Central DistrictRetail Phase ISite Plan #90

SPRC 3December 14, 2017

12/14/2017

Page 2: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

1

Agenda

Follow Up Items• Garage Volumes• Parking Circulation• Public Art & Sculpture: Potential Locations• North South Connection• Theater Architecture• Grocer Architecture• Potential Existing 1550 Treatment• Square Footage Calculations: Green & Impervious

New Items• Street & Sidewalk Sections• Block Sizing• Underground Network GFA• Community Benefits• Construction

12/14/2017

Page 3: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

2

Follow-Up Items

12/14/2017

Page 4: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

312/14/2017

Page 5: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

4

Public Art & Sculpture: Potential Locations

12/14/2017

Page 6: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

5

North South Connection

12/14/2017

Page 7: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

612/14/2017

North South Connection

Page 8: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

7

Theater Architecture

Page 9: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

8

Theater Architecture

Page 10: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

9

Theater Architecture

Page 11: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

1012/14/2017

Theater Architecture

Page 12: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

11

Theater Architecture

Page 13: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

12

Grocer Architecture

12/14/2017

Page 14: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

13

Grocer Architecture

Page 15: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

14

Grocer Architecture

Page 16: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

15

Grocer Architecture

Page 17: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

16

Potential Existing 1550 Treatment

12/14/2017

Page 18: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

17

SF Calculations – Green vs. Hardscape

Full Block Existing Public SF Private SF TotalGround Level Green 6,865 62,910 69,775

Ground Level Impervious 34,435 99,670 134,105

Rooftop Level Green 0 0 0

Rooftop Level Impervious 0 58,030 58,030

Total 41,300 220,610 261,910

Full Block Proposed Public SF Private SF TotalGround Level Green 34,725 24,040 58,765

Ground Level Impervious 54,325 35,900 90,225

Rooftop Level Green 0 26,970 26,970

Rooftop Level Impervious 0 85,950 85,950

Total 89,050 172,860 261,910

Existing

Adding 47,750 SF total of Public Space; 28,000 SF is Green

Proposed

12/14/2017

Page 19: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

18

New Items

18

12/14/2017

Page 20: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

19

Street & Sidewalk Sections

12/14/2017

Page 21: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

2012/14/2017

Street & Sidewalk Sections

Page 22: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

2112/14/2017

Street & Sidewalk Sections

Page 23: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

22

Block Sizing

250’

300’ 240’

830’250’

300’350’ 345’

500’ 500’

Clarendon Georgetown Old Town Del ReyCrystal City –

Central District Retail Phase I

12/14/2017

Page 24: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

23

1

5

2

4

3

1

5

2

43

Existing Metro EntranceProposed Metro EntranceUndergroundMt. Vernon TrailWater ParkVRE Station

Water Park 6

6

~192’ ~256’12/14/2017

Block Sizing

Page 25: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

24

Underground GFA Calculation Underground Network~110,000 SF

“Recognizing the value of this existing system, it is recommended to preserve its connectivity over-time with the understanding that the current layout may need to be modified to support the area’s redevelopment.”

– Crystal City Sector PlanSection 3.6.4, Page 52 12/14/2017

Page 26: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

25

Community Benefits

• Provision of Grocer

• Provision of Theater

• Crystal Drive and 15th Street Streetscape Improvements

• Street Dedications to Arlington County

• Public Art

• TDM

12/14/2017

Page 27: Central District Retail Phase I Site Plan #90 · 2017-12-21 · 0 Central District. Retail Phase I. Site Plan #90. SPRC 3. December 14, 2017. 12/14/2017

26

Construction Phasing

Area B

Area A

12/14/2017