20
CDOT’s Winter Maintenance Strategy

CDOT’s Winter Maintenance Strategy

Embed Size (px)

DESCRIPTION

CDOT’s Winter Maintenance Strategy. CDOT deicer program. Colorado CDOT History of our program Our evolution Situation today. Colorado. Between 37 th and 41 st parallels 104,247 square miles 40% high plains - 60% mountains Average Elevation 6,800’ low point 3,350’ 54 peaks > 14,000’ - PowerPoint PPT Presentation

Citation preview

Page 1: CDOT’s Winter Maintenance Strategy

CDOT’s Winter Maintenance Strategy

Page 2: CDOT’s Winter Maintenance Strategy

CDOT deicer program

• Colorado• CDOT• History of our program• Our evolution• Situation today

Page 3: CDOT’s Winter Maintenance Strategy

Colorado

• Between 37th and 41st parallels• 104,247 square miles• 40% high plains - 60% mountains• Average Elevation 6,800’ • low point 3,350’• 54 peaks > 14,000’• Low humidity• Thin atmosphere• Huge influence from solar

radiation• Vast temperature swings• Snow falls range from < 20” to

>300” annually

Page 4: CDOT’s Winter Maintenance Strategy

Colorado

• 23,000 lane miles• 24 hour coverage• 14 hour coverage

• 900 plow units• 3000 CDOT employees• 1500 plow drivers• 12 hour shifts• No contracted snow removal• Some cities plow minor routes in

their city

Page 5: CDOT’s Winter Maintenance Strategy

CDOT’s Winter Maintenance Strategy

Page 6: CDOT’s Winter Maintenance Strategy

Evolution

Salt / Sand program

PM 10 issues

Sedimentation in mountain streams

Governor

Page 7: CDOT’s Winter Maintenance Strategy

History

0 5 10 15 20 25 30 35

-80

-60

-40

-20

0

20

40

Solution Freezing Point Curves

% MgCl2

% NaCl

% CaCl2

Concentration of Brine (weight%)

Te

mp

era

ture

F

Page 8: CDOT’s Winter Maintenance Strategy
Page 9: CDOT’s Winter Maintenance Strategy
Page 10: CDOT’s Winter Maintenance Strategy

Situation Today

FY 14 Budget vs FY 14 Spend

Material usage

Technology

LOS

Page 11: CDOT’s Winter Maintenance Strategy

Winter ‘13 – ‘14

FY 14 Budget - $60,402,000

FY 14 Spend - $72,215,000

Page 12: CDOT’s Winter Maintenance Strategy

Material usageSection Description Quantity UOM Total Cost

Statewide Calcium Chloride, 50# 41.00 BAG $415.54

Statewide Calcium Chloride, 50# 367.55 BAG $6,116.63

Statewide SALT, ROAD 50# 6,519.00 BAG $25,490.39

Statewide Abrasive Non-Sanding 7,749.11 TON $64,066.83

Statewide Abrasive Non-Mixed for Sanding 2,808.50 TON $44,667.83

Statewide SALT-SAND MIX 18,306.94 TON $550,970.86

Statewide Liquid Deicer 254,308.10 GLL $165,553.71

Statewide ICE SLICER RS 40,345.34 TON $3,974,021.61

Statewide LIQUID DEICER SPECIAL (Liquid+Salt-Sand) 5,144.50 TON $98,044.40

Statewide Caliber 1000 14,400.00 GLL $11,784.00

Statewide APEX, LIQUID DEICER 8,822,724.70 GLL $7,323,932.29

Statewide SAND SLICER 163,606.12 TON $4,555,557.25

Statewide ICE SLICER SB 8.00 TON $861.46

Statewide RAPID THAW 23.25 TON $2,495.21

Statewide CALIBER M-2000 15,726.00 GLL $15,557.06

Statewide ICE BAN 305 2,654,557.00 GLL $2,075,344.02

Statewide LIQUID DEICER SPECIAL (PRE-MIX) 3,774.03 TON $63,006.97

Statewide Salt Brine, Gallon 600,264.60 GLL $326,849.50

Statewide Solar Qwicksalt 1,167.25 TON $100,058.24

Statewide Ice-Melt, Snow, Ice, Sidewalk, 50#, -25F 195.00 BAG $3,892.00

Statewide SOS-TM, LIQUID DEICER, MAG CLORIDE 26% 24,156.00 GLL $29,112.58$19,437,798.38

Page 13: CDOT’s Winter Maintenance Strategy

Technology

Page 14: CDOT’s Winter Maintenance Strategy

Level of Service(LOS)

Page 15: CDOT’s Winter Maintenance Strategy

Level of Service (LOS)

Page 16: CDOT’s Winter Maintenance Strategy
Page 17: CDOT’s Winter Maintenance Strategy
Page 18: CDOT’s Winter Maintenance Strategy
Page 19: CDOT’s Winter Maintenance Strategy

Re-cap

Page 20: CDOT’s Winter Maintenance Strategy

David C. Wieder, P.E.Staff Maintenance ManagerColorado Department of Transportation15285 South Golden Road, Building #45Golden, CO 80403

Office (303) 512-5502Mobile (303) 548-5853

Questions / Contact Information