Upload
rina-surana
View
214
Download
0
Embed Size (px)
Citation preview
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
1/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
This is the html version of the file http://jnnurm.nic.in/toolkit/JammuCdp/CHAPTER-8.pdf .
Google automatically generates html versions of documents as we crawl the web.
To link to or bookmark this page, use the following url: http://www.google.com/search?q=cache:xCEw9SIWDJ0J:jnnurmnic.in/toolkit/JammuCdp/CHAPTER-8.pdf+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in
Google is neither affiliated with the authors of this page nor responsible for its content.
These search terms have been highlighted: town planning city
P
City Development Plan for Jammu city
CHAPTERCHAPTERCHAPTERCHAPTER - VIII VIIIVIIIVIII
STRATEGY AND ACTION PLANSTRATEGY AND ACTION PLANSTRATEGY AND ACTION PLANSTRATEGY AND ACTION PLAN
8.0 Urban Planning and Growth
Management Strategies & Action
Plan
For improving the existing urban
infrastructure of the Jammu urban
Area to ensure its future growth in a
systematic manner, comprehensive
land use plan for the city would be
prepared together with appropriate
regulatory mechanism for strict
Planning Schemes covering
corporation areas as well as the
Planning area. In these, regulation
changes in land use and demolition
drive for illegal non-conforming land
uses shall be taken up.
8.0.2 Development Restrictions in
Specific Areas
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(1 of 16)8/20/2007 8:29:53 PM
http://jnnurm.nic.in/toolkit/JammuCdp/CHAPTER-8.pdfhttp://jnnurm.nic.in/toolkit/JammuCdp/CHAPTER-8.pdf8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
2/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water and Power Consultancy Services (India) Limited
compliance.
Urban growth management strategies
shall take into account the
environmental concerns developing of
late in the city. The strategies are to
facilitate a balanced growth with an
efficient urban form devoid of
congestion and conflicting land uses.
8.0.1 Rapid and Rational
Implementation of Development
Plan
Implementation of the development
plan lies in the finalization of the Town
Restriction of development in specific
areas shall be taken up by finalizing
TP schemes with provisions for open /
green spaces acting as buffer zones.
This is also to create an efficient urban
form and for decongestion of the CBD,
wherein many conforming activities are
to be shifted to an alternate location.
8.0.3 Decentralized Planning and
Increased Citizens Involvement in
the Development Planning Process
Public participation and consultation at
neighborhood level regarding land use
and growth patterns shall create social
ge2
City Development Plan for Jammu city
benefits and avoid non-conforming
land uses. Increased citizens
involvement in the development
planning process shall be pursued
actively to achieve the above-
mentioned social benefits.
8.0.4 Improved Co-ordination
Implementing Institutions
Town &Country Planning Deptt.,
J&K
Jammu Development Authority
Jammu Municipal Corporation
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(2 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
3/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water and Power Consultancy Services (India) Limited
Between various Sanctioning and
Implementing Agencies
Non-confirming land uses and major
non-aligned sections towards the
periphery of the corporation shall be
corrected with improved co-ordination
between the implementing agencies.
8.0.6 Action Plan / Tasks
Implementation of development
plan to cover the entire city and
its outgrowth with townplanning
schemes
Discouraging excessive urban
sprawl by establishing
appropriate building and density
regulations for selected areas
Establish green belts and buffer
zones
Development of geographical
information system
8.1 SECTOR WISE ACTION PLAN
8.1.1 WATER SECTOR
Water Supply Planning
While the current works shall focus on
the existing supply net
augmentation at source and at
distribution end, the entire system shall
be augmented and structured in a
planned and sustainable way to serve
the city in long term.
Water Auditing
Water auditing is the best practice to
reduce the system losses and involves
accounting for the entire supply of
water. This also involves leak
detection studies apart from studies on
the quality of water draws at the
consumer end and explores ways.
ge3
City Development Plan for Jammu city
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(3 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
4/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water Supply Operation and
Maintenance
At present, the PHED wing is
managing the O&M of water supply
system. To improve the O&M facilities
steps would be taken to involve
experienced private companies, which
will be solely responsible for the O&M
of the system, based on an agreed
annual fee.
Institutional Strengthening and
Capacity Building
The members of the line department
shall undergo training in project
planning, implementation, monitoring
and evaluation. The significance of
peoples participation in water
conservation shall also be
emphasised.
Sustainability Indicators
Gross supply after execution of
Tawi scheme
T&D losses and unaccounted for
water
Present Gross supply
Treatment capacity to total supply
Storage capacity to total supply
Distribution network to total road
Number of house se
connections to total property tax
assessments
% Of water availability from
alternate sources (Present)
8.1.2 Implementation of Schemes
under JNNURM
Proposed programme
implementation of various components
of the water supply scheme is shown
in implementation map.
8.1.3 Implementing Institutions
PHED would be the nodal agency to
implement the scheme.
The priority strategy and the strategy
implementation map of Water Supply
Sector are given in Tables 8.1 and 8.3.
8.2SEWERAGE AND DRAINA
SECTOR
8.2.1 Strategy
The strategies are in accordance with
the conclusions drawn in the present
infrastructure analysis carried out
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(4 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
5/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water and Power Consultancy Services (India) Limited
lengthearlier in the report and as per the
suggestions of the citizens, elected
ge4
City Development Plan for Jammu city
representatives and the other
stakeholders involved in the City
Development Plan. The strategies
would focus upon connecting all the of
household to the sewer system.
The projects identified under JNNURM
are meant to cover total population for
the horizon year 2021 the sewer
system.
Sustainability Indicators
Total sewerage generation
Total area served to total area
Total population served to total
population
Sewer network length to total
road length
Treatment capacity to total
sewerage generated
Number of sewer connections
to total water connections
Mapping and creation of
Geographical Information
System
Regularization drive to be taken
up as also an awareness
campaign on getting a
sewerage connection
Operation & maintenance plan
for all the actors involved
8.2.3 Implementing Agency
The nodal agency for implementing the
proposed schemes would be the
UEED
The priority strategy and the strategy
implementation map of Sewerage and
Drainage Sector are given in Tables
8.1 and 8.3.
8.3 SOLID WASTE MANAGEMENT
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(5 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
6/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water and Power Consultancy Services (India) Limited
8.2.2 Action Plan / Tasks
Extension, augmentation and
rehabilitation of existing
systems in an efficient manner
Ann inventory of locations spills,
leaks and mixing areas of storm
water with solid waste
SECTOR
Land acquisition for the land fill site
would be done. The equipment and
other components of SWM scheme
are proposed to be funded with
assistance from ADB.
8.3.1 Implementing Agency
ge5
City Development Plan for Jammu city
The nodal agency for implementing the
scheme of Solid Waste management
would be the JMC.
The priority strategy and the strategy
implementation map of solid Waste
Management Sector are given in
Tables 8.1 and 8.3.
8.4URBAN TRANSPORT SECTOR
8.4.1 Strategy
The strategies are in accordance with
shall be taken up in a phased manner
so as to optimize the cost and serve
the different area as per the needs
envisaged.
Widening and Strengthening of
Road Structures
With due consideration to the growing
traffic intensity, major roads, corridors
and state highways running through
the city are to the extended and
expanded. This shall in
construction of fly-overs, bridges etc.,
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(6 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
7/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water and Power Consultancy Services (India) Limited
the conclusions drawn in the present
infrastructure analysis carried out
earlier in the report and as per the
suggestions of the stakeholders.
The strategies aim at covering the
entire area and population of the city
with an effective road network by
2011, as well as improving the surface
condition of the roads.
Augmentation and Asset
Rehabilitation
Upgradation of the existing roads shall
be taken up to extend strengthened
and enhance the roads to their
ultimate design sections. The roads
would be upgraded to Cement
concrete and black top road. The plan
the works on some of which are
already in progress. This shall also
involve removal of encroachments on
road margins, shifting of electrical
poles, trees etc. and strengthening of
road structures with pavemen
footpaths and surfaced margins with a
provision for storm water lines.
Construction of New Radial Roads,
which are Missing Links in the
Transport Network
To connect the existing city area to the
newly developing outskirts area radial
road as proposed in the Jammu
Development Plan are
proposed. This will provide for the
planned connectivity and proper road
ge
6
City Development Plan for Jammu city
alignment to facilitate growth of
peripheral areas.
8.4.2 Action Plan
terms of improvement of
geometries, provision
footpaths, pavem
strengthening etc.
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(7 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
8/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water and Power Consultancy Services (India) Limited
All major roads and important
regional corridors within the city
limits shall be taken up for up-
gradation by 2011.
Increase degree of connectivity to
100 percent
Implementation of the proposed
traffic circulation system within
Central Area and improving
connectivity on peripheral areas of
the city predominantly in the
southern city, moderately in the
north eastern city and sparsely on
north western directions.
Improvement of the road in terms
of
o Expansion to 4-lanes/full
section of the roads as per
master plan
o Major improvement to road
geometries
o Provision of central verge
o Provision of footpaths and
provision of guard rails
o Pavement strengthening,
lance markings and signage
o Improvement of the Central
Area internal road network in
o Construction of ROB / RUBs
Sustainability Indicators
Road density
Per Capita road length
Concrete road length / total road
length
8.4.2 Traffic Management
8.4.3.1 Strategy
The strategies are in accordance with
the conclusions drawn in the present
infrastructure analysis carried out
earlier in the report and as per the
suggestions of the citizens, elected
representatives and the
stakeholders involved in the other
stakeholders involved in the entire City
Development Plan, the city had a
registered vehicle popula
increasing at an average annual rate
of 8.8 percent. The intra-city public
transport system is essentially road
based with private minibuses. The
strategies address the issues of traffic
management and public transport.
Since it is the need of an efficient
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(8 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
9/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
ge7
City Development Plan for Jammu city
system rather than any up-gradation or
extension, the strategies shall focus
upon system restructuring
mechanisms.
Traffic Streamlining at Intersections
Channelisers, traffic islands, traffic
signals, dividers, lane separators and
traffic police control shall be introduced
at all improvement junctions based on
necessity and design.
8.4.3 Implementing Agency
The state Public Works Department
and JMC would be nodal agencies to
implement the proposed scheme.
The priority strategy and the strategy
implementation map of Urban
Transport Sector are given in Tables
8.1 and 8.3.
8.5 BASIC SERVICES FOR
URBAN POOR AND SLUM
REHABILITATION
8.5.1 STRATEGY
suggestions of the stakeholde
involved in the entire
Development Plan. It has been
observed that maximum slums in the
city are either along major transport
corridors or water bodies or on govt.
land
The strategies for slum improvement
are focused on making Jammu a
SLUMLESS CITY by 2012. This is
proposed to be achieved by providing
sustainable and economical housing
options to the slum dwellers.
housing strategies for the Urban poor
are focused on facilitating the proper
land use, providing a marketable and
legal title to the land owner and
providing all infrastructural services for
a environmentally sustainable living
place.
Rehabilitation of Slums
Construction of housing units in the
identified slums either in-situ or
relocated to the identified
locations with all infrastructu
services are proposed.
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(9 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
10/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water and Power Consultancy Services (India) Limited
The strategies are in accordance with
the conclusions drawn in the present
infrastructure analysis carried out
earlier in the report and as per the
Infrastructural Development Works
Development of the deficient portion of
the Physical Infrastructures in all those
slums, which are identified in the
study.
ge8
City Development Plan for Jammu city
Community Development and
Social Infrastructure
Development of educational and
health center and training programme
to maintain the created infrastructures
and services
Regularization of illegal colonies
and unauthorized layouts
The various unauthorized and illegal
settlements that have come up in
different part of the city particularly in
the fringe areas due to various
reasons such as complexity in Govt.
norms and regulations, tendency of
land owners to dispose off there land
coming in the various schemes etc.
The corporation intends to regularize
Number of slums along water
bodies and transport corridors /
total number of slums
Number of slums dwelling units
relocated / rehabilitated
8.5.2 Action Plan / Tasks (Slums)
Relocation of Slums in the city
Slum Rehabilitation Campaign in
Slum
8.5.3 Operating Plan (Housing &
Slums)
Ground + 2 structure EWS housing
schemes to be introduced on the
identified land for relocating the
slum with all required basic
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(10 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
11/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water and Power Consultancy Services (India) Limited
only those settlements / illegal colonies
where violations are in the limits
prescribed after which the land use for
the specified areas shall be made legal
and adequate infrastructure shall be
provided.
Implementing Institutions
Jammu Municipal Corporation
Sustainability Indicators
Occupancy rate
Vacancy rate
infrastructure like Drinking water
supply, sewer and storm water
network, solid waste disposal,
electrification, community center,
primary healthy center etc.
Development of the defi
portion of the Phy
Infrastructures like Drinking Water
supply, see and storm water
network, solid waste disposal,
electrification, community center,
primary health center etc. in all
ge9
City Development Plan for Jammu city
those slums, which are identified in
the study.
Developed Infrastructures like Drinking
water supply, sewer and storm water
network, solid waste disposal,
electrification, community center,
primary health center etc. for plotted
development to rehabilitate the urban
poor and illegal colonies.
1. Study and Documentation of
the Historical / Her
resulting in an inventory that
would be published and marked
in map of the area, complete
with its location, ward No.
Ownership, st
photographs, descripti
historical and her
significance, age etc.
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(11 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
12/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water and Power Consultancy Services (India) Limited
Implementing Agencies
The proposed schemes would be
implemented by JMC, PHED, PWD
and UEED.
The priority strategy and the strategy
implementation map of Basic Services
to Urban Poor and Slum Rehabilitation
Sector are given in Tables 8.2 and 8.4.
8.6 URBAN HERITAGE
A well-maintained historic urban
center and an historic town to
attract the tourism activity
8.6.1 STRATEGY
Strategies can be summed up
broadly into areas mentioned below:
Building of heritage /
historic value
Drainage and W
systems
Streetscapes
culturally homogeno
areas
Crafts, skills
craftsmen of traditional
crafts
Open spaces
gardens including type of
existing trees and plants
2. Dividing the identified buildings,
areas etc. and to Provide Legal
back-up with Regulations and
Bye-laws.
3. The care and maintenance of
heritage would be entrusted to
the local community.
age10
City Development Plan for Jammu city
8.7 CITY INVESTMENT PLAN AND
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(12 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
13/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
4. Signage, public notices, road
furniture, display boards,
billboards etc. would be
designed to supplement the
ambience of the historic /
heritage area.
5. Promotion of traditional cultural
expressions and art would be
done and special spaces,
programmes and facilities
would be provided for the
growth of such activities.
Implementing Agencies
The schemes under this sector would
be implemented by the Department of
Tourism of J&K Government and the
JMC.
The priority strategy and the strategy
implementation map of Urban Heritage
Sector are given in Tables 8.1 and 8.3.
FINANCING STRATEGY
8.7.1Strategy
The City Investment Plan is the multi-
year scheduling of investments and
public improvements. The scheduling
or phasing of the plan is based on
studies of the fiscal resour
availability (for new investments and
O&M), institutional capacity
construction and O&M and the choice
of specific improvements to be
constructed for a period of seven year
into the future.
In determining a long-term financial
strategy, JMC plans to raise resources
through:
Accessing the grants available
under the JNNURM Framework
(as % of identified investment in
urban Governance
infrastructure sectors 90%
Central Govt. Grants and 10%
State Govt. Grants).
Revision of the Annual property
Tax and other taxes at certain
levels.
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(13 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
14/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water and Power Consultancy Services (India) Limited
age11
City Development Plan for Jammu city
Revision of water and imposition
of sewerage charges at specific
intervals and transfer of water
and sewerage tax to the
respective account heads.
Maintaining the collection
performance of taxes and
charges at certain minimum
levels for current and for arrears.
Levying user charges on the
facilities created
From the various remunerative
projects identified by JMC, mainly
through PPP module
Increase in Octroi Compensation
provided by State Govt. and other
various grants
Demand from State Govt. for a
stipulated Share from the Road
tax collected by RTO in Jammu
Underlying the
assumptions, basic assumptions
for growth in property tax
assessment, growth in other
taxes and miscellaneous income,
as well as changes in the main
expenditure heads have been
made, including ge
administration, establishmen
O&M, debt servicing, etc.
The phasing / scheduling of
investments have been carried
out through an interac
process and the principles of
phasing have been taken into
account
Principles of Phasing
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(14 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
15/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water and Power Consultancy Services (India) Limited
Demand from State Govt. for a
stipulated share from the
commercial tax surcharge
collected from Jammu
Priority needs, with developed
areas receiving priority over
future development areas
Inter and intra-service linkages-
Investments in one sector shall
be complemented
age
12
City Development Plan for Jammu city
corresponding improvements in
other sectors
Size and duration of the
requirements, including
preparation and implementation
of project
Project linked revenue
implications, such as installing
house connections where supply
and distribution capacities have
been increased
tp://64.233.183.104/search?q=cache:xCEw9SIWDJ0J:jn...f+town+planning+of+a+city&hl=en&ct=clnk&cd=13&gl=in(15 of 16)8/20/2007 8:29:53 PM
8/2/2019 Cdp Jammu Viii Viii Viii Viii Strategy and Action Pl
16/16
HAPTER CHAPTER CHAPTER CHAPTER - VIII VIII VIII VIII S...N PLAN STRATEGY AND ACTION PLAN STRATEGY AND ACTION PLA
Water and Power Consultancy Services (India) Limited