Instructions for Filling the Application Form Under Regulations 43/ 32
/30 of Central Electricity Authority (Measures relating to Safety and
Electric Supply) Regulations, 2010
1. Application Form, Instructions for filling the form and other details can bedownloaded form official Website: www.cea.nic.in of Central Electricity
Authority
2. Application Format Form-A is applicable for all the electrical installationsincluding DG sets and Form-B is for all Overhead Transmission Lines forinspection under Regulation 43 and Regulation 32
3. Application Format Form-C is applicable for periodical inspection of all theelectrical installations under Regulation 30.
4. Ensure that all the columns of the Application Form are filled.5. Application for inspection of Installations shall be submitted at least one month in
advance of expected date of completion of works to the concerned RIO.
6. One copy of the Application form for inspection of installations up to 132 kVwith list of equipments to be inspected only (without other enclosures) and theinstallations above 132 kV with enclosures shall be submitted to the Chief
Engineer (EI) & Chief Electrical Inspector to the Govt. of India, Central
Electricity Authority, Electrical Inspectorate Division, 6th
Floor, Sewa Bhawan,
R.K. Puram, New Delhi-110066.Telefax: 011-26109336
QUALITY SYSTEM QUALITY PLAN
(IS/ISO 9001 : 2008 Clause 8.2.3 )
PS Wing, CEA,
New Delhi
Title: Quality Plan for Statutory Inspections of
Electrical Installations under Regulations 43
& 32 of Central Electricity Authority(Measures relating to Safety and Electric
Supply) Regulations, 2010
Prepared by:
C.E. (EI)
Approved by: Member
(PS)
Issued by :
Nodal Officer
Doc. No.: PS/EI/QP/O1
Issue No.: 03
Page :10/11Page Rev. No.: 02
Effective Date: 30.06.2011
8/12/2019 CEA Instructions
2/2
7. The Periodicity of Inspections: The periodicity of inspection is as below;(i) Installations above 650V - within 2 Years
(ii) Installations above 250V and upto 650 - within 4 Years
8. Address of Chief Engineer (EI) & Chief Electrical Inspector to theGovernment of India: Central Electricity Authority, Electrical Inspectorate
Division, 6th
Floor, Sewa Bhawan, R.K. Puram, New Delhi-110066.Telefax: 011-
26109336
9. The Application Form shall be submitted to Superintending Engineer of arespective RIO as per the location of the installation falling within the area ofthe jurisdiction of that RIO as tabled below:
10. Addresses & Area of Jurisdiction of RIOsSl.
No RIO Address of RIO Area of Jurisdiction
1. RIO (North)
R.I.O.(North),C.E.A. , Room No.
324, NRPC Building, 18-A, ShaheedJit Singh Marg,, Katwaria Sarai, New
Delhi-110016.
Telefax: 011-26510249
Delhi, Uttar Pradesh, Uttranchal,
Haryana, Punjab, Himachal Pradesh,Rajasthan and U.T of Chandigarh.
2. RIO (West)
R.I.O. (West), C.E.A., Ground Floor,WRPC Building, Plot No. F-3, MIDC
Area Marol, Andheri (East), Mumbai-
400093.
Telefax: 022-28211003
Maharasthra, Gujarat, Madhya Pradesh,Chhattisgarh, Goa, U.T.s of Daman &
Diu and Dadra & Nagar Haveli.
3. RIO (South)
R.I.O. (South), C.E.A.Shastri Bhawan, Block 4, IIIrd
Floor, Chennai-600006
Telefax: 044-28257051/28276579
Tamilnadu, Kerala, Andhra Pradesh,Karnataka, U.T.s of Pondicherry,
Kairakal, Yanam, Mahe, Andaman and
Nicobar and Lakshadweep.
4. RIO (East)
RIO (East), CEA, EREB Building, 14
Golf Club Road, Tollygunge, Kolkata-700033
Telefax:033-24171358
Bihar, Orissa West Bengal, Jharkhand
and Sikkim
5. RIO (North-
East)
RIO (Noth-East), C.E.A.,
Meghalaya State Housing Financing
Co-Operative Society Ltd. Building,Nongrim Hills, Shillong-793003.
T.-0364-2521086
Assam, Arunachal Pradesh, Nagaland,
Manipur, Meghalaya, Mizoram,
Tripura
QUALITY SYSTEM QUALITY PLAN
(IS/ISO 9001 : 2008 Clause 8.2.3 )
PS Wing, CEA,
New Delhi
Title: Quality Plan for Statutory Inspections of
Electrical Installations under Regulations 43
& 32 of Central Electricity Authority
(Measures relating to Safety and Electric
Supply) Regulations, 2010
Prepared by:
C.E. (EI)
Approved by: Member
(PS)
Issued by :
Nodal Officer
Doc. No.: PS/EI/QP/O1
Issue No.: 03
Page :11/11
Page Rev. No.: 02
Effective Date: 30.06.2011