64

CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 2: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 3: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment

Controlled Copy

CCP-TP-001, Rev. 11

CCP Project Level Data Validation and Verification Effective Date: 03/23/2005

Page 40 of 103

Attachment 5 - CCP Site Project Manager Data Validation Summary

On-Line Headspace Gas Analysis (HSG) Visual Examination (VE)

Nondestructive Examination (NDE) X Nondestructive Assay (NDA)

Direct-Canister HSG Analysis Homogeneous Waste Analysis (HWA)

Radiological Characterization

I BATCH DATA REPORT NUMBER: LA-RTR2-04-0004 DATE: 4/22/2004

Criteria Description of Criteria Reviewed Met? Comments/Qualifiers

Y/N/NA 1. ITR, Tech Sup, and Facility QA checklists X

are complete and signed. Reference Source: WAP B3-10b(2) Verification Source: DGL Checklist

2. The batch data report is complete. X

Reference Source: WAP B3-10b(2) and WAC A.5.2 Verification Source: Data Sheets

3. QAOs have been met. X

Reference Source: WAP B3-10b(2) Verification Source: QC Data Sheets

4. Data reported with correct units and X significant figures.

Reference Source: WAP B3-10b(2) Verification Source: Data Sheets

5. Data have been assessed correctly. X 58336825817178581717688171748817172 Reference Sources: WAP B3-10b(2) 581716588171638817162593975938259371 and B3-10b(3) 59326 59079

Verification Source: Data Sheets 6. Is there a reference to or copy of the X No NCRs generated

associated NCRS? Reference Source: WAP Tables B3- 11, B3-12 and B3-13 Verification Source: NCR

7. The applicable SPQAO Project Level X

Validation Checklist is complete, signed, and dated. Reference Source: WAP B3-10b(2) Verification Source: SPQAO Checklist

8. NDA batch QC checks (e.g., weekly X NDE Batch interfering matrix, background, performance, and transmission checks, measurement system checks) were properly performed. Reference Source: WAC A.4.2 and/or WAC Table A-4.3 Verification Source: QC Data Sheets

9. HSG - All data are reported with the X NDE Batch

appropriate flags. Reference Source: WAP B3-10b(2) Verification Source: Data Sheet

Page 4: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment

Controlled Copy

CCP-TP-001, Rev. 11

CCP Project level Data Validation and Verification Effective Date: 03/23/2005

Page 41 of 103

Attachment 5 - CCP Site Project Manager Data Validation Summary (continued)

I 8ATCH DATA REPORT NUM8ER: LA-RTR2-04-0004 DATE: 4/22/2004

Criteria Description of Criteria Reviewed Met? Comments/Qualifiers

Y /N/NA 10. HSG batch QC checks (e.g., on-line X NDE Batch

blanks, duplicates, and laboratory control samples) were properly

performed and meet the established usability criteria.

Reference Sources: WAP 83-10b(2) and Table 83-3 and/or 81-1 b

Verification Source: QC Data Sheets 11. HSG DAC assignment is valid based X NDE Batch

upon an assessment of the data collection and evaluation necessary to make the assignment. Reference Source: WAP 83-10b(2) Verification Source: Drum Data Form

12. NDE data are complete and acceptable X Container based on the videotape or equivalent numbers: media review (independent observation and replicate scan). Reference Sources: WAP, 81-3b(2) and 83-10b(2) Verification Source: QC Data Sheets

13. VE data is complete and properly X Rep: S817162 reported. 10: 59397 Reference Sources: WAP 81-3b(3) and 83-10b(2) NDE Batch Verification Source: 8DR

14. HWA Solid/Soil VOC batch QC checks X NDE Batch

(e.g., laboratory duplicates, blanks, and control samples) were properly performed and meet the established usability criteria. Reference Sources: WAP 81-2b, 83- 10b(2) and Table 83-5 Verification Source: QC Data Sheets

15. HWA Solid/Soil Semi-VOC batch QC X NDE Batch checks (e.g., laboratory duplicates, blanks, and control samples) were properly performed and meet the established usability criteria. Reference Sources: WAP 81-2b, 83- 10b(2) and Table 83-7 Verification Source: QC Data Sheets

16. HWA Solid/Soil Total Metals 8atch X NDE Batch QC checks (e.g., duplicates, blanks, and laboratory control samples) were properly performed and meet the established criteria. Reference Sources: WAP 81-2b, 83- 10b(2), and Table 83-9 Verification Source: QC Data Sheets

Page 5: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment

Controlled Copy

CCP-TP-001, Rev. 11

CCP Project Level Data Validation and Verification Effective Date: 03/23/2005

Page 42 of 103

Attachment 5 - CCP Site Project Manager Data Validation Summary (continued)

I BATCH DATA REPORT NUMBER: LA-RTR2-04-0004 DATE: 4/22/2004

Criteria Description of Criteria Reviewed Met? Comments/Qualifiers

Y /N/NA 17. OSR for LANL Sealed Sources, does X NDE Batch

the waste meet the definition of sealed sources per 10 CFR 30.4 and 10 CFR 835.2 (effective January 1, 2004) and documentation included with the AK information?

Reference Source: WAP B-3a(1)(iii) Verification Source: AK information and Data Sheet

18. OSR for LANL Sealed Sources, does X NDE Batch

the Pipe Overpack Container (POC) only contain sources and packaging material (no non-packaging items are allowed in the waste container)? Reference Source: WAP B-3a(1)(iii) Verification Source: Data Sheet

19. OSR for LANL Sealed Sources, is the X NDE Batch

sealed source a US DOT Special Form Class 7 (Radioactive Material) per 49 CFR 34.27 (effective January 1, 2004) and is this documented in the AK information?

Reference Source: WAP B-3a(1)(iii) Verification Source: AK information and Data Sheet

20. For LANL Sealed Sources, is the X NDE Batch

integrity of each sealed source validated by documented contamination

survey results to meet the requirements of 10 CFR 34.27 (effective January 1, 2004), and is assembled as part of AK documentation? Reference Source: WAP B-3a(1)(iii) Verification Source: AK information and Data Sheet

21. OSR for LANL Sealed Sources, is each X NDE Batch

source a rigid sealed container or is it in

a rigid sealed container less than or equal to 4 L?

Reference Source: WAP B-3a(1)(iii)

Verification Source: AK information and Data Sheet

Page 6: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment

Controlled Copy

CCP-TP-001, Rev. 11

CCP Project Level Data Validation and Verification Effective Date: 03/23/2005

Page 43 of 103

Attachment 5 - CCP Site Project Manager Data Validation Summary (continued)

I BATCH DATA REPORT NUMBER: LA-RTR2-04-0004 DATE: 4/22/2004

Description of Criteria Reviewed Criteria

Met? Y /N/NA

X

Comments/Qualifiers

22. OSR for LANL Sealed Sources, does the AK information document that no VaG or VaG-bearing material are constituents of the waste? Reference Source: WAP B-3a(1)(iii) Verification Source: AK information

23. OSR for LANL Sealed Sources, does the AK information document that the

outer casing of the sealed source is a

non-VaG bearing material and is this

verified during VE? Reference Source: WAP B-3a(1)(iii) Verification Source: AK information and Data Sheet

The data for all containers in this batch are complete, properly reported, technically

reasonable, representative and meet the Quality Assurance Objectives (QAOs). On a

per waste container basis, as evidenced by my review of the Batch Data Report, all

data have been validated in accordance with the QAPjP (CCP-PO-001) and are acceptable. This validation was accomplished through the generation level and project level data review, validation, and verification of this Batch Data Report.

NDE Batch

X NDE Batch

Larry Porter Site Project Manager

/~~~ure 3/28/05 Date

Page 7: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment

Controlled Copy

CCP-TP-001-A3, Rev. 1 Effective Date: 10/16/2003 CCP SPQAO Nondestructive Examination Project level Validation Checklist and Summary Page 1 of 5

CCP SPQAO Nondestructive Examination Project level Validation Checklist and Summary

I BATCH DATA REPORT NUMBER: LA-RTR2-04-0004 EXAMINATION DATE: 4/21/04

Criteria Description of Criteria Reviewed Met? Comments/Qualifiers

Y/N/NA 1. Batch number? ~ 0 0 LA-RTR2-04-0004

Reference Source: WAP Table B3-11 Verification Source: Cover Sheet

2. Batch data report date? ~ 0 0 3/3/05

Reference Source: WAP Table B3-11 Verification Source: Data Sheets

3. Implementing procedure and revision ~ 0 0 CCP-TP-053, Rev. 1

number? Reference Source: WAP Table B3-11 Verification Source: Data Sheets

4. Listing of all the container numbers in ~ 0 0 13 containers the batch? Reference Source: WAP Table B3-11 Verification Source: Data Sheets

5. Twenty or fewer samples in the batch? ~ 0 0 Reference Source: WAP B3-10 Verification Source: Data Sheets and or Cover Sheet

6. Is there a reference to or copy of the 0 0 ~ No NCRs associated with this BDR. associated NCRs? Reference Source: WAP Table B3-11 Verification Source: NCR

7. Technical Supervisor Checklist? ~ 0 0 The original review date was crossed out and Reference Source: WAP B3-10a replaced with a second review date. RTR personnel Verification Source: TS Checklist have been asked not to cross out initial review dates

if another review is requested. 8. Facility QA Officer Checklist? ~ 0 0 The original review date was crossed out and

Reference Source: WAP B3-10a replaced with a second review date. RTR personnel Verification Source: FQAO Checklist have been asked not to cross out initial review dates

if another review is requested.

9. A radiography data form was submitted ~ 0 0 for each waste container in the batch? Reference Source: WAP B3-4 Verification Source: Data Sheets

10. Is each data sheet signed and dated by ~ 0 0 the operator? Reference Source: WAP Table B3-11 Verification Source: Data Sheets

11. Is there a documented reference to the ~ 0 0 LA-RTR2-04-0004 A (DVD) videotape for each container? LA-RTR2-04-0004 B

Reference Source: WAP Table B3-11 Verification Source: Data Sheets

12. Date of radiography examination? ~ 0 0 4/21/04 Reference Source: WAP Table B3-11 Verification Source: Data Sheets

13. TRUCON Code? ~ 0 0 LA211, LA116-119, LA125 Reference Source: WAP Table B3-11 Verification Source: Data Sheets

Page 8: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment

Controlled Copy

CCP-TP-001-A3, Rev. 1 Effective Date: 10/16/2003 CCP SPQAO Nondestructive Examination Project level Validation Checklist and Summary Page 2 of 5

CCP SPQAO Nondestructive Examination Project level Validation Checklist and Summary

I 8ATCH DATA REPORT NUM8ER: LA-RTR2-04-0004 EXAMINATION DATE: 4/21/04

Criteria Description of Criteria Reviewed Met? Comments/Qualifiers

Y/N/NA 14. Waste Matrix Code? ~ 0 0 85400 and 83120

Reference Source: WAP Table 83-11 Verification Source: Data Sheets

15. Indication of Liner? ~ 0 0 Reference Source: WAP Table 83-11 Verification Source: Data Sheets

16. Indication of liner type? ~ 0 0 Reference Source: WAP Table 83-11 Verification Source: Data Sheets

17. Indication of number of layers of ~ 0 0 confinement? Reference Source: WAP Table 83-11 Verification Source: Data Sheets

18. Amount of free liquid? ~ 0 0 Reference Source: WAP Table 83-11 Verification Source: Data Sheets

19. Indication of sealed containers> 4L? ~ 0 0 Reference Source: WAP Table 83-11 Verification Source: Data Sheets

20. Absence of prohibited items? ~ 0 0 Reference Source: WAP Table 83-11 Verification Source: Data Sheets

21. Indication of vented rigid liner? ~ 0 0 Reference Source: WAP Table 83-11 Verification Source: Data Sheets

22. Container gross weight recorded? ~ 0 0 Reference Source: WAP Table 83-11 Verification Source: Data Sheets

23. Indication of heavy and/or sharp object ~ 0 0 braced? Reference Source: TRAMPAC 2.7 Verification Source: Data

24. Fill factor reported in percent (%)? ~ 0 0 Reference Source: CCP Technical Procedures Verification Source: Data Sheets

25. Verification that the physical form ~ 0 0 matches the waste stream description?

Reference Source: WAP Table 83-11 Verification Source: Data Sheets

26. Verification that the physical form ~ 0 0 matches the Waste Matrix Code? Reference Source: WAP Table 83-11 Verification Source: Data Sheets

27. Operator signature release and date? ~ 0 0 Reference Source: WAP Table 83-11 Verification Source: Data Sheets

Page 9: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment

Controlled Copy

CCP-TP-001-A3, Rev. 1 Effective Date: 10/16/2003 CCP SPQAO Nondestructive Examination Project level Validation Checklist and Summary Page 3 of 5

CCP SPQAO Nondestructive Examination Project level Validation Checklist and Summary

I BATCH DATA REPORT NUMBER: LA-RTR2-04-0004 EXAMINATION DATE: 4/21/04

Criteria Description of Criteria Reviewed Met? Comments/Qualifiers

Y/N/NA 28. Space for Comments? ~ 0 0

Reference Source: WAP Table B3-11 Verification Source: Data Sheets

29. Estimate of each material parameter ~ 0 0 weight? (Kg) Reference Source: WAP Table B3-11 Verification Source: Data Sheets

30. Description of each material parameter? ~ 0 0 Reference Source: WAP Table B3-11 Verification Source: Data Sheets

31. The replicate scan and independent ~ 0 0 observation were performed on different waste containers? Reference Source: WAP B1-3b(2) Verification Source: Data Sheets and/or BDR

32. Replicate scan was performed once per ~ 0 0 5817162 day, or once per batch, whichever is

LESS frequent? Reference Source: WAP B1-3b(2) Verification Source: Data Sheets

33. An independent observation was ~ 0 0 59397 performed once per day, or once per batch, whichever is LESS frequent? Reference Source: WAP B1-3b(2) Verification Source: Data Sheets

34. The MPWs of the replicate scan are ~ 0 0 within V 50% of the weights of the original scan? Reference Source: CCP Technical Procedures Verification Source: Data Sheets

35. The MPWs of the independent ~ 0 0 observation scan are within V 50% of the weights of the original scan? Reference Source: CCP Technical Procedures Verification Source: Data Sheets

36. Operational checks for the radiography ~ 0 0 equipment were performed prior to analysis? Reference Source: WAP B3-4 Verification Source: Data Sheets

37. Operational checks were performed ~ 0 0 daily?

Reference Source: WAP B3-4 Verification Source: Measurement Control Report

Page 10: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment

Controlled Copy

CCP-TP-001-A3, Rev. 1 Effective Date: 10/16/2003

CCP SPQAO Nondestructive Examination Project Level

Validation Checklist and Summary Page 4 of 5

CCP SPQAO Nondestructive Examination Project Level Validation Checklist and Summary

I BATCH DATA REPORT NUMBER: LA-RTR2-04-0004 EXAMINATION DATE: 4/21/04

Criteria

Description of Criteria Reviewed Met? Comments/Qualifiers Y/N/NA

38. All the appropriate QC forms (replicate 181 0 0

scan, independent observation, operational checks)?

Reference Source: WAP Table B3-11

Verification Source: QC Sheets

39. Weight Scale Calibration Check? 181 0 0 Reference Source: CCP Technical Procedures Verification Source: Measurement. Control Report

40. Scale Weight Check? 181 0 0 Reference Source: CCP Technical Procedures Verification Source: Measurement Control Report

41. Lines-Pair Resolution Test Check? 181 0 0 Reference Source: WAP Table B3-11

Verification Source: Measurement Control Report

42. DGL Video/audio check? 181 0 0 Reference Source: WAP Table B3-11

Verification Source: Measurement Control Report

43. Was the person performing the replicate 181 0 0 scan a qualified radiography operator

different from the individual who performed the original scan?

Reference Source: WAP B1-3b(2} Verification Source: Data Sheets and/or Training Records

44. Was the independent observer a 181 0 0 qualified radiography operator different

from the individual who performed the initial observation? Reference Source: WAP B1-3b(2}

Verification Source: Data Sheets

Page 11: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment

Controlled Copy

CCP-TP-001-A3, Rev. 1 Effective Date: 10/16/2003

CCP SPQAO Nondestructive Examination Project Level

Validation Checklist and Summary Page 5 of 5

CCP SPQAO Nondestructive Examination Project Level Validation Checklist and Summary

I BATCH DATA REPORT NUMBER: LA-RTR2-04-0004 EXAMINATION DATE: 4/21/04

Criteria

Description of Criteria Reviewed Met? Comments/Qualifiers Y/N/NA

45. A videotape or equivalent media with a 181 0 0 unique identifier was submitted for each waste container in the batch?

Reference Source: WAP B3.4 Verification Source: Data Sheets

46. Training qualifications for all 181 0 0 radiography personnel are acceptable? Reference Source: WAP Table B3-10 Verification Source: Training Records

47. Is CCP-TP-001-A6 included? 0 181

The container QC checks were properly performed and meet the Quality Assurance Objectives (QAOs).

Proper procedures were followed during data reduction and analysis. The batch is complete, acceptable,

and includes all supporting data and documentation required by the QAPjP.

~

'- -""\ I

I (\ ~ Irene Quintana ; I 3/16/05

I \k ~ () \) '---..I

Site Project QA Officer Signatur~ Date

Page 12: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 13: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 14: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 15: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 16: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 17: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 18: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 19: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 20: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 21: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 22: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 23: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 24: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 25: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 26: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 27: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 28: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 29: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 30: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 31: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 32: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 33: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 34: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 35: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 36: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 37: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 38: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 39: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 40: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 41: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 42: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 43: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 44: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 45: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 46: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 47: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 48: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 49: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 50: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 51: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 52: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 53: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 54: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 55: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 56: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 57: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 58: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 59: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 60: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 61: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 62: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 63: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment
Page 64: CCP-TP-001, Effective · 2015-05-30 · Controlled Copy CCP-TP-001, Rev. 11 CCP Project Level Data Validation and Verification Effective Date: 03/23/2005 Page 40 of 103 Attachment