CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

Embed Size (px)

Citation preview

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    1/474

    CBSS9.0

    Configuration and Adjustment Guide

    Issue 01

    Date 2013-05-30

    HUAWEI TECHNOLOGIES CO., LTD.

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    2/474

    Copyright Huawei Technologies Co., Ltd. 2013. All rights reserved.

    No part of this document may be reproduced or transmitted in any form or by any means without prior written

    consent of Huawei Technologies Co., Ltd.

    Trademarks and Permissions

    and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.

    All other trademarks and trade names mentioned in this document are the property of their respective holders.

    Notice

    The purchased products, services and features are stipulated by the contract made between Huawei and the

    customer. All or part of the products, services and features described in this document may not be within the

    purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,and recommendations in this document are provided "AS IS" without warranties, guarantees or representations

    of any kind, either express or implied.

    The information in this document is subject to change without notice. Every effort has been made in the

    preparation of this document to ensure accuracy of the contents, but all statements, information, and

    recommendations in this document do not constitute a warranty of any kind, express or implied.

    Huawei Technologies Co., Ltd.

    Address: Huawei Industrial Base

    Bantian, Longgang

    Shenzhen 518129

    People's Republic of China

    Website: http://www.huawei.com

    Email: [email protected]

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    i

    http://www.huawei.com/
  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    3/474

    About This Document

    Overview

    This document describes the CDMA base station subsystem (CBSS) reconfiguration tasks,

    including capacity expansion and network reconfiguration.

    Product Version

    The following table lists the product versions related to this document.

    Product Name Product Version

    BSC6680 V300R009C00

    BTS V400R009C00

    Intended Audience

    This document is intended for:

    l Network planning engineers

    l System engineers

    Change History

    Version Description

    01 (2013-05-30) This is the first official release. Compared with

    the CBSS9.0 Draft A (2012-12-31), this release

    has modified some bugs.

    Draft A (2012-12-31) This is draft A for CBSS9.0.

    Configuration and Adjustment Guide About This Document

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    ii

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    4/474

    Organization

    1 Introduction to the BSS Configuration and Adjustment

    This describes the definition of a BSS configuration and adjustment, relations between some

    correlated scenarios, and methods and tools required for performing the BSS configuration and

    adjustment.

    2 BSS Network Capacity Expansion

    3 BSS Network Reconstruction

    Conventions

    Symbol Conventions

    The symbols that may be found in this document are defined as follows.

    Symbol Description

    Indicates a hazard with a high level or medium level of risk

    which, if not avoided, could result in death or serious injury.

    Indicates a hazard with a low level of risk which, if not

    avoided, could result in minor or moderate injury.

    Indicates a potentially hazardous situation that, if not

    avoided, could result in equipment damage, data loss,

    performance deterioration, or unanticipated results.

    Indicates a tip that may help you solve a problem or save

    time.

    Provides additional information to emphasize or supplement

    important points of the main text.

    General Conventions

    The general conventions that may be found in this document are defined as follows.

    Convention Description

    Times New Roman Normal paragraphs are in Times New Roman.

    Boldface Names of files, directories, folders, and users are in

    boldface. For example, log in as user root.

    Italic Book titles are in italics.

    Courier New Examples of information displayed on the screen are in

    Courier New.

    Configuration and Adjustment Guide About This Document

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    iii

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    5/474

    Command Conventions

    The command conventions that may be found in this document are defined as follows.

    Convention Description

    Boldface The keywords of a command line are in boldface.

    Italic Command arguments are in italics.

    [ ] Items (keywords or arguments) in brackets [ ] are optional.

    { x | y | ... } Optional items are grouped in braces and separated by

    vertical bars. One item is selected.

    [ x | y | ... ] Optional items are grouped in brackets and separated by

    vertical bars. One item is selected or no item is selected.

    { x | y | ... }* Optional items are grouped in braces and separated by

    vertical bars. A minimum of one item or a maximum of all

    items can be selected.

    [ x | y | ... ]* Optional items are grouped in brackets and separated by

    vertical bars. Several items or no item can be selected.

    GUI Conventions

    The GUI conventions that may be found in this document are defined as follows.

    Convention Description

    Boldface Buttons, menus, parameters, tabs, window, and dialog titles

    are in boldface. For example, click OK.

    > Multi-level menus are in boldfaceand separated by the ">"

    signs. For example, choose File> Create> Folder.

    Keyboard Operations

    The keyboard operations that may be found in this document are defined as follows.

    Format Description

    Key Press the key. For example, press Enterand press Tab.

    Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt

    +Ameans the three keys should be pressed concurrently.

    Key 1, Key 2 Press the keys in turn. For example, pressing Alt, Ameans

    the two keys should be pressed in turn.

    Mouse Operations

    Configuration and Adjustment Guide About This Document

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    iv

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    6/474

    The mouse operations that may be found in this document are defined as follows.

    Action Description

    Click Select and release the primary mouse button without moving

    the pointer.

    Double-click Press the primary mouse button twice continuously and

    quickly without moving the pointer.

    Drag Press and hold the primary mouse button and move the

    pointer to a certain position.

    Configuration and Adjustment Guide About This Document

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    v

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    7/474

    Contents

    About This Document.....................................................................................................................ii

    1 Introduction to the BSS Configuration and Adjustment......................................................1

    1.1 Definitionof the BSS Configuration and Adjustment....................................................................................................2

    1.2 Relations of the BSS Configuration and Adjustment.....................................................................................................31.3 Methods for the BSS Configuration and Adjustment.....................................................................................................5

    1.4 Tools for the BSS Configuration and Adjustment..........................................................................................................6

    2 BSS Network Capacity Expansion.............................................................................................9

    2.1 Adding EV-DO Carriers...............................................................................................................................................11

    2.1.1 Overview...................................................................................................................................................................11

    2.1.2 Project Preparations...................................................................................................................................................13

    2.1.3 NetworkPlanning......................................................................................................................................................13

    2.1.3.1 Site Survey..............................................................................................................................................................14

    2.1.3.2 Parameter Planning.................................................................................................................................................142.1.3.3 Data Preparation for Network Planning.................................................................................................................14

    2.1.4 BSS Data Preparations...............................................................................................................................................16

    2.1.5 Project Implementation..............................................................................................................................................23

    2.1.6 Final Inspection and Test...........................................................................................................................................24

    2.1.6.1 Final Inspection......................................................................................................................................................24

    2.1.6.2 Performance Measurement.....................................................................................................................................25

    2.1.6.3 Call Test..................................................................................................................................................................25

    2.1.6.4 Operation Monitoring.............................................................................................................................................27

    2.2 Adding a CSPS.............................................................................................................................................................27

    2.2.1 Overview of Scenarios...............................................................................................................................................27

    2.2.2 Project Preparations...................................................................................................................................................28

    2.2.3 BSC Data Preparations..............................................................................................................................................29

    2.2.4 Project Implementation..............................................................................................................................................32

    2.2.5 Final Inspection and Test...........................................................................................................................................33

    2.2.5.1 Final Inspection......................................................................................................................................................33

    2.2.5.2 Operation Monitoring.............................................................................................................................................34

    2.3 Expansion from Two Cabinets to Three Cabinets........................................................................................................34

    2.3.1 Overview of Scenarios...............................................................................................................................................34

    2.3.2 Project Preparations...................................................................................................................................................40

    Configuration and Adjustment Guide Contents

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    vi

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    8/474

    2.3.3 BSC Data Preparation................................................................................................................................................42

    2.3.4 Project Implementation..............................................................................................................................................43

    2.3.5 Final Inspection and test............................................................................................................................................47

    2.3.5.1 Final Inspection......................................................................................................................................................47

    2.3.5.2 Call Test..................................................................................................................................................................49

    2.3.5.3 Operation Monitoring.............................................................................................................................................50

    2.3.6 Rollback upon Failure...............................................................................................................................................50

    2.4 Adding E1/T1 Links over the Abis Interface...............................................................................................................52

    2.4.1 Overview of Scenarios...............................................................................................................................................52

    2.4.2 Project Preparations...................................................................................................................................................55

    2.4.3 BSS Data Preparation................................................................................................................................................56

    2.4.3.1 IMA Group as the Original Link............................................................................................................................56

    2.4.3.2 UNI Link as the Original Link...............................................................................................................................57

    2.4.3.3 FRACIMA Group as the Original Link.................................................................................................................59

    2.4.3.4 MLPPP Group as the Original Link.......................................................................................................................61

    2.4.3.5 PPP Link as the Original Link................................................................................................................................62

    2.4.4 Project Implementation..............................................................................................................................................64

    2.4.5 Final Inspection and Test...........................................................................................................................................65

    2.4.5.1 Final Inspection......................................................................................................................................................65

    2.4.5.2 Call Test..................................................................................................................................................................66

    2.4.5.3 Operation Monitoring.............................................................................................................................................66

    2.5 Adding E1/T1 Links over the A Interface....................................................................................................................67

    2.5.1 Overview of Scenarios...............................................................................................................................................672.5.2 Project Preparations...................................................................................................................................................67

    2.5.3 BSC Data Preparations..............................................................................................................................................68

    2.5.4 Project Implementation..............................................................................................................................................71

    2.5.5 Final Inspection and Test...........................................................................................................................................71

    2.5.5.1 Final Inspection......................................................................................................................................................71

    2.5.5.2 Call Test..................................................................................................................................................................72

    2.5.5.3 Operation Monitoring.............................................................................................................................................72

    2.6 Adding FE Links over the A Interface.........................................................................................................................72

    2.6.1 Overview of Scenarios...............................................................................................................................................72

    2.6.2 Project Preparations...................................................................................................................................................73

    2.6.3 BSC Data Preparations..............................................................................................................................................74

    2.6.4 Project Implementation..............................................................................................................................................76

    2.6.5 Final Inspection and Test...........................................................................................................................................77

    2.6.5.1 Final Inspection......................................................................................................................................................77

    2.6.5.2 Call Test..................................................................................................................................................................77

    2.6.5.3 Operation Monitoring.............................................................................................................................................78

    2.7 Adding 1X Channel Boards..........................................................................................................................................78

    2.7.1 Overview...................................................................................................................................................................78

    2.7.2 Project Preparations...................................................................................................................................................80

    Configuration and Adjustment Guide Contents

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    vii

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    9/474

    2.7.3 BSS Data Preparation................................................................................................................................................81

    2.7.4 Project Implementation..............................................................................................................................................83

    2.7.5 Final Inspection and Test...........................................................................................................................................84

    2.7.5.1 Final Inspection......................................................................................................................................................84

    2.7.5.2 Operation Monitoring.............................................................................................................................................85

    2.8 Adding EV-DO Channel Boards..................................................................................................................................85

    2.8.1 Overview...................................................................................................................................................................85

    2.8.2 Project Preparations...................................................................................................................................................87

    2.8.3 BSS Data Preparations...............................................................................................................................................89

    2.8.4 Project Implementation..............................................................................................................................................94

    2.8.5 Final Inspection and Test...........................................................................................................................................95

    2.8.5.1 Final Inspection......................................................................................................................................................95

    2.8.5.2 Operation Monitoring.............................................................................................................................................96

    2.9 Adding a Directly-Connected BTS...............................................................................................................................96

    2.9.1 Overview of Scenarios...............................................................................................................................................96

    2.9.2 Project Preparations...................................................................................................................................................97

    2.9.3 NetworkPlanning......................................................................................................................................................98

    2.9.3.1 Site Survey..............................................................................................................................................................98

    2.9.3.2 Parameter Planning.................................................................................................................................................98

    2.9.3.3 Data Preparation for Network Planning...............................................................................................................100

    2.9.4 BSS Data Preparations.............................................................................................................................................104

    2.9.5 Project Implementation............................................................................................................................................124

    2.9.6 Final Inspection and Test.........................................................................................................................................1262.9.6.1 Final Inspection....................................................................................................................................................126

    2.9.6.2 Performance Measurement...................................................................................................................................127

    2.9.6.3 Call Test................................................................................................................................................................128

    2.9.6.4 Operation Monitoring...........................................................................................................................................129

    2.10 Adding aCascaded BTS...........................................................................................................................................130

    2.10.1 Overview of Scenarios...........................................................................................................................................130

    2.10.2 ProjectPreparations...............................................................................................................................................131

    2.10.3 BSC Data Preparations..........................................................................................................................................132

    2.10.3.1 VP Switching Mode............................................................................................................................................132

    2.10.3.2 Fractional Timeslot Mode..................................................................................................................................136

    2.10.4 ProjectImplementation..........................................................................................................................................149

    2.10.5 Final Inspection and Test.......................................................................................................................................149

    2.10.5.1 FinalInspection..................................................................................................................................................150

    2.10.5.2 Performance Measurement.................................................................................................................................151

    2.10.5.3 Call Test..............................................................................................................................................................151

    2.10.5.4 Operation Monitoring.........................................................................................................................................152

    2.11 Widening the BTS Coverage....................................................................................................................................152

    2.11.1 Overview of Scenarios...........................................................................................................................................152

    2.11.2 ProjectPreparations...............................................................................................................................................153

    Configuration and Adjustment Guide Contents

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    viii

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    10/474

    2.11.3 Network Planning..................................................................................................................................................154

    2.11.3.1 Site Survey..........................................................................................................................................................154

    2.11.3.2 Parameter Planning.............................................................................................................................................155

    2.11.3.3 Data Preparation for Network Planning.............................................................................................................156

    2.11.4 Project Implementation..........................................................................................................................................158

    2.11.5 Final Inspection and Test.......................................................................................................................................159

    2.11.5.1 FinalInspection..................................................................................................................................................159

    2.11.5.2 Call Test..............................................................................................................................................................159

    2.11.5.3 Operation Monitoring.........................................................................................................................................160

    2.12 CapacityExpansion from S(1/1/1) to S(2/2/2).........................................................................................................161

    2.12.1 Overview of Scenarios...........................................................................................................................................161

    2.12.2 ProjectPreparations...............................................................................................................................................162

    2.12.3 Network Planning..................................................................................................................................................163

    2.12.3.1 Site Survey..........................................................................................................................................................163

    2.12.3.2 Parameter Planning.............................................................................................................................................164

    2.12.3.3 Data Preparation for Network Planning.............................................................................................................165

    2.12.4 BSS Data Preparations...........................................................................................................................................166

    2.12.5 ProjectImplementation..........................................................................................................................................171

    2.12.6 Final Inspection and Test.......................................................................................................................................172

    2.12.6.1 FinalInspection..................................................................................................................................................172

    2.12.6.2 Performance Measurement.................................................................................................................................173

    2.12.6.3 Call Test..............................................................................................................................................................173

    2.12.6.4 Operation Monitoring.........................................................................................................................................1742.13 Expanding an O(2) Site to an S(2/2/2) Site (1X and EV-DO).................................................................................175

    2.13.1 Overview...............................................................................................................................................................175

    2.13.2 ProjectPreparations...............................................................................................................................................176

    2.13.3 Data Preparation for Network Planning................................................................................................................179

    2.13.4 BSS Data Preparation............................................................................................................................................181

    2.13.5 ProjectImplementation..........................................................................................................................................184

    2.13.6 Final Inspection and Test.......................................................................................................................................185

    2.13.6.1 FinalInspection..................................................................................................................................................185

    2.13.6.2 Performance Measurement.................................................................................................................................186

    2.13.6.3 Call Test..............................................................................................................................................................187

    2.14 Adding Signaling Points...........................................................................................................................................188

    2.14.1 Overview of Scenarios...........................................................................................................................................188

    2.14.2 ProjectPreparations...............................................................................................................................................189

    2.14.3 BSC Data Preparations..........................................................................................................................................190

    2.14.4 ProjectImplementation..........................................................................................................................................191

    2.14.5 Final Inspection and Test.......................................................................................................................................191

    2.14.5.1 FinalInspection..................................................................................................................................................191

    2.14.5.2 Call Test..............................................................................................................................................................192

    2.14.5.3 Operation Monitoring.........................................................................................................................................192

    Configuration and Adjustment Guide Contents

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    ix

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    11/474

    2.14.6 Restoration upon Failures......................................................................................................................................192

    2.15 Adding a BTS3900A/DBS3900 Transmission Cabinet...........................................................................................193

    2.15.1 Overview of Scenarios...........................................................................................................................................193

    2.15.2 Project Preparations...............................................................................................................................................194

    2.15.3 BTS Data Preparations..........................................................................................................................................194

    2.15.4 ProjectImplementation..........................................................................................................................................195

    2.15.5 Final Inspection.....................................................................................................................................................196

    2.16 Adding aBTS3900A/DBS3900 Battery Cabinet.....................................................................................................196

    2.16.1 Overview of Scenarios...........................................................................................................................................196

    2.16.2 ProjectPreparations...............................................................................................................................................197

    2.16.3 BTS Data Preparations..........................................................................................................................................198

    2.16.4 ProjectImplementation..........................................................................................................................................199

    2.16.5 Final Inspection.....................................................................................................................................................199

    2.17 Adding 2.1 GHz Band Resources.............................................................................................................................200

    2.17.1 Overview of Scenarios...........................................................................................................................................200

    2.17.2 ProjectPreparations...............................................................................................................................................203

    2.17.3 BTS Data Preparations..........................................................................................................................................204

    2.17.4 ProjectImplementation..........................................................................................................................................207

    2.17.5 Final Inspection and Test.......................................................................................................................................208

    2.17.5.1 FinalInspection..................................................................................................................................................208

    2.17.5.2 Call Tests............................................................................................................................................................208

    2.17.5.3 Operation Monitoring.........................................................................................................................................210

    3 BSS Network Reconstruction..................................................................................................2113.1 Signaling Point Modification......................................................................................................................................214

    3.1.1 Overview of Scenarios.............................................................................................................................................214

    3.1.2 Project Preparations.................................................................................................................................................214

    3.1.3 BSC Data Preparations............................................................................................................................................215

    3.1.3.1 Modifying the Original Signaling Point...............................................................................................................215

    3.1.3.2 Modify the destination signaling point.................................................................................................................216

    3.1.4 Project Implementation............................................................................................................................................217

    3.1.5 Final Inspection and Test.........................................................................................................................................218

    3.1.5.1 Final Inspection....................................................................................................................................................2183.1.5.2 Call Test................................................................................................................................................................218

    3.1.5.3 Operation Monitoring...........................................................................................................................................219

    3.1.6 Restoration Upon Failures.......................................................................................................................................219

    3.2 Changing the Signaling Link Mode............................................................................................................................219

    3.2.1 Overview of Scenarios.............................................................................................................................................220

    3.2.2 Project Preparations.................................................................................................................................................220

    3.2.3 BSC Data Preparations............................................................................................................................................221

    3.2.3.1 No Reduction of Signaling Points........................................................................................................................221

    3.2.3.2 Reduction of Signaling Points..............................................................................................................................222

    3.2.4 Project Implementation............................................................................................................................................224

    Configuration and Adjustment Guide Contents

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    x

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    12/474

    3.2.5 Final Inspection and Test.........................................................................................................................................224

    3.2.5.1 Final Inspection....................................................................................................................................................224

    3.2.5.2 Call Test................................................................................................................................................................225

    3.2.5.3 Operation Monitoring...........................................................................................................................................225

    3.3 Changing the BTS ARFCN........................................................................................................................................226

    3.3.1 Overview of Scenarios.............................................................................................................................................226

    3.3.2 Project Preparations.................................................................................................................................................228

    3.3.3 BSS Data Preparations.............................................................................................................................................229

    3.3.4 Project Implementation............................................................................................................................................231

    3.3.5 Final Inspection and Test.........................................................................................................................................232

    3.3.5.1 Final Inspection....................................................................................................................................................232

    3.3.5.2 Call Test................................................................................................................................................................233

    3.3.5.3 Operation Monitoring...........................................................................................................................................234

    3.3.6 Restoration Upon Failures.......................................................................................................................................235

    3.4 Adjusting 1X and EV-DO Carriers............................................................................................................................235

    3.4.1 Overview.................................................................................................................................................................235

    3.4.2 Project Preparations.................................................................................................................................................237

    3.4.3 BSS Data Preparations.............................................................................................................................................238

    3.4.3.1 Transforming 1X Carriers to EV-DO Carriers.....................................................................................................238

    3.4.3.2 Transforming EV-DO Carriers to 1X Carriers.....................................................................................................243

    3.4.4 Project Implementation............................................................................................................................................248

    3.4.5 Final Inspection and Test.........................................................................................................................................248

    3.4.5.1 Final Inspection....................................................................................................................................................2483.4.5.2 Call Test................................................................................................................................................................249

    3.4.5.3 Operation Monitoring...........................................................................................................................................250

    3.4.6 Rollback upon Failures............................................................................................................................................250

    3.5 Modifyingthe Working Mode of the Abis Interface Board.......................................................................................250

    3.5.1 Overview of Scenarios.............................................................................................................................................251

    3.5.2 Project Preparations.................................................................................................................................................251

    3.5.3 BSC Data Preparations............................................................................................................................................253

    3.5.3.1 Changing the Working Mode from Active/Standby to Independent....................................................................253

    3.5.3.2 Changing the Working Mode from Independent to Active/Standby....................................................................255

    3.5.4 Project Implementation............................................................................................................................................258

    3.5.5 Final Inspection and Test.........................................................................................................................................258

    3.5.5.1 Final Inspection....................................................................................................................................................258

    3.5.5.2 Call Test................................................................................................................................................................260

    3.5.5.3 Operation Monitoring...........................................................................................................................................261

    3.5.6 Restoration Upon Failures.......................................................................................................................................261

    3.6 Adjusting the E1 Timeslots of the Abis Interface......................................................................................................262

    3.6.1 Overview of Scenarios.............................................................................................................................................262

    3.6.2 Project Preparations.................................................................................................................................................263

    3.6.3 BSS Data Preparations.............................................................................................................................................264

    Configuration and Adjustment Guide Contents

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    xi

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    13/474

    3.6.3.1 FRACTIONAL ATM Link..................................................................................................................................264

    3.6.3.2 FRACTIONAL IMA Link....................................................................................................................................267

    3.6.4 Project Implementation............................................................................................................................................269

    3.6.5 Final Inspection and Test.........................................................................................................................................270

    3.6.5.1 Final Inspection....................................................................................................................................................270

    3.6.5.2 Call Test................................................................................................................................................................271

    3.6.5.3 Operation Monitoring...........................................................................................................................................271

    3.7 Changing the type of the BTS links from single link to link group...........................................................................271

    3.7.1 Overview of Scenarios.............................................................................................................................................271

    3.7.2 Project Preparations.................................................................................................................................................273

    3.7.3 BSS Data Preparations.............................................................................................................................................274

    3.7.3.1 Changing UNI Link to IMA Link.........................................................................................................................274

    3.7.3.2 Changing PPP Link to MLPPP Link Group.........................................................................................................276

    3.7.4 Project Implementation............................................................................................................................................278

    3.7.5 Final Inspection and Test.........................................................................................................................................279

    3.7.5.1 Final Inspection....................................................................................................................................................279

    3.7.5.2 Call Test................................................................................................................................................................281

    3.7.5.3 Operation Monitoring...........................................................................................................................................282

    3.7.6 Rollback upon Failures............................................................................................................................................282

    3.8 Deleting aBTS...........................................................................................................................................................283

    3.8.1 Overview of the Scenario........................................................................................................................................283

    3.8.2 Project Preparations.................................................................................................................................................284

    3.8.3 Data Preparation for Network Planning................................................................................. .................................2853.8.4 BSS Data .................................................................................................................................................................286

    3.8.5 Project Implementation............................................................................................................................................288

    3.8.6 Final Inspection and Test.........................................................................................................................................289

    3.8.6.1 Operation Monitoring...........................................................................................................................................289

    3.8.7 Rollback upon Failures............................................................................................................................................289

    3.9 Interconnecting BSCs.................................................................................................................................................290

    3.9.1 Overview of Scenarios.............................................................................................................................................290

    3.9.2 Project Preparations.................................................................................................................................................293

    3.9.3 Data Preparation for Network Planning................................................................................. .................................294

    3.9.4 BSC Data.................................................................................................................................................................296

    3.9.4.1 1X Networking.....................................................................................................................................................296

    3.9.4.2 EV-DO Networking..............................................................................................................................................298

    3.9.5 Project Implementation............................................................................................................................................300

    3.9.6 Final Inspection and Test.........................................................................................................................................301

    3.9.6.1 Final Inspection....................................................................................................................................................301

    3.9.6.2 Performance Measurement...................................................................................................................................302

    3.9.6.3 Call Test................................................................................................................................................................302

    3.9.6.4 Operation Monitoring...........................................................................................................................................303

    3.9.7 Overview of Scenarios.............................................................................................................................................304

    Configuration and Adjustment Guide Contents

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    xii

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    14/474

    3.9.8 Project Preparations.................................................................................................................................................305

    3.9.9 Data Preparation for Network Planning..................................................................................................................306

    3.9.10 BSS Data Preparations...........................................................................................................................................307

    3.9.11 Project Implementation..........................................................................................................................................311

    3.9.12 Final Inspection and Test.......................................................................................................................................311

    3.9.12.1 FinalInspection..................................................................................................................................................311

    3.9.12.2 Call Test..............................................................................................................................................................312

    3.9.12.3 Operation Monitoring.........................................................................................................................................314

    3.9.13 Rollback upon Failures..........................................................................................................................................314

    3.10 Modifying the IP Addresses Related to the BSC.....................................................................................................315

    3.10.1 Overview of Scenarios...........................................................................................................................................315

    3.10.2 ProjectPreparations...............................................................................................................................................316

    3.10.3 BSC Data Preparations..........................................................................................................................................317

    3.10.3.1 Modifying the BSC IP Address..........................................................................................................................317

    3.10.3.2 Modifying the IP Address of the A Interface.....................................................................................................319

    3.10.3.3 Modifying the IP Address of the Abis Interface.................................................................................................322

    3.10.3.4 Modifying the IP Address of the Neighbor BSC A3/A7 Interface.....................................................................325

    3.10.3.5 Modifying the IP Address of the Neighbor AN A13/A16/A17/A18 Interface..................................................328

    3.10.3.6 Modifying the IP Address of the PCF A10/A11/A12 Interface.........................................................................329

    3.10.3.7 Modifying the IP Addresses of Ports..................................................................................................................334

    3.10.4 ProjectImplementation..........................................................................................................................................335

    3.10.5 Final Inspection and Test.......................................................................................................................................336

    3.10.5.1 FinalInspection..................................................................................................................................................3363.10.5.2 Call Test..............................................................................................................................................................337

    3.10.5.3 Operation Monitoring.........................................................................................................................................338

    3.10.6 Rollback upon Failures..........................................................................................................................................339

    3.10.7 Overview of Scenarios...........................................................................................................................................339

    3.10.8 ProjectPreparations...............................................................................................................................................340

    3.10.9 BSS Data Preparations...........................................................................................................................................342

    3.10.10 Project Implementation........................................................................................................................................342

    3.10.11 Final Inspection and Test.....................................................................................................................................343

    3.10.11.1 Final Inspection................................................................................................................................................343

    3.10.11.2 Performance Measurement...............................................................................................................................344

    3.10.11.3 CallTest............................................................................................................................................................345

    3.10.11.4 Operation Monitoring.......................................................................................................................................346

    3.11 Changing a Directional Antenna to an Omnidirectional Antenna............................................................................346

    3.11.1 Overview of Scenarios...........................................................................................................................................347

    3.11.2 ProjectPreparations...............................................................................................................................................347

    3.11.3 ProjectImplementation..........................................................................................................................................348

    3.11.4 Final Inspection and Test.......................................................................................................................................350

    3.11.4.1 FinalInspection..................................................................................................................................................350

    3.11.4.2 Call Test..............................................................................................................................................................350

    Configuration and Adjustment Guide Contents

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    xiii

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    15/474

    3.11.4.3 Operation Monitoring.........................................................................................................................................352

    3.12 Changing an Omnidirectional Antenna to a Directional Antenna............................................................................352

    3.12.1 Overview of Scenarios...........................................................................................................................................352

    3.12.2 Project Preparations...............................................................................................................................................353

    3.12.3 Project Implementation..........................................................................................................................................354

    3.12.4 Final Inspection and Test.......................................................................................................................................355

    3.12.4.1 FinalInspection..................................................................................................................................................355

    3.12.4.2 Call Test..............................................................................................................................................................356

    3.12.4.3 Operation Monitoring.........................................................................................................................................357

    3.13 Adding BTS Standby Interface Boards....................................................................................................................357

    3.13.1 Overview...............................................................................................................................................................358

    3.13.2 ProjectPreparations...............................................................................................................................................358

    3.13.3 BTS Data Preparations..........................................................................................................................................359

    3.13.3.1 CMPT in Active/Standby Mode.........................................................................................................................359

    3.13.3.2 UTRP in Active/Standby Mode..........................................................................................................................360

    3.13.4 ProjectImplementation..........................................................................................................................................361

    3.13.5 Final Inspection and Test.......................................................................................................................................361

    3.13.5.1 FinalInspection..................................................................................................................................................361

    3.13.5.2 Call Test..............................................................................................................................................................363

    3.13.5.3 Operation Monitoring.........................................................................................................................................363

    3.14 Transforming Non-RET Antennas to RET Antennas...............................................................................................363

    3.14.1 Overview of Scenarios...........................................................................................................................................363

    3.14.2 ProjectPreparations...............................................................................................................................................3643.14.3 BTS Data Preparations..........................................................................................................................................366

    3.14.4 ProjectImplementation..........................................................................................................................................369

    3.14.5 Final Inspection and Test.......................................................................................................................................371

    3.14.5.1 FinalInspection..................................................................................................................................................371

    3.14.5.2 Call Test..............................................................................................................................................................372

    3.14.5.3 Operation Monitoring.........................................................................................................................................373

    3.15 Color Code Adjustment............................................................................................................................................373

    3.15.1 Overview of Scenarios...........................................................................................................................................373

    3.15.2 ProjectPreparations...............................................................................................................................................375

    3.15.3 BSC Data Preparations..........................................................................................................................................375

    3.15.3.1 Splitting an AN Subnet.......................................................................................................................................376

    3.15.3.2 Modifying Entire AN..........................................................................................................................................377

    3.15.4 ProjectImplementation..........................................................................................................................................379

    3.15.5 Final Inspection and Test.......................................................................................................................................380

    3.15.5.1 FinalInspection..................................................................................................................................................380

    3.15.5.2 Call Test..............................................................................................................................................................380

    3.15.5.3 Operation Monitoring.........................................................................................................................................381

    3.15.6 Rollback Failures...................................................................................................................................................381

    3.16 Modifying the SID/NID............................................................................................................................................382

    Configuration and Adjustment Guide Contents

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    xiv

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    16/474

    3.16.1 Overview of Scenarios...........................................................................................................................................383

    3.16.2 Project Preparations...............................................................................................................................................384

    3.16.3 BSC Data Preparations..........................................................................................................................................384

    3.16.3.1 Changing the SID/NID of a Cell........................................................................................................................385

    3.16.3.2 Changing the SID/NID of an External Carrier...................................................................................................385

    3.16.4 ProjectImplementation..........................................................................................................................................386

    3.16.5 Final Inspection and Test.......................................................................................................................................386

    3.16.5.1 FinalInspection..................................................................................................................................................386

    3.16.5.2 Call Test..............................................................................................................................................................387

    3.16.5.3 Operation Monitoring.........................................................................................................................................387

    3.16.6 Rollback Failures...................................................................................................................................................387

    3.17 Adjusting the PN......................................................................................................................................................388

    3.17.1 Overview of Scenarios...........................................................................................................................................388

    3.17.2 ProjectPreparations...............................................................................................................................................389

    3.17.3 BSC Data Preparations..........................................................................................................................................390

    3.17.4 ProjectImplementation..........................................................................................................................................391

    3.17.5 Final Inspection and Test.......................................................................................................................................391

    3.17.5.1 FinalInspection..................................................................................................................................................391

    3.17.5.2 Call Test..............................................................................................................................................................391

    3.17.5.3 Operation Monitoring.........................................................................................................................................392

    3.17.6 Rollback Failures...................................................................................................................................................392

    3.18 Changing the LAC....................................................................................................................................................392

    3.18.1 Overview of Scenarios...........................................................................................................................................3933.18.2 ProjectPreparations...............................................................................................................................................394

    3.18.3 BSC Data Preparations..........................................................................................................................................395

    3.18.3.1 Changing the LAC of a Cell...............................................................................................................................395

    3.18.3.2 Changing the LAC of an External Carrier..........................................................................................................396

    3.18.4 ProjectImplementation..........................................................................................................................................396

    3.18.5 Final Inspection and Test.......................................................................................................................................397

    3.18.5.1 FinalInspection..................................................................................................................................................397

    3.18.5.2 Call Test..............................................................................................................................................................397

    3.18.5.3 Performance Measurement.................................................................................................................................398

    3.18.5.4 Operation Monitoring.........................................................................................................................................398

    3.18.6 Rollback Failures...................................................................................................................................................398

    3.19 Changing the Protocol of Signaling Links to SCTP.................................................................................................399

    3.19.1 Scenario Overview................................................................................................................................................399

    3.19.2 ProjectPreparations...............................................................................................................................................401

    3.19.3 BSS Data Preparation............................................................................................................................................402

    3.19.4 ProjectImplementation..........................................................................................................................................406

    3.19.5 Final Inspection and Test.......................................................................................................................................408

    3.19.5.1 FinalInspection..................................................................................................................................................408

    3.19.5.2 Call Test..............................................................................................................................................................409

    Configuration and Adjustment Guide Contents

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    xv

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    17/474

    3.19.5.3 Operation Monitoring.........................................................................................................................................410

    3.19.6 Rollback Upon Service Failures............................................................................................................................410

    3.20 Admission Bandwidth Specification Adjustment.....................................................................................................411

    3.20.1 Overview of Scenarios...........................................................................................................................................411

    3.20.2 Project Preparations...............................................................................................................................................412

    3.20.3 BSS Data Preparations...........................................................................................................................................413

    3.20.4 Project Implementation..........................................................................................................................................413

    3.20.5 Final Inspection and Test.......................................................................................................................................416

    3.20.5.1 Call Test..............................................................................................................................................................416

    3.20.5.2 Operation Monitoring.........................................................................................................................................417

    3.21 Reconstructing a CBTS to an MBTS Supporting CPRI Convergence.....................................................................417

    3.21.1 Scenarios................................................................................................................................................................417

    3.21.2 ProjectPreparations...............................................................................................................................................418

    3.21.3 Data Preparation....................................................................................................................................................420

    3.21.4 ProjectImplementation..........................................................................................................................................421

    3.21.5 Final Inspection.....................................................................................................................................................423

    3.21.6 Rollback Upon Failure...........................................................................................................................................423

    3.22 Relocation of BTSs to Other SPUO Subsystems on the Same BSC........................................................................424

    3.22.1 Application Scenarios............................................................................................................................................424

    3.22.2 Relocation Preparations.........................................................................................................................................425

    3.22.3 BSS Data Preparation............................................................................................................................................426

    3.22.4 Relocation Implementation....................................................................................................................................434

    3.22.5 Final Inspection and Test.......................................................................................................................................4363.22.5.1 FinalInspection..................................................................................................................................................436

    3.22.5.2 Calling Test.........................................................................................................................................................437

    3.22.5.3 Running Monitoring...........................................................................................................................................438

    3.23 Replacing the CMPT with the UMPT(CO)..............................................................................................................438

    3.23.1 Application Scenarios............................................................................................................................................438

    3.23.2 ProjectPreparations...............................................................................................................................................439

    3.23.3 BSS Data Preparation (4E1 CMPT)......................................................................................................................440

    3.23.4 BSS Data Preparation (8E1 CMPT)......................................................................................................................444

    3.23.5 ProjectImplementation..........................................................................................................................................451

    3.23.6 Final Inspection and Test.......................................................................................................................................454

    3.23.6.1 FinalCheck.........................................................................................................................................................454

    3.23.6.2 Call Test..............................................................................................................................................................455

    3.23.6.3 Running Status Monitoring................................................................................................................................457

    3.23.7 Rollback upon Failure...........................................................................................................................................457

    Configuration and Adjustment Guide Contents

    Issue 01 (2013-05-30) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    xvi

  • 8/10/2019 CBSS Configuration and Adjustment Guide(CBSS9.0_01)(PDF)-En

    18/474

    1Introduction to the BSS Configuration andAdjustment

    About This Chapter

    This describes the definition of a BSS configuration and adjustment, relations between some

    correlated scenarios, and methods and tools required for performing the BSS configuration and

    adjustment.

    1.1 Definition of the BSS Configuration and Adjustment

    The BSS network adjustment refers to software or hardware adjustments of the BSS system a