8th November 2017
10-Nov-17 1
CECA Meeting Infrastructure Projects Southern
/
Introduction
Cameron Burns Commercial Director, Infrastructure Projects - Southern
/
Today’s Agenda
10-Nov-17 3
Agenda Item Time Lead
Introduction 10:00 Cameron Burns
IP Southern Safety Update 10:05 Stephen Webber
IP Southern PDSW Update 10:20 Craig Lightheart
NR Update and Personnel Changes 10.35 Cameron Burns
IP Southern CP5 Procurement Opportunities 10.50 Cameron Burns
IP Southern CP6 Procurement Strategy Update Cameron Burns
IP Southern Major Enhancements Cameron Burns
CECA Updates 11.00 Alan Taylor
Q&A 11.30 Alan Taylor
/
Safety Update
Stephen Webber Head of Safety & Sustainable Development, Infrastructure Projects - Southern
/
How are we performing? LTIFR
5
Year Minor LTI
2014/15 94 36
2015/16 75 18
2016/17 84 22
2017/18 47 10
/ 10/11/2017
Period 10 - 2015/16 │ Published 15/01/2016 │ Data correct at time of publishing
6
/
Waterloo Blockade 1 x Specified RIDDOR 1 x Lost Time RIDDOR 3 x Lost Time Minors 9 x Minor Accidents
7 x Operational Close Calls
1 x Dangerous Occurrence
2 x Environmental Reportable events
/ 10-Nov-17 8
Accidents – Past 13 periods to P5 17/18 Manual Handling accidents account for 39.4% of all our accidents over the past 13 periods and is still #1 Slips Trips and Falls are currently our second highest type of accident with 20.2% overall Use of tools & equipment is our third highest type of accident with 11% overall Together they account for 70% of all our accidents in IPS
Type Type % TypeManual Handling 43 39.4%Slip Trip 22 20.2%Tools & Equipment 12 11.0%Mistake 7 6.4%Chemical 4 3.7%Puncture 4 3.7%Pest 4 3.7%Dust 3 2.8%Altercation 3 2.8%Materials 2 1.8%RTA 1 0.9%TBC 1 0.9%Plant 1 0.9%Cramp 1 0.9%Non work related 1 0.9%Grand Total 109 100.0%
/ 10-Mar-16 9
Recent Visits – Manual Handling
/
Risk Assessment Review
10-Mar-16 10
/
Recent Visits - Access
10-Mar-16 11
/ 10-Mar-16 12
Local Southern Shield Events
/
Southern Shield
13
Safety Leadership Team
Best Practice Group
Culture Health, wellbeing and fatigue
Improving Design Safety Safe use of plant Driving &
Fatigue
Improving Behaviours
Supply Chain Involvement
Front Line Managers &
Supervisors
/
Route map to Home Safe 2017/18
Regional events Sep-Nov 2017
2017 strategy Jan 2017
Stop. Make A Change ‘What Good Looks Like’ Apr 2017
Safety Conversations (Champions) Aug 2017 onwards
Production vs Safety campaign Oct 2017
2017 strategy Jan 2017
Focus Groups Apr-Jun 2017
Feel Safe To Ask campaign Jul 2017 onwards
Close Call investigation Jan 2017
Predict and prevent Sep 2017 onwards
H&S competences update Timescale subject to professions programme
BUSINESS AS USUAL
ENG
AGEM
ENT
&
CO
LLAB
OR
ATIO
N
CU
LTU
RE
LEAR
NIN
G
OR
GAN
ISAT
ION
To help protect your privacy, PowerPoint has blocked automatic download of this picture.
Winter -Back To Work Dec 2017 / Jan 2018
Version 1.2
Supply Chain Event Jul 2017
Step Up For Safety Jun 2017
Summer - Back To Work Aug 2017
Reward & recognition Sep onwards
/ 10-Nov-17 15
Zen Nichols (Chair) John Bashforth - Naima Westmaas
Rebecca Wells - Michael Asare David Reville
Anthea Hague (Chair) Sherena Kravat -Neil Earnshaw
Stephen Francis-Katherine Dalton
Chris Mackie (Chair) Phil Churchill - Oma Megbele
Gary Green - Steve Bell
Hazel Holt (Chair) Dan Smith - David Reville
Anil Rana (Chair) Anthony Hull - Billy Peat
John Berrington - Adriaan Bekker
Environment & Sustainable Development
/
PDSW Update
Craig Lightheart Programme Manager, Infrastructure Projects - Southern
/
NR Organisation and Personnel Changes
/
Western Wessex Wales South East
LNW LNE/EM Anglia
Scotland
Safety, Technical and Engineering
Route Services
Infrastructure Projects
Route Support
England & Wales
Network Strategy & Capacity Planning
Central Support
Digital Railway
Freight
System Operator
Technical Authority
Common Services
Delivering capacity
Growing capacity
Network Rail Operating Model
/
Organisation Changes Route Managing Director Anglia Route Meliha Duymaz Director - Route Asset Management (Acting) South East Route Derek Butcher
/
IP Southern Update
/
IP Southern – Senior Team
21
Commercial Director Cameron Burns
Lead HR Business Partner
Matt Duffy
Head of S&SD Stephen Webber
Route Delivery Director (Anglia)
Andy Duffin
Route Delivery Director (Wessex)
Steve Walters
Head of Programme Management
Richard Anderson
Head of Programme Development
Paul Futter
Personal Assistant Karen Tordoff
Acting Route Delivery Director
(South East) Paul Devoy
Head of Engineering Rupert Randhawa
Finance Director Yomi Okunola
Regional Director Janice Crawford
/
IP Southern – Procurement Opportunities
/ 10-Nov-17 23
CP5 Opportunities within IP-Southern Our strategic partners have committed to transparently of workload to Tier 2/3
http://www.networkrail.co.uk/tender-opportunities/
In addition to the CP5 Direct Opportunities, our key suppliers have listed over
350 procurement opportunities to work in IP-Southern
/ 10-Nov-17 24
CP5 Direct Opportunities IP-Southern Region/ Programme Category Procurement
Contact Contract Name and GRIP Stage Estimated Contract Value Confidence (High, Medium, Low)
Procurement Route
ITT Issue Date (as per P3e)
(DD/MM/YYYY)
Development Services Tracey Cherrie Croydon Area Re-modelling Scheme Environmental Impact Assessment - 2 to 3 EU Threshold - £10, 000,000 Medium Mini Tender -
Framework 11/09/2017
Development Services Tracey Cherrie Croydon Area Re-modelling Scheme Surveys - 2 to 3 EU Threshold - £10, 000,000 High Mini Tender -
Framework 01/09/2017
Development Services Tracey Cherrie Croydon Area Re-modelling Scheme Design Development - 2 to 3 EU Threshold - £10, 000,000 Medium Mini Tender -
Framework 30/10/2017
NEPT Services Keith Dellow Electrical Safety Delivery Programme £5001 to EU Threshold High Single Tender
Southern Signalling & Telecoms Tracey Cherrie 138026 London managed Stations CCTV - 4 to 8 EU Threshold - £10, 000,000 High
RISQS - Competitive
Tender13/06/2017
Southern - Anglia Elec & Plant Danny Samuels Barking Riverside - 1 to 4 Low TBA TBA
Southern - Anglia Signalling & Telecoms Danny Samuels Barking Riverside - 1 to 4 Low TBA TBA
Southern - Anglia Elec & Plant Danny Samuels Barking Riverside - 5 to 8 Low TBA TBA
Southern - Anglia Signalling & Telecoms Danny Samuels Barking Riverside - 5 to 8 Low TBA TBA
Southern - Anglia Multi-discipline Danny Samuels Beaulieu Park Station - 5 to 8 Over £50,000,000 Low
OJEU - Competitive
TenderTBA
/ 10-Nov-17 25
CP5 Direct Opportunities IP-Southern Cont. Region/ Programme Category Procurement
Contact Contract Name and GRIP Stage Estimated Contract Value Confidence (High, Medium, Low)
Procurement Route
ITT Issue Date (as per P3e)
(DD/MM/YYYY)
Southern - Anglia Multi-discipline Danny Samuels Braintree Branch Line Enhancement - 1 to 4 EU Threshold - £10, 000,000 Medium Mini Tender -
Framework 01/12/2017
Southern - Anglia Multi-discipline Danny Samuels Braintree Branch Line Enhancemment 5 to 8 £25, 000,001 - £50,000,000 Medium TBA TBA
Southern - Anglia Elec & Plant Danny Samuels
CP5 E&P Renewals OLE General (Bridge Bonding Design) - 4 to 5 £25, 000,001 - £50,000,000 High TBA TBA
Southern - Anglia Elec & Plant Danny Samuels
CP5 E&P Renewals OLE General (ACT Design) - 4 to 5 £25, 000,001 - £50,000,000 Medium Mini Tender -
Framework 29/09/2017
Southern - Anglia Multi-discipline Danny Samuels Ely Area Capacity Enhancements - 3 to 4 EU Threshold - £10, 000,000 Medium Mini Tender -
Framework 01/10/2019
Southern - Anglia Multi-discipline Danny Samuels Ely Area Capacity Enhancements - 5 to 8 Over £50,000,000 Medium
OJEU - Competitive
TenderTBA
Southern - Anglia Services Danny Samuels GA Train Lengthening - 2 to 4 EU Threshold - £10, 000,000 Low Mini Tender -
Framework 01/10/2017
Southern - Anglia Multi-discipline Danny Samuels GA Train Lengthening - 5 to 8 £10,000,001 - £25,000,000 Low
OJEU - Competitive
Tender01/05/2019
Southern - Anglia Elec & Plant Danny Samuels GE OLE Renewals - 6 to 7 £5001 to EU Threshold High TBA TBA
/ 10-Nov-17 26
CP5 Direct Opportunities IP-Southern Cont. Region/ Programme Category Procurement
Contact Contract Name and GRIP Stage Estimated Contract Value Confidence (High, Medium, Low)
Procurement Route
ITT Issue Date (as per P3e)
(DD/MM/YYYY)
Southern - Anglia Multi-discipline Danny Samuels Grays AFA - 3 to 4 £5001 to EU Threshold Medium TBA TBA
Southern - Anglia Multi-discipline Danny Samuels Grays AFA - 5 to 8 £5001 to EU Threshold Low TBA TBA
Southern - Anglia Building Danny Samuels
Liverpool St Roof Design - 1 to 3 £5001 to EU Threshold Medium TBA TBA
Southern - Anglia Building Danny Samuels
Liverpool St Roof Design - 4 EU Threshold - £10, 000,000 Low TBA TBA
Southern - Anglia Building Danny Samuels
Liverpool St Roof Design - 5 to 8 £25, 000,001 - £50,000,000 Low TBA TBA
Southern - Anglia Elec & Plant Danny Samuels OLE Mid-Life Refurbishment - 3 to 4 EU Threshold - £10, 000,000 Low
OJEU - Competitive
TenderTBA
Southern - Anglia Elec & Plant Danny Samuels OLE Mid-Life Refurbishment - 5 to 8 EU Threshold - £10, 000,000 Medium
RISQS - Competitive
TenderTBA
Southern - Anglia Multi-discipline Danny Samuels Park Lane Level Crossing - 5 to 8 £5001 to EU Threshold Medium
RISQS - Competitive
Tender01/06/2019
Southern - Anglia Multi-discipline Danny Samuels Park Lane Level Crossing - GRIP 4 £5001 to EU Threshold Medium Mini Tender -
Framework 01/02/2018
/ 10-Nov-17 27
CP5 Direct Opportunities IP-Southern Cont. Region/ Programme Category Procurement
Contact Contract Name and GRIP Stage Estimated Contract Value Confidence (High, Medium, Low)
Procurement Route
ITT Issue Date (as per P3e)
(DD/MM/YYYY)
Southern - Anglia Structures Keith Dellow Gospel Oak to Barking - Electrification (GOB-E) £5001 to EU Threshold HighRISQS -
Competitive Tender
22/09/2017
Southern - Anglia Structures Keith Dellow CP6 Structures Development £10,000,001 - £25,000,000 MediumOJEU -
Competitive Tender
26/01/2018
Southern - South East Elec & Plant Tracey Cherrie Kent Points Heating Renewal - 5 to 8 EU Threshold - £10, 000,000 HighRISQS -
Competitive Tender
23/06/2017
Southern - South East Signalling & Telecoms Tracey Cherrie Kent & Sussex DOO CCTV Renewal GRIP 4-8 EU Threshold - £10, 000,000 HighRISQS -
Competitive Tender
30/06/2017
Southern - South East Structures Tracey Cherrie 150405 North End Footbridge 4 to 8 EU Threshold - £10, 000,000 HighRISQS -
Competitive Tender
20/10/2017
Southern - South East Structures Tracey Cherrie 149949 Crofton Lane OB Works 6 to 8 EU Threshold - £10, 000,000 HighRISQS -
Competitive Tender
20/10/2017
Southern - South East Services Tracey Cherrie CP5 - B & C Development - 3 to 5 EU Threshold - £10, 000,000 High Mini Tender - Framework 16/08/2017
Southern - South East Services Keith Dellow Brighton Mainline Upgrade Programme (BMUP) £5001 to EU Threshold High Mini Tender - Framework 11/10/2017
/
IP Southern CP6
/
Network Rail’s Position in the Infrastructure Market
10
£ m
illio
n
/
Southern
£1.19bn Wessex
£1.95bn South East
£1.08bn Anglia
CP6 Potential Renewals (unconfirmed)
30
/
Route Delivery Long Term Planning Process
Investment Decision Framework – activity view
Programme Development
OBC FBC
Joint Decision
to develop
Joint Decision
to design
Final Investm
ent Decision
SOBC
Funder strategies, priorities & policies for
customers
Stage A. Assess
Where is the railway now and
what do our customers need
medium and long term?
Stage B. Plan the Railway
What is the best railway strategy
to deliver improved services?
Stage C. Identify
What are the right things to
offer our funder(s)?
Stage D. Build the Proposal
What is our
proposal to the funder?
Stage E. Define & develop the Programme
How do we best
deliver the benefits?
Stage F. Design the service
change
What is the best solution to deliver
the service change?
Stage G. Execute
Deliver the work to enable the
service change & deliver benefits
Stage H. Close the Programme
Have we
delivered what we said and what lessons have we
learnt?
Understand current and future customer demand on the railway , identify opportunities and set strategic goals.
Identify where the railway is currently unable to meet its strategic goals and identify the best railway options to address.
In the context of the strategic plan, identify which opportunities should be prioritised and progressed
Develop the overall programme of work, reducing risk and developing increased clarity and certainty. Prepare a proposal for the funder which outlines the whole programme with a plan, protocol and cost for the next stage of work.
Work with our funder to develop a proposal which outlines the opportunity and provides a plan, protocol & cost for the next stage of work.
Design all elements of the change. Plan, cost and undertake all pre-contract activities.
Execute the integrated programme as per the contract.
Close down the programme in agreement with internal & external clients.
Industry Integration: Timetable & rolling stock inputs to deliver service
change
Funder decision to purchase railway output, not
infrastructure
NR decision to deliver
31
/
CP6 Potential Enhancement Schemes (unconfirmed)
Southern
1. Clapham Jcn £400m 2. Woking grade separation £350m 3. London HV (Wimbledon Grid) £39m 4. Access for All – Walton-on-Thames £3m
1. BMUP (CARS) £600m 2. Victoria Station Capacity £25m 3. Access for All – Various Kent £13m 4. Access for All – Hither Green £4m
1. Ely to Soham Doubling £108m 2. GEML Capacity Improvements £100m 3. Ely Area Capacity £55m 4. Grays Underpass £15m
32
/
IP Southern CP6 Procurement Strategy
/
IP Southern - CP6 Procurement Programme (Provisional)
Stag
e
Activity Date Date
Dec
-17
Jan-
18
Feb-
18
Mar
-18
Apr
-18
May
-18
Jun-
18
Jul-1
8
Aug
-18
Sep-
18
Oct
-18
Expression of Interest / OJEU 04/12/2017 03/01/2018
Prequalification 10/01/2018 12/02/2018
Tender 17/04/2018 02/07/2018
Tender Evaluation 02/07/2018 06/08/2018
Standstill Period* 13/11/2018 23/11/2018
Award / Commencement 26/11/2018 26/11/2018
Tend
er
START END
Nov
-18
Aw
ard
Qua
lific
atio
n
/
Questions
/
CECA Updates
Alan Taylor CECA
/
Thank You…………..