respo

    agrees to

    performanc

    percentage

    ition No.129/

    ence, the suint of view. eration of ve

    ards the ad

    of PMUs a

    PMUs und

    on have a

    o the petiti

    ar State E

    ectively. The

    ons are disc

    bjective of

    and vis

    /corrective

    fficiency. S

    of the tran

    mission syst

    ondents are

    a 100% p

    ce below 1

    e point of de

    /MP/2012      

    bject schemBesides ab

    ery large spr

    dditional ca

    as part of R

    er the pilo

    lready bee

    ion have b

    lectricity Bo

    e replies of

    cussed as u

    f the prop

    sualization

    control act

    ince the ex

    nsmission n

    tem capab

    e agreeab

    erformance

    00% may

    ecrease fro

                           

    me shall beove, it would

    read grid in n

    apital expe

    RLDC fee a

    ot scheme

    en exclude

    been filed b

    oard vide t

    f both the re

    under:

    osed sche

    of powe

    tion in the

    xisting syste

    network, th

    le of opera

    le to the

    e level of i

    result in de

    om 100% av

                           

    a good propd facilitate renew regime.

    nditures sa

    nd charges

    es for RLD

    ed from th

    by BSES R

    heir affidav

    espondents

    eme is rea

    er system

    new regim

    em is opera

    e proposed

    ating at 10

    proposal p

    its transmis

    ecrease @

    vailability.

                           

    position fromeliable, secu"

    anctioned to

    s, it has bee

    DCs appro

    he propose

    Rajdhani Po

    vits dated 9

    s are identic

    al time me

    as well

    me of grid m

    ating at mo

    d scheme s

    00% perform

    provided th

    ssion netw

    @ 1% of eq

       Page 11 of 

    m cost-beneure and stab

    o RLDCs f

    en submitte

    oved by th

    ed URTDS

    ower Limite

    9.7.2012 an

    cal. The gis

    easurement

    as takin

    manageme

    ore than 99

    should mak

    mance leve

    he petition

    work and an

    uity for eac

      

    26 

    efit ble

    for

    ed

    he

    SM

    ed

    nd

    sts

    ts,

    ng

    ent

    %

    ke

    el.

    er

    ny

    ch

  •  

    10. D

    subm

    shoul

    accor

    Order in Peti

    (b) As reg

    penetration

    of resource

    and no spe

    assure the

    (c) A large

    Centres a

    Expenditur

    The petiti

    communica

    proposed

    already ma

    (d) Only t

    Regional S

    URTDSM S

    charge of s

    During the

    mission mad

    d be discu

    rdance wit

    ition No.129/

    gards the s

    n of renewa

    es, it has b

    ecific or qua

    beneficiari

    e investme

    at the cos

    re has bee

    oner has

    ation syste

    expenditure

    ade is a hug

    the State T

    Standing Co

    Scheme an

    such invest

    hearing on

    de in its rep

    ussed with

    h the Reg

    /MP/2012      

    second obj

    able genera

    been stated

    antifiable pe

    es of the be

    ent has be

    st of the

    n allowed t

    also be

    ems retaine

    e of Rs. 5

    ge burden o

    Transmissio

    ommittees o

    nd the bene

    ment were

    10.7.2012

    ply to the p

    all stakeho

    gulatory Ap

                           

    jective of t

    ation into th

    d that these

    erformance

    enefits from

    een made

    beneficiarie

    to POSOC

    en allowe

    ed by it a

    500 crore

    on the bene

    on Utilities

    on Power S

    eficiaries w

    not invited

    2, learned c

    petition and

    olders. The

    pproval Re

                           

    he scheme

    e grid as w

    e objective

    e increase h

    m the projec

    in the Re

    es. A hug

    CO for the c

    ed fees a

    fter format

    over and

    eficiaries.

    attended t

    System Pla

    who would b

    in the mee

    counsel for

    submitted

    e Commissi

    egulations,

                           

    e to facilita

    well as optim

    s are gene

    has not bee

    ct.

    egional Loa

    ge amount

    control per

    and charg

    tion of PO

    above the

    he joint me

    anning for fi

    be required

    eting.

    the BRPL

    that propo

    ion had cla

    consultati

       Page 12 of 

    te increase

    mal utilizatio

    eric in natu

    en claimed

    ad Despatc

    t of Capit

    iod 2009-1

    ges for th

    OSOCO. Th

    e investme

    eeting of th

    rming up th

    d to bear th

    reiterated i

    osed schem

    arified that

    on with th

      

    26 

    ed

    on

    re

    to

    ch

    tal

    4.

    he

    he

    ent

    he

    he

    he

    its

    me

    in

    he

  •  

    benef

    URTD

    11.

    discu

    (a) UR

    in Hyd

    (b) I

    of the

    buses

    have

    29.11

    NRPC

    block

    Repo

    (c)

    Meeti

    be int

    Joint

    Order in Peti

    ficiaries is

    DSM schem

    The petit

    ssion in the

    RTDSM sc

    derabad an

    In the 23rd

    e proposed

    s which we

    been appr

    .2012, stag

    C, PGCIL

    king schem

    ort.

    URTDSM

    ing held on

    tegrated ef

    standing

    ition No.129/

    required a

    me in the RP

    ioner in its

    e Regional

    heme was

    nd after deli

    TCC and 2

    d scheme

    re connect

    roved in st

    ge-II (rema

    was advis

    me on the

    M scheme

    n 18.5.2012

    ffectively in

    committee

    /MP/2012      

    and accord

    PCs.

    s affidavit d

    Power Com

    discussed

    iberation, th

    26th meeting

    was appro

    ed by wide

    age-I. In th

    aining part)

    sed to carr

    line of re

    was discu

    2 at Indore.

    URTDSM

    meeting a

                           

    ingly, direc

    dated 13.2.

    mmittee me

    in the 20th

    he scheme

    g of NRPC

    oved for in

    e band netw

    he 24th TC

    ) was also

    ry out pilot

    commenda

    ussed and

    WRPC no

    scheme on

    and the in

                           

    cted the pe

    2013 has s

    eetings as u

    SRPC mee

    was appro

    held on 13

    stallation o

    work. In NR

    C and 27th

    approved.

    t project o

    ations of th

    deliberate

    oted that W

    n all India b

    nstallation

                           

    etitioner to

    submitted t

    under:

    eting held o

    oved.

    3.7.2012, th

    of PMUs o

    R, out of 460

    h RPC mee

    During this

    on PMU ba

    he Enquiry

    ed in the

    R WAMS p

    basis as de

    of PMUs

       Page 13 of 

    discuss th

    the status

    on 28.9.201

    he first stag

    only at thos

    0 PMUs, 33

    eting held o

    s meeting

    ased Zone

    y Committe

    20th WRP

    project wou

    ecided in th

    by WRLDC

      

    26 

    he

    of

    12

    ge

    se

    30

    on

    of

    -3

    ee

    PC

    uld

    he

    C.

  •  

    WRP

    place

    (d)

    princi

    (e) In

    felt th

    its co

    fruitfu

    ULDC

    welco

    const

    that e

    CERC

    schem

    analy

    12.

    subm

    Appro

    the g

    Order in Peti

    C further d

    ement.

    In specia

    ple for imp

    n the 22nd E

    hat (i) fresh

    ost benefit a

    ul if it could

    C schemes

    oming any t

    traints of E

    each const

    C. The peti

    me as to

    ysis.

    During th

    mitted that

    oval Regula

    grid param

    ition No.129/

    ecided that

    al TCC NE

    lementation

    ERPC mee

    investmen

    analysis an

    d be done

    s. Chairman

    technologic

    ER States,

    tituent wou

    itioner was

    how it wou

    he course o

    the regula

    ations for e

    eters, whic

    /MP/2012      

    t MSETCL

    ERPC mee

    n of propos

    eting held o

    nt in any sc

    nd (ii) delibe

    in compari

    n, JSEB in

    cal advance

    the project

    uld separat

    also reque

    uld preven

    of hearing

    atory appro

    expansion o

    ch is the

                           

    would exam

    eting held

    sed scheme

    on 25.8.201

    cheme coul

    eration on

    son to effe

    n his capac

    ement obse

    t might be

    ely commu

    ested to cir

    t the grid

    on 9.4.201

    oval can b

    of transmiss

    responsibil

                           

    mine inclus

    on 9.2.201

    e.

    2, the mem

    ld be made

    such new

    ectiveness o

    city as Cha

    erved that k

    funded by

    unicate its

    rculate a d

    collapse a

    3, learned

    e granted

    sion line an

    ity of syst

                           

    sion of Mum

    13, NERPC

    mbers of the

    e only after

    scheme co

    of present

    airperson,

    keeping in v

    PSDF. ER

    views in th

    raft paper

    along with

    counsel fo

    under the

    nd not for th

    tem operat

       Page 14 of 

    mbai for PM

    C agreed

    e Committe

    ascertainin

    ould be mo

    SCADA an

    ERPC whi

    view the fun

    RPC decide

    he matter

    on propose

    cost bene

    or the BRP

    e Regulator

    he improvin

    tor. Learne

      

    26 

    MU

    in

    ee

    ng

    re

    nd

    ile

    nd

    ed

    to

    ed

    efit

    PL

    ry

    ng

    ed

  •  

    couns

    was a

    13.

    cost e

    14.

    POSO

    that

    Regu

    Appro

    Order in Peti

    sel for TAN

    allowed. Ho

    The petiti

    estimates o

    • Ic

    • D

    • Iw

    We have

    OCO. First

    the regula

    lations for

    oval Regula

    "3. Scope (1) These (i) an ISTgeneratorsRegulatoryMedium-TMatters)

    ition No.129/

    NTRANSCO

    owever, TAN

    ioner vide

    of phase-I a

    Est

    URTD

    PHAInstallation ocontrol centeDevelopmen

    PHAInstallation owith associa

    TOTA

    considere

    of all, we d

    atory appro

    r improving

    ations provi

    e and appli

    regulations

    TS Schemes have souy Commisserm Open Regulation

    /MP/2012      

    O requeste

    NTRANSC

    its affidavit

    and phase-I

    imated Cos

    DSM

    SE-I of 1186 PMUers nt of analyticSE-II of 554 PMUsated terminaAL

    ed the subm

    deal with the

    oval canno

    g grid par

    ides as und

    cability

    s shall apply

    e proposedught long-tsion (Gran

    Access tos, 2009,

                           

    ed for one

    O has not f

    t dated 12.7

    I of the pro

    st of URTDS

    Us along with

    cs etc.

    s, 11000 kml equipment

    missions of

    e objection

    ot be gran

    rameters. R

    der:

    y to:

    d by Centraterm acces

    nt of Conno the Inter-and for w

                           

    week time

    filed any re

    7.2013 has

    oposed sche

    SM Scheme

    h 32 PDCs a

    m OPGW aloetc.

    f the petitio

    s of the lea

    nted under

    Regulation

    al Transmiss as per nectivity, Lo-State Tranwhich con

                           

    to file its

    ply.

    s submitted

    eme as und

    Cost ( crore)

    at 278.89

    ng 377.09

    655.98

    oner, respo

    arned couns

    r Regulato

    3 of the

    ission Utilitthe Centr

    ong-Term nsmission

    nsultation w

       Page 15 of 

    reply, whic

    d the revise

    der:

    Rs in

    9

    9

    8

    ondents an

    sel for BRP

    ory Approv

    Regulator

    ty, for whicral ElectriciAccess anand Relatewith Centr

      

    26 

    ch

    ed

    nd

    PL

    al

    ry

    ch ity nd ed ral

  •  

    In o

    enabl

    impro

    the R

    accor

    petitio

    Comm

    accor

    notice

    15.

    in all

    electr

    On th

    need

    Order in Peti

    Electricity setting upwith all the (ii) an ISTCentral Treconomicaconsultatiohas been h (2) ThesebeneficiariAgreemen

    our view, t

    ling reliabl

    oving syste

    Regulatory A

    rdance wit

    oner has c

    mittees. Th

    rdance with

    e, no sugge

    The India

    fronts viz.

    ricity marke

    he one han

    to be integ

    ition No.129/

    Authority ap the ISTS e beneficiar

    TS Schemeransmissional flow of on with Ceheld.

    regulationes/respecti

    nt to share t

    he URTDS

    e, efficient

    m paramet

    Approval R

    h Regulati

    consulted C

    he petition

    h the Reg

    estions/obje

    an power sy

    . generatio

    et also pose

    nd, non-co

    grated with

    /MP/2012      

    and beneficScheme,

    ries have no

    e for systen Utility to

    electricity ntral Electr

    ns shall noive STUs the transmi

    SM scheme

    t, coordina

    ters and is

    Regulations

    on 4 of t

    Central Ele

    ner has p

    gulatory Ap

    ections hav

    ystem is gro

    n, transmis

    es challeng

    onventional

    the grid for

                           

    ciaries if alrbut for whot been sig

    em strengthenable rewithin an

    ricity Autho

    ot apply to have sig

    ssion charg

    e is requir

    ated and e

    therefore

    . The petiti

    the Regula

    ectricity Au

    ublished a

    pproval Re

    e been rece

    owing mani

    ssion and d

    ge in maint

    energy re

    r sustainabi

                           

    ready identich Power ned on the

    hening/up-geliable, efficnd acrossority and b

    ISTS Schgned Bulk ges."

    red for sys

    economical

    covered un

    ioner has m

    atory Appro

    uthority and

    a notice in

    gulations.

    eived.

    ifolds and c

    distribution

    aining grid

    sources m

    lity. On the

                           

    tified has bPurchase date of app

    gradation, cient, co-or

    the regioeneficiaries

    eme, for wPower T

    stem stren

    flow of e

    nder Regul

    made the a

    oval Regu

    d the Reg

    n the new

    In respons

    complexity

    . New regi

    security an

    must be dev

    e other hand

       Page 16 of 

    been held fAgreemen

    plication.

    identified brdinated ann for whics if identifie

    which all thTransmissio

    gthening fo

    electricity b

    ation 3(ii) o

    application

    lations. Th

    ional Powe

    wspapers

    se to publ

    is increasin

    ime of ope

    nd reliabilit

    veloped an

    d, increasin

      

    26 

    for nts

    by nd ch ed

    he on

    or

    by

    of

    in

    he

    er

    in

    ic

    ng

    en

    y.

    nd

    ng

  •  

    emph

    interm

    powe

    transm

    transm

    The in

    have

    time m

    impac

    transm

    of syn

    with P

    emerg

    conte

    (URT

    inclus

    comm

    availa

    Comm

    that t

    have

    comm

    monit

    Order in Peti

    hasis on R

    mittency in

    er system n

    mission lin

    mission sys

    ncidents lik

    the potent

    measureme

    ct of such i

    mission sys

    nchrophaso

    Phasor Da

    ged to add

    ext, the p

    TDSM) sche

    sive and in

    munication

    able resou

    mittees on

    the benefits

    been made

    munication a

    toring the

    ition No.129/

    enewable

    their outpu

    now has 40

    es and sin

    stem feedin

    ke natural c

    tial to caus

    ents, monit

    ncidences.

    stem throug

    or technolo

    ta Concent

    dress the g

    proposed "

    eme would

    ntelligent m

    capabilitie

    rces. In th

    Power Sys

    s of synchr

    e possible

    and compu

    power sys

    /MP/2012      

    Energy So

    ut, contribut

    000 MW s

    ngle genera

    ng large citi

    calamity, etc

    se a major

    toring and c

    To addres

    gh smart g

    ogy using P

    trators (PD

    growing an

    "Unified R

    d help in id

    measureme

    s with aim

    he joint m

    stem Planni

    rophasor te

    due to tech

    utation. This

    stem in re

                           

    ources, whi

    te to challe

    single powe

    ation units

    es and var

    c., even on

    grid distur

    control syst

    ss these iss

    rid applicat

    Phasor Mea

    DC) and fib

    d emerging

    Real Time

    dentifying a

    ents, monit

    m to impr

    meeting of

    ng held on

    echnology f

    hnological d

    s technolog

    eal time, w

                           

    ch are bes

    enges in sy

    er stations,

    of 1000 M

    ious critica

    n a single e

    rbance. The

    tem is a m

    sues, introd

    tions is inev

    asurement

    re optic co

    g challenge

    Dynamic

    and develop

    toring, ana

    rove reliab

    all the fiv

    5.3.2012,

    for system

    developme

    gy has capa

    which would

                           

    set with va

    ystem oper

    high capa

    MW and 80

    l loads are

    lement of t

    e highest o

    ust to avoid

    uction of in

    vitable. The

    Unit (PMU

    ommunicatio

    es in the g

    State Me

    ping modul

    alysis and

    ility and e

    ve Region

    IIT Mumba

    monitoring

    nts in the f

    ability of me

    d be helpf

       Page 17 of 

    ariability an

    ation. India

    acity 765 k

    00kV HVD

    on the anv

    his capacit

    order of re

    d or mitigat

    ntelligence

    e applicatio

    U), integrate

    on links ha

    grid. In th

    easuremen

    les for mor

    control an

    efficiency o

    nal Standin

    ai highlighte

    g and contr

    field of GPS

    easuring an

    ful in bette

      

    26 

    nd

    an

    kV

    C

    vil.

    y,

    al

    te

    in

    on

    ed

    as

    is

    nt"

    re

    nd

    of

    ng

    ed

    rol

    S,

    nd

    er

  •  

    visua

    reliab

    16. T

    2011-

    been

    PMUs

    and p

    projec

    India

    'Sync

    the re

    real-t

    data/i

    digita

    freque

    powe

    Supe

    (SCA

    throug

    respe

    with t

    contro

    Order in Peti

    lization of

    bility, securi

    The synchr

    -12 through

    placed in

    s installed i

    post dispatc

    cts underta

    have be

    chrophasors

    eport which

    ime is de

    information

    al informatio

    ency, volta

    er station l

    rvisory C

    ADA/EMS).

    gh which t

    ective Load

    the high s

    ol centre,

    ition No.129/

    the system

    ty and econ

    rophasor te

    h pilot proje

    some sele

    in different

    ch applicatio

    aken in No

    en compil

    s Initiatives

    h indicates

    ependent

    n available

    on related

    age and po

    level is pr

    ontrol an

    In India, t

    he informa

    Despatch

    peed wide

    called Wi

    /MP/2012      

    m and utili

    nomy.

    echnology a

    ect in North

    ected statio

    regions are

    ons. The ex

    orthern, We

    led by PO

    in India'. T

    that ability

    on their

    with them

    to the pow

    ower flow (M

    resented in

    d Data

    there is a

    ation is rout

    Centre. Ho

    band comm

    ide Area

                           

    zation of e

    at inter-Stat

    hern Regio

    ons in Sout

    e presently

    xperiences

    estern, Sou

    OSOCO in

    The petition

    of the syst

    ‘situational

    in real-time

    wer system

    MW/MVAr)

    n the Load

    Acquisition

    hierarchica

    ted and up

    owever, the

    munication

    Measurem

                           

    existing tra

    te level wa

    n. Subsequ

    thern and

    being utiliz

    of the pilot

    uthern regio

    n a repor

    er has plac

    tem operato

    awarenes

    e. Convent

    m, such as

    measured

    d Despatc

    n/Energy

    al architectu

    pdated (eve

    e synchroph

    infrastruct

    ent System

                           

    ansmission

    s introduce

    uently PMU

    Western R

    zed for cert

    t/demo/ com

    onal power

    rt of POS

    ced on reco

    ors to take

    ss’ derived

    ionally, the

    circuit bre

    d at the su

    h Centre

    Manageme

    ure of SCA

    ery 10 seco

    hasor techn

    ure from s

    m (WAMS

       Page 18 of 

    assets wit

    ed in India

    Us have als

    Regions. Th

    tain real tim

    mplementa

    r systems

    SOCO title

    ord a copy o

    decisions

    d from th

    e analog an

    eaker statu

    bstation an

    through th

    ent Syste

    ADA syste

    onds) at th

    nology alon

    substation t

    ), has no

      

    26 

    th

    in

    so

    he

    me

    ry

    in

    ed

    of

    in

    he

    nd

    s,

    nd

    he

    m

    m

    he

    ng

    to

    ow

  •  

    overc

    monit

    enabl

    voltag

    interv

    17.

    reclos

    Distu

    Syste

    netwo

    valida

    study

    18.

    the p

    seque

    dip du

    also b

    inter a

    of mo

    stabil

    the o

    Order in Peti

    come the a

    tor the ph

    les visualiz

    ge/current,

    vals of the o

    It is obse

    se of EHV

    rbance Re

    em Protecti

    ork model,

    ation of tra

    y of Ringdow

    We have

    petitioner an

    ence comp

    uring fault,

    be used in

    area/ local

    ore Analyt

    ity and gen

    utput of WA

    ition No.129/

    above limit

    ase angles

    zation of m

    frequency,

    order of say

    erved that t

    lines, valida

    corder (DR

    on Scheme

    Validation

    ansfer capa

    wn oscillatio

    also consi

    nd they are

    ponents, an

    voltage re

    computatio

    area mode

    ics like ru

    neration of

    AMS has b

    /MP/2012      

    tation. With

    s at the c

    agnitude a

    rate of cha

    y 40 millisec

    there are m

    ation of me

    R)/ Event L

    e (SPS), va

    of Offline s

    ability, Spe

    ons and Co

    idered the

    e primarily

    ngular sepa

    covery afte

    on of Frequ

    e oscillation

    nning of r

    control sig

    been used f

                           

    h the help

    control cen

    nd angle o

    ange of fre

    conds at th

    many other

    easurement

    Loggers (E

    alidation of

    simulation s

    ectral Analy

    omputation

    practical ap

    for the pur

    aration, inte

    er clearance

    uency Resp

    s. Howeve

    eal time E

    nal etc. Th

    for PSS tun

                           

    of WAMS

    ntre. In ad

    of each pha

    quency and

    e Load Des

    r benefits li

    t cycle of df

    L), validati

    f steady sta

    study, detec

    ysis using

    of System

    pplications

    rpose of vi

    er area osc

    e of fault, s

    ponse Char

    r, there is a

    EMS and a

    e real time

    ning at gene

                           

    S it is now

    dition, this

    ase of the

    d angular s

    spatch Cen

    ike validatio

    f/dt relays,

    on of the

    ate SCADA

    ction of osc

    fast fourie

    Inertia con

    of PMUs s

    sualization

    cillations, d

    synchro ch

    racteristics,

    a need for d

    assessmen

    analysis d

    erating stat

       Page 19 of 

    possible t

    s technolog

    three phas

    separation a

    ntre.

    on of Auto

    validation o

    operation o

    A and offlin

    cillations an

    er transform

    stant.

    submitted b

    of phasor

    df/dt, voltag

    eck and ca

    detection o

    developme

    nt of syste

    done throug

    tions. As pe

      

    26 

    to

    gy

    se

    at

    o-

    of

    of

    ne

    nd

    m,

    by

    rs,

    ge

    an

    of

    nt

    m

    gh

    er

  •  

    above

    gener

    South

    These

    were

    As th

    Rama

    Damp

    also b

    inade

    and T

    WAM

    19.

    above

    Order in Peti

    e report of

    rating statio

    hern Regio

    e were cap

    considered

    (i)

    (ii)

    (iii)

    (iv)

    e oscillatio

    agundam,

    ping contro

    be propose

    equate dam

    Tehri powe

    MS.

    The petiti

    e level sub

    ition No.129/

    POSOCO,

    on in SR w

    on through

    ptured by P

    d:

    Oscillation

    damping

    Inter-Area

    Intra-Plan

    Intra-Plan

    scenario (

    the mode

    ns seem to

    it was sug

    ollers which

    ed for HVD

    mping. It is u

    er plants h

    ioner has s

    b-stations a

    /MP/2012      

    Oscillations

    whenever t

    HVDC Bh

    MUs. On a

    ns generat

    by HVDC C

    a Oscillation

    nt Oscillatio

    nt oscillation

    (inter-area

    of low freq

    o be origina

    ggested to

    h are norma

    C Back to

    understood

    have been

    sought to in

    and 220 kV

                           

    s were obs

    the power-f

    hadrawati in

    analysis of P

    ted by the

    Control Sys

    ns.

    ons in Weste

    ns in South

    oscillations

    quency osci

    ating on ac

    take up t

    ally provide

    Back Bhad

    that PSS T

    successful

    nstall PMU

    V generatio

                           

    served from

    flow from t

    ncreased t

    PMU outpu

    e HVDC Li

    stem.

    ern Region

    hern Region

    s) were furt

    illation.

    ccount of in

    tuning of P

    ed at HVDC

    drawati whi

    Tuning at K

    lly done ba

    at all sub-

    on switchy

                           

    Ramagund

    the Wester

    to 900MW

    ut, following

    ink due to

    n.

    n. PMU plo

    her analyse

    ntra-plant o

    PSS at Ra

    C Bipole st

    ich will help

    Karcham W

    ased on th

    stations of

    yard and al

       Page 20 of 

    dam (NTPC

    rn Region t

    and above

    g possibilitie

    inadequat

    ots of secon

    ed to identif

    scillations a

    amagundam

    tations mig

    p to addres

    Wangtoo HE

    he output o

    400 kV an

    ll feeders o

      

    26 

    C)

    to

    e.

    es

    te

    nd

    fy

    at

    m.

    ht

    ss

    EP

    of

    nd

    of

  •  

    STU,

    Phase

    meas

    feede

    now

    techn

    petitio

    reduc

    20.

    detail

    petitio

    analy

    some

    and i

    shoul

    21.

    Syste

    was a

    this s

    PDCs

    vide

    Order in Peti

    ISTS sepa

    e voltage a

    surement o

    ers are conn

    available i

    nology and

    oner is adv

    ce the proje

    The anal

    s of some

    on. We ar

    ytics (applic

    e of the ST

    mplementa

    d also ensu

    In joint m

    em Plannin

    around Rs.

    scheme was

    s and Optic

    affidavit da

    ition No.129/

    arately. It h

    and two 3 p

    of line curre

    nected to. H

    n the mark

    optimize

    vised to a

    ect cost with

    ytics are im

    application

    re of the o

    cations) in

    TUs in a tim

    ation of an

    ure that EM

    meeting of

    g held on

    355 Cr. In

    s around R

    cal Fibre Gr

    ated 12.7.2

    /MP/2012      

    has been c

    hase curre

    ents on tw

    However, P

    ket. It is e

    number of

    vail best p

    hout affectin

    mportant fo

    ns have be

    opinion tha

    consultatio

    me bound m

    alytics mus

    MS applicati

    all the five

    05.03.2012

    n the Proje

    Rs. 500 Cr w

    round Wire

    2013, the p

                           

    clarified tha

    nts. Thus, t

    wo feeders

    PMUs with m

    expected th

    f PMUs to

    possible co

    ng reliability

    or optimum

    een provide

    at the petit

    on with IIT,

    manner for

    st be done

    ions are av

    e Regional

    2, the broa

    ct Inception

    which includ

    (OPGW) o

    petitioner h

                           

    at each PM

    the same P

    and bus v

    more numb

    hat the pet

    be install

    onfiguration

    y.

    m utilization

    ed by the p

    tioner sho

    , POSOCO

    optimal ut

    e in the Ph

    vailable in re

    Standing

    d cost esti

    n Report (P

    ded installa

    of 10,000 km

    has submit

                           

    MU can me

    PMU should

    voltage of

    ber of phaso

    titioner will

    led at a lo

    n with an

    n of PMU o

    petitioner in

    ould devel

    O, CEA and

    tilization of

    hase-I. Th

    eal time in d

    Committee

    mates of

    PIR) cost e

    ation of 166

    m. Later in

    tted estima

       Page 21 of 

    asure one

    d be used fo

    the bus th

    or inputs ar

    utilize be

    ocation. Th

    endeavor t

    outputs. Th

    the prese

    op requisit

    d RPCs an

    the schem

    he petitione

    due course

    es on Powe

    this schem

    estimated fo

    69 PMUs, 5

    submissio

    ated cost fo

      

    26 

    3

    or

    he

    re

    st

    he

    to

    he

    nt

    te

    nd

    me

    er

    e.

    er

    me

    or

    59

    n,

    or

  •  

    Phase

    instal

    of An

    km of

    22.

    includ

    been

    Phase

    crore

    numb

    23.

    imme

    dimin

    fibre o

    micro

    by 20

    strate

    locati

    OPGW

    PMUs

    Order in Peti

    e-I as ` 27

    lation of 11

    nalytics etc.

    f OPGW alo

    The pet

    ding develo

    revised to

    e-II, cost of

    estimated

    ber of PDCs

    Further,

    ediately. Th

    utive perio

    optic comm

    owave frequ

    014-15 alon

    egic locatio

    ons as pro

    W along w

    s in sub-sta

    ition No.129/

    8.89 crore

    86 PMUs a

    . Phase-II

    ong with as

    titioner in P

    opment of a

    o `278.89 c

    f ` 377.09 c

    in PIR. The

    s and increa

    we observ

    he desired

    od. As prop

    munication l

    uency vaca

    ng with insta

    ons in Stat

    oposed by t

    with associ

    ations not c

    /MP/2012      

    and for Ph

    along with 3

    involves in

    ssociated te

    PIR had in

    analytics/ a

    crore as pe

    crore has b

    e Petitione

    ase in leng

    ve that Ph

    d benefit o

    posed, PM

    ink is eithe

    ting progra

    allation of P

    te, remote

    the petition

    iated termi

    connected to

                           

    ase-II as `

    32 PDCs at

    stallation o

    erminal equ

    nitially estim

    application

    er affidavit

    been estima

    r has not g

    th of optica

    hase-I invo

    of the sch

    Us will be

    r available

    mme and r

    PDCs at all

    consoles

    ner. Phase-

    inal equipm

    o wide ban

                           

    377.09 cro

    t control ce

    of balance

    uipments.

    mated `204

    software w

    dated 12.0

    ated now as

    given any ra

    al fibre.

    olves work

    eme shall

    placed at

    or would be

    regional stre

    SLDCs, R

    at RPCs,

    -II mainly in

    ment and

    d area netw

                           

    ore. Phase-

    enters and d

    554 PMUs

    4.82 crore

    which has s

    07.2013. S

    s compared

    ationale for

    and can

    also be

    those loca

    e made ava

    engthening

    RLDCs, NLD

    CEA, CTU

    nvolves lay

    installation

    work.

       Page 22 of 

    -I consists o

    developme

    and 11,00

    for Phase

    subsequent

    Similarly, fo

    d to ` 295.5

    r reduction

    be initiate

    visible in

    ations wher

    ailable unde

    g programm

    DC, NTAMC

    U and othe

    ying down o

    of balanc

      

    26 

    of

    nt

    00

    e-I

    tly

    or

    57

    in

    ed

    a

    re

    er

    me

    C,

    er

    of

    ce

  •  

    24.

    propo

    those

    be m

    streng

    SLDC

    RPCs

    25.

    Cable

    petitio

    requir

    propo

    comm

    OPGW

    syste

    the s

    appro

    OPGW

    the p

    PMUs

    Order in Peti

    According

    osed and a

    e locations

    ade availab

    gthening p

    Cs, RLDCs

    s, CEA, CT

    Phase

    es. Comm

    oner is gra

    red for exe

    osed by th

    munication

    W of afore

    m for powe

    scheme to

    oval for pr

    W for the s

    progress an

    s for Phase

    ition No.129/

    gly we gran

    greed in C

    where fibre

    ble under m

    programme

    , NLDC, NT

    U and othe

    e-II of the s

    unication

    anted liber

    ecution of U

    he petition

    requiremen

    mentioned

    er system o

    the Com

    oviding PM

    said phase

    nd benefit

    e-II.

    /MP/2012      

    nt in-princip

    EA meeting

    e optic com

    microwave

    by 2014-

    TAMC, stra

    er locations

    scheme m

    being bac

    rty to file a

    URTDSM a

    ner in Pet

    nts. The pe

    schemes t

    operation. C

    mmission. T

    MU for Pha

    . The petit

    of Phase-I

                           

    ple approva

    g dated 05

    mmunicatio

    frequency v

    -15 along

    ategic locat

    as propose

    ainly involv

    ck bone o

    a composi

    and Grid Se

    tition No

    etitioner sha

    to enable d

    CEA may al

    The Comm

    ase-II com

    ioner is dir

    I along wit

                           

    al for Phas

    5.03.2012, P

    n link is eit

    vacating pr

    with instal

    tions in Sta

    ed.

    ves laying

    of power s

    te scheme

    ecurity Exp

    265/MP/20

    all provide f

    due priority

    so be cons

    mission als

    mmensurate

    rected to ap

    th the upda

                           

    e-I of the s

    PMUs will b

    ther availab

    rogramme

    llation of P

    ate, remote

    down of O

    system op

    e for laying

    pert System

    012 as we

    full details

    y to the com

    sulted befor

    o accords

    e with the

    pprise the

    ated cost e

       Page 23 of 

    scheme. A

    be placed a

    ble or wou

    and region

    PDCs at a

    consoles a

    Optical Fibr

    peration, th

    g of OPGW

    m (GSES) a

    ell as othe

    in respect o

    mmunicatio

    re submittin

    in-princip

    approval o

    Commissio

    estimates o

      

    26 

    As

    at

    ld

    al

    all

    at

    re

    he

    W

    as

    er

    of

    on

    ng

    le

    of

    on

    of

  •  

    26.

    to Na

    progr

    27.

    regula

    transm

    URTD

    of the

    mitiga

    earth

    as the

    28.

    met th

    the sa

    equity

    shall

    Mana

    amou

    by PG

    loan f

    PSDF

    Order in Peti

    The petiti

    ational Pow

    ress report

    Some of

    atory appro

    mission sys

    DSM schem

    e URTDSM

    ate the prob

    fault, line t

    e forced ou

    BRPL and

    hrough Pow

    aid sugges

    y in the rati

    be funded

    aging Comm

    unt. Since t

    GCIL to PS

    for the mat

    F. It is clarif

    ition No.129/

    ioner is dir

    wer Comm

    of the proje

    f the bene

    oval should

    stem would

    me. In this c

    M scheme is

    bability of th

    to line fault,

    utage in the

    d BSEB ha

    wer System

    stion. In our

    io of 70:30

    d from the

    mittee of P

    here is a p

    DF and act

    tching amo

    fied that the

    /MP/2012      

    ected to su

    mittee (NPC

    ect to CERC

    eficiaries lik

    d be accor

    d achieve 1

    connection,

    s to improv

    he gird failu

    , etc. It may

    system ca

    ave suggest

    m Developm

    r view, the

    . PGCIL sh

    PSDF. PG

    SDF for re

    possibility o

    tual reimbu

    ount, which

    e execution

                           

    ubmit progr

    C) for revi

    C on quarte

    ke BSEB

    rded only

    100% avail

    , we intend

    e the visibi

    ure and can

    y not be po

    nnot be rule

    ted that the

    ment Fund (

    projects sh

    hall contribu

    GCIL shall

    imburseme

    f time lag b

    ursement of

    shall be re

    n of the sch

                           

    ress of imp

    iew of pro

    erly basis.

    and BRPL

    if the petit

    ability after

    to clarify th

    ility and sec

    nnot preven

    ssible to ac

    ed out.

    e funding fo

    (PSDF). We

    hould be fu

    ute the equ

    make an

    ent of funds

    between m

    f the fund, P

    epaid on re

    heme should

                           

    plementatio

    ogress and

    L have su

    tioner assu

    r implemen

    hat the prim

    curity of the

    nt the physic

    chieve 100%

    r the schem

    e are in agr

    unded throu

    ity and the

    application

    s equivalen

    aking of th

    PGCIL sha

    eceipt of the

    d not be aff

       Page 24 of 

    n of schem

    d submit th

    ubmitted th

    ures that th

    ntation of th

    mary purpos

    e grid and

    cal faults lik

    % availabili

    me should b

    reement wi

    ugh debt an

    debt portio

    n before th

    nt to the loa

    e applicatio

    ll arrange f

    e funds fro

    ffected in an

      

    26 

    me

    he

    hat

    he

    he

    se

    to

    ke

    ity

    be

    ith

    nd

    on

    he

    an

    on

    for

    om

    ny

  •  

    way o

    URTD

    29.

    shall

    help t

    also

    trainin

    feedb

    30.

    on 29

    Zone-

    For t

    Deve

    31.

    petitio

    reimb

    canno

    32.

    infruc

    Order in Peti

    on account

    DSM schem

    We obse

    share all re

    them in ca

    be invol

    ng/worksho

    back for the

    It is furthe

    9.11.2012

    -3 blocking

    this, the p

    lopment of

    The petit

    on. In term

    bursement

    ot be allowe

    Since, we

    ctuous.

    ition No.129/

    of the time

    me shall be

    rve that the

    elevant info

    apacity build

    lved in t

    op in all fi

    ese worksho

    er observed

    advised th

    g scheme in

    petitioner i

    Analytics p

    tioner has

    ms of our

    of filing fee

    ed.

    e have disp

    /MP/2012      

    e taken for g

    worked ou

    e URTDSM

    ormation an

    ding. Centr

    the capac

    ive regions

    ops in the fo

    d that NRP

    e petitione

    n line of rec

    s directed

    proposed u

    sought rei

    r order da

    e and expe

    posed of the

                           

    getting the

    t according

    M shall be p

    nd co-ordin

    ral and Sta

    city buildi

    s and POS

    orm of case

    C in its 24t

    er to carry

    commenda

    d to includ

    nder phase

    mburseme

    ated 11.1.2

    enses on p

    e main petit

                           

    funds from

    gly.

    part of sma

    nate with S

    ate Power U

    ng by P

    SOCO sha

    e studies.

    h TCC and

    out pilot p

    ation of Enq

    de pilot pr

    e-I of the sc

    nt of fee p

    2009 in P

    publication

    tion, I.A. No

                           

    m PSDF. Th

    art grid. Th

    MARTGRID

    Utilities per

    POWERGR

    all provide

    27th RPC m

    project on

    quiry Comm

    roject on

    cheme.

    paid by it

    Petition No

    in the pre

    o. 18/2012

       Page 25 of 

    e tariff of th

    he petitione

    D forum an

    rsonnel sha

    RID throug

    operation

    meeting he

    PMU base

    mittee repor

    PMU unde

    for filing th

    o. 109/200

    esent petitio

    has becom

      

    26 

    he

    er

    nd

    all

    gh

    al

    ld

    ed

    rt.

    er

    he

    09,

    on

    me

  •  

    33.

    Order in Peti

    This orde

    Sd(M. Deena Membe

    ition No.129/

    er disposes

    d/- Dayalan) er

    /MP/2012      

    of Petition

                           

    No. 129/M

                           

    P/2012.

                           

    (V.S. V

    Mem

       Page 26 of 

    sd/- Verma) mber

      

    26