CELL / MODEL NAME DESCRIPTION DATE
BA-P-39CS-0 (1 of 3) Bridge Approach; Precast; 39 in. Constant Slope; No skew 6/15/2019
BA-P-39CS-0 (2 of 3) Bridge Approach; Precast; 39 in. Constant Slope; No skew 6/15/2019
BA-P-39CS-0 (3 of 3) Bridge Approach; Precast; 39 in. Constant Slope; No skew 6/15/2019
BA-P-39CS-L-Greater than 30
degrees (1 of 3)Bridge Approach; Precast; 39 in. Constant Slope; Left skew; Greater than 30 degrees 6/15/2019
BA-P-39CS-L-Greater than 30
degrees (2 of 3)Bridge Approach; Precast; 39 in. Constant Slope; Left skew; Greater than 30 degrees 6/15/2019
BA-P-39CS-L-Greater than 30
degrees (3 of 3)Bridge Approach; Precast; 39 in. Constant Slope; Left skew; Greater than 30 degrees 6/15/2019
BA-P-39CS-L-Less than or equal
to 30 degrees (1 of 3)
Bridge Approach; Precast; 39 in. Constant Slope; Left skew; Less than or equal to 30
degrees6/15/2019
BA-P-39CS-L-Less than or equal
to 30 degrees (2 of 3)
Bridge Approach; Precast; 39 in. Constant Slope; Left skew; Less than or equal to 30
degrees6/15/2019
BA-P-39CS-L-Less than or equal
to 30 degrees (3 of 3)
Bridge Approach; Precast; 39 in. Constant Slope; Left skew; Less than or equal to 30
degrees6/15/2019
BA-P-39CS-R-Greater than 30
degrees (1 of 3)Bridge Approach; Precast; 39 in. Constant Slope; Right skew; Greater than 30 degrees 6/15/2019
BA-P-39CS-R-Greater than 30
degrees (2 of 3)Bridge Approach; Precast; 39 in. Constant Slope; Right skew; Greater than 30 degrees 6/15/2019
BA-P-39CS-R-Greater than 30
degrees (3 of 3)Bridge Approach; Precast; 39 in. Constant Slope; Right skew; Greater than 30 degrees 6/15/2019
BA-P-39CS-R-Less than or equal
to 30 degrees (1 of 3)
Bridge Approach; Precast; 39 in. Constant Slope; Right skew; Less than or equal to 30
degrees6/15/2019
BA-P-39CS-R-Less than or equal
to 30 degrees (2 of 3)
Bridge Approach; Precast; 39 in. Constant Slope; Right skew; Less than or equal to 30
degrees6/15/2019
BA-P-39CS-R-Less than or equal
to 30 degrees (3 of 3)
Bridge Approach; Precast; 39 in. Constant Slope; Right skew; Less than or equal to 30
degrees6/15/2019
BA-P-44CS-0 (1 of 3) Bridge Approach; Precast; 44 in. Constant Slope; No skew 6/15/2019
BA-P-44CS-0 (2 of 3) Bridge Approach; Precast; 44 in. Constant Slope; No skew 6/15/2019
Approach Slabs-Bridge Precast Page 1 of 3 6/15/2019
CELL / MODEL NAME DESCRIPTION DATE
BA-P-44CS-0 (3 of 3) Bridge Approach; Precast; 44 in. Constant Slope; No skew 6/15/2019
Approach Slabs-Bridge Precast Page 2 of 3 6/15/2019
DATE REVISION HISTORY
8/11/2017 ● Added top and bottom footing elevations.
● Changed footing thickness to constant 10 inches such that the bottom of footing follows the grade.
● Corrected parapet reinforcement on base sheet BA-P-42FS-0.
● Called out formed joint at beginning of approach slabs.
● Removed strip seal details with the intent that the strip seal base sheets will cover these.
● Recessed fabric bearing pads into the footing and increased their thickness to 3/4 inch.
● Corrected miscellaneous editorial and drafting errors.
6/15/2019 ● Replaced F-shaped parapets with new constant slope parapets and revised all reinforcement accordingly.
● Called out wingwall joint material on cross section.
Approach Slabs-Bridge Precast Page 3 of 3 6/15/2019
(Sheet 1 of 3)
length of beam
Styrofoam block full
bearing pad
Interior fabric
wearing surface, typ.
Shear key cast with concrete
BA-P-39CS-0
PLAN
DETAIL 'A'
(Beams: 36" min. width; 72" max. width)
Bottom
A
B
C
D
F
E
Point
Approach
Top Top Bottom
Approach
FOR APPROACH FOOTING
TOP AND BOTTOM ELEVATIONS
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
for pavement connector
See Hwy. Std. 420401
15'-0" typ.
of Abut.
Back
Top and botto
m of
Approach Footin
g,
See Sec.
A-
A
-#
4 t10(E)
bars at 12"
cts.
¡
-#
4 b10(E)
bars at 12"
cts.
7'-0" 3'-0"
A A
Approach Footing
10'-0"
'-"
out to out
Approach Sla
b and Footin
g at curb
typ.
6"
A
B
C F
E
D
Bend to fit taper.
1-#4 b12(E) bar in curb, typ.
1'-
5"
1'-
5"
'-"
out to out
Approach Sla
b at parapet
23-#5 d11(E) bars at 8" cts. typ.
Lap with each a10(E) bar
16-#5 a12(E) bars at 12" cts., typ.
16-#5 a10(E) bars at 12" cts.
6"
tilt as necessary to fit curb
16-#4 a11(E) bars at 12" cts.,
bottom of slab, typ.
2-#5 b11(E) bars top and
typ.
2'-0" typ.
11"
5'-0" typ.
Footing. See Sec A-A
Top and bottom of Approach
20-#5 w10(E) bars at 6" cts.
30'-0" end to end approach
¡ Roadway
1'-5"
D(E)
bearing pad
*Interior fabric
NEAR ABUTMENT AT APPROACH FOOTING
typ.
1'-
3"
Bridge Approach Slab
1-11" x - Precast
Bridge Approach Slab
1-11" x - Precast
"2
13'-
1
(Looking )
See Detail 'A'
Slope % Slope % Slope % Slope %
CROSS SECTION
6"
cl.
2"
4"
3'-
3"
")4
1(±
" cl.
41
2
Bridge Approach Slabs
-11" x - Precast
D1(E)
d10(E)
e10(E)
d11(E)
b11(E)
a10(E)
b12(E)
a12(E)
b10(E)
w10(E) t10(E) bearing pad
*Exterior fabric
bonded to the top of the fabric bearing pads.
approach footing and bonded. Adjusting shims, when required, shall be
* Fabric bearing pads at the expansion end shall be recessed ¼" into the
adhesive as recommended by supplier.
bonded to wingwall with suitable
of the Standard Specifications)
2" PJF (per Article 1051.09
"43
"415
a11(E)
of approach slab full length.
Placed under cast in place portion
to ASTM C 578 (Types V, VII or XV).
" Cellular polystyrene according21
6-15-2019
"2
19
"2
17
"2
19
"2
17
")41(±
"413
")41(±
2"
"219 "2
17
surface, 5"
Concrete wearingmin.,
typ.2" cl
.
(Sheet 2 of 3)
3" Radius
"2
15
"2
1
Top of Beam
" Ø Conduit411
¡ Key
"213
2'-5"
"213
"2
14
"2
14
"211'-1
10" "213
"2
14
"2
14
3" Ø Hole
Edge of beam
INTERIOR EXTERIOR
B(E)
¡ Lifting loopof lift
60° min. angle
cl.
"211
S1(E)
S(E) or
B1(E)
S1(E)
S(E) or
"211
"2
11"4
11
11"
"4
3
"8
3
"85
face of outside beams
Omit key on exterior
(Showing dimensions)
"2
18
1'-
0"
D1(E)
D(E) "215
Bar No. Size Length Shape
B(E)
S(E) #5
#5
(For information only)
Bar No. Size Length Shape
B(E)
#5
#5
(For information only)
S1(E)
D(E) #4 #4D1(E)22 32
#9B1(E)
58
B1(E) #9
58
Interior Beam
bar spacing
#4 D(E)
bar spacing
#5 S(E)
typ.
1'-3"
¡ Lifting loops
Exterior Beam
5"
cts. full le
ngth,
botto
m
-#
9 B
1(E)
bars at
12"
cts. full le
ngth, top
-#
5 B(E)
bars at
5"
cts. full le
ngth,
botto
m
-#
9 B
1(E)
bars at
12"
cts. full le
ngth, top
-#
5 B(E)
bars at
except as noted
Symmetrical about ¡
typ.
10"
1'-5"
1'-2"
"211 "2
17
1'-5"
"211 "2
17
(Showing reinforcement)
S1(E)
S(E) or
cl.
"212
D1(E)
D(E) orB(E)
cl.
"2
11
B1(E)
utilized according to the manufacturer's recommendations may be used)
(An alternate lifting loop with a proof load of 25,000 lbs. and
6-15-2019
LIFTING LOOP DETAIL
FABRIC BEARING PAD
SECTION B-B SECTION C-C
EACH INTERIOR BEAM
BAR LIST
EACH EXTERIOR BEAM
BAR LIST
BA-P-39CS-0
C
C
C
B B
BB
PLAN
SECTION C-C
C
3"
4"
4"
Compressive strength of precast concrete during initial lifting, f'ci shall be 5,000 psi.
Compressive strength of precast concrete, f'c shall be 6,000 psi.
handling.
" Ø lifting pins shall be used to engage the lifting loops during21 A minimum 2
Bridge Approach Slab.
shall be provided for each bearing pad location. Cost included with Precast
" fabric adjusting shims of the dimensions of the exterior bearing pad81 Two
IDOT "Manual for Fabrication of Precast Prestressed Concrete Products."
precast prestressed deck beams with concrete wearing surface as specified in the
The top surface of precast bridge approach slabs shall be finished similar to
Cast-in-place substitution of Precast Bridge Approach Slab is not allowed.
square foot for Precast Bridge Approach Slab.
Standard Specifications and shall be paid for at the contract unit price per
The precast bridge approach slab shall be according to Section 504 of the
Notes:
30'-0" End-to-end beam
3"
3" 7"
3"
9"
28 Spaces at 6" = 14'-0"
8 Spaces at 1'-6" = 12'-0"
cl.
1"
3" Ø Holes
1'-10"
9"
9"
7"
rods at fixed ends only
¡ 2" Ø Holes for dowel
6"
270 ksi strands
" Ø 213-
6"7"
typ.
6"
3" 7" 8 Spaces at 1'-6" = 12'-0"
1'-10" 8 Spaces at 1'-6" = 12'-0"
28 Spaces at 6" = 14'-0"
9"
3"
29'-8"
29'-8"
29'-8"
29'-8"
6" 6"
(Beams: 36" min. width; 72" max. width)
D1(E)
D(E) or
S1(E)
S(E)
BARS D(E) & D1(E) BARS S(E) & S1(E)
bar spacing
#4 D1(E)
(fixed end only)
#4 D1(E) bar spacing
bar spacing
#5 S1(E)
slab footing end of beams.
Omit holes for fabric bearing pads at approach
bearing pads at expansion end shall be ¾" thick.
Bearing pads at fixed end shall be ½" thick and
Notes:
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
(Sheet 3 of 3)
Concrete Superstructure Cu. Yd.
Pound
Cu. Yd.Concrete Structures
Epoxy Coated
Reinforcement Bars,
Precast Bridge Approach Slab Sq. Ft.
Sq. Yd.
32
32
16
92
92
40
80
#5
#4
#5
#5
#5
#4
#4
#5
6'-5"
9'-8"
#4
D1(E)
D(E) or"
21
Surface, 5"
Concrete Wearing
1'-
4"
footing
Approach
approach slab
Precast bridge
1'-
3"
3'-6"
parapet
End ofThreads
41
Nut
and washer
Locknut
Cost of anchor bolt assemblies included with Concrete Superstructure)
Article 1006.09 of the Standard Specifications.
(Anchor bolt assemblies shall be galvanized according to
typ.
"411
3'-6" 3'-0"
7'-0" 3'-0"
for Structures
Granular Backfill
6-15-2019BA-P-39CS-0
BILL OF MATERIAL
TWO APPROACHES
INSIDE ELEVATION OF PARAPET AND CURB
SECTION A-A
")4
1(±
" cl.
41
2
9"
7" 5"
Approach Slab.
beam). Cost included with Precast Bridge
holes drilled and grouted in cap (2 each
" Ø21¡ 1" Ø x 2'-0" Dowel rods in 1
cl.
2"
cl.
2"
bearing pads
" Fabric43¡
6"
29'-8"
14'-8"
6'-5"
14'-8"
Concrete Wearing Surface, 5"
4"
1" Ø ANCHOR BOLT
(Beams: 36" min. width; 72" max. width)
Bar No. Size Length Shape
a10(E) b10(E)
w10(E)
t10(E)
BAR d10(E)
BAR a11(E)
BAR a12(E)
a10(E)
a11(E)
b10(E)
b11(E)
d10(E)
d11(E)
e10(E)
t10(E)
w10(E)BAR d11(E)
See sheet __ of __ for details.
Strip Seal Joint
10"
" Fabric bearing pads21¡
relief joint sealer. Full width.
¼" x ¾" Formed joint with bridge
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
Cost of cellular polystyrene is included with Concrete Superstructure.
For Granular Backfill for Structures and drainage treatment details, see sheet of .
Cost of excavation for approach footing included with Concrete Structures.
The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.
Approach footing concrete shall be paid for as Concrete Structures.
Parapet concrete shall be paid for as Concrete Superstructure.
The strip seal shall extend 6" beyond the edge of the approach slab on each end.
be paid for separately, but will be included in the cost of Concrete Wearing Surface, 5".
Any concrete poured monolithically with the wearing surface, such as curbs, shall not
and wearing surface.
the Standard Specifications for a minimum of 24 hours before casting the shear keys
to top of precast slab and cured according to Article 1020.13(a)(3) or 1020.13(a)(5) of
abutment and anchor dowels placed. Dowel holes shall be filled with non-shrink grout
After precast bridge approach slabs have been erected, holes shall be drilled into
bridge length plus the length of the bridge approach slab.
length of bridge used to calculate the adjustment shall be equal to half the total
Standard Specifications. However, since this detail is for jointless structures, the
The joint opening shall be adjusted for temperature per Article 520.04 of the
Notes:
15'-0" 15'-0"
2'-0"
5"
4"
5'-0"
2"
Cut last 3 bars to fit taper
23-#5 d10(E) bars at 8" cts.
section near abutment
10-#4 e10(E) bars. See cross
b12(E)
Standard 631031.
connections see Highway
631026. For Type 6 terminal
View B-B and Highway Standard
terminal connections only, See
1" Ø Anchor bolts for Type 5
D
D
Bend to fit taper
Rad.
"852
2'-
7"
"437
"2
1
2'-
7
"8111
6"
4"
4"
4"
¡ 1" Ø Anchor bolts
"436
"8
72'-
0
"43 "4
15
11"
5"
Rad.
"814 "8
11'-0
"8
71'-
9
"8
71'-
9
"811'-0 1'-2"
6"
1'-
11"
BAR a10(E)
6'-6"
1'-
0"
8"
a12(E) 64 #5 8'-2"
b12(E) 4 #4 14'-8"
a11(E)
30'-0" end to end approach
typ.
10"
typ.
"2
15
VIEW D-D
(Sheet 1 of 3)BA-P-39CS-L(>30°)
PLAN
(Beams: 36" min. width; 72" max. width)
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
"2
19
1'-
5"
"2
17
"2
19
1'-
5"
"2
17
23-#5 d11(E) bars at 8" cts. typ.
'-"
out to out
Approach Sla
b at parapet
of Abut.
Back
¡
C
B
A D
E
F
Approach Footing
10'-0"7'-0"
3'-0"
5'-0" typ.
for pavement connector
See Hwy. Std. 420401
Top and botto
m of
Approach Footin
g,
See Sec.
A-
A
-#
4 t10(E)
bars at 12"
cts.
'-"
out to out
Approach Sla
b and Footin
g at curb
AA
See S
ec A-A
of Approach Footing.
6" cts. Top and bottom
20-#5 w
10(E) bars at
Skew
°
bar to fit
Bend d11(E)
Bend to fit taper.
1-#4 b14(E) bar in curb.
Bend to fit taper.
1-#4 b13(E) bar in curb.
d11(E) bar to fit
Cut back leg of
15'-0"
15'-0"
30'-0" end to end approach
-#5 a10(E) bars at 12" cts.
tilt as necessary to fit curb
-#4 a11(E) bars at 12" cts.
with each a10(E) bar
at 12" cts., typ. Lap
-#5 a12(E) bars
bottom of slab, cut to fit
2-#5 b11(E) bars top and
bottom of slab, cut to fit
2-#5 b12(E) bars top and
6-15-2019
-#4 b10(E) bars at 12" cts.
length of beam
Styrofoam block full
bearing pad
Interior fabric
wearing surface, typ.
Shear key cast with concrete
DETAIL 'A'
Bottom
A
B
C
D
F
E
Point
Approach
Top Top Bottom
Approach
FOR APPROACH FOOTING
TOP AND BOTTOM ELEVATIONS
bonded to the top of the fabric bearing pads.
approach footing and bonded. Adjusting shims, when required, shall be
* Fabric bearing pads at the expansion end shall be recessed ¼" into the
")41(±
"413
")41(±
2"
¡ Roadway
1'-5"
D(E)
bearing pad
*Interior fabric
NEAR ABUTMENT AT APPROACH FOOTING
typ.
1'-
3"
Bridge Approach Slab
1-11" x - Precast
Bridge Approach Slab
1-11" x - Precast
"2
13'-
1
(Looking )
See Detail 'A'
Slope % Slope % Slope % Slope %
CROSS SECTION
6"
cl.
2"
4"
3'-
3"
")4
1(±
" cl.
41
2
Bridge Approach Slabs
-11" x - Precast
D1(E)
d10(E)
e10(E)
d11(E) a10(E)a12(E)
b10(E)
w10(E) t10(E) bearing pad
*Exterior fabricadhesive as recommended by supplier.
bonded to wingwall with suitable
of the Standard Specifications)
2" PJF (per Article 1051.09
"43
"415
a11(E)
of approach slab full length.
Placed under cast in place portion
to ASTM C 578 (Types V, VII or XV).
" Cellular polystyrene according21
"219 "2
17
surface, 5"
Concrete wearing
b12(E)
b11(E) or
typ.
2'-0" typ.
11" typ.
6"
b14(E)
b13(E) or
min., typ
.2" cl.
(Sheet 2 of 3)
INTERIOR EXTERIOR
2'-5"
"21
3
¡ Ke
y
"21
3
"2
14
"2
14
"21
1'-1
10"
"21
3
"2
14
"2
143" Ø Hole
Edge of
beam
"211
"2
11"4
11
11"
"4
3
"8
3
"85
face of outside beams
Omit key on exterior
(Showing dimensions)
(Showing reinforcement)
Bar No. Size Length Shape
B(E)
S(E) #5
#5
(For information only)
Bar No. Size Length Shape
B(E)
#5
#5
(For information only)
S2(E)
D(E) #4 #4D1(E)22 32
#9B1(E)
58
B1(E) #9
58
B(E)
¡ Lifting loopof lift
60° min. angle
cl.
"211 B1(E)
1'-5"
1'-2"
loops
¡ Lifting
typ.
1'-3"
1'-5"
58 -#5 S(E) bars at 6" cts.
spacing
#4 D(E) bar
5"
cts. full le
ngth,
botto
m
-#
9 B
1(E)
bars at
12"
cts. full le
ngth,
Top
-#
5 B(E)
bars at
full length, bottom
-#9 B1(E) bars at 5" cts.
full length, Top
-#5 B(E) bars at 12" cts.
miss the dowel rod holes and the lifting loops at the beam ends)
(Spacing of D(E) and D1(E) bars may be adjusted up to 3" to
(showing precast bridge approach beams)
Exterior Beam
typ.
10"
Cut to fit
Fan -#5 S3(E) bars.
except as noted
Similar about ¡
cl."2
11
Interior Beam
skew
Cut to fit
Fan -#5 S1(E) bars.
utilized according to the manufacturer's recommendations may be used)
(An alternate lifting loop with a proof load of 25,000 lbs. and
"2
18
S3(E)
S1(E)
S1(E) #5 S3(E) #5
(Showing reinforcement)
D1(E)
D(E) or
cl.
"2
11
cl.
"212
B(E)
B1(E)
S2(E)
S(E) or
6-15-2019BA-P-39CS-L(>30°)
FABRIC BEARING PAD
LIFTING LOOP DETAIL
SECTION C-C
SECTION C-C
EACH INTERIOR BEAM
BAR LIST
EACH EXTERIOR BEAM
BAR LIST
SECTION B-B
C
PLAN VIEW
B
C
B
B B
C
C
VIEW D-D
D
D
D
D
Compressive strength of precast concrete during initial lifting, f'ci shall be 5,000 psi.
Compressive strength of precast concrete, f'c shall be 6,000 psi.
handling.
" Ø lifting pins shall be used to engage the lifting loops during21 A minimum 2
Bridge Approach Slab.
shall be provided for each bearing pad location. Cost included with Precast
" fabric adjusting shims of the dimensions of the exterior bearing pad81 Two
IDOT "Manual for Fabrication of Precast Prestressed Concrete Products."
precast prestressed deck beams with concrete wearing surface as specified in the
The top surface of precast bridge approach slabs shall be finished similar to
Cast-in-place substitution of Precast Bridge Approach Slab is not allowed.
square foot for Precast Bridge Approach Slab.
Standard Specifications and shall be paid for at the contract unit price per
The precast bridge approach slab shall be according to Section 504 of the
Notes:
3"
4"
4"
3"
9"
3" 7" 9"8 spaces at 1'-6" cts. = 12'-0"
cl.
1"
typ.
6"
7"
3" Ø H
oles
1'-1
0"
9"
9"
rods at fixed ends only
¡ 2" Ø Holes for dowel
1'-10"
3" 7"
8 spaces at 1'-6" cts. = 12'-0"
8 spaces at 1'-6" cts. = 12'-0" 9"
30'-0" End-to-end beam29'-8"
29'-8"
29'-8"
29'-8"
(Beams: 36" min. width; 72" max. width)
D1(E)
D(E) or
BARS S(E) & S2(E)
BARS D(E) & D1(E)
S3(E)
S1(E) or
S1(E) or S3(E)
S1(E) bars
1 pair of #5
S3(E) bars
1 pair of #5
BARS S1(E) & S3(E)
(fixed end only)
#4 D1(E) bar spacing
spacing
#4 D1(E) bar
58 -#5 S2(E) bars at 6" cts.
slab footing end of beams.
Omit holes for fabric bearing pads at approach
bearing pads at expansion end shall be ¾" thick.
Bearing pads at fixed end shall be ½" thick and
Notes:
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB
3" Radius
"2
15
"2
1
Top of Beam
" Ø Conduit411
"2
18
1'-
0"
D1(E)
D(E)
"215
S1(E)
S(E) or
cl.
"212
D1(E)
D(E) orB(E)
cl.
"2
11
B1(E)
3"
cl.
1"
6"
270 ksi strands
" Ø 213-
6"7"
6" 6"
S2(E)
S(E)
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
(Sheet 3 of 3)
Concrete Superstructure Cu. Yd.
Pound
Cu. Yd.Concrete Structures
Epoxy Coated
Reinforcement Bars,
Precast Bridge Approach Slab Sq. Ft.
Sq. Yd.
8
92
92
40
80
#4
#4
#5
#5
#4
#4
#5
6'-5"
#4
#4
#4
6-15-2019BA-P-39CS-L(>30°)
29'-8"
6'-5"
14'-8"
Concrete Wearing Surface, 5"
(Beams: 36" min. width; 72" max. width)
Bar Length ShapeNo. Size
b10(E)
b11(E)
b12(E)
b13(E)
b14(E)
d10(E)
d11(E)
e10(E)
t10(E)
w10(E)
8
2
2
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
3'-6"
parapet
End ofThreads
41
Nut
and washer
Locknut
Cost of anchor bolt assemblies included with Concrete Superstructure)
Article 1006.09 of the Standard Specifications.
(Anchor bolt assemblies shall be galvanized according to
4"
1" Ø ANCHOR BOLT
typ.
"411
BAR d10(E)
BAR a11(E)
BAR a12(E)
BAR d11(E)
Rad.
"852
2'-
7"
"437
"2
1
2'-
7
"8111
6"
Rad.
"814 "8
11'-0
"8
71'-
9
"8
71'-
9
"811'-0 1'-2"
6"
1'-
11"
BAR a10(E)
6'-6"
1'-
0"
8"
typ.
10"
typ.
"2
15
D1(E)
D(E) or"
21
Surface, 5"
Concrete Wearing
1'-
4"
footing
Approach
approach slab
Precast bridge
1'-
3"
3'-6" 3'-0"
7'-0" 3'-0"
for Structures
Granular Backfill
INSIDE ELEVATION OF PARAPET AND CURB
SECTION A-A
")4
1(±
" cl.
41
2
9"
7" 5"
Approach Slab.
beam). Cost included with Precast Bridge
holes drilled and grouted in cap (2 each
" Ø21¡ 1" Ø x 2'-0" Dowel rods in 1
cl.
2"
cl.
2"
bearing pads
" Fabric43¡
6"
a10(E) b10(E)
w10(E)
t10(E)
See sheet __ of __ for details.
Strip Seal Joint
10"
" Fabric bearing pads21¡
relief joint sealer. Full width.
¼" x ¾" Formed joint with bridge
15'-0" 15'-0"
2'-0"
5"
4"
5'-0"
2"
Cut last 3 bars to fit taper
23-#5 d10(E) bars at 8" cts.
Standard 631031.
connections see Highway
631026. For Type 6 terminal
View B-B and Highway Standard
terminal connections only, See
1" Ø Anchor bolts for Type 5
D
D
Bend to fit taper
a11(E)
30'-0" end to end approach
b14(E)
b13(E) or
#5
#4
a10(E)
a11(E)
a12(E) #5 8'-2"
BILL OF MATERIAL
TWO APPROACHES
section near abutment
10-#4 e10(E) bars. See cross
Cost of cellular polystyrene is included with Concrete Superstructure.
For Granular Backfill for Structures and drainage treatment details, see sheet of .
Cost of excavation for approach footing included with Concrete Structures.
The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.
Approach footing concrete shall be paid for as Concrete Structures.
Parapet concrete shall be paid for as Concrete Superstructure.
The strip seal shall extend 6" beyond the edge of the approach slab on each end.
be paid for separately, but will be included in the cost of Concrete Wearing Surface, 5".
Any concrete poured monolithically with the wearing surface, such as curbs, shall not
and wearing surface.
the Standard Specifications for a minimum of 24 hours before casting the shear keys
to top of precast slab and cured according to Article 1020.13(a)(3) or 1020.13(a)(5) of
abutment and anchor dowels placed. Dowel holes shall be filled with non-shrink grout
After precast bridge approach slabs have been erected, holes shall be drilled into
bridge length plus the length of the bridge approach slab.
length of bridge used to calculate the adjustment shall be equal to half the total
Standard Specifications. However, since this detail is for jointless structures, the
The joint opening shall be adjusted for temperature per Article 520.04 of the
Notes:
4"
4"
4"
¡ 1" Ø Anchor bolts
"436
"8
72'-
0
"43 "4
15
11"
5"
VIEW D-D
(Sheet 1 of 3)(Beams: 36" min. width; 72" max. width)BA-P-39CS-L(≤30°)
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
"2
19
1'-
5"
"2
17
"2
19
1'-
5"
"2
17
23-#5 d11(E) bars at 8" cts. typ.
'-"
out to out
Approach Sla
b at parapet
C
B
A
D
E
F
Approach Footing
10'-0"
7'-0"
3'-0"
5'-0" typ.
for pavement connector
See Hwy. Std. 420401
Top and botto
m of
Approach Footin
g,
See Sec.
A-
A
-#
4 t10(E)
bars at 12"
cts.
'-"
out to out
Approach Sla
b and Footin
g at curb
AA
Skew
°
bar to fit
Bend d11(E)
Bend to fit taper.
1-#4 b14(E) bar in curb.
Bend to fit taper.
1-#4 b13(E) bar in curb.
d11(E) bar to fit
Cut back leg of
¡
15'-0"
15'-0"
30'-0" end to end approach
-#5 a10(E) bars at 12" cts.
tilt as necessary to fit curb
-#4 a11(E) bars at 12" cts.
with each a10(E) bar
at 12" cts., typ. Lap
-#5 a12(E) bars
bottom of slab, cut to fit
2-#5 b12(E) bars top and
bottom of slab, cut to fit
2-#5 b11(E) bars top and
6-15-2019
-#4 b10(E) bars at 12" cts.
length of beam
Styrofoam block full
bearing pad
Interior fabric
wearing surface, typ.
Shear key cast with concrete
DETAIL 'A'
Bottom
A
B
C
D
F
E
Point
Approach
Top Top Bottom
Approach
FOR APPROACH FOOTING
TOP AND BOTTOM ELEVATIONS
bonded to the top of the fabric bearing pads.
approach footing and bonded. Adjusting shims, when required, shall be
* Fabric bearing pads at the expansion end shall be recessed ¼" into the
")41(±
"413
")41(±
2"
¡ Roadway
1'-5"
D(E)
bearing pad
*Interior fabric
NEAR ABUTMENT AT APPROACH FOOTING
typ.
1'-
3"
Bridge Approach Slab
1-11" x - Precast
Bridge Approach Slab
1-11" x - Precast
"2
13'-
1
See Detail 'A'
Slope % Slope % Slope % Slope %
6"
cl.
2"
4"
3'-
3"
")4
1(±
" cl.
41
2
Bridge Approach Slabs
-11" x - Precast
D1(E)
d10(E)
e10(E)
d11(E) a10(E)a12(E)
b10(E)
w10(E) t10(E) bearing pad
*Exterior fabricadhesive as recommended by supplier.
bonded to wingwall with suitable
of the Standard Specifications)
2" PJF (per Article 1051.09
"43
"415
a11(E)
of approach slab full length.
Placed under cast in place portion
to ASTM C 578 (Types V, VII or XV).
" Cellular polystyrene according21
"219 "2
17
surface, 5"
Concrete wearing
b12(E)
b11(E) or
b14(E)
b13(E) or
(Looking )
CROSS SECTION
Footing. See Sec A-A
Top and bottom of Approach
20-#5 w10(E) bars at 6" cts.
typ.
2'-0"
typ.
11" typ.
6"
PLAN
of Abut.
Back
min., typ
.2" cl.
(Sheet 2 of 3)
1'-5"
1'-2"
Exterior Beam
Interior Beam
loops
¡ Lifting
typ.
1'-3"
1'-5"
58 -#5 S(E) bars at 6" cts.
spacing
#4 D(E) bar
except as noted
Similar about ¡
full length, bottom
-#9 B1(E) bars at 5" cts.
full length, Top
-#5 B(E) bars at 12" cts.Cut to fit
Fan -#5 S3(E) bars.
5"
cts. full le
ngth,
botto
m
-#
9 B
1(E)
bars at
12"
cts. full le
ngth,
Top
-#
5 B(E)
bars at
Cut to fit
Fan -#5 S1(E) bars.
typ.
10"
cl.
"211
skew
miss the dowel rod holes and the lifting loops at the beam ends)
(Spacing of D(E) and D1(E) bars may be adjusted up to 3" to
(showing precast bridge approach beams)
"211
"2
11"4
11
11"
"4
3
"8
3
"85
face of outside beams
Omit key on exterior
(Showing dimensions)
B(E)
¡ Lifting loopof lift
60° min. angle
cl.
"211 B1(E)
INTERIOR EXTERIOR
2'-5"
"21
3
¡ Ke
y
"21
3
"2
14
"2
14
"21
1'-1
10"
"21
3
"2
14
"2
143" Ø Hole
Edge of
beam
Bar No. Size Length Shape
B(E)
S(E) #5
#5
(For information only)
Bar No. Size Length Shape
B(E)
#5
#5
(For information only)
S2(E)
D(E) #4 #4D1(E)22 32
#9B1(E)
58
B1(E) #9
58
S1(E) #5 S3(E) #5
S2(E)
S(E) or
6-15-2019
PLAN VIEW
B B
C
C
BB
C
C
SECTION C-CSECTION B-B
FABRIC BEARING PAD
EACH INTERIOR BEAM
BAR LIST
EACH EXTERIOR BEAM
BAR LIST
D
DD
D
Compressive strength of precast concrete during initial lifting, f'ci shall be 5,000 psi.
Compressive strength of precast concrete, f'c shall be 6,000 psi.
handling.
" Ø lifting pins shall be used to engage the lifting loops during21 A minimum 2
Bridge Approach Slab.
shall be provided for each bearing pad location. Cost included with Precast
" fabric adjusting shims of the dimensions of the exterior bearing pad81 Two
IDOT "Manual for Fabrication of Precast Prestressed Concrete Products."
precast prestressed deck beams with concrete wearing surface as specified in the
The top surface of precast bridge approach slabs shall be finished similar to
Cast-in-place substitution of Precast Bridge Approach Slab is not allowed.
square foot for Precast Bridge Approach Slab.
Standard Specifications and shall be paid for at the contract unit price per
The precast bridge approach slab shall be according to Section 504 of the
Notes:
3"
4"
4"
9"
3" 7" 8 spaces at 1'-6" cts. = 12'-0" 9"
typ.
6"
7"
3" Ø H
oles
1'-1
0"
9"
rods at fixed ends only
¡ 2" Ø Holes for dowel
9"
9"
1'-10"
3" 7"
8 spaces at 1'-6" cts. = 12'-0"
8 spaces at 1'-6" cts. = 12'-0"
30'-0" End-to-end beam29'-8"
29'-8"
29'-8"
29'-8"
(Beams: 36" min. width; 72" max. width)
D1(E)
D(E) or
BA-P-39CS-L(≤30°)
S3(E)
S1(E) or
S1(E) bars
1 pair of #5
S3(E) bars
1 pair of #5
(fixed end only)
#4 D1(E) bar spacing
spacing
#4 D1(E) bar
58 -#5 S2(E) bars at 6" cts.
slab footing end of beams.
Omit holes for fabric bearing pads at approach
bearing pads at expansion end shall be ¾" thick.
Bearing pads at fixed end shall be ½" thick and
Notes:
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB
(Showing reinforcement)
utilized according to the manufacturer's recommendations may be used)
(An alternate lifting loop with a proof load of 25,000 lbs. and
"2
18
S3(E)
S1(E)
(Showing reinforcement)
D1(E)
D(E) or
cl.
"2
11
cl.
"212
B(E)
B1(E)
LIFTING LOOP DETAIL
SECTION C-C VIEW D-D
3"
cl.
1"
BARS S(E) & S2(E)
BARS D(E) & D1(E)
S1(E) or S3(E)
BARS S1(E) & S3(E)
3" Radius
"2
15
"2
1
Top of Beam
" Ø Conduit411
"2
18
1'-
0"
D1(E)
D(E)
"215
S1(E)
S(E) or
cl.
"212
D1(E)
D(E) orB(E)
cl.
"2
11
B1(E)
3"
cl.
1"
6"
270 ksi strands
" Ø 213-
6"7"
6" 6"
S2(E)
S(E)
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
BA-P-39CS-L(≤30°)(Sheet 3 of 3)
Concrete Superstructure Cu. Yd.
Pound
Cu. Yd.Concrete Structures
Epoxy Coated
Reinforcement Bars,
Precast Bridge Approach Slab Sq. Ft.
Sq. Yd.
8
92
92
40
80
#4
#4
#5
#5
#4
#4
#5
6'-5"
#4
#4
#4
6-15-2019
29'-8"
6'-5"
14'-8"
Concrete Wearing Surface, 5"
(Beams: 36" min. width; 72" max. width)
Bar Length ShapeNo. Size
b10(E)
b11(E)
b12(E)
b13(E)
b14(E)
d10(E)
d11(E)
e10(E)
t10(E)
w10(E)
8
2
2
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
3'-6"
parapet
End ofThreads
41
Nut
and washer
Locknut
Cost of anchor bolt assemblies included with Concrete Superstructure)
Article 1006.09 of the Standard Specifications.
(Anchor bolt assemblies shall be galvanized according to
4"
1" Ø ANCHOR BOLT
typ.
"411
BAR d10(E)
BAR a11(E)
BAR a12(E)
BAR d11(E)
Rad.
"852
2'-
7"
"437
"2
1
2'-
7
"8111
6"
Rad.
"814 "8
11'-0
"8
71'-
9
"8
71'-
9
"811'-0 1'-2"
6"
1'-
11"
BAR a10(E)
6'-6"
1'-
0"
8"
typ.
10"
typ.
"2
15
D1(E)
D(E) or"
21
Surface, 5"
Concrete Wearing
1'-
4"
footing
Approach
approach slab
Precast bridge
1'-
3"
3'-6" 3'-0"
7'-0" 3'-0"
for Structures
Granular Backfill
INSIDE ELEVATION OF PARAPET AND CURB
SECTION A-A
")4
1(±
" cl.
41
2
9"
7" 5"
Approach Slab.
beam). Cost included with Precast Bridge
holes drilled and grouted in cap (2 each
" Ø21¡ 1" Ø x 2'-0" Dowel rods in 1
cl.
2"
cl.
2"
bearing pads
" Fabric43¡
6"
a10(E) b10(E)
w10(E)
t10(E)
10"
" Fabric bearing pads21¡
15'-0" 15'-0"
2'-0"
5"
4"
5'-0"
2"
Cut last 3 bars to fit taper
23-#5 d10(E) bars at 8" cts.
Standard 631031.
connections see Highway
631026. For Type 6 terminal
View B-B and Highway Standard
terminal connections only, See
1" Ø Anchor bolts for Type 5
D
D
Bend to fit taper
a11(E)
30'-0" end to end approach
b14(E)
b13(E) or
#5
#4
a10(E)
a11(E)
a12(E) #5 8'-2"
BILL OF MATERIAL
TWO APPROACHES
relief joint sealer. Full width.
¼" x ¾" Formed joint with bridge
See sheet __ of __ for details.
Strip Seal Joint
section near abutment
10-#4 e10(E) bars. See cross
Cost of cellular polystyrene is included with Concrete Superstructure.
For Granular Backfill for Structures and drainage treatment details, see sheet of .
Cost of excavation for approach footing included with Concrete Structures.
The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.
Approach footing concrete shall be paid for as Concrete Structures.
Parapet concrete shall be paid for as Concrete Superstructure.
The strip seal shall extend 6" beyond the edge of the approach slab on each end.
be paid for separately, but will be included in the cost of Concrete Wearing Surface, 5".
Any concrete poured monolithically with the wearing surface, such as curbs, shall not
and wearing surface.
the Standard Specifications for a minimum of 24 hours before casting the shear keys
to top of precast slab and cured according to Article 1020.13(a)(3) or 1020.13(a)(5) of
abutment and anchor dowels placed. Dowel holes shall be filled with non-shrink grout
After precast bridge approach slabs have been erected, holes shall be drilled into
bridge length plus the length of the bridge approach slab.
length of bridge used to calculate the adjustment shall be equal to half the total
Standard Specifications. However, since this detail is for jointless structures, the
The joint opening shall be adjusted for temperature per Article 520.04 of the
Notes:
4"
4"
4"
¡ 1" Ø Anchor bolts
"436
"8
72'-
0
"43 "4
15
11"
5"
VIEW D-D
(Sheet 1 of 3)BA-P-39CS-R(>30°) (Beams: 36" min. width; 72" max. width)
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
1'-
5"
"2
19
1'-
5"
"2
17
23-#5 d11(E) bars at 8" cts. typ.
'-"
out to out
Approach Sla
b at parapet
of Abut.
Back¡
A
C
E
D
Appr
oach F
ooting
10'-0"7'
-0"
3'-0"
5'-0" typ.
for pavement connector
See Hwy. Std. 420401
Top and botto
m of
Approach Footin
g,
See Sec.
A-
A
-#
4 t10(E)
bars at 12"
cts.
'-"
out to out
Approach Sla
b and Footin
g at curb
See S
ec A-A
of A
ppro
ach
Footing.
6" cts. To
p an
d bottom
20-#
5 w10(E) bars at
Bend to fit taper.
1-#4 b14(E) bar in curb.
Bend to fit taper.
1-#4 b13(E) bar in curb.
d11(E) bar to fit
Cut back leg of
A A
B
F
30'-0" end to end approach
15'-0"
15'-0"
Bend d11(E) bar to fit
"2
17
"2
19
-#5 a10(E) bars at 12" cts.
tilt as necessary to fit curb
-#4 a11(E) bars at 12" cts.
with each a10(E) bar
at 12" cts., typ. Lap
-#5 a12(E) bars
bottom of slab, cut to fit
2-#5 b11(E) bars top and
bottom of slab, cut to fit
2-#5 b12(E) bars top and
6-15-2019
-#4 b10(E) bars at 12" cts.
¡ Roadway
1'-5"
D(E)
bearing pad
*Interior fabric
NEAR ABUTMENT AT APPROACH FOOTING
typ.
1'-
3"
Bridge Approach Slab
1-11" x - Precast
Bridge Approach Slab
1-11" x - Precast
"2
13'-
1
See Detail 'A'
Slope % Slope % Slope % Slope %
6"
cl.
2"
4"
3'-
3"
")4
1(±
" cl.
41
2
Bridge Approach Slabs
-11" x - Precast
D1(E)
d10(E)
e10(E)
d11(E) a10(E)a12(E)
b10(E)
w10(E) t10(E) bearing pad
*Exterior fabricadhesive as recommended by supplier.
bonded to wingwall with suitable
of the Standard Specifications)
2" PJF (per Article 1051.09
"43
"415
a11(E)
of approach slab full length.
Placed under cast in place portion
to ASTM C 578 (Types V, VII or XV).
" Cellular polystyrene according21
"219 "2
17
surface, 5"
Concrete wearing
b12(E)
b11(E) or
b14(E)
b13(E) or
(Looking )
CROSS SECTION
length of beam
Styrofoam block full
bearing pad
Interior fabric
wearing surface, typ.
Shear key cast with concrete
DETAIL 'A'
Bottom
A
B
C
D
F
E
Point
Approach
Top Top Bottom
Approach
FOR APPROACH FOOTING
TOP AND BOTTOM ELEVATIONS
bonded to the top of the fabric bearing pads.
approach footing and bonded. Adjusting shims, when required, shall be
* Fabric bearing pads at the expansion end shall be recessed ¼" into the
")41(±
"413
")41(±
2"
typ.
6"
typ.
2'-0"
typ.
11"
Skew
°
PLAN
min., typ
.2" cl.
(Sheet 2 of 3)
1'-5"
1'-2"
loops
¡ Lifting
typ.
1'-3"
1'-5"
58 -#5 S(E) bars at 6" cts.
spacing
#4 D(E) bar
5"
cts. full le
ngth,
botto
m
-#
9 B
1(E)
bars at
12"
cts. full le
ngth,
Top
-#
5 B(E)
bars at
full length, bottom
-#9 B1(E) bars at 5" cts.
full length, Top
-#5 B(E) bars at 12" cts.
miss the dowel rod holes and the lifting loops at the beam ends)
(Spacing of D(E) and D1(E) bars may be adjusted up to 3" to
(showing precast bridge approach beams)
Exterior Beam
typ.
10"
Cut to fit
Fan -#5 S3(E) bars.
except as noted
Similar about ¡
Interior Beam
skew
Cut to fit
Fan -#5 S1(E) bars.
cl.
"21
1
"211
"2
11"4
11
11"
"4
3
"8
3
"85
face of outside beams
Omit key on exterior
(Showing dimensions)
B(E)
¡ Lifting loopof lift
60° min. angle
cl.
"211
S2(E)
S(E) or
B1(E)
Bar No. Size Length Shape
B(E)
S(E) #5
#5
(For information only)
Bar No. Size Length Shape
B(E)
#5
#5
(For information only)
S2(E)
D(E) #4 #4D1(E)22 32
#9B1(E)
58
B1(E) #9
58
S1(E) #5 S3(E) #5
INTERIOR EXTERIOR
2'-5"
"21
3
¡ Ke
y
"21
3
"2
14
"2
14
"21
1'-1
10"
"21
3
"2
14
"2
143" Ø Hole
Edge of
beam
6-15-2019BA-P-39CS-R(>30°)
C
PLAN VIEW
B
C
B
B B
C
C
SECTION C-CSECTION B-B
EACH INTERIOR BEAM
BAR LIST
EACH EXTERIOR BEAM
BAR LIST
FABRIC BEARING PAD
D
D D
D
Compressive strength of precast concrete during initial lifting, f'ci shall be 5,000 psi.
Compressive strength of precast concrete, f'c shall be 6,000 psi.
handling.
" Ø lifting pins shall be used to engage the lifting loops during21 A minimum 2
Bridge Approach Slab.
shall be provided for each bearing pad location. Cost included with Precast
" fabric adjusting shims of the dimensions of the exterior bearing pad81 Two
IDOT "Manual for Fabrication of Precast Prestressed Concrete Products."
precast prestressed deck beams with concrete wearing surface as specified in the
The top surface of precast bridge approach slabs shall be finished similar to
Cast-in-place substitution of Precast Bridge Approach Slab is not allowed.
square foot for Precast Bridge Approach Slab.
Standard Specifications and shall be paid for at the contract unit price per
The precast bridge approach slab shall be according to Section 504 of the
Notes:
3"
4"
4"
30'-0" End-to-end beam
8 spaces at 1'-6" cts. = 12'-0" 9"
8 spaces at 1'-6" cts. = 12'-0"
3" 7"
1'-10"
rods at fixed ends only
¡ 2" Ø Holes for dowel3" Ø H
oles
1'-1
0"
9"
9"
7"
typ.
6"
8 spaces at 1'-6" cts. = 12'-0" 9"3" 7"
9"
29'-8"
29'-8"
29'-8"
29'-8"
(Beams: 36" min. width; 72" max. width)
D1(E)
D(E) or
S3(E)
S1(E) or
58 -#5 S2(E) bars at 6" cts.
spacing
#4 D1(E) bar
(fixed end only)
#4 D1(E) bar spacing
S3(E) bars
1 pair of #5
S1(E) bars
1 pair of #5
slab footing end of beams.
Omit holes for fabric bearing pads at approach
bearing pads at expansion end shall be ¾" thick.
Bearing pads at fixed end shall be ½" thick and
Notes:
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB
(Showing reinforcement)
utilized according to the manufacturer's recommendations may be used)
(An alternate lifting loop with a proof load of 25,000 lbs. and
"2
18
S3(E)
S1(E)
(Showing reinforcement)
D1(E)
D(E) or
cl.
"2
11
cl.
"212
B(E)
B1(E)
LIFTING LOOP DETAIL
SECTION C-C VIEW D-D
3"
cl.
1"
BARS S(E) & S2(E)
BARS D(E) & D1(E)
S1(E) or S3(E)
BARS S1(E) & S3(E)
3" Radius
"2
15
"2
1
Top of Beam
" Ø Conduit411
"2
18
1'-
0"
D1(E)
D(E)
"215
S1(E)
S(E) or
cl.
"212
D1(E)
D(E) orB(E)
cl.
"2
11
B1(E)
3"
cl.
1"
6"
270 ksi strands
" Ø 213-
6"
7"
6" 6"
S2(E)
S(E)
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
BA-P-39CS-R(>30°)(Sheet 3 of 3)
Concrete Superstructure Cu. Yd.
Pound
Cu. Yd.Concrete Structures
Epoxy Coated
Reinforcement Bars,
Precast Bridge Approach Slab Sq. Ft.
Sq. Yd.
8
92
92
40
80
#4
#4
#5
#5
#4
#4
#5
6'-5"
#4
#4
#4
6-15-2019
29'-8"
6'-5"
14'-8"
Concrete Wearing Surface, 5"
(Beams: 36" min. width; 72" max. width)
Bar Length ShapeNo. Size
b10(E)
b11(E)
b12(E)
b13(E)
b14(E)
d10(E)
d11(E)
e10(E)
t10(E)
w10(E)
8
2
2
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
3'-6"
parapet
End ofThreads
41
Nut
and washer
Locknut
Cost of anchor bolt assemblies included with Concrete Superstructure)
Article 1006.09 of the Standard Specifications.
(Anchor bolt assemblies shall be galvanized according to
4"
1" Ø ANCHOR BOLT
typ.
"411
BAR d10(E)
BAR a11(E)
BAR a12(E)
BAR d11(E)
Rad.
"852
2'-
7"
"437
"2
1
2'-
7
"8111
6"
Rad.
"814 "8
11'-0
"8
71'-
9
"8
71'-
9
"811'-0 1'-2"
6"
1'-
11"
BAR a10(E)
6'-6"
1'-
0"
8"
typ.
10"
typ.
"2
15
D1(E)
D(E) or"
21
Surface, 5"
Concrete Wearing
1'-
4"
footing
Approach
approach slab
Precast bridge
1'-
3"
3'-6" 3'-0"
7'-0" 3'-0"
for Structures
Granular Backfill
INSIDE ELEVATION OF PARAPET AND CURB
SECTION A-A
")4
1(±
" cl.
41
2
9"
7" 5"
Approach Slab.
beam). Cost included with Precast Bridge
holes drilled and grouted in cap (2 each
" Ø21¡ 1" Ø x 2'-0" Dowel rods in 1
cl.
2"
cl.
2"
bearing pads
" Fabric43¡
6"
a10(E) b10(E)
w10(E)
t10(E)
10"
" Fabric bearing pads21¡
15'-0" 15'-0"
2'-0"
5"
4"
5'-0"
2"
Cut last 3 bars to fit taper
23-#5 d10(E) bars at 8" cts.
Standard 631031.
connections see Highway
631026. For Type 6 terminal
View B-B and Highway Standard
terminal connections only, See
1" Ø Anchor bolts for Type 5
D
D
Bend to fit taper
a11(E)
30'-0" end to end approach
b14(E)
b13(E) or
#5
#4
a10(E)
a11(E)
a12(E) #5 8'-2"
relief joint sealer. Full width.
¼" x ¾" Formed joint with bridge
See sheet __ of __ for details.
Strip Seal Joint
BILL OF MATERIAL
TWO APPROACHES
section near abutment
10-#4 e10(E) bars. See cross
Cost of cellular polystyrene is included with Concrete Superstructure.
For Granular Backfill for Structures and drainage treatment details, see sheet of .
Cost of excavation for approach footing included with Concrete Structures.
The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.
Approach footing concrete shall be paid for as Concrete Structures.
Parapet concrete shall be paid for as Concrete Superstructure.
The strip seal shall extend 6" beyond the edge of the approach slab on each end.
be paid for separately, but will be included in the cost of Concrete Wearing Surface, 5".
Any concrete poured monolithically with the wearing surface, such as curbs, shall not
and wearing surface.
the Standard Specifications for a minimum of 24 hours before casting the shear keys
to top of precast slab and cured according to Article 1020.13(a)(3) or 1020.13(a)(5) of
abutment and anchor dowels placed. Dowel holes shall be filled with non-shrink grout
After precast bridge approach slabs have been erected, holes shall be drilled into
bridge length plus the length of the bridge approach slab.
length of bridge used to calculate the adjustment shall be equal to half the total
Standard Specifications. However, since this detail is for jointless structures, the
The joint opening shall be adjusted for temperature per Article 520.04 of the
Notes:
4"
4"
4"
¡ 1" Ø Anchor bolts
"436
"8
72'-
0
"43 "4
15
11"
5"
VIEW D-D
(Sheet 1 of 3)6-15-2019 (Beams: 36" min. width; 72" max. width)BA-P-39CS-R(≤30°)
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
"2
19
1'-
5"
"2
17
"2
19
1'-
5"
"2
17
23-#5 d11(E) bars at 8" cts. typ.
'-"
out to out
Approach Sla
b at parapet
of Abut.
Back
¡
A
B
C F
E
D
7'-0"
3'-0"
5'-0" typ.
for pavement connector
See Hwy. Std. 420401
Top and botto
m of
Approach Footin
g,
See Sec.
A-
A
-#
4 t10(E)
bars at 12"
cts.
'-"
out to out
Approach Sla
b and Footin
g at curb
bar to fit
Bend d11(E)
Bend to fit taper.
1-#4 b14(E) bar in curb.
Bend to fit taper.
1-#4 b13(E) bar in curb.
d11(E) bar to fit
Cut back leg of
A A
10'-0
" Appro
ach
Footi
ng
15'-0"
15'-0"
30'-0" end to end approach
-#5 a10(E) bars at 12" cts.
tilt as necessary to fit curb
-#4 a11(E) bars at 12" cts.
with each a10(E) bar
at 12" cts., typ. Lap
-#5 a12(E) bars
bottom of slab, cut to fit
2-#5 b11(E) bars top and
-#4 b10(E) bars at 12" cts.
length of beam
Styrofoam block full
bearing pad
Interior fabric
wearing surface, typ.
Shear key cast with concrete
DETAIL 'A'
Bottom
A
B
C
D
F
E
Point
Approach
Top Top Bottom
Approach
FOR APPROACH FOOTING
TOP AND BOTTOM ELEVATIONS
bonded to the top of the fabric bearing pads.
approach footing and bonded. Adjusting shims, when required, shall be
* Fabric bearing pads at the expansion end shall be recessed ¼" into the
")41(±
"413
")41(±
2"
¡ Roadway
1'-5"
D(E)
bearing pad
*Interior fabric
NEAR ABUTMENT AT APPROACH FOOTING
typ.
1'-
3"
Bridge Approach Slab
1-11" x - Precast
Bridge Approach Slab
1-11" x - Precast
"2
13'-
1
See Detail 'A'
Slope % Slope % Slope % Slope %
6"
cl.
2"
4"
3'-
3"
")4
1(±
" cl.
41
2
Bridge Approach Slabs
-11" x - Precast
D1(E)
d10(E)
e10(E)
d11(E) a10(E)a12(E)
b10(E)
w10(E) t10(E) bearing pad
*Exterior fabricadhesive as recommended by supplier.
bonded to wingwall with suitable
of the Standard Specifications)
2" PJF (per Article 1051.09
min., typ
.2" cl.
"43
"415
a11(E)
of approach slab full length.
Placed under cast in place portion
to ASTM C 578 (Types V, VII or XV).
" Cellular polystyrene according21
"219 "2
17
surface, 5"
Concrete wearing
b12(E)
b11(E) or
b14(E)
b13(E) or
(Looking )
CROSS SECTION
bottom of slab, cut to fit
2-#5 b12(E) bars top and
typ.
2'-0"
typ.
11"
typ.
6"
Footi
ng. S
ee S
ec A-A
Top an
d botto
m of A
ppro
ach
20-#
5 w10
(E) ba
rs at 6
" cts.
Skew
°
PLAN
(Sheet 2 of 3)
miss the dowel rod holes and the lifting loops at the beam ends)
(Spacing of D(E) and D1(E) bars may be adjusted up to 3" to
(showing precast bridge approach beams)
1'-5"
1'-2"
Exterior Beam
Interior Beam
loops
¡ Lifting
typ.
1'-3"
1'-5"
58 -#5 S(E) bars at 6" cts.
spacing
#4 D(E) bar
except as noted
Similar about ¡
full length, bottom
-#9 B1(E) bars at 5" cts.
full length, Top
-#5 B(E) bars at 12" cts.
Cut to fit
Fan -#4 S3(E) bars.
5"
cts. full le
ngth,
botto
m
-#
9 B
1(E)
bars at
12"
cts. full le
ngth,
Top
-#
5 B(E)
bars at
Cut to fit
Fan -#4 S1(E) bars.
typ.
10"
skew
cl.
"211
INTERIOR EXTERIOR
2'-5"
"21
3
¡ Ke
y
"21
3
"2
14
"2
14
"21
1'-1
10"
"21
3
"2
14
"2
143" Ø Hole
Edge of
beam
"211
"2
11"4
11
11"
"4
3
"8
3
"85
face of outside beams
Omit key on exterior
(Showing dimensions)
Bar No. Size Length Shape
B(E)
S(E) #5
#5
(For information only)
Bar No. Size Length Shape
B(E)
#5
#5
(For information only)
S2(E)
D(E) #4 #4D1(E)22 32
#9B1(E)
58
B1(E) #9
58
B(E)
¡ Lifting loopof lift
60° min. angle
cl.
"211 B1(E)
S1(E) #5 S3(E) #5
S2(E)
S(E) or
6-15-2019
PLAN VIEW
B B
C
C
BB
C
C
FABRIC BEARING PAD
SECTION C-C
EACH INTERIOR BEAM
BAR LIST
EACH EXTERIOR BEAM
BAR LIST
SECTION B-B
D
D D
D
Compressive strength of precast concrete during initial lifting, f'ci shall be 5,000 psi.
Compressive strength of precast concrete, f'c shall be 6,000 psi.
handling.
" Ø lifting pins shall be used to engage the lifting loops during21 A minimum 2
Bridge Approach Slab.
shall be provided for each bearing pad location. Cost included with Precast
" fabric adjusting shims of the dimensions of the exterior bearing pad81 Two
IDOT "Manual for Fabrication of Precast Prestressed Concrete Products."
precast prestressed deck beams with concrete wearing surface as specified in the
The top surface of precast bridge approach slabs shall be finished similar to
Cast-in-place substitution of Precast Bridge Approach Slab is not allowed.
square foot for Precast Bridge Approach Slab.
Standard Specifications and shall be paid for at the contract unit price per
The precast bridge approach slab shall be according to Section 504 of the
Notes:
3"
4"
4"
30'-0" End-to-end beam
8 spaces at 1'-6" cts. = 12'-0"
8 spaces at 1'-6" cts. = 12'-0"
9"3" 7"
1'-10"
3" Ø H
oles
1'-1
0"
9"rods at fixed ends only
¡ 2" Ø Holes for dowel
9"
7"
typ.
6"
9"3" 7"
9"
8 spaces at 1'-6" cts. = 12'-0"
29'-8"
29'-8"
29'-8"
29'-8"
(Beams: 36" min. width; 72" max. width)BA-P-39CS-R(≤30°)
D1(E)
D(E) or
S3(E)
S1(E) or
58 -#5 S2(E) bars at 6" cts.
spacing
#4 D1(E) bar
(fixed end only)
#4 D1(E) bar spacing
S3(E) bars
1 pair of #5
S1(E) bars
1 pair of #5
slab footing end of beams.
Omit holes for fabric bearing pads at approach
bearing pads at expansion end shall be ¾" thick.
Bearing pads at fixed end shall be ½" thick and
Notes:
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB
(Showing reinforcement)
utilized according to the manufacturer's recommendations may be used)
(An alternate lifting loop with a proof load of 25,000 lbs. and
"2
18
S3(E)
S1(E)
(Showing reinforcement)
D1(E)
D(E) or
cl.
"2
11
cl.
"212
B(E)
B1(E)
LIFTING LOOP DETAIL
SECTION C-C VIEW D-D
3"
cl.
1"
BARS S(E) & S2(E)
BARS D(E) & D1(E)
S1(E) or S3(E)
BARS S1(E) & S3(E)
3" Radius
"2
15
"2
1
Top of Beam
" Ø Conduit411
"2
18
1'-
0"
D1(E)
D(E)
"215
S1(E)
S(E) or
cl.
"212
D1(E)
D(E) orB(E)
cl.
"2
11
B1(E)
3"
cl.
1"
6"
270 ksi strands
" Ø 213-
6"7"
6" 6"
S2(E)
S(E)
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
BA-P-39CS-R(≤30°)(Sheet 3 of 3)
Concrete Superstructure Cu. Yd.
Pound
Cu. Yd.Concrete Structures
Epoxy Coated
Reinforcement Bars,
Precast Bridge Approach Slab Sq. Ft.
Sq. Yd.
8
92
92
40
80
#4
#4
#5
#5
#4
#4
#5
6'-5"
#4
#4
#4
6-15-2019
29'-8"
6'-5"
14'-8"
Concrete Wearing Surface, 5"
(Beams: 36" min. width; 72" max. width)
Bar Length ShapeNo. Size
b10(E)
b11(E)
b12(E)
b13(E)
b14(E)
d10(E)
d11(E)
e10(E)
t10(E)
w10(E)
8
2
2
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
3'-6"
parapet
End ofThreads
41
Nut
and washer
Locknut
Cost of anchor bolt assemblies included with Concrete Superstructure)
Article 1006.09 of the Standard Specifications.
(Anchor bolt assemblies shall be galvanized according to
4"
1" Ø ANCHOR BOLT
typ.
"411
BAR d10(E)
BAR a11(E)
BAR a12(E)
BAR d11(E)
Rad.
"852
2'-
7"
"437
"2
1
2'-
7
"8111
6"
Rad.
"814 "8
11'-0
"8
71'-
9
"8
71'-
9
"811'-0 1'-2"
6"
1'-
11"
BAR a10(E)
6'-6"
1'-
0"
8"
typ.
10"
typ.
"2
15
D1(E)
D(E) or"
21
Surface, 5"
Concrete Wearing
1'-
4"
footing
Approach
approach slab
Precast bridge
1'-
3"
3'-6" 3'-0"
7'-0" 3'-0"
for Structures
Granular Backfill
INSIDE ELEVATION OF PARAPET AND CURB
SECTION A-A
")4
1(±
" cl.
41
2
9"
7" 5"
Approach Slab.
beam). Cost included with Precast Bridge
holes drilled and grouted in cap (2 each
" Ø21¡ 1" Ø x 2'-0" Dowel rods in 1
cl.
2"
cl.
2"
bearing pads
" Fabric43¡
6"
a10(E) b10(E)
w10(E)
t10(E)
10"
" Fabric bearing pads21¡
15'-0" 15'-0"
2'-0"
5"
4"
5'-0"
2"
Cut last 3 bars to fit taper
23-#5 d10(E) bars at 8" cts.
Standard 631031.
connections see Highway
631026. For Type 6 terminal
View B-B and Highway Standard
terminal connections only, See
1" Ø Anchor bolts for Type 5
D
D
Bend to fit taper
a11(E)
30'-0" end to end approach
b14(E)
b13(E) or
#5
#4
a10(E)
a11(E)
a12(E) #5 8'-2"
relief joint sealer. Full width.
¼" x ¾" Formed joint with bridge
See sheet __ of __ for details.
Strip Seal Joint
BILL OF MATERIAL
TWO APPROACHES
section near abutment
10-#4 e10(E) bars. See cross
Cost of cellular polystyrene is included with Concrete Superstructure.
For Granular Backfill for Structures and drainage treatment details, see sheet of .
Cost of excavation for approach footing included with Concrete Structures.
The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.
Approach footing concrete shall be paid for as Concrete Structures.
Parapet concrete shall be paid for as Concrete Superstructure.
The strip seal shall extend 6" beyond the edge of the approach slab on each end.
be paid for separately, but will be included in the cost of Concrete Wearing Surface, 5".
Any concrete poured monolithically with the wearing surface, such as curbs, shall not
and wearing surface.
the Standard Specifications for a minimum of 24 hours before casting the shear keys
to top of precast slab and cured according to Article 1020.13(a)(3) or 1020.13(a)(5) of
abutment and anchor dowels placed. Dowel holes shall be filled with non-shrink grout
After precast bridge approach slabs have been erected, holes shall be drilled into
bridge length plus the length of the bridge approach slab.
length of bridge used to calculate the adjustment shall be equal to half the total
Standard Specifications. However, since this detail is for jointless structures, the
The joint opening shall be adjusted for temperature per Article 520.04 of the
Notes:
4"
4"
4"
¡ 1" Ø Anchor bolts
"436
"8
72'-
0
"43 "4
15
11"
5"
VIEW D-D
(Sheet 1 of 3)BA-P-44CS-0 (Beams: 36" min. width; 72" max. width)
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
7'-0" 3'-0"
for pavement connector
See Hwy. Std. 420401
'-"
out to out
Approach Sla
b at parapet
of Abut.
Back
Top and botto
m of
Approach Footin
g,
See Sec.
A-
A
-#
4 t10(E)
bars at 12"
cts.
¡
bottom of slab, typ.
2-#5 b11(E) bar top and
typ.
2'-0" Bend to fit taper.
1-#4 b12(E) bar in curb, typ.
A A
'-"
out to out
Approach Sla
b and Footin
g at curb
typ.
6"
Approach Footing
10'-0"
5'-0" typ.
A
B
C
D
E
F
"2
18
"2
18
1'-
5"
"2
18
"2
18
1'-
5"
Footing. See Sec A-A
Top and bottom of Approach
20-#5 w10(E) bars at 6" cts.
typ.
11"
30'-0" end to end approach
15'-0"
23-#5 d11(E) bars at 8" cts., typ.
"218
1'-5"
"2
13'-
6 3'-
8"
d10(E)
e10(E)
d11(E)
min., typ
.2" cl.
"218
16-#5 a10(E) bars at 12" cts.
tilt as necessary to fit curb
16-#4 a11(E) bars at 12" cts.
-#
4 b10(E)
bars at 12"
cts.
with each a10(E) bar
at 12" cts., typ. Lap
16-#5 a12(E) bars
6"
6-15-2019
length of beam
Styrofoam block full
bearing pad
Interior fabric
wearing surface, typ.
Shear key cast with concrete
DETAIL 'A'
Bottom
A
B
C
D
F
E
Point
Approach
Top Top Bottom
Approach
FOR APPROACH FOOTING
TOP AND BOTTOM ELEVATIONS
bonded to the top of the fabric bearing pads.
approach footing and bonded. Adjusting shims, when required, shall be
* Fabric bearing pads at the expansion end shall be recessed ¼" into the
")41(±
"413
")41(±
2"
¡ Roadway
D(E)
bearing pad
*Interior fabric
NEAR ABUTMENT AT APPROACH FOOTING
typ.
1'-
3"
Bridge Approach Slab
1-11" x - Precast
Bridge Approach Slab
1-11" x - Precast
(Looking )
See Detail 'A'
Slope % Slope % Slope % Slope %
CROSS SECTION
6"
cl.
2"
4"
")4
1(±
" cl.
41
2
Bridge Approach Slabs
-11" x - Precast
D1(E)
b11(E)
a10(E)
b12(E)
a12(E)
b10(E)
w10(E) t10(E) bearing pad
*Exterior fabricadhesive as recommended by supplier.
bonded to wingwall with suitable
of the Standard Specifications)
2" PJF (per Article 1051.09
"43
"415
a11(E)
of approach slab full length.
Placed under cast in place portion
to ASTM C 578 (Types V, VII or XV).
" Cellular polystyrene according21
surface, 5"
Concrete wearing
PLAN
(Sheet 2 of 3)
Interior Beam
bar spacing
#4 D(E)
bar spacing
#5 S(E)
typ.
1'-3"
¡ Lifting loops
Exterior Beam
5"
cts. full le
ngth,
botto
m
-#
9 B
1(E)
bars at
12"
cts. full le
ngth, top
-#
5 B(E)
bars at
5"
cts. full le
ngth,
botto
m
-#
9 B
1(E)
bars at
12"
cts. full le
ngth, top
-#
5 B(E)
bars at
except as noted
Symmetrical about ¡
typ.
10"
1'-5"
1'-2"
"211 "2
17
1'-5"
"211 "2
17
B(E)
¡ Lifting loopof lift
60° min. angle
cl.
"211
S1(E)
S(E) or
B1(E)
S1(E)
S(E) or
"211
"2
11"4
11
11"
"4
3
"8
3
"85
face of outside beams
Omit key on exterior
(Showing dimensions)
¡ Key
"213
2'-5"
"213
"2
14
"2
14
"211'-1
10" "213
"2
14
"2
14
3" Ø Hole
Edge of beam
INTERIOR EXTERIOR
Bar No. Size Length Shape
B(E)
S(E) #5
#5
(For information only)
Bar No. Size Length Shape
B(E)
#5
#5
(For information only)
S1(E)
D(E) #4 #4D1(E)22 32
#9B1(E)
58
B1(E) #9
58
6-15-2019BA-P-44CS-0
C
C
C
B B
BB
PLAN
SECTION B-B SECTION C-C
FABRIC BEARING PAD
EACH INTERIOR BEAM
BAR LIST
EACH EXTERIOR BEAM
BAR LISTC
3"
4"
4"
Compressive strength of precast concrete during initial lifting, f'ci shall be 5,000 psi.
Compressive strength of precast concrete, f'c shall be 6,000 psi.
handling.
" Ø lifting pins shall be used to engage the lifting loops during21 A minimum 2
Bridge Approach Slab.
shall be provided for each bearing pad location. Cost included with Precast
" fabric adjusting shims of the dimensions of the exterior bearing pad81 Two
IDOT "Manual for Fabrication of Precast Prestressed Concrete Products."
precast prestressed deck beams with concrete wearing surface as specified in the
The top surface of precast bridge approach slabs shall be finished similar to
Cast-in-place substitution of Precast Bridge Approach Slab is not allowed.
square foot for Precast Bridge Approach Slab.
Standard Specifications and shall be paid for at the contract unit price per
The precast bridge approach slab shall be according to Section 504 of the
Notes:
30'-0" End-to-end beam
3" 7"
3"
9"
28 Spaces at 6" = 14'-0"
8 Spaces at 1'-6" = 12'-0"
3" Ø Holes
1'-10"
9"
9"
7"
rods at fixed ends only
¡ 2" Ø Holes for dowel
typ.
6"
3" 7" 8 Spaces at 1'-6" = 12'-0"
1'-10" 8 Spaces at 1'-6" = 12'-0"
28 Spaces at 6" = 14'-0"
9"
3"
29'-8"
29'-8"
29'-8"
29'-8"
(Beams: 36" min. width; 72" max. width)
D1(E)
D(E) or
bar spacing
#4 D1(E)
(fixed end only)
#4 D1(E) bar spacing
bar spacing
#5 S1(E)
slab footing end of beams.
Omit holes for fabric bearing pads at approach
bearing pads at expansion end shall be ¾" thick.
Bearing pads at fixed end shall be ½" thick and
Notes:
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB
3" Radius
"2
15
"2
1
Top of Beam
" Ø Conduit411
"2
18
1'-
0"
D1(E)
D(E) "215
(Showing reinforcement)
S1(E)
S(E) or
cl.
"212
D1(E)
D(E) orB(E)
cl.
"2
11
B1(E)
utilized according to the manufacturer's recommendations may be used)
(An alternate lifting loop with a proof load of 25,000 lbs. and
LIFTING LOOP DETAIL
SECTION C-C
3"
cl.
1"
6"
270 ksi strands
" Ø 213-
6"7"
6" 6"
S1(E)
S(E)
BARS D(E) & D1(E) BARS S(E) & S1(E)
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
(Sheet 3 of 3)6-15-2019BA-P-44CS-0 (Beams: 36" min. width; 72" max. width)
BAR d10(E)
VIEW D-D
STRUCTURE NO.
PRECAST BRIDGE APPROACH SLAB SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
CONTRACT NO. DEPARTMENT OF TRANSPORTATION
STATE OF ILLINOIS
USER NAME =
PLOT SCALE =
PLOT DATE =
DESIGNED REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS
-
-
-
-
-
-
-
-
CHECKED
DRAWN
CHECKED
$TIME$$DATE$
MO
DE
L:
FIL
E N
AM
E:
$M
OD
EL
NA
ME$
$FIL
EL$
3'-6"
parapet
End ofThreads
41
Nut
and washer
Locknut
Cost of anchor bolt assemblies included with Concrete Superstructure)
Article 1006.09 of the Standard Specifications.
(Anchor bolt assemblies shall be galvanized according to
4"
1" Ø ANCHOR BOLT
D1(E)
D(E) or"
21
Surface, 5"
Concrete Wearing
1'-
4"
footing
Approach
approach slab
Precast bridge
1'-
3"
3'-6" 3'-0"
7'-0" 3'-0"
for Structures
Granular Backfill
SECTION A-A
")4
1(±
" cl.
41
2
9"
7" 5"
Approach Slab.
beam). Cost included with Precast Bridge
holes drilled and grouted in cap (2 each
" Ø21¡ 1" Ø x 2'-0" Dowel rods in 1
cl.
2"
cl.
2"
bearing pads
" Fabric43¡
6"
a10(E) b10(E)
w10(E)
t10(E)
10"
" Fabric bearing pads21¡
a11(E)
30'-0" end to end approach
¡ 1" Ø Anchor bolts
4"
Rad.
"212 "2
17
"4
32'-
10
"439
"8
7
2'-
10
6"
4"
4"
"436
"415"4
3
"8
72'-
0
11"
10"
typ.
"411
BAR a11(E)
BAR a12(E)
BAR a10(E)
6'-6"
1'-
0"
8"
typ.
10"
typ.
"2
15
Concrete Superstructure Cu. Yd.
Pound
Cu. Yd.Concrete Structures
Epoxy Coated
Reinforcement Bars,
Precast Bridge Approach Slab Sq. Ft.
Sq. Yd.
32
32
16
92
92
48
80
#5
#4
#5
#5
#5
#4
#4
#5
7'-0"
9'-8"
#4
29'-8"
14'-8"
6'-5"
14'-8"
Concrete Wearing Surface, 5"
Bar No. Size Length Shape
a10(E)
a11(E)
b10(E)
b11(E)
d10(E)
d11(E)
e10(E)
t10(E)
w10(E)
a12(E) 64 #5 8'-2"
b12(E) 4 #4 14'-8"
BILL OF MATERIAL
TWO APPROACHES
See sheet __ of __ for details.
Strip Seal Joint
relief joint sealer. Full width.
¼" x ¾" Formed joint with bridge
Cost of cellular polystyrene is included with Concrete Superstructure.
For Granular Backfill for Structures and drainage treatment details, see sheet of .
Cost of excavation for approach footing included with Concrete Structures.
The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.
Approach footing concrete shall be paid for as Concrete Structures.
Parapet concrete shall be paid for as Concrete Superstructure.
The strip seal shall extend 6" beyond the edge of the approach slab on each end.
be paid for separately, but will be included in the cost of Concrete Wearing Surface, 5".
Any concrete poured monolithically with the wearing surface, such as curbs, shall not
and wearing surface.
the Standard Specifications for a minimum of 24 hours before casting the shear keys
to top of precast slab and cured according to Article 1020.13(a)(3) or 1020.13(a)(5) of
abutment and anchor dowels placed. Dowel holes shall be filled with non-shrink grout
After precast bridge approach slabs have been erected, holes shall be drilled into
bridge length plus the length of the bridge approach slab.
length of bridge used to calculate the adjustment shall be equal to half the total
Standard Specifications. However, since this detail is for jointless structures, the
The joint opening shall be adjusted for temperature per Article 520.04 of the
Notes:
BAR d11(E)
Rad.
"814 "8
11'-0
"8
71'-
9
"8
71'-
9
"811'-0 1'-2"
6"
1'-
11"
INSIDE ELEVATION OF PARAPET AND CURB
15'-0" 15'-0"
2'-0"
4"
5'-0"
2"
Cut last 3 bars to fit taper
23-#5 d10(E) bars at 8" cts.
Standard 631031.
connections see Highway
631026. For Type 6 terminal
View B-B and Highway Standard
terminal connections only, See
1" Ø Anchor bolts for Type 5
D
D
Bend to fit taper
b14(E)
b13(E) or
section near abutment
12-#4 e10(E) bars. See cross
10"