    German Solar Corporation

    Centennial Road Solar Project - Construction Plan Report

    H353010-00000-121-066-0071 Rev. B

    May 16, 2017

  • This document contains confidential information intended only for the person(s) to whom it is addressed. The information in this document may not be disclosed to, or used by, any other person without Hatch's prior written consent.

    German Solar Corporation

    Centennial Road Solar Project - Construction Plan Report

    H353010-00000-121-066-0071 Rev. B

    May 16, 2017

  • German Solar Corporation Project Management Report Environment Sustainability and Community Interface

    ManagementH353010 Centennial Road Solar Project Draft Construction Plan

    Report

    H353010-00000-121-066-0071, Rev. B,

    Ver: 04.03 Hatch 2017 All rights reserved, including all rights relating to the use of this document or its contents.

    Report

    Centennial Road Solar Project Draft Construction Plan Report

    H353010-00000-121-066-0071

    2017-05-16 B Client Review J. Villella K. Vukovics K. Vukovics K. Vukovics

    2017-04-24 A Internal Review J. Villella K. Vukovics K. Vukovics K. Vukovics

    DATE REV. STATUS PREPARED BY CHECKED BY APPROVED BY APPROVED BY

    Discipline Lead Functional Manager Project Manager

  • German Solar Corporation Project Management Report Environment Sustainability and Community Interface

    ManagementH353010 Centennial Road Solar Project Draft Construction Plan

    Report

    H353010-00000-121-066-0071, Rev. B, Page i

    Ver: 04.03 Hatch 2017 All rights reserved, including all rights relating to the use of this document or its contents.

    Glossary

    AC Alternating current

    DC Direct current

    EC Environment Canada

    FIT Feed-in Tariff

    FWCA Fish & Wildlife Conservation Act

    GSC German Solar Corporation

    HDPE High density polyethylene

    HONI Hydro One Networks Inc.

    IESO Independent Electricity System Operator

    kW Kilowatt

    MBCA Migratory Birds Convention Act

    MNRF Ministry of Natural Resources and Forestry

    MTCS Ministry of Tourism, Culture and Sport

    OHSA Ontario Occupational Health & Safety Act

    OPP Ontario Provincial Police

    OPSS Ontario Provincial Standards Specification

    PAHs Polyaromatic hydrocarbons

    PHCs Petroleum hydrocarbons

    PV Photovoltaic

    REA Renewable Energy Application

  • German Solar Corporation Project Management Report Environment Sustainability and Community Interface

    ManagementH353010 Centennial Road Solar Project Draft Construction Plan

    Report

    H353010-00000-121-066-0071, Rev. B, Page ii

    Ver: 04.03 Hatch 2017 All rights reserved, including all rights relating to the use of this document or its contents.

    Disclaimer

    This report has been prepared by or on behalf of German Solar Corporation (GSC) on behalf of MNO Solar FIT 4 LP for submission to the Ontario Ministry of the Environment and Climate Change as part of the Renewable Energy Approval process. The content of this report is not intended for the use of, nor is it intended to be relied upon by, any other person. Neither GSC, MNO Solar FIT 4 LP nor any of their directors, officers, employees, agents or consultants has any liability whatsoever for any loss, damage or injury suffered by any third party arising out of, or in connection with, their use of this report.

  • German Solar Corporation Project Management Report Environment Sustainability and Community Interface

    ManagementH353010 Centennial Road Solar Project Draft Construction Plan

    Report

    H353010-00000-121-066-0071, Rev. B, Page iii

    Ver: 04.03 Hatch 2017 All rights reserved, including all rights relating to the use of this document or its contents.

    Table of Contents

    1. Introduction ........................................................................................................................................ 1-1

    1.1 Background ................................................................................................................................ 1-11.2 Objective and Scope .................................................................................................................. 1-1

    2. Project Construction Plan ................................................................................................................ 2-1

    2.1 Construction Overview ............................................................................................................... 2-12.1.1 Site Plan and Project Drawings .................................................................................... 2-12.1.2 Construction Schedule ................................................................................................. 2-1

    2.2 Construction/Installation Attributes ............................................................................................ 2-22.2.1 Safety Management...................................................................................................... 2-22.2.2 Workforce ..................................................................................................................... 2-22.2.3 Construction and Installation Equipment ...................................................................... 2-32.2.4 Materials Brought on Site ............................................................................................. 2-42.2.5 Security Gate, Fencing and Lighting ............................................................................ 2-52.2.6 Fire Control Plan ........................................................................................................... 2-52.2.7 Drainage ....................................................................................................................... 2-52.2.8 Landscaping and Vegetation ........................................................................................ 2-62.2.9 Power and Communication .......................................................................................... 2-62.2.10 Temporary Water Takings ............................................................................................ 2-62.2.11 Materials/Waste Generated At Or Transported From the Project Location ................. 2-6

    2.3 Construction Phases .................................................................................................................. 2-62.3.1 Phase 1 Site Preparation ........................................................................................... 2-62.3.2 Phase 2 Construction and Installation ....................................................................... 2-82.3.3 Phase 3 Testing and Commissioning ........................................................................ 2-92.3.4 Phase 4 Site Restoration ......................................................................................... 2-10

    3. Environmental Effects ....................................................................................................................... 3-1

    3.1 Topography ................................................................................................................................ 3-13.2 Soils ........................................................................................................................................... 3-13.3 Groundwater .............................................................................................................................. 3-23.4 Surface Water Quality ................................................................................................................ 3-23.5 Aquatic Habitat and Biota .......................................................................................................... 3-23.6 Vegetation .................................................................................................................................. 3-33.7 Wildlife ....................................................................................................................................... 3-33.8 Air Quality and Noise ................................................................................................................. 3-43.9 Traffic ......................................................................................................................................... 3-43.10 Municipal Roadways .................................................................................................................. 3-53.11 Public and Construction Site Safety .......................................................................................... 3-53.12 Waste Management ................................................................................................................... 3-53.13 Land Use .................................................................................................................................... 3-53.14 Protected Properties .................................................................................................................. 3-5

  • German Solar Corporation Project Management Report Environment Sustainability and Community Interface

    ManagementH353010 Centennial Road Solar Project Draft Construction Plan

    Report

    H353010-00000-121-066-0071, Rev. B, Page iv