38th Engineering Squadron Center of Excellence for Air Force Cyberspace Infrastructure Establishing, Extending, Enabling the Cyberspace Domain The Overall Classification of this briefing is: UNCLASSIFIED Presenter: Mr. Stephen Mitchell 38 ES Engineering Services: Enabling the Cyber Domain

Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

38th Engineering Squadron

Center of Excellence for Air Force Cyberspace Infrastructure

Establishing, Extending, Enabling the Cyberspace Domain

The Overall Classification of this briefing is: UNCLASSIFIED

Presenter:Mr. Stephen Mitchell

38 ES Engineering Services: Enabling

the Cyber Domain

Page 2: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Agenda

2

• 38 ES Mission− Organizational Structure− Functional Task Areas

• Capabilities and Significant Activities− Installation Planning (CSIs)− Engineering Solutions - Special Mission Teams− Enterprise Planning− Project Management with Implementation Support

• Key Projects• Support Requests• Takeaways

Page 3: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Mission

3

Building the Foundation of Cyber Operations

“Cyberspace is a Man-Made Domain … a domain that must be engineered and sustained”

Page 4: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Organizational Structure

4

ACC

ENP ENO ENC ENI

24 AF

688 CW

38 CEIG

38 ES

Enterprise Planning

Program Management

Engineering Solutions

Installation Planning

Mr. Carroll E. Dobbs 38 ES/CLDSN: 884-7514

Mr. John R. Davis 38 ES/ENCDSN: 884-4119

Mr. Jeffrey R. Peters 38 ES/ENIDSN: 884-0560

Mr. Mehrdad R. Farahani 38 ES/ENODSN: 884-7540

Mr. Stephen L. Mitchell 38 ES/ENPDSN: 884-7578

Page 5: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

38th Engineering Squadron

5

Engineering Mgmt OpsHoney Badger TeamsSubject Matter Experts

Rqmts and ImplementationAFWP PMs (MAJCOM)

24 AF & Special Proj PMsEngineering SMEs

Workload Control

Enterprise EngineeringCSI-A (Air Staff) CSI-D (COCOM)

NAF, Functional, PMO,Cyber Weapon Systems

Consulting, Functional Specs,

Standard Solutions,ESS Roadmap,

BAN-FS, CMT, WHCA, JET,

C2 Networks

OP SENTIENT ARMOR(NETLAW, AFCSNet),

Base Assessments, SDP-Mod, NMCC, CMT

Engineering PlanningCSI-C (MAJCOM)

CSI-B (Base)

Design Reviews, Consultation,

Assessments, Rqmts Analysis, Costings,

Data Calls, AF Work Plan Input

EI Work Plan Execution, 24 AF Contract Support, Mgmt

of Special Projects,Site Surveys/SOOs/IGEs,

Workflow Management (CIPS, Nexus-E,BE-SCITL)

CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE SYSTEM INTEGRATORS

EnterprisePlanning

Engineering Analyses &

Assessments

EngineeringPlanning

Requirements &Implementation

HONEY BADGERSHONEY BADGERS

“Integrating Cyber for the Future”

Page 6: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Engineering Solutions: Capabilities

• NETLAW Teams• SMT/Network Troubleshooting Teams• AFCSN Teams• DCOI Teams

BaseSupport

• Harden the AFIN• Deployment/Employment Support for SPO (SDP Mod)• Review, evaluate, assess and perform directed infrastructure hardening• Mobility Evolution and Architecture Support • Cyber Solutions/Innovations

AFNETSupport

• 24 Supplement to AFI 33-150• FRAGO 3, 24 AF OPORD 15-001, OP Sentient Spanner (OSS)• CHANGE 1, FRAGO 1, TASKORD 15-0007, OP Sentient Armor (OSA)

SourceDocuments

6

Page 7: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Engineering Solutions: Significant Activities

7

• AFBAN FS/STIG Compliance• FY18: 9 Bases completed; 2 Bases in progress NETLAW

• Enterprise Level accredited network enclave• Harden ATCALS Platforms; 107 Sites FY19/20AFCSNet

• NIPR Routers - 61 of 123 bases completed• SIPR Routers – 46 of 107 bases completedANG SDP Mod

• Evaluate Data Centers; Develop Consolidation/Virtualization Plans; 2 –4/yrDCOI Support

• Resolve Network/Mission Outages at 13 locations in FY18Mission Assurance

SMT/IRT

Mobility

UNCLASSIFIED

• Derived Credentials; Collaboration Pathfinder; Native Apps; Future Architecture

Page 8: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Enterprise Planning: Capabilities

• Enterprise Standards Development Products• 3 Function Specs, 12 Enterprise Std Solns, 14 BBPs, 3 Design Guides

BaseSupport

• 24 AF/AFCYBER Support• Cyber Tech Rvw Boards/Weapon System Rvw Boards• IAFNOS and DCRIOS; NOS and CPT O&M Contracts

• Network Normalization Supporting Operation Sentient Armor (OSA) • Functional Specifications (FS) • Enterprise Standard Solutions (ESS) – Standardize the AF• Enterprise Bullet Background Papers (EBBP); emerging technologies• Design Guides• FY18 Enterprise Roadmap for Base-Level Infrastructure• Research and Development• Establish network discovery/capture/configuration audit process• Roadmap for Enterprise Infrastructure (Future effort)

AFNETSupport

• 24 Supplement to AFI 33-150• FRAGO 3, 24 AF OPORD 15-001, OP Sentient Spanner (OSS)• CHANGE 1, FRAGO 1, TASKORD 15-0007, OP Sentient Armor (OSA)

SourceDocuments

8

Page 9: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Enterprise Planning: Significant Activities

9

• AFBAN & IPN; AFSPC ApprovedFunctional Specs

• Key ESSs to Implement; Supporting JIEFY18 Enterprise

Roadmap

• Std Solutions: Components, Cost Estimates, Design Issues; Data Required

Enterprise Std Solutions

• Integrates IMSC’s efforts with CSIs• Developed ESSs/BBPs for ELMR, Giant Voice/Mass Notification &

VoiceAFIMSC Support

• Optimized BITI’s Efforts; Integrates BITI’s efforts with CSIsAFLCMC Support

24 AF Support • Annual Process; TS&Cs; Justifications

UNCLASSIFIED

Page 10: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Installation Planning: CSI Capabilities

• Each CSI-C (MAJCOM Level) cover 2 MAJCOMs; Total of 7 CSI-Cs• Each CSI-B (Base Level) cover 2 MOBs; Total of 56 CSI-Bs• Technical Consultant to CSO• Apply AF/Enterprise and MAJCOM Standard Solutions and Initiatives• MCP Communications Support• Infrastructure Assessments/Gap Analysis

• Rqmts Analysis, TS&Cs; Upgrade Plans• Knowledgeable of Missions; Support Mission Assurance• EI Workplan Support; EI Implementation Support

MAJCOM and Base Support

• Network SA; Identify Deviations from AF Standards• Network Documentation• Deployment Support for SPO• Employment Support (ENFAAS, SDP, etc.)• 24 AF Taskings; Data Calls; Assessment Requests• Mission Mapping (Future)• HBT Support

AFNETSupport

• 24 Supplement to AFI 33-150• MPTO 00-33D-2002• TASKORD 15-0007 • OPORD 15-0001

SourceDocuments

10

Page 11: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Installation Planning: CSI Significant Activities

11UNCLASSIFIED

• OSA Checklist/Automating Process; Network & Boundary DiagramsNetwork SA

• 60/63 Certified8570 Certification

• 85/90 Bases Completed; Standard FormatNetwork Diagrams

• Server Data; Migration Plan; TS&CsDCOI Support

• Mission Users; Connectivity; Traffic FlowsMission Assurance

• Operationalizing network tools; SolarWindsOperational

Support• Standardizing Infrastructure & AFNETStd Solutions

EI Workplan • Annual Process; Starts in Oct of Previous FY; TS&Cs; Justifications

Page 12: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Program Management: Capabilities

12

• Execution & Management of AF-wide EI Work Plan

• PM & Implementation Support to MAJCOMs and AF Bases

• Total Force Integration

• PM & Implementation Support; COCOMs, DoD & other Agencies

Requirements Implementation

Support

• 24 AF Acquisition

• Workload Control

• Downward Directed AF Projects

• 38 Task Schedule ManagementEnterprise Support

• 24 Supplement to AFI 33-150

• MPTO 00-33A-2001

• MPTO 00-33D-3002

•TASKORD 15-0007

SourceDocuments

UNCLASSIFIED

Page 13: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Program Management: System Engineering Capabilities

13

• Site survey• Develop SOO & IGE AFWP• Develop SOO & IGE EA

Base Support

• Outside Plant, MHDS• Video Surveillance Systems, IDS• Fixed and Deployable Communications systems• Inside-Plant Cable (Premise Wiring)• Voice over IP (VoIP)• Command Post Consolidation and Modernization• Mass Notification System, PA, Giant Voice• A/V Systems, VTC, SVTC• VDI• Radio, LMR

Capabilities Supported

• Completed 49 Work Orders to Date• Currently supporting 85 Work Orders AF-wideCY 18 Status

UNCLASSIFIED

Page 14: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Program Management: Significant Activities

14

• FY17: 133 Projects; Obligated $22.67M• FY18: 175+ Projects; Obligated $46.7MAF EI Work Plan

• FY17: 80 Completed; 12 in Progress• FY18: 49 Completed; 73 in Progress

Systems Engineering

• Support 15 EI Air National Guard Units; 1 EI Active Duty UnitTotal Force Integration

• FY 18: Completed 9 bases; 2 in ProgressNETLAW

• NIPR Routers - 61 of 123 bases completed• SIPR Routers – 46 of 107 bases completedANG SDP Mod

• 3 Cyber Services Contracts worth over $439M24 AF Acquisition

UNCLASSIFIED

Page 15: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Current Projects

15

• NMCC Support− Survey Existing Network Infrastructure− Develop Network Design; Support Execution

• Innovation Cell− Yubikey

− Collaboration Communications (AF CTO Request)− VPN Dependency Reduction

• Alternative User Platform Initiative (SAF/CIO)− MacOS devices on the NIPRNet

− AF Directory Services; Enterprise Applications

Page 16: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Current Projects

16

• CAC Pin Prompt− CTO IN1194− 38 ES (Lead), AFNIC, 83rd, 561st, 33 NWS, MicroSoft and HID Global− Result: GPO for ActivClient Middleware

• AFNET Domain Controllers Assessment‒ CTOs IN1192 and IN1439‒ Health of Domain Controllers; Engineering Recommendations

• SolarWinds Employment‒ Operationalize SolarWinds for Local Environment‒ Enterprise Architecture; MAJCOM view into Base

Page 17: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Current Projects

17

• Offutt Cyber Situational Awareness (SA) Pilot

‒ Integrating Existing Tools; SA of Base Networks

‒ Phase 1: SolarWinds; Phase 2: ACAS, SCCM, Tanium, HBSS

• Remote Engineering Support Center

− Remote Access to AFNET Equipment

− Near Instant Response to Network Issues

− Utilized for ANG SDP Mod Router Configurations

Page 18: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Support Requests

18

• Work with your CSI-B/C to Obtain 38 ES Services• CIPS 5.0 Workload Management Module• Air Force Work Plan (AFWP) in CIPS

– AFSPC funded; IMSC administrated– Comm Sq works with CSI-B; define rqmts; budgetary estimates; MAJCOM

coordination with CSI-C

• AF Form 229 (Submitted via BE-SCITL)– Projects not on the AFWP; Generally customer-funded

• Emergency Support– 24 AF on-boarding; SCITL/BE-SCITL process; e-mail

• 38 ES Service Catalog (in development)

UNCLASSIFIED

Page 19: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

DISAPPROVED APPROVED

Mission Partner works with CSI to prepare 38 CEIG service request

Mission Partner submits AFTO Form

229 to 38 CEIG

Support Requests

38 CEIG processes Request (Sends to 24 AF to become CTO or Assigns in Nexus-E)

38 CEIG fulfills Mission Partner

request

End

Prepare Submit Route Fulfill

AFTO Form 229 submitted via BE-SCITL or

sent to 38 ES or 85 EIS group

mailbox.

CSI works with Mission Partner to correctly scope and word the

request. CSI works with key 38 CEIG personnel to socialize the incoming

request.

38 CEIG reviews the request to determine if it is normal 38th AFI workload. If it isn’t then it must be routed to 24 AF for approval ([email protected]). If it is normal AFI then it will be process through local

Work Flow

24 AF Approves or Disapproves Workload

If the request requires AF EI Work Plan funding, the OPR

will create a CIPS Requirement from the

associated Work Order.

AFI

Non-AFI

UNCLASSIFIED 19BE-SCITL: https://cs2.eis.af.mil/sites/11779/38th%20Cyber%20Engineering%20Group%20Wiki%20Library/BE-SCITLHome.aspx

Page 20: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Take-Aways

• Mission: Deliver resilient infrastructure to further operations in/through cyberspace domain– All AF Missions; $35+B Supporting Infrastructure

• Four Flights– Installation Planning (CSIs)– Engineering Solutions (Cyber SMEs)– Enterprise Planning (Standards)– Program Management (Project Execution)

• Request Support Through Your CSI• Extends, Standardizes & Optimizes the AFNET

Establish – Extend – Enable: The Cyber Domain 20

Page 21: Center of Excellence for Air Force Cyberspace ......of Special Projects, Site Surveys/SOOs/IGEs, Workflow Management (CIPS, Nexus-E,BE-SCITL) CYBERSPACE SYSTEM INTEGRATORSCYBERSPACE

UNCLASSIFIED

Questions?

21Interstate! Thirty-eight!