CCAT Project Status CCAT Project Status

CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,

Embed Size (px)

Citation preview

Page 1: CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,

CCAT Project StatusCCAT Project StatusCCAT Project StatusCCAT Project Status

Page 2: CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,

The Project:The Project:The Project:The Project:

• Phase 1: Phase 1: Feasibility/Concept Design StudyFeasibility/Concept Design Study, , $2M, completed and peer reviewed$2M, completed and peer reviewed

• Phase II: Phase II: Engineering Concept Design, 1-year Engineering Concept Design, 1-year study, $2M – current workstudy, $2M – current work

• Phase III: Development Phase to FDR, Build Phase III: Development Phase to FDR, Build and Assemble on siteand Assemble on site

• Phase IV: CommissionPhase IV: Commission and into service by 2013 and into service by 2013• Total cost $100M (includes first-light Total cost $100M (includes first-light

instrument budget of $20M) plus operating instrument budget of $20M) plus operating costs of $5M/ycosts of $5M/y

Page 3: CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,

The Review Panel The Review Panel Report:Report:The Review Panel The Review Panel Report:Report:• ‘‘Blue Ribbon Review’Blue Ribbon Review’

• Chaired by Bob WilsonChaired by Bob Wilson

• Very supportive:Very supportive:– ‘‘Combined with ALMA, which provides Combined with ALMA, which provides

unprecedented sensitivity and resolution to unprecedented sensitivity and resolution to image submm/FIR sources, the CCAT will image submm/FIR sources, the CCAT will revolutionize Astronomy in the submm/FIR band revolutionize Astronomy in the submm/FIR band and enable significant progress in unraveling and enable significant progress in unraveling the cosmic origin of stars, planets and galaxies. the cosmic origin of stars, planets and galaxies. CCAT is very timely and cannot wait.’ CCAT is very timely and cannot wait.’

Page 4: CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,

Project ManagementProject Management::Project ManagementProject Management:: Project Director: Professor Riccardo Giovanelli, Project Director: Professor Riccardo Giovanelli,

Cornell - leading efforts to develop the full Cornell - leading efforts to develop the full partnership needed to complete the Project.partnership needed to complete the Project.

Project Manager: Thomas Sebring, CornellProject Manager: Thomas Sebring, Cornell Deputy Project Manager: Simon Radford, Deputy Project Manager: Simon Radford,

Caltech.Caltech. Lead development of the Project from an Lead development of the Project from an

administrative and technical perspective. The administrative and technical perspective. The science communities of the partner institutions have science communities of the partner institutions have developed plans for instrumentation, science developed plans for instrumentation, science programs, and collaborations toward the future of programs, and collaborations toward the future of CCAT.CCAT.

Page 5: CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,

Partnership StatusPartnership Status Partnership StatusPartnership Status • Cornell UniversityCornell University:: The Astronomy Department has The Astronomy Department has

identified an individual donor who has pledged to provide identified an individual donor who has pledged to provide $10 M of Cornell’s share. Cornell hopes to have $10 M of Cornell’s share. Cornell hopes to have approximately a 1/3 share of CCAT.approximately a 1/3 share of CCAT.

• CaltechCaltech:: The Chairman of the Division of Physics The Chairman of the Division of Physics Mathematics and Astronomy has indicated that Caltech Mathematics and Astronomy has indicated that Caltech intends to participate as a partner in the Project and will intends to participate as a partner in the Project and will make funds available for Phase II, looking at 20-25% inc JPL. make funds available for Phase II, looking at 20-25% inc JPL.

• JPLJPL:: The administration of JPL has indicated intention to The administration of JPL has indicated intention to continue support development of CCAT. While large continue support development of CCAT. While large investments in ground based astronomy facilities are not investments in ground based astronomy facilities are not likely by NASA, development of instrumentation, focal likely by NASA, development of instrumentation, focal planes, and other high dollar value elements of CCAT by JPL planes, and other high dollar value elements of CCAT by JPL is under discussion.is under discussion.

• University of ColoradoUniversity of Colorado:: Intention to become a partner at a Intention to become a partner at a level of $10 M, possibility of ZSpeC as day-I instrument. level of $10 M, possibility of ZSpeC as day-I instrument.

• Northwestern:Northwestern: Looking for 5-10% but must involve Looking for 5-10% but must involve technology.technology.

• Canada: Canada: Probably through individual universities such as Probably through individual universities such as UBC and Waterloo at the moment – maybe around $5-10M.UBC and Waterloo at the moment – maybe around $5-10M.

Page 6: CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,

So what does this mean?So what does this mean?So what does this mean?So what does this mean?• Project is short of funding to complete Project is short of funding to complete

itit

• Looking for a ‘big’ partner rather than Looking for a ‘big’ partner rather than lots of little partnerslots of little partners

• I have indicated that the UK/Europe I have indicated that the UK/Europe would be looking to be partners at the would be looking to be partners at the 50% level50% level

• The big questions are:The big questions are:– From where do we get the funds ?From where do we get the funds ?– What are the timescales ?What are the timescales ?

Page 7: CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,

What has happened so What has happened so far ?far ?What has happened so What has happened so far ?far ?• Visit by the CCAT team to the UK and Visit by the CCAT team to the UK and

Europe in June 2006Europe in June 2006• Business meeting at Cornell in JulyBusiness meeting at Cornell in July• Setting up of a Management Committee Setting up of a Management Committee

and telecons – I am the UK rep on this and and telecons – I am the UK rep on this and one telecon held so far (August) – next one telecon held so far (August) – next scheduled for Sept 26scheduled for Sept 26thth

• Scientific meeting of the UK community - Scientific meeting of the UK community - todaytoday

• Instrumentation working group meeting Instrumentation working group meeting Caltech in DecemberCaltech in December

Page 8: CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,

What do we need to do What do we need to do Now:Now:What do we need to do What do we need to do Now:Now:

• Be very clear as to the scientific importance Be very clear as to the scientific importance of CCAT in the realm of post SCUBA-2 of CCAT in the realm of post SCUBA-2 surveys, an LMT of 25-50m diameter, and surveys, an LMT of 25-50m diameter, and ALMA mosaicing areas of around 1 sq arcminALMA mosaicing areas of around 1 sq arcmin

• Encourage European scientific supportEncourage European scientific support• Submit an SoI to PPARC this autumnSubmit an SoI to PPARC this autumn• Work to get the science case for CCAT on the Work to get the science case for CCAT on the

AstroNet roadmap AstroNet roadmap • Big question - how do we access Big question - how do we access

Opticon/RadioNet EU FP7 funding sourcesOpticon/RadioNet EU FP7 funding sources• Possibility of SCUBA-2 being a day-1 Possibility of SCUBA-2 being a day-1

instrumentinstrument