Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
A5
A6A8 A3
A7
A9
A2
A1
A12
A13A14
A11
A15
A4-1A4-2
A10-2
A10-1
Agreement No. :
Project Title: Figure Title: Checked
Designed
Scale
Drawn
Rev.
Date
Consultant
Improvement to Pok Oi Interchange -Environmental Impact Assessment Study
WD 6/2007 Environmental Impact Assessment Report
PREDICTED DAILY NO2 CONCENTRATION(µg m-3)AT 10m ABOVE GROUND
FIGURE 5.6dEnvironmentalResourcesManagment
Halcrow China Ltd.Halcrow China Ltd.As Engineering Sub-consultant
PS
TF
-
AM 03/11/2008
0 200100Meters
0072252_no2_10m_25Aug08.mxd
´
Key
ASR
24-hr NO2 Concentration
Proposed Alignment
Note: HKAQO Limit for 24-hr NO2 is 150µg m-3
ASR LOCATIONA1 Wong Uk TsuenA2 Small Traders New VillageA3 Planned Development in Yuen Long Area 15
A4-1 Pok Oi HospitalA4-2 Jockey Club Care and Attention HomeA5 Sun Kong HotelA6 Pond Fish Wholesale MarketA7 Planned Development in Yuen Long Area 12A8 Kwong Ming Ying Loi SchoolA9 YOHO Town Phase 1
A10-1 Village HouseA10-2 Village HouseA11 Yeung Uk TsuenA12 Ming Sum Home for the AgedA13 Hoover GardenA14 Hoover Garden Phase 2A15 Chuk San Tsuen