59
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013 Sr. No Tender No. Item /nature of work Mode of tender Dt. of publication of NIT Types of bidding ( single /two bid system ) Last date of receipt of tender Nos. of tenders received Nos. and name of parties qualified after technical evaluation Nos. & names of parties not qualified after technical evaluation Whether contract awarded to lowest tenderer evaluated L1 Contract No. & date. Name of contractor. Value of contract Scheduled date of completion of supplies. Actual date of start of work Actual date of completion Remarks/ Reason for delay if any, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 CE(C)I-JP Dy. CE/C/III-JP 1 AF/BKI/GC/JP/4R Construction strengthening and rebuilding minor bridges between Nadbai- Bharatpur Open tender Two bid system 29.04.99 15 07 08 Yes CPM/JP/KTT/ CA/16 dated 15.02.2000 M/s Jugendra Singh & Co., Etah. 2.98 crore 04.01.2000 01.06.01 31/3/04 Work completed, case was investigated by vigilance final variation advice is awaited. Reminder sent. 2 AF/BKI/GC/ JP/68 Laying and linking BG track between BTE- AH section Open tender 24..04.04 One bid system 27.09.04 5 1 4 Yes NWR/S&C/CA /51 dated 04.01.05 M/s RSV Construction Hyderabad 1.83 crore 01.03.05 5.11.04 31.5.05 Work completed. Final bill Under technical check 3 AF/BKI/GC/J P/69 Laying and linking BG track between BTE-AH section Open tender 24.04.04 One bid system 27.9.2004 5 1 4 Yes NWR/S&C/CA /49 dated24.12.0 4 M/s Engipress Rail Link, Gwalior 1.58 crore 25.02.05 28.10.04 30.11.05 Work is in dispute as money suit filed by contractor. 4 AF/BKI/GC/36 Welding of rail joints bet. BKI- KL section Open tender - One packet system 09.06.03 3 1 2 Yes Dy. CE(C)JP/CA/7 7 dated 07.10.03 M/s India Thermit Corp Ltd., Kanpur 1.02 Crore 08/3/04 12/10/03 30/06/04 Final bill under technically check since 27.12.12 5 NWR-JP/RE yard/11 Const./Exten of station building at RE yard Open tender 8.08.2008 One packet system 29.08.2008 01 - 01 Yes Dy CE/C- JP/CA/221 dt. 17.02.09 M/s New Everest Stone Curshing Co. Gurgaon 4.88 Crore 14/6/09 26/10/08 31/08/11 Work completed. Under Technically check. 6 HIS-RE/Doubling/2 Const/ Extension of FOB&PF shelter shed bet. RE-HIS. Open tender 24.07.2008 One packet system 25.08.2008 03 - 01 Yes Dy CE/C- JP/CA/224 dt. 19.03.09 M/S Sanjeev Brothers, Jaipur. 4.16 Lakhs 22/4/09 22/02/09 31/12/11 Work is in progress, further DOC extension is under sanction 7 AWR-HSI Doubling/5 Construction of Minor Bridge E/Work bet. HIS to Km.57 to AWR Open tender 09.08.2007 One packet system 12.09.2007 02 01 01 Yes Dy.CE(C)/ JP/CA/213 dated 08.07.08 M/s Jugeundra Singh Co., Etah 5.80 Crore 09/01/09 08/05/08 31/3/11 Work completed final bill technically checked .Final variation will be submitted for adm. Approval of competent authority

CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1

CE(C)I-JP

Dy. CE/C/III-JP

1

AF/

BK

I/G

C/J

P/4

R

Construction

strengthening and

rebuilding minor

bridges between

Nadbai- Bharatpur

Open

tender

Two bid

system

29

.04

.99

15 07 08 Yes CPM/JP/KTT/

CA/16 dated

15.02.2000

M/s Jugendra Singh &

Co., Etah.

2.98 crore 04.01.2000 01.06.01 31/3/04 Work completed,

case was

investigated by

vigilance final

variation advice is

awaited. Reminder

sent.

2

AF/

BK

I/G

C/

JP/6

8

Laying and linking BG

track between BTE- AH

section

Open

tender

24

..0

4.0

4

One bid

system

27

.09

.04

5 1 4 Yes NWR/S&C/CA

/51 dated

04.01.05

M/s RSV Construction

Hyderabad

1.83 crore 01.03.05 5.11.04 31.5.05 Work completed.

Final bill Under

technical check

3

AF/

BK

I/G

C/J

P/6

9

Laying and linking BG

track between BTE-AH

section

Open

tender

24

.04

.04

One bid

system 2

7.9

.20

04

5 1 4 Yes NWR/S&C/CA

/49

dated24.12.0

4

M/s Engipress Rail

Link, Gwalior

1.58 crore 25.02.05 28.10.04 30.11.05 Work is in dispute

as money suit filed

by contractor.

4

AF/

BK

I/G

C/3

6

Welding of rail joints

bet. BKI- KL section

Open

tender

-

One packet

system

09

.06

.03

3 1 2 Yes Dy.

CE(C)JP/CA/7

7 dated

07.10.03

M/s India Thermit Corp

Ltd., Kanpur

1.02

Crore

08/3/04 12/10/03 30/06/04 Final bill under

technically check

since 27.12.12

5

NW

R-J

P/R

E

yard

/11

Const./Exten of station

building at RE yard

Open

tender

8.0

8.2

00

8

One packet

system

29

.08

.20

08

01 - 01 Yes Dy CE/C-

JP/CA/221 dt.

17.02.09

M/s New Everest Stone

Curshing Co. Gurgaon

4.88 Crore 14/6/09 26/10/08 31/08/11 Work completed.

Under Technically

check.

6

HIS

-RE/

Do

ub

ling/

2

Const/ Extension of

FOB&PF shelter shed

bet. RE-HIS.

Open

tender

24

.07

.20

08

One packet

system

25

.08

.20

08

03 - 01 Yes Dy CE/C-

JP/CA/224 dt.

19.03.09

M/S Sanjeev Brothers,

Jaipur.

4.16

Lakhs

22/4/09 22/02/09 31/12/11 Work is in progress,

further DOC

extension is under

sanction

7

AW

R-H

SI D

ou

blin

g/5

Construction of Minor

Bridge E/Work bet. HIS

to Km.57 to AWR

Open

tender

09

.08

.20

07

One packet

system

12

.09

.20

07

02 01 01 Yes Dy.CE(C)/

JP/CA/213

dated

08.07.08

M/s Jugeundra Singh

Co., Etah

5.80

Crore

09/01/09 08/05/08 31/3/11 Work completed

final bill technically

checked .Final

variation will be

submitted for adm.

Approval of

competent

authority

Page 2: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

2

DY. CE/C/II-JP

1 JP-RGS/RUB/ Deposit/1RR

RUB in military cantt area

Open tender

- Single Packet System

31/8/07 4 M/s. P. J. Sood, BRC

3 NO Dy.CE(C)-II/JP/CA /13 dt. 27/12/07

M/s. P. J. Sood, BRC 355.269 24/9/08 12-04-2007 24/09/08 Extended upto 30/12/11

Final Variation approval

Dausa-Jaipur Doubling Project.

2 DO-JP/ Doubling/3R

Earth work & minor bridge

Open tender

- Single Packet System

30/3/07 M/s B. P. Modi Jaipur

YES DyCE(C)II/JP/CA/14dt. 29/12/07

M/s B. P. Modi Jaipur 762.91 17/12/08 20/11/07 17/12/08 extended upto 31/12/2010

Work completed & Final variation sanctioned

8

HSI

-RE/

Do

ub

ling/

1

Construction of Major

Bridge minor bridge

R/wall earth work station

building ballast supply ,

track linking etc.

Open

tender

2

1 &

22

.07

.20

08

One packet

system

23

.04

.20

08

05 - 01 Yes NWR/S&C/CA

/101 dated

23.10.08-

M/s ARSS- Triveni(JV)

Bhubaneshwar

50.81

Crore

24/2/10 03/11/08 31/10/12 Work is in progress.

Further extension

of DOC is awaited

from agency.

9

AW

R-H

SI/D

ou

blin

g/6

Construction station

building Misc. structure

ballast supply track

linking etc.

Open

tender

21

.02

.20

08 One packet

system

23

.04

.20

08

06 - 01 Yes NWR/S&C/CA

/102 dated

23.10.08

M/s ARSS Infra structure

project Ltd.

Bhubaneshwar (Orissa)

21.24

Crore

02/07/09 27/10/08 31/05/12 Work is in progress.

Further extension

of DOC is awaited

from agency.

10

NW

R/S

&C

/RO

B/1

11

/

9

Const of ROB at LC

No.111-C.

Open

tender

02

.10

.20

08

One packet

system

0

5.1

1.2

00

8

03 - 01 Yes Dy.CE(C)/

JP/CA/230

dated

13.10.10

M/S Bharat Spun Pipe &

Const.Co. JP

6.52 Cr. 04/05/10 25/08/09 28.2.13 Work is in progress.

11

WR

/S&

C/T

/13

Construction of 72 units

Type-II, 108 units Type-

III, 36 units Type-IV in

Multistoried Towers &

HEALTH Unit, shopping

complex

Open

tender

-

One bid

system

15

/04

/20

09

04 04 0 Yes CE/S&C/CA/

27 dtd.

8.9..2009

M/s Balaji Builders &

Developers (JV) Jaipur

28.88

Crore

14.1.11 16.7.09 30.1.13 Work almost

completed.

Page 3: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

3

3 JP-DO/ Doubling/8

Construction of FOB bet. DO-JP section

Open tender

- Single Packet System

29.11.06 2 M/s. Sanjeev Brothers Jaipur

1 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07

M/s. Sanjeev Brothers Jaipur

130.02 15.4.08 14.2.07 15/04/08 Extended upto 15/10/2010

Clearance required from Vig.

4 DO-JP/ Doubling/12RR

Construction of Major bridge bet. JW - KUT in C/with DO-JP doulbing project.

Open tender

- Single Packet System

30/11/07 2 M/s. B. M. Construction, GZB.

2 YES NWR/ S&C/ CA/100 dated 23/9/08

M/s. B. M. Construction, GZB.

846.08 27/04/2009 09-10-2008 27/04/2009 Exdtended upto 30/11/2010

Work completed & F/bill passed

5 DO-JP/ Doubling/14

Construction of Major bridge bet. JW - KUT in C/with DO-JP doulbing project.

Open tender

- Single Packet System

30.05.07 1 M/s. B. M. Construction, GZB.

0 YES NWR/ S&C/CA/99 dated 27/03/08

M/s. B. M. Construction, GZB.

1044.84 24.10.08 11-06-2007 24.10.08 extended upto 31/03/11.

Completed & final variation under A/C vetting .

6 DO-JP-FL/ Doubling/16

Welding of 52Kg. /60Kg. Rails

Open tender

- Single Packet System

31/07/07 1 M/s. ITC, Kanpur.

0 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07

M/s. ITC, Kanpur. 341.22 18/02/09 20/06/09 18/02/09 Extended upto 30/04/2011

Physically completed.

7 T. No. DO-JP/ Doubling/21

Dismantling of existing BG track, laying & linking in Zone-I DO (Excl.) to JT (incl.) stn in DO-JP section

Open tender

- Single Packet System

19/12/08 1 M/s. B. S. Sangwan, Sonipat (Haryana)

0 YES Dy.CE(C)-II/JP/CA/34 dt. 20/06/09

M/s.B. S. Sangwan, Sonipat (Haryana)

206.44 22/09/09 04-10-2009 22/09/09 Extended upto 15/07/10

Final variation under approval..

8 T. No. DO-JP/ Doubling/22

Dismantling of existing BG track, laying & linking in Zone-II DO (Excl.) to JT (incl.) stn in DO-JP section

Open tender

- Single Packet System

19/12/08 4 M/s. P. C. Sharma, Noida

3 YES Dy.CE(C)-II/JP/CA/33 dt. 05/06/09

M/s. P. C. Sharma, Noida

194.57 09-09-2009 04-01-2009 9/9/2009 Extended upto 31/08/10

Final variation under techinical check.

9 T. No. DO-JP/ Doubling/23

Dismantling of existing BG track, laying & linking in Zone-III BAI (Excl.) to KWP (incl.) stn in DO-JP section

Open tender

- Single Packet System

19/12/08 3 M/s. P. C. Sharma, Noida

2 YES Dy.CE(C)-II/JP/CA/32 dt. 29/05/09

M/s. P. C. Sharma, Noida

187.06 09-09-2009 04-01-2009 9/9/2009 Extended upto 31/01/11

Final bill under process with SE/C/PW/JP

Page 4: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

4

10 T. No. DO-JP/ Doubling/24

Dismantling of existing BG track, laying & linking in Zone-IV KWP (Excl.) to JP (incl.) stn in DO-JP section

Open tender

- Single Packet System

19/12/08 2 M/s. B. S. Sangwan, Sonipat (Haryana)

1 YES Dy.CE(C)-II/CA/35 dated 02/09/09

M/s.B. S. Sangwan, Sonipat (Haryana)

239.75 22/09/09 18/05/09 22/09/09 Extended upto 31/03/11

Finla bill passed.

11 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/1 RR

Construction of minor bridges, wing/return walls , earthwork in formation ,construction including addition and altertation of station buildings, passanger platforms & shelters.FOB etc between Jaipur (incl) & Ringus (incl) stations of Jaipur -Ringus Section

Open tender

_ Single Packet System

18/01/2011 Giriraj Civil Developers Pvt Ltrd. BorivaliBombay

YES NWR/S&C/CA/110 Dated 16/08/2011

Giriraj Civil Developers Pvt Ltrd. BorivaliBombay

2141 08-10-2012 07/04/2011 _ contract terminated final measurment in techinical check

12 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/5 RR

Construction of Minor Bridges , Wing /Return walls.E/work in formation construction including addition altretation of stn. Bldg. Passanger platforms etc.Bet RGS -SIKAR

Open tender

_ Single Packet System

16/09/2011 Modi Construction(JV) Jaipur

YES NWR/S&C/CA/116 Dated 27/03/2012

Modi Construction(JV) Jaipur

1724 26/04/2013 02.01.2012 Work in progress

Page 5: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

5

13 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/ 01(geotech)

Staking out alignment , conducting geotechnical investigation design of the sun/super structure of minor & major bridges , prepration of GAD got minor &Major bridges etc

Open tender

Single Packet System

20.12.2011 M/S Surbhi Enterprises Jagatpura Jaipur.

YES NWR/S&C/CA/118 Dated 25/07/12

M/S Surbhi Enterprises Jagatpura Jaipur.

946 Lakhs 01.09.2012 08-01-2012 Work in progress

14 TENDER NO. NWR/S&C/JP- SIKR/GC/T-3

Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Ringus Km. 189.00 to SIKAR Km 238.70 on Ringus - SIKAR section in connection with Jaipur-Ringus-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Open tender

22.1.12 Single Packet System

24.2.12 7 M/s Rajsthan Mining Engineers Jaipur

NO M/s Rajsthan Mining Engineers Jaipur

4.66 crors 22.4.13 Work in progress

Page 6: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

6

15 NWR/S&C/ROB/Design-Drg/T/1

Carrying out Geotechnical investigation and consultancy work for Road Over/Under Bridge (ROB/RUB) for Railway span including detail design (foundation, sub structure and super structure), preparation of GAD and working drawing as desired in scope of work of 3 ROBs on LC No.C-149 (at Phulera in Ringus – Phulera section), LC No.323/A (Jodhpur- Samdari- Barmer section), LC No.61-A (at Rewari in Rewari – Alwar section) and 2 RUBs on LC No.232 & 234 (in Jaipur – Phulera section).

Open tender

Single Packet System

17.02.12 6 C.S.Engineers & consulants Delhi 12

no 19.30 lacs Work in proggress

Page 7: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

7

Dy. CE/C/GC-JP

1. NWR/S&

C/JP-

SIKR-LHU

& SIKR-

CUR

/GC/T/3R

Construction of minor

bridges, wing / return

walls, earthwork in

formation,

construction including

addition and

alteration of station

buildings, passenger

platforms & shelters,

FOB etc

Op

en t

en

der

Single

Packet

system

NWR/S&C/CA

/108 dt.

28.06.2011

M/s Giriraj Civil

Developers Pvt. Ltd.,

B- 15, Paras Dersan

Socity, S. V. Road,

Borivali (East), Mumbai.

19

55

39

39

2.0

3

29.6.12

25.3.2011

Co

ntr

act

Term

inat

ed.

Page 8: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

8

2 DY.CE

/C/GC/

NWR/

2011/T-5

Transportation of

various type of BG PSC

sleepers from sleeper

factory such as Khatu,

Marwar Chapari,

Degana, Churu or any

other sleeper

factory/place and P.

way materials

Op

en t

en

der

08.04.11 Single

Packet

system

12.5.11 04 - - yes 02 /NWR/Dy.

CE/C-GC/JP

/2011-12/JP-

SIKR-CUR &

SIKR-LHU dt.

07.09.2011.

M/s Hanuman

Construction Company,

Bhootra Niwas, new

market

Nokha.

39

56

03

90

.62

07.05.12

Ext.

14.10.12

20.7.2011

14

.10

.12

3 DY.CE

/C/GC/

NWR/

2011/T-3

Supplying and stacking

65mm gauge stone

ballast machine

crushed (hard stone)

conforming to RDSO

specifications

Op

en t

en

der

16.3.11 Single

Packet

system

21.4.11 08 01

M/s

CH

EVR

ON

MIN

ERA

LS A

sho

k

Ku

mar

Ban

sal &

Ass

oci

ates

, New

Del

hi

No

t aw

ard

ed t

o L

1 03 /NWR/Dy.

CE/C-GC/JP

/2011-12/JP-

SIKR-CUR &

SIKR-LHU dt.

23.09.2011.

M/s. Jai Mata

Construction Co.

House No. 14169, Stree

No. 8A,

Ganesh Nagar, Bhatinda

41

35

42

40

.00

15.08.12

Ext.

15.09.12

30.11.12

17.08.2011

4 DY.CE

/C/GC/

NWR/

2011/T-2

Supplying and stacking

65mm gauge stone

ballast machine

crushed (hard stone)

conforming to RDSO

specifications

Op

en t

en

der

16.3.11 Single

Packet

system

21.4.11 06 01

M/s

CH

EVR

ON

MIN

ERA

LS A

sho

k

Ku

mar

Ban

sal &

Ass

oci

ates

, New

Del

hi

No

t aw

ard

ed t

o L

1

04 /NWR/Dy.

CE/C-GC/JP

/2011-12/JP-

SIKR-CUR &

SIKR-LHU dt.

24.10.2011.

M/s Devender Singh

Contractor, 7, pratap

nagar, Saket Colony,

Rajgarh Raod, Hissar

35

96

57

60

.00

01.09.12

Ext.

30.09.12

30.10.12

17.09.2011

28

.10

.20

12

.

5 DY.CE

/C/GC/

NWR/

2011/T-

10

Supplying and stacking

65mm gauge stone

ballast machine

crushed (hard stone)

conforming to RDSO

specifications

between Km.0.000 to

Km. 30.2718 (L. C. No.

29) on Sikar - Churu

section

Op

en t

en

der

09.8.11 Single

Packet

system

15.9.11 07 -

-

Yes.

09 /NWR/Dy.

CE/C-GC/JP

/2011-12/JP-

SIKR-CUR &

SIKR-LHU dt.

05.05.2012.

M/s CHEVRON

MINERALS & Mines Pvt.

Ltd, Flat No. 10, 3rd

Floor, Satyanikertan,

New Delhi

2,3

2,7

2,5

00

.00

11.01.13.

14.02.2012

Co

ntr

act

Term

inat

ed.

6 DY.CE /C/

GC/

NWR/

2011/T-

11

Supplying and stacking

65mm gauge stone

ballast machine

crushed (hard stone)

conforming to RDSO

specifications

between Km. 30.2718

to Km. 59.901 (L. C.

No. 51) on Sikar -

Churu section

Op

en t

en

der

09.8.11 Single

Packet

system

15.9.11 09 02

1.M

/s J

BG

Co

nst

ruct

ion

Co

.29

07

,

GH

GT

road

, Nea

r Zi

la p

aris

had

,

Bh

atin

da

2. M

/s S

anto

sh C

on

st. C

o.,

Sad

ar

Baz

ar, N

ew M

arke

t, N

okh

a

No

t a

wa

rded

to

L1

10 /NWR/Dy.

CE/C-GC/JP

/2011-12/JP-

SIKR-CUR &

SIKR-LHU dt.

05.05.2012.

M/s CHEVRON

MINERALS & Mines Pvt.

Ltd, Flat No. 10, 3rd

Floor, Satyanikertan,

New Delhi

27

78

65

00

.00

24.01.13

14.02.2012

Co

ntr

act

Term

inat

ed.

Page 9: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

9

7 DY.CE /C/

GC/

NWR/

2011/T-

15

Supplying and stacking

65mm gauge stone

ballast machine

crushed (hard stone)

conforming to RDSO

specifications at

jhunjhunu depot on-

Sikar-Loharu section O

pen

te

nd

er

23.9.11 Single

Packet

system

24.10.11 08 01

M/s

San

tosh

Co

nst

. Co

.,

Sad

ar B

azar

, New

Mar

ket,

No

kha

No

t a

wa

rded

to

L1

07 /NWR/Dy.

CE/C-GC/JP

/2011-12/JP-

SIKR-CUR &

SIKR-LHU dt.

12.3.2012

M/s CHEVRON

MINERALS & Mines Pvt.

Ltd, Flat No. 10, 3rd

Floor, Satyanikertan,

New Delhi

25

40

00

00

.00

20.7.12

30.01.2012

Co

ntr

act

Term

inat

ed.

8 DY.CE /C/

GC/

NWR/

2011/T-

4R

Supplying and stacking

65mm gauge stone

ballast machine

crushed (hard stone)

conforming to RDSO

specifications

between Km.325.415

to Km. 360.900

(including Loharu

station) on Sikar -

Loharu section

Op

en t

en

der

28.9.11 Single

Packet

system

01.11.11 05 - - yes. 05 /NWR/Dy.

CE/C-GC/JP

/2011-12/JP-

SIKR-CUR &

SIKR-LHU dt.

12.3.2012

M/s CHEVRON

MINERALS & Mines Pvt.

Ltd, Flat No. 10, 3rd

Floor, Satyanikertan,

New Delhi

28

43

72

00

.00

20.7.12

Ext.

30.9.12.

15.12.12

05.02.2012.

Co

ntr

act

Term

inat

ed.

9 DY.CE /C/

GC/

NWR/

2011/T-

14

Construction of New Major Bridge of span 12 X 6.10 m (Km. 319/6-7) and strengthening of Bridge no. 165 (3x6.10 M at Km. 268/5-6) and PSC Slabs as super-structure including earth work in approaches and other ancillary works in Sikar- Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu Gauge conversion Project.

Op

en t

en

der

16.12.11 Single

Packet

system

25.01.12 06 - - Yes 11/NWR/Dy.

CE/C-GC/JP

/2012-13/JP-

SIKR-CUR &

SIKR-LHU dt.

04.07.12

M/s Surabhi

Maheshwar rao,

C-58, Road No. 1,

Film Nagar,Jublee Hills,

Hyderabad

2,7

6,4

7,1

51

.47

15.08.12

Ext.

15.10.12

30.11.12

30.3.2012.

Page 10: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

10

10 DY.CE /C/

GC/

NWR/

2011/T-

18

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-II (Km. 267.50 to Km. 314.00) including Dundlod Mukundgarh, Nua & Jhunjhunu yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project

Op

en t

en

der

16.12.11 Single

Packet

system

20.01.12 02 - YES 16/NWR/Dy.

CE/C-GC/JP

/2012-13/JP-

SIKR-CUR &

SIKR-LHU dt.

27.09.12

M/s Bharwal Lal

Bijarnia,

Villgae- Raipur, Post-

Prewari, Distt. Nagour.

5,1

1,1

6,6

65

.77

06.03.13 20.7.2012

11 DY.CE /C/

GC/

NWR/

2011/T-

19

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-III (Km. 314.00 to Km. 360.70) including Ratan Shahar, Chirawa, Surajgarh & Loharu yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project.

Op

en t

en

der

16.12.11 Single

Packet

system

18.01.12 05 - - YES 13/NWR/Dy.

CE/C-GC/JP

/2012-13/JP-

SIKR-CUR &

SIKR-LHU dt.

03.08.12.

M/s Laxyo Energy Pvt.

Ltd.,

113, Bakhatgarh Tower,

10/A, New Plasia,

Indore (MP)

4,7

3,9

4,3

38

.37

06.03.13 20.7.2012

Page 11: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

11

12 DY.CE /C/

GC/

NWR/

2011/T-

17

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-I (Km. 237.50 to Km. 267.50) including Sikar & Nawalgarh yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project.

Op

en t

en

der

16.12.11 Single

Packet

system

23.01.12 04 03 1. M/s Bhika ram Dev rath, VPO- Dhiarla, Distt. Churu.

2. M/s Goel Brothers Rail Infra PVT. Ltd., Bareilly.

3. Shri Nahar Const. Co., Jodhpur.

L-4 12/NWR/Dy.

CE/ C-

GC/JP /2012-

13/JP-SIKR-

CUR & SIKR-

LHU dt.

03.08.12

M/s Shupal Kumawat,

Rly. Contractor, Village

& Post.- Badhal, Distt.-

Jaipur.

3,3

0,9

6,6

19

.97

04.04.13 06.9.2012

13 Dy.CE/C/G

C/2012/T-

23

Transportation of various type of BG PSC sleepers from sleeper factory such as Khatu, Marwar Chapari, Degana, Churu or any other sleeper factory/place and P. way materials i.e. rails, switches & crossing and other P. Way fittings etc. from various locations including loading, unloading and and stacking at site in Sikar (inclusive) - Churu (inclusive) section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Op

en t

en

der

05.03.12 Single

Packet

system

09.04.12 04 - - Yes 14/NWR/Dy.

CE/C-GC/JP

/2012-13/JP-

SIKR-CUR &

SIKR-LHU dt.

16.08.12

M/s Hanuman

Construction Company,

Bhootra Niwas, new

market

Nokha.

5,3

6,4

8,9

55

.93

19.06.13 15.7.2012

Page 12: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

12

14 Dy.CE/C/G

C/2011/T-

12R

Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between 59.901 (L. C. 51) to Km. 90.46 (Churu Station) on Sikar – Churu section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Op

en t

en

der

04.4.12 Single

Packet

system

07.5.12 05 - - yes 17/NWR/Dy.

CE/C-GC/JP

/2012-13/JP-

SIKR-CUR &

SIKR-LHU dt.

03.10.12

M/s Kamakhaya Trading

Co. House No. 32, Patel

Nagar, Bhiwani.

31

91

07

60

.00

23.01.13 09.08.2012

15 Dy.CE/C/G

C/2012/T-

26

Residual work of construction including addition and alteration of station buildings, Staff quarters, passenger platforms, platform surfacing, and all other ancillary works between Jhunjhunu (excl.)-Loharu (incl.) stations of Sikar- Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project

Op

en t

en

der

12.6.12 Single

Packet

system

16.7.12 02 - - yes 18/NWR/Dy.

CE/C-GC/JP

/2012-13/JP-

SIKR-CUR &

SIKR-LHU dt.

22.11.12

M/s RSB Project

Limited, RSB Plaza,

SCO,,30.31, Sector -16

Faridabad (Haryana) 78

39

69

06

.64

10.3.13 18.09.12

16 Dy.CE/C/G

C/2012/T-

9

Residual work of construction including addition and alteration of station buildings, Staff quarters, passenger platforms, platform surfacing, and all other ancillary works between Sikar(Incl.)-Jhunjhunu (incl.) stations of Sikar- Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project

Op

en t

en

der

14.6.12 Single

Packet

system

17.7.12 01 - yes NWR

/S&C/CA/119

dtd.20.11.12

M/s RSB Project

Limited, RSB Plaza,

SCO,,30.31, Sector -16

Faridabad (Haryana)

12

13

13

54

6.2

7

20.3.13 25.09.12

Page 13: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

13

17 Dy.CE/C/G

C/2012/T-

28

Residual earth work in

bank, Cutting and lead

bank utilising cut

spoils for

widening/construction

of BG formation

including side drains,

trolley refuses, cess

wall etc. and other

ancillary works

between Sikar(Incl.)-

Loharu (Incl.) stations

of Sikar- Loharu

section in connection

with Jaipur-Sikar-

Loharu & Sikar-Churu

GC project.

Op

en t

en

der

11.7.12 Single

Packet

system

14.08.12 02 - - yes 19/NWR/Dy.

CE/C-GC/JP

/2012-13/JP-

SIKR-CUR &

SIKR-LHU dt.

21.12.12

M/s Bharwal Lal

Bijarnia,

Jaulsa Kua Road, Near

Tagore B. Ed. College,

Tegore Nagar,

Kuchaman City, Distt.

Nagour.

11

92

19

30

.36

03.01.13 21.09.2012

18 Dy.CE/C/G

C/2012/T-

29

Residual work for construction of minor bridges including dismantling of existing bridges, construction of return/wing walls, launching of already casted & transported RCC box and other ancillary works between Sikar(Incl.)-Loharu (Incl.) and Sikar(Incl.)-Churu (Incl.) stations of Sikar- Loharu & Sikar – Churu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project.

Op

en t

en

der

11.7.12 Single

Packet

system

14.8.12 01 - - yes 21/NWR/Dy.

CE/C-GC/JP

/2012-13/JP-

SIKR-CUR &

SIKR-LHU dt.

19.01.13

M/s Surabhi

Maheshwar rao,

C-58, Road No. 1,

Film Nagar,Jublee Hills,

Hyderabad

30

17

94

05

.06

26.02.13 -

19 Dy.CE/C/G

C/2012/T-

27

Providing in situ Glued joints of G-3 ( L) type as per RDSO drawings for 60 kg & 52 kg rails with all fittings etc. complete in Jaipur - Sikar -Loharu & Sikar - Churu section in connection with Jaipur - Sikar - Loharu & Sikar - Churu

Op

en t

en

der

06.07.12 Single

Packet

system

07.08.12 03 - - yes 22/NWR/Dy.

CE/C-GC/JP

/2012-13/JP-

SIKR-CUR &

SIKR-LHU dt.

22.02.13

M/s Creatice Engineers,

F-189, Road NO. 5, I. P.

Industrial Area,

Kota. 14

12

19

70

.56

19.04.15 20.12.12

Page 14: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

14

20 Dy.CE/C/G

C/2012/T-

21R

Earth work in bank, Cutting and lead bank, utilizing cut spoils, providing blanketing layer for widening/construction of BG formation, including side drains, trolley refuses, cess wall etc. and other ancillary work between Sikar(Excl.)-Churu (Incl.) stations of Sikar- Churu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project.

Op

en t

en

der

15.06.12 Single

Packet

system

17.7.12 04 - 01.

M/s Jai Shiv

Construction

Co. Village

Umara, Post

Brahmin

Kheda Tehsil:

Deeg,

Bharatpur.

No. 20/NWR/Dy.

CE/C-GC/JP

/2012-13/JP-

SIKR-CUR &

SIKR-LHU dt.

17.01.13

M/s Rachna

Construction

Company,12,

Vishnunagar Society,

Opp. Gunj Bazaar,

Nr. Sardarnagar,

Chanshma Highway

Road,

Patan (Guj.)

47

52

99

82

.55

21.08.13 -

21 Dy. CE /C/

GC/

NWR/201

2/T-33

Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Jhunjhunu station on Sikar - Loharu section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.

Op

en t

en

der

09.11.12 Single

Packet

system

14.12.12 05 - - yes Under

Finance

vetting

M/s Shree Shyam

Engineering Company,

Punia Colony, Churu

1,0

1,3

4,6

21

.00 15.5.13 23.1.13

22 Dy. CE /C/

GC/NWR/

2012/T-

31

Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Nawalgarh station on Sikar - Loharu section in connection with Jaipur- Sikar-Loharu and Sikar-Churu Gauge Conversion project

Op

en t

en

der

09.11.12 Single

Packet

system

11.12.12 05 - - Yes Under

Finance

vetting

M/s Devendra Singh

Contractor,

7, pratap nagar, Saket

Colony,

Rajgarh Raod, Hissar

21

30

54

00

.00

28.7.13

Page 15: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

15

CE/C/II-JP

Dy. CE/C/I-UDZ

1 T.NO.UDZ

-HMT

/GC/MB/

T-2

Const., minor

bridges &

earthwork from

Km. 160/0 to 187/0

in connection with

UDZ-HMT Section

GC Project

Open 19.11.10 Single 21.12.10 3 Yes NWR/S&C/

CA/109 dtd.

16.8.11

M/s Braham Prakash

ModiRavi Constn.Co.

(JV) , Jaipur

1212.6

21.09.12

27.6.13

30.04.11

Work in Pr

ogress

2 T.NO.UDZ-

HMT/MB/T

/1

Construction of

Major bridges from

DNRP-HMT in

connection with

UDZ-HMT section

GC Project .

Open 19.11.10 Single 21.12.10 2 Yes NWR/S&C/

CA/111 dtd.

9.9.11

M/S Om Prakash Goyal

& Co., Neemach

1568

29.11.12

31.12.13

10.08.11 Work in

Progress

3 T.NO.UDZ

-

HMT/GC/

EW/T/3

Construction of

Minor bridges &

earthwork from

Km. 270/0 to 320/0

in connection with

UDZ-HMT section

GC Project.

Open 08.12.10 Single 20.01.11 5 Yes NWR/S&C/

CA/112 dtd.

21.10.11

Amit-Mass (JV) ,

Alkapuri, VADODARA

1665.1

20.01.13 03.08.11 Contract

terminated on

07.11.2012

4 T.NO.UDZ

-

HMT/GC/

EW/T/4

Construction of

Minor bridges &

earthwork form

Km. 207/0 to 250/0

in connection with

UDZ-HMT section

GC Project .

Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/

CA/113 dtd.

21.10.11

M/s Rahee-Triveni

(J/V), Kolkatta

3045.2

07.02.13 23.08.11 Work in

Progress

5 UDZ-

HMT/GC/

BLDG/T-6-

R

Provision of office &

residential

accommodation at

UDZ in connection

with UDZ-HMT

Open 29.6.12 Single 3.8.12 01 01 0 Yes M/S Aakrati Builders &

Associates J.K.House,

121, , Fatehpura,

Udaipur

199.54 9.5.13 18.9.12 Work in

Progress

Page 16: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

16

section GC Project

6 T.NO.UDZ-

HMT/GC/

EW/T/11

Construction of

Minor bridges &

earthwork from

Km.187/0 to 207 in

connection with

UDZ-HMT section

GC Project

Open 17.07.12 Single 23.8.12 03 - - Yes M/S M.G. Contractors,

Pvt., Ltd., Panchkula

1919.40 6.02.12 27.11.12 Work in

Progress

7 T.NO.UDZ-

HMT/GC/

EW/T/12

Construction of

Minor bridges &

earthwork from

Km. 250/0 to 270/0

in connection with

UDZ-HMT section

GC Project

Open 17.07.12 Single 23.8.12 03 - - Yes M/S Ravi Infrabuild

Projects Pvt, Ltd.,

sector-11, Udaipur

3517.86 17.01.14 03.11.12 Work in

Progress

Page 17: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

17

Dy. CE/C/DNRP

Dy. CE/C/BNSW

------------------- NIL ----------------------

CE/C/III-JP

DY. CE/C/I-Aii

1

Aii/

Co

nst/ L

oco/M

od/T

/1

Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds, BG/MG tracks in c/with Modernisation of

Open 25.08.09 Single 28-10-09 08 Nos. M/s Era Infra Engg. Ltd. Noida.

- No, Tender awarded to 2nd lowest tenderer, after Tech. evaluation of L-1.

NWR/S&C/ CA/31 Dt. 17-06-10

M/s Bharat Span- GPT (JV) 43 Industrial Area, Jhotwara, Jaipur

3829.48 Lakhs

22/04/2012, 06/11/2012 & 30/06/2013

27-03-10 - Work is in progress.

1 Dy.CE/C

/UDZ/D

NRP-

RTM/

FLS/201

1/T/1

Carrying out final

location of survey

& ….other

preliminary

activities in

connection with

new BG line

between DNRP-

RTM via

Banswara

Open 1/6/11 &

30/6/11

Single 1/7/11 10 Dy.CE/C/

UDZ/DNR

P-RTM

/FLS/2011

/T/1

M/s

S.M.Consultants,

Bhubneswar

4.99 Cr 12/11/12 28/11/11 14/11/12 Work in

progress

Page 18: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

18

Loco Workshop at Ajmer.

2

Aii/

Co

nst/ C

&W

/Mod

. /T

/3/R

1

Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds, BG/MG tracks in c/with Modernisation of C&W Workshop at Ajmer.

Open 14.06.10 Single 07-07-2010

- - - Yes Under execution

M/s Prem Fabricators 301 Meera Manon Arcude, Near Krupa Petrol Pump, Parimal Garden, Ellis Bridge, Ahmedabad.

1524.97 Lakhs

05/12/2012 & 31/12/2013

05-09-2011 - Work is in progress.

3

AII/B

NG

M-R

AS

/ N

L/T

/2 Construction of

major bridge including earth work on the approaches between BNGM (Excl.)-RAS (incl.) section in c/with BNGM-RAS New B.G. Rail Line Project.

Open 03.11.10 Single 10.12.10 07 Nos. - - Yes Under execution

M/s SB-SHC-MCDPL (JV) C-10, Vaishali Nagar, Jaipur.

Rs. 1592.08 Lakhs

18/07/2012, 31/12/2012 & 31/08/2013

23.07.2011 - Work is in progress.

4

AII/B

NG

M-R

AS

/

NL/T

/3(R

)

Earthwork in bank/cutting and construction of minor bridges between Km. 0.00 to 10.50

Open 12.07.11 Single 03.08.11 07 Nos. - - Yes Under execution

M/s Jandu Construction Co. 305, Model Town Mandi, Adampur Hisar

Rs. 1060.43 Lakhs

30/10/2012 & 31/03/2013

10.11.2011 - Work is in progress.

5

AII/B

NG

M-R

AS

/ N

L/T

/4 Earthwork in

bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS ( Km. 10.50 to 20.50) section in

Open 16.12.10 Single 24.01.11 10 Nos. - - Yes Under execution

M/s Jai Mata Di Energy System (JV) VPO-Narodara, Tehsil - Laxmangarh Sikar (Raj.)

Rs. 1103.49 Lakhs

16/06/2012, 31/12/2012 & 31/05/2013

29.06.2011 - Work is in progress.

Page 19: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

19

c/with Bangurgram-RAS new BG Rail Link Project.

6

AII/B

NG

M-R

AS

/ N

L/T

/5

Earthwork in bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS ( Km. 20.50 to 28.50) section in c/with Bangurgram-RAS new BG Rail Link Project.

Open 16.12.10 Single 24.01.11 08 Nos. - - Yes Under execution

M/s Jandu Construction Co. 305, Model Town Mandi, Adampur Hisar

Rs. 825.62 Lacs

16/06/2012, 31/12/2012 & 30/06/2013

04.07.2011 - Work is in progress.

7

AII/B

NG

M-R

AS

/ N

L/T

/8

Supplying and Stacking machine crushed stone track Ballast in stacks as per Railways’ specifications between Km. 0.00 to 28.50 [Bangurgram to Ras] in connection with Bangurgram - Ras new rail line project.

Open 19.08.11 Single 27.09.11 4 Nos. - - Yes Under execution

M/s Rajesh Kumar Gupta, 54, Nehru Nagar, Kush Marg, Alwar(Raj.)

Rs. 406.50 Lacs

25/12/2012 & 31/03/2013

08.02.2012 - Work is in progress.

8

AII/B

NG

M-R

AS

/NL/T

/12

Construction of Road under Bridges & Road Over Bridges including earth work & Road work on the approaches & miscellaneous works in connection with Bangurgram-Ras New BG line project

Open 13.08.12 Single 21.09.12 6 Nos. - - Yes Under execution

M/s. Varaha Infra Ltd., Umesh Smriti, 6- Jalam Vilas Sceheme, Paota, B-Road, Jodhpur (Raj.)

3359

448

42.4

5

21/10/2013 23/11/2012 - Work is in progress.

Page 20: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

20

Dy. CE/C/II-Ajmer

1 T.No.AII/KVJ-KRJD/I/BG Doubling/T/3

Earthwork in bank/cutting for formation between Keshavganj (incl.) – Swarupganj (Excl.) section in connection with Keshavganj– Swarupganj Patch Doubling Project.

Open 24.09.10 Single 01.11.10 14 Nos. Ist Lowest M/S Varaha Infra Ltd., Umesh Smriti-6

Jalam Vilas Scheme, Poata B.

Road, Jodhpur

NIL Yes NWR/S&C/CA/32 Dt. 21.07.11

M/S Varaha Infra Ltd., Umesh Smriti-6

Jalam Vilas Scheme, Poata B. Road,

Jodhpur

`896.90

Lacs.

17.11.2011, 31.03.2012, 30.06.2012,30.11.2012 & 31.12.2012

01.02.11 - Work under progress

2 T.No.AII/KVJ-KRJD/I/BGD/T/2R

Construction/Extension of Major/minor bridges including earthwork on the approaches between Keshavganj (incl.) – Swarupganj (Excl.) section with Railway’s design & drawing and construction of ORH at Abu Road in connection with Keshavganj-Swarupganj Patch Doubling Project.

Open 04.02.11 Single 03.03.11 04 Nos. Ist Lowest M/s Tantia-YSCC-IV BPL (JV), 1304, 13th Floor, 17,

Vijaya Building,

Barakhamba Road,

Connaught Place, New

Delhi.

NIL Yes NWR/S&C/CA/33 Dt. 30.08.11

M/s Tantia-YSCC-IV BPL (JV), 1304, 13th

Floor, 17, Vijaya Building, Barakhamba

Road, Connaught Place, New Delhi.

`1095.38

Lacs.

20.02.2012, 30.06.2012,30.11.2012 & 31.01.2013

-- - Work under progress

3 T.No.AII/KVJ-KRJD/I/BG Doubling/T/6

Supplying and stacking 50mm machine crushed stone track ballast confirming to Railway specifications in stacks on cess along the track and in yards at various stations between Keshavganj – Swarupganj (both incl.) section in connection with Keshavganj– Swarupganj BG Patch Doubling Project

Open 04.04.2011 Single 10.05.11 05 Nos. Ist Lowest M/s Bhaniyana

Construction, 28, Kanishka

Resort,By Pass Road, PAL,Distt.

Jodhpur(Raj.)

NIL Yes Dy.CE(C)AII/KVJ-

SRPJ/BGD/CA/69 Dtd. 16.11.2011

Ist Lowest M/s Bhaniyana

Construction, 28, Kanishka Resort,By

Pass Road, PAL,Distt. Jodhpur(Raj.)

`371.12

Lacs.

17.05.2012, 17.11.2012

& 31.03.2013

-- - Work under progress

Page 21: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

21

4 T.No.AII/KVJ-KRJD/I/BG Doubling/T/8-R:

Dismantling of existing BG track, laying and linking of Broad gauge main line, loop lines including points and crossings at various yards, spreading of ballast, tamping of track, transportation of P.Way materials and other ancillary works between Keshavganj – Swarupganj (both incl.) section in connection with Keshavganj– Swarupganj BG Patch Doubling Project.

Open 27.07.11 Single 02.09.11 6 Nos. Ist Lowest M/s Laxyo Energy

Pvt. Ltd., 46/1, TIT

Road, Ratlam (M.P.)

NIL Yes Dy.CE(C)AII/KVJ-

SRPJ/BGD/CA/71 Dtd. 05.12.2011

Ist Lowest M/s Laxyo Energy Pvt. Ltd., 46/1,

TIT Road, Ratlam (M.P.)

`371.12

Lacs.

14.04.2012, 30.09.2012

& 30.04.2013

-- - Work under progress

5 T.No.AII/KVJ-KRJD/I/BG Doubling/T/14-R

Addition, alteration and construction of S&T structures, Pass. Platform, Platform Shelters, station Building, staff Quarters, water Huts, toilets, Hand Pumps, FOBs, Level Crossing works, Km Post, Gradient Posts & Hectometer Posts etc. between Keshavganj – Swarupganj (both incl.) section and Officer Rest House at Aburoad Station in connection with Keshavganj– Swarupganj BG Patch Doubling Project.

Open 30.07.12 Single 03.09.12 02 Nos. Ist Lowest M/S Varaha Infra Ltd., Umesh Smriti-6

Jalam Vilas Scheme, Poata B.

Road, Jodhpur

NIL Yes - M/S Varaha Infra Ltd., Umesh Smriti-6

Jalam Vilas Scheme, Poata B. Road,

Jodhpur

`898.86

Lacs.

14.06.2013 - - Work under progress

6 T.No.AII/Const/LHS/T/1

Construction of Limited Height Subway in lieu of existing LC No. 101 (Km 548/5-6), LC No. 102 (Km 550/7-8), LC No. 107 (Km 562/6-7), LC No. 109 (Km 568/9-10), LC No. 110 (Km 571/2-3) & LC No. 111 (Km 572/5-6) between stations Keshavganj-Swarupganj of Marwar-PalanPur Section in connection with elimination of level crossing gates.

Open 08.08.12 Single 19.09.12 2 Nos. 2nd Lowest M/s. Ravi Infrabuild

Projects Pvt. Ltd. Office 95, Hiran Magri Sector-11, Udaipur-313002 (Raj.).

NIL No - M/s. Ravi Infrabuild Projects Pvt. Ltd.

Office 95, Hiran Magri Sector-11, Udaipur-

313002 (Raj.).

`1122.63

Lacs.

11.05.2013 - - Work under progress

Page 22: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

22

7 T.No.AII/GRI-MJ/BGD/T/1

: Earthwork in embankment for cutting & filling, Blanketing for bank, Addition, alteration and construction of S&T structures, Pass. Platform, Platform Shelters, station Building, staff Quarters, water Huts, toilets, Hand Pumps, FOBs, TMC Rest house etc. between Guriya–Marwar Jn. stations (both excl.) and Officer Rest House at Mawar Jn. Station in connection with Guriya-Marwar Jn. BG Patch Doubling Project.

Open 30.08.12 Single 16.10.12 07 Nos. 1st Lowest M/s. Braham

Prakash Modi, 74

Sudarshanpura, Industrial

Area, Baisgodam, Jaipur-06

NIL No - M/s. Braham Prakash Modi, 74

Sudarshanpura, Industrial Area,

Baisgodam, Jaipur-06

`3541.71

Lacs.

09.03.2014 - - Work under progress

Dy. CE/C/Jodhpur

1. 1 JU/Const.-

1/

19/2008-

09,

Zone-I - Laying &

linking of BG track.

Open

Tender

24.03.09 Single 28.04.09 3 1 (M/s P.C.

Sharma, A-87,

Noida [UP])

1

(M/s Bhanwar

Lal Bijarnia)

Yes Dy.CE/C-

I/JU /16/

2009-10

dtd.06.09.0

9

M/s P.C. Sharma, A-87,

Distt. Gautam Budh

Nagar [UP]

236.35 212.22 05.11.09

31.03.10

15.02.10

31.03.10

30.04.10

23.07.09 30.04.10 Final bill passed

during Jan,2013

2. 2 JU/Const.-

1/

25/2008-

09,

Depot supply of Stone

ballast

Open

Tender

06.05.09 Single 10.06.09 3 1 (M/s

Vinayak

Const. Co.,

Jaswantgarh)

1 (M/s J.K.

Const. Co.,

Nokha)

Yes Dy.CE/C-

I/JU /21/

2009-10

dtd.26.11.0

9

M/s Vinayak Const. Co.,

Jaswantgarh

143.68 173.88 28.12.09

31.01.10

31.03.10

15.05.10

15.06.10

28.12.09 - Final bill passed

during Dec.,2012

3. 3 T.No.JU/

Const.-

I/30 /

2009-10

AT Welding of rail

joint

Open

Tender

19.09.09 Single 22.10.09 1 1 (The India

Thermit Corp.

Kanpur)

- Yes Dy.CE/C

JU

/22/2009-

10

dt.29.3.10

The India Thermit Corp.

Kanpur

103.63 77.31 22.04.10

31.08.10

15.11.10

31.03.11

30.05.11

28.11.09 - Final bill passed

during Dec.,2012

4. 4 JU/C/04/0

4-05

Bridge work No. 31 &

72 SMR- BLDI

Open

tender

6.6.04 Single 6.7.04 08 Nos M/S Rachna

Const.

Company

N/A L I NWR/S&C/C

A/53 Dt.

20.1.05

M/S Rachna Const.

Comp.,. TAL-

Ankleshwar Distt

Bharuch

394.31 465.25

403.15

23.11.05 15.3.05 31.07.09

Final variation duly

vetted by AFA/C/ JU

sent to HQ for

finance vetting &

sanction of CA.

5. 5 JU/C/08/0

4-05

Dt.19.

11.04

Bridge work 30,56 &

76 SMR- BLDI

Open

tender

Single 29.12.04 NWR/S&C/C

A/ 64 dt

.14.9.05

M/S Rachna Const.

Company

373.42 318.74

254.22

11.06.06 7.10.05 30.11.09 Final Bill passed &

sent to Accounts

during this month

(Mar, 2013)

Page 23: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

23

6. 6 JU/C-

II/01/09-

10

Const. of ROB at LC

36-C( At MKN) & 63-C

(At NGO)

Open single 14.7,09 05 M/S Rachana

Const Co.

N/A L-I DyCE/C-

II/JU/29/20

09-10 Dated

25.2.2010

M/S Rachana Const Co.

Unjha

546.95 09.07.10

30.10.11

31.01.12

20.02..12

30.04.12

30.09.12

24.8.09 Work

completed.

-

7. 7 JUConst-/

03/2010-

11

E/work in cutting in

filling PLC – Bye pas

Open

tender

02.07.2010 Single 03.08.10 01 M/S Bhanwar

Lal Bijarnia

N/A L-1 DyCE/C-

II/JU/30/20

10-11 Dated

02.02.20110

M/S Bhanwar Lal 106.04 13.07.11

30.08.11

15.11.11

31.12.11

28.10.10 Work

completed.

Final bill passed

during Dec.,2012

8. 8 JU/Const-

6/10-11 Const of ROB at L.C.

No. C-325 at (BME)

Open

tender

15.10.2010 Single 16.09.10 06 M/S Rachana

const. comp.

N/A L-1 Dy CE/C

/JU/34/201

1-12 dt.

21.10.11

M/S Rachana const.

comp.

380.99 07.11.11

31.07.12

30.11.12

28.02.13

30.04.13

28.06.11 Work in

progress

-

9. 9 JUConst-/

08/2010-

11

Extension of Bay No.4

inside Diesel Shad

BGKT

Open

temder

22.09.2010 Single 25.10.10 02 M/s Anil

Trading co.

Sikar

M/S Jai Bala Ji

Const. co. Sri-

Gananagar

L-1 Dy CE/C

/JU/35/201

1-12 dt.

21.10.11

M/s Anil Trading co.

Sikar

242.85 16.11.11

30.07.12

15.10.12

15.03.11 Work

terminated on

23.10.12

-

10. 10 JUConst-/

09.R/2010

-11

MKN-BIDD E/Work in

cutting & filling

Const.of ROB insted

of LC etc.

Open

temder

21.02.11 Single 07.06.11 01 M/s Bhanwar

Lal Briainiya

Vill. Rajpura

Distt. NGO

- L-1 Dy.CE/C/

JU/37/

2011-12

dtd.

23.01.12

M/s Bhanwar Lal

Briainiya

289.66 29.09.12

31.01.13

30.04.13

10.10.11 Work in

progress

-

11. 11 T.NO.JU/

CONST/T

-01/2012-

13 (ROB)

Accepted

on

10.09.12

Construction of ROB

at LC No. C-323-A

(at Barmer),

Open 05.07.12 Single 07.08.12 02 Parul

Construction

Co.,

Mehsana

M/s Vishnu

Prakash R

Pungalia,

Jodhpur.

L-1 Dy.CE/C/

JU/04/2012-

13, dtd.

08.01.13

Parul Construction Co.,

Mehsana

329.43 09.07.13 25.10.12 Work in

progress

12. 12 T.No. JU/

CONST/

15/2011-

12

Accepted

on–

17.09.12

Work of remodeling

of JU yard including

all work related to P.

way, AT welding

Open 25.03.12 Single 26.04.12 04 Sh.Girdhari

Ram S/o Sh.

Sajjan Ram,

JODHPUR

M/s P.C.

Sharma,

Noida (U.P.)

L-1 Dy.CE/C/

JU/03/2012-

13, dtd.

13.12.12

Sh.Girdhari Ram S/o Sh.

Sajjan Ram,

JODHPUR

132.02 16.06.13 11.11.12 Work in

progress

13. 13 T.No.

JU/CONS

T/T-

02/2012-

13 (JU

Yard)

Accepted

on–

16.10.12

Work of remodeling

of JU yard including

all work related to

Civil works

Open 19.07.12 Single 22.08.12 03 M/s Kalu Ram

Contractor, E-

15, Shastri

Nagar,

Jodhpur.

M/s Prathem

Builders,

Jodhpur

Kera Ram S/o

Pusha Ram,

Jodhpur.

L-1 Dy.CE/C/

JU/05/2012-

13, dtd.

08.01.13

M/s Kalu Ram

Contractor, E-15,

Shastri Nagar, Jodhpur.

442.50 15.08.13 07.12.13 Work in

progress

14. 14 T.No.JU/

CONST./

T-

07/2012-

- Residual work of

extension of Bay No.4

inside Diesel Shed

Open

tender

30.10.2012 Single 30.11.12 05 M/s Jai Mata

De Energy

System,

VP. Narodara

- L-1 - M/s Jai Mata De Energy

System,

VP. Narodara (Laxman

garh),

185.30 10.04.13 30.01.13 Work in

progress

Page 24: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

24

13

(D.Shed) BGKT (Laxman

garh),

Sikar (Raj)

Sikar (Raj)

15. 15 T.No.JU/

Const./T-

04/2012-

13/GAD

Carrying out

Geotechnical

investigation for ROB

on LC No.21 & LC

No.61

Open

tender

10.10.12 Single 08.11.12 04 M/s C.S.

Engineers &

Consultants,

Shakarpur,

DELHI – 110

092

1. M/s Strength

Engineering

Services Pvt.

Ltd., Tonk

Road, Jaipur

2. M/s

ARKITECHN

O Consultants

(India) Pvt.

Ltd., ,

Bhubaneswar

L-2 - M/s C.S. Engineers &

Consultants, Shakarpur,

DELHI – 110 092

18.25 28.04.13 07.02.13 Work in

progress

CE/C/IV-JP

Dy. CE/C/BKN

1 Const/BKN/42/2009-10

Construction of RRI Building & Sick line office complex and construction & modification of station building, platforms, platform shelters, conversion of MG sick line shed into Track machine shelter and dismantling of MG AC maintenance shed, FOB landing and other miscellaneous works at Bikaner in connection with Sadulpur - Bikaner Gauge conversion project

open tender

29.03.09 single 29.04.09 08 Nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

150-NWR/Dy CE/C-I/BKN Dt 24.12.09

M/S Govind Gupta, 5/99, Chopra Patti Narwana Distt Jind ( Haryana)

Rs 377.44 lakhs

02.09.09 21.09.09 15.03.12 Final variation in process

Page 25: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

25

2 Const/BKN/03/2010-11dated 19.06.2010

Const. of twenty four coach length BG washing line after dismantling of existing MG washing line and oher related miscellaneous works at Bikaner in connection with BKN-SDLP GC

Open tender

11.06.10 single 14.07.10 09 Nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

163-NWR/Dy CE/C-I/BKN Dt 14.12.2010

M/S Jitender Singh , V&PO- Kakoda Distt. Jhujhunu

Rs 279.82 lakhs

16.10.10 12.11.10 31.03.12 Final variation in process

3 Const/BKN/18/2009-10/RE-HSR/Std-II dated 18.02.2010

Const. of Station biliding and other service buildimnngs etc. between Rewari ( excluiding ) to Hansi in c/with RE-HSR Std-II panel interlocking.

Open tender

18.02.10 single 26.03.10 05 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

102-NWR/Dy CE/C-II/BKN Dt 19.10.2010

M/S V.K.Const. Co. 2-D-37, Jawahar Nagar Sri Ganganagar

Rs 416.38 lakhs

15.05.11 15.06.10 15.03.13 Work is in progress.

4 Const/BKN/07/HSR - RE/2010-11 dated 04.09.2010

Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track etc. at all stations in c/with Std-III and MACL Signaling work at Kishangarh Balawas, Jausana, Kosli, Jharli & Charkhi Dadari on Rewari - Hisar section.

Open tender

04.09.10 single 13.10.10 04 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

107-NWR/Dy CE/C-II/BKN/2010-11 Dt 04.02.11

M/S Bhikha Ram Devrath PO- Dhigarla , Tehsil- Rajgarh ( Churu)

Rs 230.69 lakhs

27.09.11 18.01.11 28.02.13 Work is in progress.

Page 26: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

26

5 Const/ BKN/02(R)/ SDRA/ 2010-11 Dated 05.06.10

Construction of station building , passenger platforms, staff quarters , duty huts for L-Xing, earthwork in embankment etc. in connection with Provision of B class station at Sudhrana .

Open tender

11.06.10 Single 14.07.10 09 nos Tender awarded to evaluated L1 tenderer.

Tender awarded to evaluated L1 tenderer, hence further offer not discussed.

103/NWR/Dy CE/C-II/BKN Dt 13.12.2010

M/S Jitender Singh , VPO- Kakoda Distt Jhunjhnu

RS 366.52 lakhs

18.10.11 01.11.10 30.09.12 Work is in progress.

6 Const/BKN/26(R )/2007-08

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, stone pitching etc, from Km.388.00 to Km 455.00 on BKN-SDLP section

open tender

18.12.07 single 23.01.08 1 Nos. Tender awarded to evaluated L-1 further offers not discussed by TC

Yes, tender awarded to lowest valid and eligible tenderer

120 NWR/DY CE/C-I/BKN/ 2008-09 dt 16.02.09

M/S Bheron Singh Rathore & Co.Sarvoday Basti, Bikaner (Raj)

3.08 Crores 15.03.09 28.08.08 31.03.11 Final bill is under passing

7 Const/BKN/26(R ) /2008-09

Earthwork (including Blanketing material) in formation in bank & cutting with mechanical compaction, construction of 2 Nos RUBs having spans 2x10.50m & 1 No. RUB having spans of 1x6.10m and 5 Nos RUBs cum balancing culverts of spans 1x 3.66m ( all RCC boxes) including other ancillary works for construction of Ratangarh Bye Pass in connection with Bikaner-Ratangarh-Sadulpur gauge conversion project

open tender

18.02.09 single 23.03.09 10 Nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

CE/S&C/CA/28 dated 12.10.09

M/S Maya Const. Co. Pvt. Ltd., A-20, Shyam Darshan Society, Harivila Road, New Naroda, Ahmedabad-382346.

Rs 829.25 lakhs

13.08.09 27.08.09 15.05.11 Final bill is under passing.

Page 27: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

27

8 Const/BKN/04/2011-12/BKN-SDLP-RTGH-SRDR

Supplying and stacking 55000 cum 65mm gauge stone ballast machine crushed (hard stone) confirming to RDSO specifications between Ratangarh & Ratangarh West & Ratangarh West to km.19.00 on Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project

Open tender

14.09.11 single 14.10.11 08 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

172-NWR/Dy CE/C-I/BKN Dt 09.03.2012

M/S Jai Mata Const.Co. H.No.14169 Street no.8A Ganesh Nagar Bhatinda( Pb)

Rs 305.25 lakhs

25.05.12 10.01.12 31.03.13 Work is in progress.

9 Const/BKN/08/2011-12/BKN-SDLP-RTGH-SRDR

Earthwork in banks and cutting for formation including side drains , trolley refuges, toe walls/ retaining wall , stone pitching etc. in Ratangarh ( including) to Sardarshahar (including) section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.

Open tender

17.09.311 single 17.10.11 2 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

173-NWR/Dy CE/C-I/BKN Dt 09.03.2012

M/S LVJ Projects Private Limited, 1 & 2, 1st Floor, Shri Krishna Centre , Near Mithakhari Six Roads , Navrangpura, Ahemadabad-380009 , Gujrat

Rs 534.82 lakhs

01.06.12 05.01.12 31.03.13 Work is in progress.

Page 28: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

28

10 Const/BKN/06 (R)/2011-12/BKN-SDLP-RTGH-SRDR

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station yards) on Ratangarh - Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar Gauge conversion project

Open tender

20.01.12 single 22.02.12 2 nos Tender awarded to evaluated L-1 .

Yes, tender awarded to lowest valid and eligible tenderer

178-NWR/Dy CE/C-I/BKN Dt 18.08.2012

M/S Shree Nahar Construction Co., A-328, Shastri Nagar , Jodhpur -342003

Rs 531.61 lakhs

25.12.12 24.05.12 30.06.13 Work is in progress.

Page 29: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

29

11 Const/BKN/02/2010-11

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-02 (Km. 50.00 to 81.00 including Rai Singhnagar & Gajsinghpur station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

Open tender

08.08.10 single 08.09.10 01 no. Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

3-NWR/Dy CE/C-III/BKN Dt 14.12.10

M/S Jhawar Sales Corporation, Rani Bazar Bikaner

Rs 194.62 lakhs

26.06.11 15.12.10 31.03.12 Final bill under technical check.

12 Const/BKN/03/2010-11

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-03 ( Km.81.00 to 115.00 including Sri Karanpur & Keasri Singhpur station yard) on Suratgarh –Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

Open tender

08.08.10 single 08.09.10 03 Nos. Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

9-NWR/Dy CE/C-III/BKN Dt 09.03.2011.

M/S Bhanwar Lal Bijarnia Village-Rajpura Post-Parewadi Tehsil-Nawa Distt: Nagaur (Raj)

Rs 178.57lakhs

31.05.11 15.12.10 30.06.12 Final bill to be recored in MB by SE/C/Pway?SOG.

Page 30: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

30

13 Const/BKN/04/2010-11

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-04 (Km. 115.00 to 138.00 including Prithvirajpur & Sri Gangashahar station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

Open tender

08.08.10 single 08.09.10 03 Nos. Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

7-NWR/Dy CE/C-III/BKN Dt 25.01.11

M/S Karnani Construction New Line Gangashahar, Bikaner(Raj)

Rs 138.34 lakhs

05.06.11 15.12.10 28.02.13 Work is in progress.

14 Const/BKN/01 (R)/2010-11

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p.way materials and other ancillary works in Zone-01 (Km. 20.500 to 50.00 including Bhagwansar, Sarupsar & Mohansar station yard) on Suratgarh-Sri Ganganagar section in connection with Sarupsar-Sri Ganganagar gauge conversion project

Open tender

07.10.10 single 08.11.10 02 Nos. Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1 .

6-NWR/Dy CE/C-III/BKN Dt 19.01.11.

M/S P.C.Sharma, A-87, Sector-49, Nodia, Gautam Budh Nagar ( UP)

Rs 174.99 lakhs

21.07.11 15.12.10 31.10.12 Final bill to be recored in MB by SE/C/Pway?SOG.

Page 31: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

31

15 Const/BKN/12/2010-11/SGNR-HMH-SURP

Construction, Strengthening/extension of existing Minor bridges and placement of PSC slabs with RCC ballast retainers of span upto 6.10m including earthwork in approaches of bridges and other ancillary works in Diplana (excluding) to Suratpura (including) section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project

Open tender

09.10.10 single 10.11.10 04 nos Tender awarded to evaluated L-1 .

02 Nos (i) M/S Vikas Const. Co. Bhagina Road Near Water Works Pilani (ii) M/S Dalip Singh & Co., V&P Lalana Tehsil- Nohar Distt. Hanumangarh

132-NWR/Dy CE/C-II/BKN dt 07.03.12

M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar

Rs 165.50 lakhs

23.02.12 05.10.11 31.05.13 work is in progress.

Page 32: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

32

16 Const/BKN/10/2010-11/SGNR-HMH-SURP

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall etc, including supply of cement between Diplana (excluding) to Suratpura (including) to section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project

Open tender

09.10.10 single 10.11.10 06 nos Tender awarded to evaluated L-1 .

03 Nos (i) M/S Rajender Singh Contractor, 817, Sector-15A, Hisar (ii) M/S Dalip Singh & Co., V&P Lalana Tehsil- Nohar Distt. Hanumangarh (iii) M/S Devender Singh Naveen (JV),7 Pratap Nagar , Saket Colony Rajgarh Road Hisar.

122-NWR/Dy CE/C-II/BKN dt 26.11.2011.

The Birhi Kalan L/C Co Op. Society Ltd. Birhi Kalan, Tehsil-Charkhi Dadri, Distt-Bhiwani

Rs 510.15 lakhs

23.03.12 26.07.11 30.06.13 work is in progress.

17 Const/BKN/23/2010-11/SGNR-HMH-SURP

Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 88.00 to 132.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project

Open tender

11.12.10 single 12.01.11 04 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

14-NWR/Dy CE/C-2/BKN Dt 15.09.2011

M/S Gawar Const. Ltd. DDS 378, Sector 16-17, Hisar

Rs 653.23lakhs

06.05.12 01.07.11 20.01.13 Final bill passed.

Page 33: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

33

18 Const/BKN/ 20/2008-09/SOG-BTI

Addition and alteration to station yards, insertion of fan shaped turnouts, linking of track, sand humps and overruns, shifting of and other miscellaneous works at all stations in c/w Standard–III and MACL signaling work at Rangmahal, Pilibanga, Dabli Rathan, Maneksar, Sangaria and Dhaban stations on Suratgarh-Bathinda section.

Open tender

27.02.09 single 01.04.09 01 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No- 78-NWR/Dy CE/C-II/BKN dated 17.08.2009

M/s Karnani Const. New Line, Ganga Shahar, Bikaner

Rs 202.39 lakhs

14.06.11 12.06.09 15.04.12 Final variation in process

19 Const/BKN/62/2007-08

Supplying and stacking 21900 cum 65mm gauge stone ballast machine between Suratgarh & Bathinda Railway stations in c/w Standard-III & MACL signaling work on Suratgarh-Bathinda section.

Open tender

17.12.07 single 18.01.08 02 nos Tender awarded to evaluated L-1 .

01 nos (i) M/S Ganpati Construction Co. H.No.430-B,/1 (22333) Shanti Nagar, Bhatinda

Agmt No 63/NWR/Dy CE/C-II/BKN dated 31.10.2008

M/s T.C. Const. Co, (JV), Nokha

Rs 211.38 lakhs

30.10.10 30.07.08 30.10.10 Final variation sanctioned by Competent authority on 24.01.13. Final bill is to be passsed after submission of NOC by Mining deptt.

20 Const/BKN/ 13/2010-11

Supply of 52 kg /90 UTS SKV welding portions to the Railways for welding of rail joints from km 20.500 to 138.00 between Sarupsar (including) to Sri Ganganagar (including) in connection with Sarupsar to Sri Ganganagar Gauge conversion project.

Open tender

20.01.10 single 29.01.12 02 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No17/NWR/Dy CE/C-II/BKN/ SRPR-SGNR dated 28.02.2012

M/S India Thermit Corporation Ltd. 84/22, Fazal Ganj, Kanpur

Rs181.73 lakhs

29.01.12 28.08.11 30.06.13 Work in progress

Page 34: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

34

21 Const/BKN/03 /2011-12/SRPR-SGNR

Widening & extension of High level platform No 3,4 & 5,providing hydrants for coach filling , Dismantling of old FOB, Shifting of PF shelters, Dismantling of MG washing line & goods platform, construction of road approach for BG goods platform at Suratgarh , Construction of type -II & III quarter at Sarupsar, Construction of duty hut & gate lodge at Suratgarh , Brick pitching for slope protection and other misc. work at Suratgarh and on Suratgarh -Sri Ganganagar ( excluding) section in connection with Sarupsar - Sri Ganaganagar gauge conversion project

Open tender

18.09.11 single 31.10.11 03 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

Agmt No16/NWR/Dy CE/C-II/BKN/ SRPR-SGNR dated 17.01.12

M/S Aditya Traders 38, Gurudawara Gali, Hanumangarh Jn

Rs 458.32 lakhs

28.08.12 12.12.11 28.02.13 Work in progress

22 Const/BKN/03/2011-12/SURP-HMH-SGNR Dt. 19.05.2011

Construction / modification of station building & structures i.e. S&T buildings, platforms, PF shelters , duty bunk and other ancillary works between Tehsil Bhadra ( excluding) to Sidhmukh (including) section in connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project

Open tender

26.05.11 single 29.06.11 03 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

126-NWR/Dy CE/C-II/BKN dated 11.01.12

M/S Agarwal Const Co. Dudhwa Khara , Churu

Rs 418.60 lakhs

10.10.12 11.11.11 31.03.13 work in progress

Page 35: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

35

23 Const/BKN/27®/2010-11/SGNR-HMH-SURP dated 28.06.2011

Transportation of BG PSC sleepers from sleepers factory at Manaksar, Khatu or any other sleeper factory / place including unloading and stacking /spreading at site from km 88.000 to 178.580 ( including Suratpura yard ) in connection with Sri Ganganagar – Hanumangarh – Suratpura gauge conversion project

Open tender

02.07.11 single 03.08.11 05 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

124/11-12 dated 19.12.2011. of /Dy CE/C-II/BKN

M/S Har Har Const. Co. Surender Nagar ).

Rs 192.38 lakhs

02.10.12 07.11.11 02.03.13 work in progress

24 Const/BKN/02/SURP-HMH-SGNR/11-12

Construction / modification of station building & structures i.e. S&T buildings, platforms, duty bunk and other ancillary works between Sidhmukh ( excluding) to Suratpura Jn. (including) section in connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project

Open tender

26.05.11 single 29.06.11 05 nos Tender awarded to evaluated L-1 .

(i) M/S Ridhi Sidhi Construction Co. Sujangarh Road , Nokha , Bikaner ( Raj) (ii) M/S Sangam Construction Company C/O Nasar Latif S/O Abdul Khan Moh. Nardiyan Ward No.17, Rajgarh , Sadulpur ( Churu)

129-NWR/Dy CE/C-II/BKN Dt 02.02.12.

M/S Pyare Lal Dhaka Const. Co. Churu)

Rs 315.48 lakhs

04.11.12 23.11.11 31.03.13 work in progress

Page 36: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

36

25 Const/BKN/09(R)/2011-12/BKN-SDLP-RTGH-SRDR Dt 13.01.2012.

Construction and modification of station buildings, platform, platform shelter level crossings and earthwork in filling for platforms between Ratangarh ( including ) to Sardarshahar (including) in Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project

Open tender

20.01.12 single 28.03.12 04 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

177-NWR/Dy CE/C-II/BKN Dt 07.08.12.

M/S Maheshwari Construction Co Bikaner Road, Nokha(Bikaner)

Rs 647.31 lakhs

03.03.13 06.07.12 03.03.13 Work is in progress

26 Const/BKN/32(R)/2011-12/SURP-HMH-SGNR Dated 29.05.2012

Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 132.00 to 175.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project

Open tender

01.06.12 single 09.07.12 2 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

01-NWR/Dy CE/C/BKN/SURP-HMH Dt 12.09.2012

M/S Jai Mata Const. Co, 14169, Street no.8-A, Ganesh Nagar , Bathinda

Rs 726.00 lakhs

03.04.13 05.08.12 03.04.13 Work is in progress

27 Const/BKN/01/2012-13/SRPR-SGNR Dated 29.08.2012

Supplying and stacking 14000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Suratgarh yard & near Sri Ganganagar yards in connection with Sarupsar -Sri Ganganagar Gauge Conversion

Open tender

26.05.12 single 27.06.12 05 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

20/NWR/Dy CE/C/BKN/2012-13/SRPR-SGNR Dated 19.10.2012

M/S R.K.Infrastructure, 407, Pink Tower, Tonk Road, Jaipur

Rs137.94 lakhs

28.12.12 07.09.12 28.06.13 Work is in progress

Page 37: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

37

project

28 Const/BKN/05/2012-13/SRPR-SGNR

Dismantling & reconstruction of parcel office, extension of waiting hall, construction of platform shelters, improvement of platform surfacing of Island platform and other ancillary works at Sri Gangsanagar in connection with Sarupsar -Sriganganagar Gauge Conversion Project.

Open tender

08.08.12 single 08.08.12 02 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

PG submitted.

M/S V.K.Const Co, 2-D-37,Jawaharnagar Sri Ganganagar

Rs131.75 lakhs

06.05.13 26.10.12 06.05.13 Work is in progress

29 Const/BKN/33 (R)/2011-12/SURP-HMH-SGNR Dated 09.07.12

Supplying and stacking 65000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Paharsar halt, Hansiawas Halt, Anupshahar & any other suitable location between Km. 132.00 to 175.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project

Open tender

09.07.12 single 13.08.12 04 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

02-NWR/Dy CE/C/BKN/2012-13/SURP-HMH-SGNR Dt 20.11.2012

Devender Singh Contractor, 7 Pratap Nagar, Saket Colony, Rajgarh Road, Hisar

Rs 620.10 lakhs

11.06.13 17.10.12 11.06.13 Work is in progress

Page 38: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

38

30 Const/BKN/01 (R)/2011-12/SURP-HMH-SGNR Dated 26.07.12

Supplying and stacking 41600 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Sidhmukh, Narwasi & Gogameri depots on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project

Open tender

26.07.12 single 30.08.12 07 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

03-NWR/Dy CE/C/BKN/2012-13/SURP-HMH-SGNR Dt 11.12.2012

M/S R.K.Infrastructure , Near Sangam Chouraha, Sardarshahar Road, Ratangarh Distt Churu

Rs 399.36 lakhs

11.06.13 15.11.12 11.06.13 Work is in progress

31 Const/HMH/09/2012-13/SURP-HMH-SGNR Dated 16.07.12

Construction/modification of station buildings & structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Diplana (excluding) to Tehsil Bhadra (including) section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project

Open tender

16.07.12 single 22.08.12 05 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

NWR/S&C/CA/48 dated 22.01.2013

M/S Ramesh Kumar Bansal, 182, Vinoba Basti, Near Dhan Mandi Gate, Sri Ganganagar ( Raj)

Rs 1051.42 lakhs

03.08.13 Work is in progress

03.08.13 Work is in progress

32 Const/BKN/03/2012-13/SRPR-SGNR

Dismantling & Construction of BG Washing line coach care complex,BG goods platform with approach road, electrical sub-station building,building extension of high level passenger platform, water hydrants on washable apron,drainage pipe line and other ancillary works at Sri Gangsanagar

Open tender

27.06.12 single 06.08.12 02 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

NWR/S&C/CA/45 dated 07.12.12.

M/S Pragati Construction Consultants, 28/12, East Punjabi Bagh, Main Ring Road, New Delhi -110026.

Rs 1009.05 lakhs

02.07.13 26.10.12 02.07.13 Work is in progress

Page 39: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

39

station yard in connection with Sarupsar -Sriganganagar Gauge Conversion Project.

33 Const/BKN/04/2012-13/SRPR-SGNR

Construction of BG Sick line shed , Dismantling of MG sheds & MG goods PF at Sri Ganganagar, Foot Over bridge at Sri Ganganagar & Suratgarh station, and other ancillary works at Sriganganagr station yard in connection with Sarupsar-Sriganganagar Gauge Conversion Project

Open tender

27.06.12 single 06.08.12 01 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

NWR/S&C/CA/44 dated 07.12.12.

M/S Pragati Construction Consultants, 28/12, East Punjabi Bagh, Main Ring Road, New Delhi -110026.

Rs 1266.63 lakhs

02.07.13 26.10.12 02.07.13 Work is in progress

34 Const/BKN/01/2012-13/SURP-DPLN-HMH-SGNR dated 08.08.12

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines, including points and crossings in yards, spreading of ballast tamping of track, transportation of P.Way materials and other ancillary works in Zone-3 (Ch.88000 to 132000 including Gogameri, Tehsil Bhadra & Anupsahar station yard) on Hanumangarh-Suratpura section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project

Open tender

11.08.12 single 14.09.12 2 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

PG submitted

M/S Laxyo Energy Pvt. Ltd 46/1 TIT Road Ratlam (MP)

553.10 lakhs 08.11.13 Work is in progress

08.11.13 Work is in progress

Page 40: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

40

35 Const/BKN/02/2012-13/SURP-DPLN-HMH-SGNR dated 08.08.12

Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines, including points and crossings in yards, spreading of ballast tamping of track, transportation of P.Way materials and other ancillary works in Zone-4 (Ch.132000 to 175000 including Sidhmukh, Narwasi, Suratpura & Sadulpur By-pass station yard) on Hanumangarh-Suratpura section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project

Open tender

11.08.12 single 14.09.12 2 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

PG submitted

M/S Bhairav Construction Co, Sukh sagar , Arya Samaj Road, Gulab Bari < Kota ( Raj)

521.79 lakhs 08.11.13 Work is in progress

08.11.13 Work is in progress

36 Const/BKN/01/2012-13/RE-HSR/Std.III dt. 08.10.2012

Supplying & stacking 28500 cum 65mm gauge stone ballast machine crushed (hard stone) confirming to RDSO specifications in Jharli,Chakhi Dadri, Manheru, Bawani Khera, Jitakhera & Hansi yards in connection with Standard-III interlocking works in Hisar-Rewari section

Open tender

11.10.12 single 12.11.12 5 nos Tender awarded to evaluated L-1 .

Tender awarded to evaluated L-1.

04/NWR/Dy CE/C/BKN/2012-13/SURP-DPLN dated 31.12.2012

M/S Shyam Associates, 110, New Swastik Appt., Plot No. 2, Sector -9 , Rohini, Delhi -110085

267.76 lakhs 08.11.14 17.12.12 12.06.13 Work is in progress

Page 41: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

41

DY. CE/C/HMH

1 Const/ BKN/11/10-11/ SGNR-HMH-SURP dt. 04.10.10

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, etc between Hanumangarh Jn (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

09.10.10 One packet system

10.11.10 7 1 6 Yes, L-1

Const/ BKN/ 11/10-11/ SGNR-HMH-SURP Dt: - 13.01.11

The Birhi Kalan L/C Co Op. Society Ltd. Birhi Kalan, Tehsil-Charkhi Dadri, Distt-Bhiwani

660.84 12.01.12 04.03.11 12.01.12 31.03.13

Work is in progress.

2 Const/ BKN/ SURP-HMH-SGNR/ 13/

2010-11 Dt. 04.10.10

Rebuilding, Construction, Strengthening/ extension of existing Minor bridges and upto 6.10m including earthwork in in Hanumangarh (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

09.10.10 One packet system

10.11.10 4 1 3 Yes, L-1

Const/ BKN/ SURP-HMH-SGNR/ 13/ 2010-11 Dt: - 05.02.11

M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar

425.56 04.02.12 24.11.11 04.02.12 31.05.13

Work is in progress.

3 Const/ BKN/17/ SURP-HMH-SGNR/ 2010-11 dt. 02.12. 2010

Construction/modification of station buildings & structures i.e. S&T buildings, Platforms, P.F. Shelters/ FOB, between Sadul Shahar (excluding) to Hanumangarh Jn. (excluding) section in c/w SURP-HMH-SGNR GC project.

Open Tender

05.12.10 One packet system

12.01.11 8 1 7 Yes, L-1

Const/ BKN/17/ SURP-HMH-SGNR/ 2010-11 dt. 17.02.11

M/s Jai Matadi Energy System, VPO-Narodara, Tehsil-Laxmangarh, Distt-Sikar.)

402.09 16.02.12 30.03.11 16.02.12 31.03.13

Work is in progress.

Page 42: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

42

4 Const/ BKN/15/10-11/ SGNR-HMH-SURP dt. 02.12.10

“Rebuilding, Construction, Strengthening/extension of existing Minor bridges PSC slabs with RCC ballast retainers of span upto 6.10m in Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

05.12.10 One packet system

12.01.11 3 1 2 Yes, L-1

Const/ BKN/15/ 10-11/ SGNR-HMH-SURP dt. 25.03.11

M/s G.K. Contractor, House No. 157, Sector No. 9, Extension, Hanumangarh Jn.

273.28 24.03.12 10.07.11 24.03.12 30.4..13

Work is in progress

5 Const/ BKN/ 22/2010-11 Dated 04.12.10

Supplying and stacking 75000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km. 44.00 to 88.00 on Hanumangarh–Suratpura section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project

Open Tender

11.12.10 One packet system

12.01.11 6 1 5 Yes, L-1

Const/ BKN/ 22/2010-11 Dated 07.05.11

M/s Jai Mata Const. Co. H.No. 14169 Street No. 8A, Bathinda

686.25 07.05.11 25.07.11 07.05.12 30.04.13

Work is in progress.

6 Const/ BKN/ 14/2010-11 Dated 04.12.10

Earthwork in banks and cutting for formation including side drains, trolley refuges, toe walls/retaining wall, etc, including supply of cement between Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

01.01.11 One packet system

12.01.11 7 1 6 Yes, L-1

Const/ BKN/ 14/2010-11 Dated 07.05.11

M/s Jaimatadi Energy Systems (JV), VPO Narodara, Teh. Laxmangarh, Dist. Sikar

416.61 06.05.12 01.07.11 31.10.12 Work has been completed & final bill under process

Page 43: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

43

7 Const/BKN/16/ 2010-11/ SGNR-HMH-SURP dt. 02.12.10

Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, PF shelters / FOB, duty bunk and other ancillary works between Sri Ganganagar (excluding) to Sadul Sahar (including) section c/w SURP-HMH-SGNR GC project.

Open Tender

01.01.11 One packet system

12.01.11 6 1 5 Yes, L-1

Const/BKN/16/2010-11/SGNR-HMH-SURP 07.05.11

M/s Surender Kumar Bansal,59 P Block, Shri Ganga Nagar

547 17.05.12 27.05.11 30.9.12230.4.13

Work is in progress.

8 Const/ BKN/ SURP-HMH-SGNR/ 29/ 2010-11 Dated 19.02.11

Construction/Rebuilding of substructure of Bridge No. 40 (1 x 45.70 m Open Web Girder) at km 141.515 on Gang Canal, Bridge No. 2-A (2 x 61.0 m Open Web Girder) at km 2.347 on Ghaggar River, Bridge No. 14-B (2 x 61.0 m Open Web Girder) at km 18.345 on Ghaggar River and Bridge No. 21-A (1 x 76.20 m Open Web Girder) at km 28.638 on Indira Gandhi Main Canal including other ancillary works in c/w SURP-HMH-SGNR GC project.

Open Tender

24.02.11 One packet system

30.03.11 5 1 4 Yes, L-1

Const/ BKN/ SURP-HMH-SGNR/ 29/ 2010-11 Dated 15.07.11

M/s Jaimatadi Energy System, JV, VPO Narodara, Teh. Laxmangarh, Dist. Sikar

13.34 Cr. 14.07.12 01.02.12 14.7.13 Work is in progress.

9 Const/ BKN/ 16/2011-12/ SURP-HMH-SGNR Dated–16.08.2011

Construction of Foot Over Bridge and Platform Shelter at Hanumangarh Junction, Hanumangarh Town, Ellenabad and Nohar station in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion

Open Tender

28.08.11 One packet system

28.09..11 2 1 1 Yes, L-1

Const/BKN/16/2011-12/SURP-HMH-SGNR Dated: - 16.12.2011

M/s Sajneev Brothers, C-10, Vaishali Nagar, Jaipur

302.87 Lakh 15.12.12 20.03.12 15.12.12 31.03.13

work is in progress

Page 44: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

44

project.””

10 Const/BKN/ 09(R)/ SURP-HMH-SGNR/ 2011-12 Dated – 10.10.2011

Supplying and stacking 40000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Banwali, Fateh Singhwala, Budh Singhwala & between Km.201.00 to 202.00 Depot on Sri Ganganagar–Diplana section in connection with Suratpura-Hanumangarh-Sri Ganganagar Gauge Conversion project.

Open Tender

14.10.11 One packet system

18.11.2011 4 1 3 Yes, L-1

Const/ BKN/ 09(R)/ SURP-HMH-SGNR/ 2011-12 Dated – 14.12.2011

M/s Jai Mata Const. Co., House No. 14169, Street No. 8A, Ganesh Nagar, Bathinda

439.70 LAKH

13.06.12 17.12.11 31.07.1215.4.13

Work is in progress

11 Const/BKN/SURP-HMH-SGNR/ 19(R-1)/ 2010-11 dt. 19. 10.11

Supplying and stacking 65000 cum 65mm gauge stone ballast between Km.137.250 to 171.00 (including Sri Ganganagar) on Sri Ganganagar–Hanumangarh section in c/w SURP-HMH-SGNR GC project..

Open Tender

25.10.11 One packet system

30.11.11 4 1 3 Yes, L-1

Const/BKN/SURP-HMH-SGNR/ 19(R-1)/ 2010-11 dt. 14.12.11

M/S J.K.Const. Co. New Market, Nokha

719.90 LAKH

13.08.12 23.12.11 13.08.12 Work complited final bill under process.

12 Const/HMH/ 23/ SURP-HMH-SGNR/ 2011-12 dt. 05.12.2011

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in section &

Open Tender

10.12.11 One packet system

11.01.12 3 1 2 Yes, L-1

Const/HMH/ 23/ SURP-HMH-SGNR/ 2011-12 dt. 22.01.12

M/s RAVI INFRABUILD PROJECTS PVT. LTD., 95, Hiran Magri Sector-11, Udaipur

904.54 21.01.13 01.02.12 21.01.1331.03.13

Work is in progress

Page 45: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

45

at LC’s of Zone-1 (Ch. 138.000 to 204.130) on Sri Ganganagar-Hanumangarh section c/w SURP-HMH-SGNR GC project.

13 Const/HMH/20(R-2)/ SURP-HMH-SGNR/2010-11 Dated 22.12.2011

Supplying and stacking 65000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications between Km.171.00 to 204.130 (including Hanumangarh)

Open Tender

25.12.11 One packet system

25.01.12 5 1 4 Yes, L-1

Const/HMH/20(R-2)/SURP-HMH-SGNR/2010-11 Dated 24.02.12

M/s Sura Const. Co., Sector-13, 1323/1133, Hisar.

687.05 23.10.12 25.02.12 23.10.1215.02.13

Work complited final bill under process.

14 Const/HMH/25/SURP-HMH-SGNR/2011-12Dated–07.01.12

Supplying and stacking 90000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications in various Depots i.e. near Hanumangarh Junction, Talwara Jhil, Ellenabad, Nohar, Diplana & any other location on Hanumangarh-Diplana section

Open Tender

13.01.12 One packet system

13.03.12 5 1 4 Yes, L-1

Const/HMH/25/SURP-HMH-SGNR/2011-12 Dated–09.05.12

(Sh. Devender Singh, 7, Pratap Nagar,Saket Colony, Rajgarh Road, Hisar).

874.71 08.05.13 01.06.12 08.05.13 work is in progress

15 Const/HMH/1/ 12-13/SURP-HMH-SGNR Dated 23.6.2012,

Transportation, Assembling, Erection, Cambering, Riveting (with contractor’s rivets) painting and launching (as per contractor’s approved scheme) of open web through steel girders on Bridge No. 2-A (2 x

Open Tender

13.01.12 One packet system

30.7.12 4 1 3 Yes, L-1

Const/HMH/1/ 12-13/SURP-HMH-SGNR Dated 23.6.2012,

M/S Kiran Infra engg.Lted B-141 Road no 9D VKI area JP

495.56 16.9.13 - 16.8.13 work is in progress

Page 46: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

46

61.00m) at km. 2.347 on Ghaggar River, Bridge No. 14-B (2 x61.00m) at km. 18.345 on Ghaggar River and Bridge No. 21-A (1x 76.20m) at Km. 28.638 on Indira Gandhi Main Canal (Girder components will be supplied by Railway) with supplying & fixing of bearings and supplying, fabricating & fixing of galvanized steel channel sleepers along with matching fittings at site, on newly constructed top of pier/abutment to perfect level & alignment and other ancillary works in c/with SURP-HMH-SGNR GC project. (M/s Kiran Infra Engineers Ltd, Jaipur.

16 Const/HMH/ 03/2012-

13/SGNR-HMH-SURP dt. 23.06.12

“Balance work of Rebuilding of existing Major & Minor bridges with RCC BOX of span upto 6.0 m including earthwork in approaches of bridges and other ancillary works in Sriganganagar (excluding) to Hanumangarh (including) section i.e. from Km. 137.00 to Km 205.00 in c/w SURP-HMH-SGNR GC project.

Open Tender

28.6.12 One packet system

30.7.12 5 1 4 Yes, L-1

Const/HMH/ 03/2012-

13/SGNR-HMH-SURP dt. 23.06.12

M/s. Shree Karni Traders, C-171, Kanta kathuria Colony,Bikaner

168.78 7.12.12 14.8.12 7.12.12 07.01.13

Work complited final bill has been passed

Page 47: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

47

17 Const/HMH/05/S

URP-HMH-SGNR/2012-13 Dated – 09.07.2012

Construction / modification of station buildings & structures i.e. RRI Building, officers / sub ordinate rest house, S&T buildings, Platforms, duty bunk and other ancillary works between Hanumangarh Jn (including) to Hanumangarh Town (including) section

Open Tender

11.07.12 One packet system

13.08.12 2 1 1 Yes, L-1

Const/HMH/05/SUR

P-HMH-SGNR/2012-13 Dated – 09.07.2012

M/S. V.K. Construction Co, 2-D-37, Jawahar Nagar, Sri Ganganagar

828.64 03.8.13 20.10.12 03.8.13 work is in progress

18 Const/HMH/06/S

URP-HMH-SGNR/2012-13 Dated – 09.07.2012

Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Hanumangarh Town (excluding) to Talwara Jhil (including) section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project.

Open Tender

11.07.12 One packet system

13.08.12 4 1 3 Yes, L-1

Const/HMH/06/SUR

P-HMH-SGNR/2012-13 Dated – 09.07.2012

M/S. V.K. Construction Co, 2-D-37, Jawahar Nagar, Sri Ganganagar

691.32 23.07.13 20.11.12 23.07.13 work is in progress

19 Const/HMH/7/ 12-13/SURP-HMH-SGNR Dated 09.7.2012,

Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Talwara Jhil (excluding) to Khinaniyan (including) section in connection

Open Tender

11.7.12 One packet system

13.8.12 4 1 3 Yes, L-1

Const/HMH/25/SURP-HMH-SGNR/2011-12Dated–07.01.12

M/S P.S.Infra Build Pvt.Lited 15 jaat Dharmshala G.T.Road Fatehabad

779.3 12.7.13 4.11.12 12.7.13 work is in progress

Page 48: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

48

20 Const/HMH8/ 12-13/SURP-HMH-SGNR Dated 09.7.2012,

Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Khinaniyan (excluding) to Diplana (including) section in connection

Open Tender

11.7.12 One packet system

13.8.12 4 1 3 Yes, L-1

Tender No. Const/HMH/08/SURP-HMH-SGNR/2012-13 Dated – 09.07.2012

M/S Shree Shyam Engineering Co.29 Poonia Colony Churu(Raj)

779.3 12.7.13 29.10.12 12.7.13 work is in progress

21 Const/HMH9/ 12-13/SURP-HMH-SGNR Dated 05.8.2012,

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-1 (Ch. 0.000 to 44.000 including Hanumangarh, Hanumangarh town, Sherekan, Talwara Jhil & Ellenabad station yard)

Open Tender

10.8.12 One packet system

14.9.12 2 1 1 Yes, L-1

Const/HMH/09/SURP-HMH-SGNR/2012-13 Dated – 05.08.2012

M/S Bhanwar Lal Bijarnia, village- Rajpura, Tehsil nawa. Distt.Nagaur (Raj)

709.89 30.10.13 22.11.12 30.10.13 work is in progress

Page 49: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

49

22 Const/HMH10/ 12-13/SURP-HMH-SGNR Dated 05.8.2012,

Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-2 (Ch. 44.000 to 88.000 including Khinaniyan, Nohar & Diplana station yard)

Open Tender

10.8.12 One packet system

14.9.12 2 1 1 Yes, L-1

Const/HMH10/ 12-13/SURP-HMH-SGNR Dated 05.8.2012,

M/S. P.C.Sharma A-87-sector 49 NOIDA Distt. Gautum Budh Nagar

444.35 21.10.13 23.10.12 21.10.13 work is in progress

23 Const/HMH11/ 12-13/SURP-HMH-SGNR Dated 26.9.2012,

Construction of Road under Bridges in lieu of existing Level crossing No.122 (km 140/5-6), 135 (km 152/4-5), 142 (km 160/11-12), 169 (km 193/2-3)and 178 ( km.201 / 12-13 ) on Sriganganagar - Hanumangarh section inconnection with elimination of level crossing gates.

Open Tender

29.9.12 One packet system

30.10.12 6 1 5 Yes, L-1

Const/HMH11/ 12-13/SURP-HMH-SGNR Dated 26.9.2012,

M/S Gawar const. ltd. S.F-1, JMD Galleria. Sector 48. Sohna road. Gurgaon

688.4 6.4.13 17.11.12 6.4.13 work is in progress

24 Const/HMH13/ 12-13/SURP-HMH-SGNR Dated 22.10.2012,

Construction of Road under Bridges in lieu of existing Level crossing No.33 at km. 47.420, 38 at km. 55.032, 40 at km. 67.620, 48 at km. 75.564, 53-1 at km.93.197, 56 at km. 99.028, 74 at km. 132.745 & 81 at km. 143. 380 on Hanumangarh-Sadulpur section in connection with elimination of level crossing gates.

Open Tender

25.10.12 One packet system

27.11.12 1 1 1 Yes, L-1

Const/HMH13/ 12-13/SURP-HMH-SGNR Dated 22.10.2012,

M/S Hari Singh & Co.,H.No.101, Model Town, Narwana, Distt- Jind 09416464971.

852.45 10.11.13 - 10.11.13 work is in progress

Page 50: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

50

25 Const/HMH1213/12(R)/SU

RP-HMH-SGNR Dated

07.12.12,

Transportation of BG PSC sleepers from various sleepers factories or any other places or yards including loading, unloading and stacking / spreading at site from KM 0.000 to 88.000 and Transportation of Rails from various places in North Western Railway and other Railways like North Central Railway, West Central Railway etc. including loading, leading, unloading and stacking in station yards /between block sections of Hanumangarh Junction-Diplana (KM 0.000 to 88.000) in connection with Sri Ganganagar-Hanumangarh-Suratpura Gauge Conversion Project.

Open Tender

11.01.13 One packet system

11.01.13 7 1 6 Yes, L-1

Const/HMH1213/12(R)/SURP-

HMH-SGNR Dated

07.12.12,

M/A Karni const New lane BKN

243.9 4.8.13 - 4.8.13 Work yet not started

26 Const/HMH13/

12-14/SURP

-HMH-SGNR Dated

15.12.2012,

Hiring of 03 (Three) numbers Scorpio/TATA sumo/ Toyota Qualish or any other equivalent vehicles with hard top for use of officers in connection with-Suratpura-Hanumangarh-Sriganganagar Gauge Conversion and other projects on Bikaner division

Open Tender

15.12.12 One packet system

22.1.13 2 1 1 Yes, L-1

Const/HMH13/ 12-

14/SURP-HMH-SGNR Dated

15.12.2012,

Sh. Jetha Ram Kukna, Village- Bamblu, Teh.& Distt.- Bikaner

22.22 02.02.13 - 01.02.14 work is in progress

Page 51: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

51

CE/C/V-JP

Dy. CE/C/DO

1

DO

/GG

C/N

L/8

-

Construction of minor bridges from Chainage 00.00 to 30000 Between Dausa

and Lalsot in connection with

DO-GGC new BG Line

Op

en t

end

er

Single Packet system

07

/12

/20

05

Yes NWR/S&C/CA/78 dated

27.06.06

M/s Jain construction Co.(JV)

Ajmer

6.33 crore 20/05/07 Further

extension granted

upto 31/12/2007

04/04/06 Contract terminated.

Risk and cost has been ascertained and being process

for vetting and approval please.

2

DO

/GG

C/N

L/9

Construction of BG formation

from Chainage 1150 to 15000 between Dausa Kala-Shekhpura in connection with DO-GGC new BG line

project.

Op

en t

end

er

Single Packet system

04

/01

/20

06

Yes NWR/S&C/CA/81dated 06.09..06

M/s Kewai Construction (JV)

Jodhpur

6.45 crore 26/09/07 Further

extension granted up

to 30/11/2011

12/07/06 - contract terminate on

24/11/12. Final measurements

have been recorded but not

signed by contractor

3

DO

/GG

C/N

L/1

0

Construction of BG formation

from Chainage 15000 to 28000 between Dausa

and Lalsot in connection with

DO-GGC new BG line project.

Op

en t

end

er

Single Packet system

16

/01

/20

06

Yes NWR/S&C/CA/79 dated

30.06.06

M/s Parma Ram Bhakar Jodhpur.

6.39 crore 17/07/07 extended

upto 30/11/2011

11/05/06 - Contract terminate on

24/11/12. Final measurements

have been recorded but not

signed by contractor

Page 52: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

52

4

DO

/GG

C/N

L/1

4

Construction of Major Bridges with 1200mm dia cast in situ board piles &

PSC girder superstructure

of 18.30 M between DO-GGC in c/with

DO –GGC NLBG Project

Op

en t

end

er

03

/10

/20

07

Single Packet system

14

/11

/20

07

Yes NWR/S&C/CA/94 dated

18/02/2008

M/s Atlanta-ARSS

(JV) Bhubaneshwar (Orissa).

41.63 crore 16/09/09 Extended

upto 31/10/2012

20/02/08 - work completed. Final bill under

process.

5

DO

/GG

C/N

L/1

5

Construction of Minor Bridges from chainage

30000.00 to 38500.00 &

Construction of BG Formation from chainage

28000.00 to 38500.00

between Dausa and Lalsot in

connection with DO-GGC New

BG line Project

Op

en t

end

er

03

/10

/20

07

Single Packet system

14

/11

/20

07

3 Yes Dy. CE/C/I/JP/

CA/16 dated

29/02/2008

M/s. ARSS Infrastructure

Projects Limited, Bhubaneshwar

(Orissa).

5.31Crores 09/06/09 Extended

upto 31/08/2011

24/01/08 - Work completed. Final bill under

process.

6

DO

/GG

C/N

L/1

8

Construction of Broad Gauge Formation &

Minor Bridges from Chainage

41000.00 to 45000.00

between Dausa and Lalsot in

connection with Dausa-

Gangapur City New Broad Gauge line

project.

Op

en t

end

er

Single packet system

14

/11

/20

07

Yes NWR/S&C/CA/97 dated

03/03/2008

M/s Atlanta-ARSS (JV) Bhubneshwar

(Orissa)

17.95 Crore 30/07/09 extended

upto 31/12/2012

further extension

under process

14/03/0/8 - Work in progress

Page 53: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

53

7

DO

/GG

C/N

L/2

1

Construction of BG formation

and Minor Bridge from

chanaige 45000 to 60000 bet.

Lalsot and Gangapur City in connection with DO-GGC New B G line

Project

Op

en t

end

er

24

/09

/20

07

Single Packet system

02

/11

/20

07

3 Yes NWR/S&C/CA/95 dated

18/02/2008

M/s. ARSS Infrastructure

Projects Limited, Bhubaneshwar

8.41 Crores

20/03/09 Extended

upto 31/03/2013

15/03/08 - Work in progress

8

DO

/GG

C/N

L/2

2

Construction of BG formation

and Minor Bridge from

chanaige 60000to 75000 bet. Lalsot and Gangapur City in connection with DO-GGC New B G line

Project

Op

en t

end

er

24

/09

/20

07

Single Packet system

02

/11

/20

07

3 Yes Dy. CE/C/I/JP/

CA/17 dated

29/02/2008

M/s. ARSS Infrastructure

Projects Limited, Bhubaneshwar

6.71 Crores 10/03/09 Extended

upto 31/03/2013

10/03/08 - Work held up. 7 days notice issued

on 28/03/2012

9

DO

/GG

C/N

L/2

3

Construction of BG formation

and Minor Bridge from

chanaige 75000 to 90000 bet.

Lalsot and Gangapur City in connection with DO-GGC New B G line

Project

Op

en t

end

er

24

/09

/20

07

Single Packet system

02

/11

/20

07

3 Yes NWR/S&C/CA/96 dated

18/02/2008

M/s. ARSS Infrastructure

Projects Limited, Bhubaneshwar

8.56 Crores

20/03/09 Extended

upto 30/06/2013

15/03/08 -

work in progress

Page 54: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

54

10

DO

/GG

C/N

L/8

(R&

C)

Construction of Minor Bridges from Chainage

00.00 to 30000.00

between Dausa and Lalsot in

connection with Dausa Gangapur city new Broad

gauge line project.

Op

en t

end

er

17

/01

/20

08

Single packet system

20

/02

/20

08

1 Yes Dy. CE/C//DO/

CA/20 Dated23/0

6/2008

M/s Kewai Construction Co.

(J/V), Jodhpur

5.98 Crore 01/01/09 Extended

upto 31/08/2012

28/08/08 - Work has been terminate on

12/07/12.

11

JP/C

/W/4

8R

R/R

OB

Dau

sa

Construction of Road Over

Bridge across the Railway

track in Dausa Yard at Level Crossing No. 181-B at Km. 179/10-11 on

Jaipur Bandikui section.

Op

en t

end

er

16

/12

/20

07

Single packet system

18

/01

/20

08

1 - Yes NWR/S&C/CA/94

dated 18/02/200

8.

M/s Bharat Spun Pipe & Construction Co.,

Jaipur

3.82 Crore 15/07/09 Extended

upto 15/11/2012

25/04/2009- - Work completed. Final bill under

process

12

DO

/GG

C/N

L/2

9

Construction of platforms,

earthwork in platform in

connection with Dausa-

Gangapurcity new BG line

project.

Op

en t

end

er

27

/01

/20

09

Single packet system

02

/03

/20

09

9 - - Yes Dy.CE/C/DO/CA/ 35

dated: 15 /10/2009

M/s Bharat- Kamal (J/V), Jaipur

5.47 crore 04/08/10 Extended

upto 31/5/13

07/08/2009 - work in progress.

13

DO

/GG

C/N

L/3

6

Construction of broad gauge formation &

muior bridges from Chainage 90000 to 92700 between Lalsot

and Gangapurcity

new Broad gauge line

project.

Op

en t

end

er

22

/11

/20

09

Single packet system

28

/12

/20

09

2 - - yes Dy. CE/C/DO/CA/43 dated 07/04/201

0

M/s Mohan Singh Jat, Gangapurcity

1.50 crore 05/12/2010 Extended

upto 6/12/11.

07/04/2010 - Work held up. Contractor has filed suit in the

court.

Page 55: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

55

14

DO

/GG

C/N

L/3

1

Construction of ROBs across

Railway track at chainage

37034,83925 & 37925 and

drainage over pass at chainage 36960 & 37520

between salempura to

Udaikalan station

inconnection with Dausa-

Gangapurcity new BG line

project

Op

en t

end

er

Single packet system

16

/02

/20

10

11 - - Yes NWR/S&C/CA/105 dated

22/11/2010

M/s Shree Ram Kripa Construction Jaipur

13.44 Crore 29/02/2012. Extended up

to 15/11/2012.

Further extension

under process.

- - Work in progress

15

DO

/GG

C/N

L/3

2

Construction of 150unit type II, 7 units type-III

staff quarters & IOW office and other ancillary

works the water supply,

sewerage, drinakge, roads,

parking, sanitary and provision of electrical//

communication conduits &

metal boxes for NWR residential

colony at various stations between Dausa-

Gangapurcity new BG line

project.

Op

en t

end

er

Single packet system

05

/07

/20

1

02 - - Yes NWR/S&C/CA/107 dated

28/03/2011

M/s L.N. Agrawal-MCD Pvt. Ltd., (J/V)

Jaipur

15.65 Crore 31/03/2012. Extended

upto 31/03/13

- - Work in progress.

Page 56: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

56

16

DO

/GG

C/N

L/3

0

Construction of single line 13

standard straight

alignment tunnel in soil

and rock including cut

and cover portion

between chainage 38/720 to

40/840 including side

drain and other approaches of

tunnel between Didwana- Lalsot Railway station in connection with Dausa-

Gangapurcity new BG line

project.

Op

en t

end

er

Single packet system

27

/07

/20

09

12 - - Yes NWR/S&C/CA/106 dated

29/12/10

M/s Valecha-Transtonelstroey

(J/V) Mumbai

53.02 Crore 27/09/2012. Extended

upto 30/09/2013.

- - Work in progress

17

DO

/GG

C/N

L/2

6

DO/GGC/NL/26- Supplying and stacking 50mm gauge machine crushed stone track ballast in stacks as per

Railway’s specification between Km. 1.00 to 41.00 (Dausa-Lalsot)

section in connection with

Dausa- Gangapurcity new BG line

project.

Op

en t

end

er

Single packet system

07

/01

/20

11

6 Yes Dy.CE/C/DO/CA/54

dated 22/07/11

M/s R.K. Infra (J/V), Jaipur

7.74 Crore 05/04/2012 Extended

upto 05/04/2013

Work in progress

Page 57: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

57

18

DO

/GG

C/N

L/2

8

Construction of Broad gauge formation in

cutting, construction of rail side drain,

catch water drain & slope

protection work from chainage

36000 to 38500 between Dausa

and Lalsot in connection with

Dausa- Gangapurcity new BG line

project

Op

en t

end

er

15

/03

/20

11

Single packet system

21

/04

/20

11

3 - - Yes Dy.CE/C/DO/CA/57

dated 30/11/201

1

M/s Jagdish Prasad Agrawal, Alwar

6.03 Crore 26/04/12 Extended

upto 31/07/2013

17/10/11 work in progress

19

DO

/GG

C/N

L/4

0

Laying and linking of BG

track and transportation

of P.Way material, PSC sleepers etc

between Dausa- Deedwana section in

connection with Dausa-

Gangapurcity new BG line

project.

Op

en t

end

er

28

/03

/20

11

Single packet system

18

/05

/20

11

6 - - Yes Dy.CE/C/DO/CA/56

dated 18/10/11

M/s Goel Brothers Rail Infra Pvt. Ltd.,

Bareilly.

5.66 Crore 01/08/2012. Extended

upto 31/03/2013

13/09/11 Work in progress

20

DO

/GG

C/N

L/4

3

Construction of duty bunk

miscellaneous structures and road work etc.

between Dausa

Gangapurcity section in

connection with Dausa

Gangapurcity new BG line

project.

Op

en T

end

er

21

/05

/20

11

Single packet system

27

/06

/20

11

4 - - Yes - M/s Bharat –Kamal (J/V), Udaipur

5.31 Crore 18/10/12 - - Contract proposed to be

closed vide letter dated 19/03/2012

Page 58: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

58

21

DO

/GG

C/N

L/3

9R

R

Construction of station buildings, signaling

structures and miscellaneous structures etc.

at various stations between

Dausa (excl.) to

Gangapurcity (excl.) in

connection with Dausa

Gangapurcity new BG line

project.

Op

en T

end

er

28

/06

/20

11

Single packet system

05

/08

/20

11

3 - - Yes NWR/S&C/CA/115 dated

21/03/2012

M/s Bharat-Kamal (J/V), Udaipur

8.25 Crore 28/02/13. Further

extension under

process.

- - work in progress

22

DO

/GG

C/N

L/9

(R

&C

)

Construction of Broad Gauge

Formation from chainage

1150.00 to 15000.00

between Dausa Kala and

Shekhpura Villages in

connection with Dausa-

Gangapur City New Broad Gauge line

Project(Risk & Cost tender).

Op

en t

end

er

25

/11

/20

11

Single packet system

28

/12

/20

11

7 - - Yes Dy.CE/C/DO/CA/58

dated 21/02/201

12

M/s Jai Salasar Balaji Construction Co.

(J/V) Jaipur

4.60 04/05/12 Extended

upto 04/09/2012

21/01/12 - Work terminate on 09/07/12.

Page 59: CE(C)I-JP Dy. CE/C/III-JP - North Western Railway zonenwr.indianrailways.gov.in/uploads/files/... · Modi Jaipur YES DyCE(C)II/JP /CA/14dt. 29/12/07 M/s B. P. Modi Jaipur 762.91 17/12/08

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF March, 2013

Sr. No

Tender No.

Item /nature of work

Mode of tender

Dt. of publication

of NIT

Types of bidding ( single /two bid system )

Last date of receipt of tender

Nos. of tenders received

Nos. and name of parties

qualified after

technical evaluation

Nos. & names of parties not qualified

after technical

evaluation

Whether contract awarded to lowest tenderer

evaluated L1

Contract No. & date.

Name of contractor. Value of contract

Scheduled date of completion of supplies.

Actual date of start of

work

Actual date of

completion

Remarks/ Reason for delay

if any,

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

59

For CAO/C/JP

23

DO

/GG

C/N

L/1

0 (

R&

C)

Construction of Broad Gauge

Formation from chainage

15000.00 to 28000.00

between Dausa and Lalsot in

connection with Dausa-

Gangapur City New Broad Gauge line

Project(Risk & Cost tender).

Op

en t

end

er

25

/11

/20

11

Single packet system

28

/12

/20

11

7 - - Yes Dy.CE/C/DO/CA/59

dated 21/02/201

12

M/s Jai Salasar Balaji Construction Co.

(J/V) Jaipur

2.95 04/05/12 Extended

upto 04/09/2012

21/01/12 - work terminated on 09/07/12

24

DO

/GG

C/N

L/4

4R

R Welding of rail

joints through flash butt process

between Dausa- Gangapurcity

section

Op

en t

end

er

07

/06

/20

12

single packet system

12

/07

/20

12

1 - - yes - M/s The India Thermit Corporation

Ltd., Kanpur

4.66 crore 18/02/2014 - Agreement is under process