Center Street & 2080 East Roadway Connection

Springville City

John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist

Center Street & 2080 East Roadway Connection

Springville City

John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist

Center Street & 2080 East Roadway Connection

Springville City

John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist

Center Street & 2080 East Roadway Connection

Springville City

John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist

Roadway Alignment

• Minimizes property acquisition• Incorporates a T-intersection where Spring Oaks

Drive meets Center Street• Meets Springville City specifications for road width• Horizontal curves designed for 35 mph speeds and

minimize size of required retaining wall size

Horizontal Alignment

Center Street & 2080 East Roadway Connection

Springville City

John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist

0 200 400 600 800 1000 1200 14004760

4780

4800

4820

4840

4860

4880

4900

4920

Existing Elevation Proposed Curve Elevation

Station [ft] (north to south)

Elev

ation

Roadway Alignment

• Minimizes property acquisition• Incorporates a T-intersection where Spring Oaks

Drive meets Center Street• Meets Springville City specifications for road width• Horizontal curves designed for 35 mph speeds and

minimize size of required retaining wall size

Vertical Alignment

Center Street & 2080 East Roadway Connection

Springville City

John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist

Roadway Alignment

• Minimizes property acquisition• Incorporates a T-intersection where Spring Oaks

Drive meets Center Street• Meets Springville City specifications for road width• Horizontal curves designed for 35 mph speeds and

minimize size of required retaining wall size

Center Street & 2080 East Roadway Connection

Springville City

John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist

• Cheaper than traditional concrete wall• MSE wall: $25-$35 / ft²• concrete wall: $60-$100 / ft²

• Polyethylene geogrids placed within soil provide strength

• Precast concrete facing units provide aesthetics• Designed using FHWA Publication No. NHI-00-043 &

Utexas Educational 4 software

Retaining Wall Design

Center Street & 2080 East Roadway Connection

Springville City

John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist

• Cheaper than traditional concrete wall• MSE wall: $25-$35 / ft²• concrete wall: $60-$100 / ft²

• Polyethylene geogrids placed within soil provide strength

• Precast concrete facing units provide aesthetics• Designed using FHWA Publication No. NHI-00-043 &

Utexas Educational 4 software

Retaining Wall Design

Center Street & 2080 East Roadway Connection

Springville City

John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist

• Cheaper than traditional concrete wall• MSE wall: $25-$35 / ft²• concrete wall: $60-$100 / ft²

• Polyethylene geogrids placed within soil provide strength

• Precast concrete facing units provide aesthetics• Designed using FHWA Publication No. NHI-00-043 &

Utexas Educational 4 software

Retaining Wall Design

Utexas Educational 4, © 2007

FS = 1.847

Center Street & 2080 East Roadway Connection

Springville City

John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist

Sedimentation Basin Design• Designed to prevent sediment from ending up in citizens’

yards after rainstorms• Will catch sediment at the root of the problem with bio

filters• 15” pipe will carry the sediment filled water from the bio

filters to the basin• Basin will be 6’ wide and 12’ long• Clean water will be piped into existing storm drains

Center Street & 2080 East Roadway Connection

Springville City

John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist

Sedimentation Basin Design• Designed to prevent sediment from ending up in citizens’

yards after rainstorms• Will catch sediment at the root of the problem with bio

filters• 15” pipe will carry the sediment filled water from the bio

filters to the basin• Basin will be 6’ wide and 12’ long• Clean water will be piped into existing storm drains

Center Street & 2080 East Roadway Connection

Springville City

John Cazier, Derrick Turner, Justin Brewer, Taylor Nordquist

Stormwater Sump Design• Designed to drain streets of water runoff from curb

and gutter• Curb face inlets catch water discharge from streets

and remove sediment• Filtered water is sent through a series of gravity flow

pipes, 15” diameter, to a centrally located manhole. • As the manhole fills, it releases the water into a sump

designed to allow stormwater to percolate into the ground