This document contains confidential information intended only for the person(s) to whom it is addressed. The information in this document may not be disclosed to, or used by, any other person without Hatch's prior written consent.
German Solar Corporation
Centennial Road Solar Project - Construction Plan Report
H353010-00000-121-066-0071 Rev. B
May 16, 2017
This document contains confidential information intended only for the person(s) to whom it is addressed. The information in this document may not be disclosed to, or used by, any other person without Hatch's prior written consent.
German Solar Corporation
Centennial Road Solar Project - Construction Plan Report
H353010-00000-121-066-0071 Rev. B
May 16, 2017
German Solar Corporation Project Management Report Environment Sustainability and Community Interface
ManagementH353010 Centennial Road Solar Project Draft Construction Plan
Report
H353010-00000-121-066-0071, Rev. B,
Ver: 04.03 Hatch 2017 All rights reserved, including all rights relating to the use of this document or its contents.
Report
Centennial Road Solar Project Draft Construction Plan Report
H353010-00000-121-066-0071
2017-05-16 B Client Review J. Villella K. Vukovics K. Vukovics K. Vukovics
2017-04-24 A Internal Review J. Villella K. Vukovics K. Vukovics K. Vukovics
DATE REV. STATUS PREPARED BY CHECKED BY APPROVED BY APPROVED BY
Discipline Lead Functional Manager Project Manager
German Solar Corporation Project Management Report Environment Sustainability and Community Interface
ManagementH353010 Centennial Road Solar Project Draft Construction Plan
Report
H353010-00000-121-066-0071, Rev. B, Page i
Ver: 04.03 Hatch 2017 All rights reserved, including all rights relating to the use of this document or its contents.
Glossary
AC Alternating current
DC Direct current
EC Environment Canada
FIT Feed-in Tariff
FWCA Fish & Wildlife Conservation Act
GSC German Solar Corporation
HDPE High density polyethylene
HONI Hydro One Networks Inc.
IESO Independent Electricity System Operator
kW Kilowatt
MBCA Migratory Birds Convention Act
MNRF Ministry of Natural Resources and Forestry
MTCS Ministry of Tourism, Culture and Sport
OHSA Ontario Occupational Health & Safety Act
OPP Ontario Provincial Police
OPSS Ontario Provincial Standards Specification
PAHs Polyaromatic hydrocarbons
PHCs Petroleum hydrocarbons
PV Photovoltaic
REA Renewable Energy Application
German Solar Corporation Project Management Report Environment Sustainability and Community Interface
ManagementH353010 Centennial Road Solar Project Draft Construction Plan
Report
H353010-00000-121-066-0071, Rev. B, Page ii
Ver: 04.03 Hatch 2017 All rights reserved, including all rights relating to the use of this document or its contents.
Disclaimer
This report has been prepared by or on behalf of German Solar Corporation (GSC) on behalf of MNO Solar FIT 4 LP for submission to the Ontario Ministry of the Environment and Climate Change as part of the Renewable Energy Approval process. The content of this report is not intended for the use of, nor is it intended to be relied upon by, any other person. Neither GSC, MNO Solar FIT 4 LP nor any of their directors, officers, employees, agents or consultants has any liability whatsoever for any loss, damage or injury suffered by any third party arising out of, or in connection with, their use of this report.
German Solar Corporation Project Management Report Environment Sustainability and Community Interface
ManagementH353010 Centennial Road Solar Project Draft Construction Plan
Report
H353010-00000-121-066-0071, Rev. B, Page iii
Ver: 04.03 Hatch 2017 All rights reserved, including all rights relating to the use of this document or its contents.
Table of Contents
1. Introduction ........................................................................................................................................ 1-1
1.1 Background ................................................................................................................................ 1-11.2 Objective and Scope .................................................................................................................. 1-1
2. Project Construction Plan ................................................................................................................ 2-1
2.1 Construction Overview ............................................................................................................... 2-12.1.1 Site Plan and Project Drawings .................................................................................... 2-12.1.2 Construction Schedule ................................................................................................. 2-1
2.2 Construction/Installation Attributes ............................................................................................ 2-22.2.1 Safety Management...................................................................................................... 2-22.2.2 Workforce ..................................................................................................................... 2-22.2.3 Construction and Installation Equipment ...................................................................... 2-32.2.4 Materials Brought on Site ............................................................................................. 2-42.2.5 Security Gate, Fencing and Lighting ............................................................................ 2-52.2.6 Fire Control Plan ........................................................................................................... 2-52.2.7 Drainage ....................................................................................................................... 2-52.2.8 Landscaping and Vegetation ........................................................................................ 2-62.2.9 Power and Communication .......................................................................................... 2-62.2.10 Temporary Water Takings ............................................................................................ 2-62.2.11 Materials/Waste Generated At Or Transported From the Project Location ................. 2-6
2.3 Construction Phases .................................................................................................................. 2-62.3.1 Phase 1 Site Preparation ........................................................................................... 2-62.3.2 Phase 2 Construction and Installation ....................................................................... 2-82.3.3 Phase 3 Testing and Commissioning ........................................................................ 2-92.3.4 Phase 4 Site Restoration ......................................................................................... 2-10
3. Environmental Effects ....................................................................................................................... 3-1
3.1 Topography ................................................................................................................................ 3-13.2 Soils ........................................................................................................................................... 3-13.3 Groundwater .............................................................................................................................. 3-23.4 Surface Water Quality ................................................................................................................ 3-23.5 Aquatic Habitat and Biota .......................................................................................................... 3-23.6 Vegetation .................................................................................................................................. 3-33.7 Wildlife ....................................................................................................................................... 3-33.8 Air Quality and Noise ................................................................................................................. 3-43.9 Traffic ......................................................................................................................................... 3-43.10 Municipal Roadways .................................................................................................................. 3-53.11 Public and Construction Site Safety .......................................................................................... 3-53.12 Waste Management ................................................................................................................... 3-53.13 Land Use .................................................................................................................................... 3-53.14 Protected Properties .................................................................................................................. 3-5
German Solar Corporation Project Management Report Environment Sustainability and Community Interface
ManagementH353010 Centennial Road Solar Project Draft Construction Plan
Report
H353010-00000-121-066-0071, Rev. B, Page iv
Ver: 04.03 Hatch 2017 All rights reserved, including all rights relating to the use of this do