1 CBA Cost-benefit analysis Basin Authority of the Romagna Rivers Aveiro seminar 26-27 October 2011

CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

  • Upload
    buidan

  • View
    223

  • Download
    1

Embed Size (px)

Citation preview

Page 1: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

1

CBA Cost-benefit analysis

Basin Authority of the Romagna Rivers

Aveiro seminar 26-27 October 2011

Page 2: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

The procedure of CBA has been realised by the Basin Authority of the Romagna Rivers for the management of the hydro-geologic risk:

• landslide risk

• flood risk

Page 3: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Stage of CBA

• The Basin Authority is experiencing some cost benefits analysis methodologies for comparison of different policy scenarios about the hydrogeological risk management.

• In 2001 a first attempt to address flood risk issuesrelated to cost-benefit analysis was made on floodrisk.

• At present an experimental CBA on landslide risk isin progress.

Page 4: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

We will show you two different examples of CBA:

- Landslide risk: slow flow earth in “Spinello” – Santa Sofia (FC)

- Looming flood risk over Ravenna city

Page 5: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Territorial localisation of CBA

Lanslide riskLanslide risk Flood riskFlood risk

Page 6: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Experimental CBA of landslide riskWe have studied a slow flow earth that could damage a village and a

sport centre.

We have to decide which kind of mitigation measures (rules, regulations, structural works) to adopt for risk management.

Expertise involved• Geology• Geostatistics• Engineering • Economy

Page 7: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Experimental CBA of landslide risk

Following the Uzielli’s methodology (2011) on risk analysis, we have collected data on the shift of earth surface by permanent scatters (about 20 years) and inclinometers (about five years)

SAR interferometry and permanent scattererstechniqueSynthetic Aperture Radar (SAR) combines signal-processing techniques with satellite orbit information to produce a high-resolution radar image. Both amplitude and phase information are stored from the returning echoes. Interferogram is a phase difference image of two SAR-images acquired at slightly different positions. When the two images are not taken simultaneously the technique is called repeat-pass interferometry. Interferogram can be converted to a digital elevation model (DEM) with meter accuracy.

By TRE

Inclinometer

Page 8: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Blu point = permanent scatters

Red point = inclinometers

Placement of detection points

Page 9: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Landslide evolution

The landslide monitoring indicates that it is going towards the sport centre and the village.

Data indicate a regressive movement of the slow flow earth.

Landslide evolution could affect houses, buildings and economic activity.

How should we behave?

Page 10: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Hazard

We can obtain the spatial probability of the hazard by geostatistic methods.

We have drawn hazardous map elaborating the data of the landslide shift using the geostatistical model “Universal kriging with linear drift”.

Page 11: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Vulnerability

Typology of structures

Typology of foundations Age

Page 12: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

IntensityIntensityResilienceResilience

Page 13: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Recalling the risk formula

R=H*V*E

H = hazard

V = vulnerability

E = elements at risk

We can get the total spatial risk value

Page 14: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Value of elements at riskValue of elements at risk

HazardHazard

euro

VulnerabilityVulnerability

Page 15: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Expected damage

Because of the slow-motion landslide we could foresee heavy damages in 200 years.

So in that period of time, we could expect a cost of the potential damage to the elements at risk of about 12.700.000 Euros.

But to estimating cost-benefit,

we need another parameter.

Page 16: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Time

So, for example, we could apply a law of the forecast of temporal event

H(N)=1-(1-P)N = 1-(1-1/T)N

where

H(N) = hazardous in time

P = probability of the impact

T = return time of maximum deformation

N = number of esteemed years

Assuming N=100 years – e.g.: life prediction of structures of the village

and T=5 years, as observed by data

H(N) =H(N) =~~ 0.630.63

Page 17: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Cost of risk mitigation

A possible hypothesis to defend the elements at risk is to implement structural works.

Here is an example of a preliminary project plan.To build a bulkhead piling foundation we would need:

– About 130 piles – everyone on average deep 15 linear meters– About 130 tieback anchors - everyone on average long 30 linear

meters– About 130 sub-horizontal drainages - everyone on average long

30 linear meters– A concrete beam linking piles

COST ABOUT 1.400.000 euros +COST ABOUT 1.400.000 euros +Maintenance about 50.000 euros on average every ten yearsMaintenance about 50.000 euros on average every ten years

Page 18: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Examples of structures of

some bulkhead wall

[email protected]

bulkhead piling foundation

Page 19: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

CBA:

fundamental economic formula

∑t(Bt-Ct±Et)*(1+r)-t>0

Where

Bt = Benefit as a function of time

Ct = Cost as a function of timeEt = Environmental cost or benefit as a function of time

t = Timer = Rate discount

Avoiding the environmental parameter because too much uncertain and in this case perhaps less significant, we can calculate the

convenience of the risk mitigation.

Page 20: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Cost-benefit analysis

discount rate = 0,05

cost and benefit plan Discounting

Years CostBenefitby H(N)

Cost Bt/(1+r)t

BenefitCt/(1+r)t net benefit

1 € 1.400.000,00 € 0,00 -€ 1.333.333,33 € 0,00 -€ 1.333.333,33

10 € 50.000,00 € 222.394,81 -€ 30.695,66 € 136.531,12 € 105.835,46

20 € 50.000,00 € 412.702,63 -€ 18.844,47 € 155.543,28 € 136.698,81

30 € 50.000,00 € 574.515,79 -€ 11.568,87 € 132.930,00 € 121.361,13

40 € 50.000,00 € 711.057,99 -€ 7.102,28 € 101.002,72 € 93.900,43

50 € 50.000,00 € 825.220,65 -€ 4.360,19 € 71.962,32 € 67.602,13

60 € 50.000,00 € 919.595,92 -€ 2.676,78 € 49.231,05 € 46.554,27

70 € 50.000,00 € 996.506,30 -€ 1.643,31 € 32.751,34 € 31.108,03

80 € 50.000,00 € 1.058.031,49 -€ 1.008,85 € 21.347,88 € 20.339,03

90 € 50.000,00 € 1.106.032,57 -€ 619,35 € 13.700,33 € 13.080,98

100 € 50.000,00 € 1.142.173,87 -€ 380,22 € 8.685,65 € 8.305,43

€ 7.968.232,01 total net benefit -€ 688.547,64

Page 21: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Results

This experimental report was used inside Basin Authority in order to take a decision about the management of Spinello risk zone.

The Spinello CBA suggested not to make structural works.

So we have only worked out rules and regulations for the territory management.

Page 22: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Spinello risk zone

Page 23: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Outcome: a mandatory rule for Provinces and Municipalities

Page 24: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Rule and regulation

Zone 1S Very high hazard

•No new buildings

It is only allowed•Routine and extraordinary maintenance of existing structures •Risk mitigation works

Zone 2S

Medium hazard

What is allowed:

•Routine and extraordinary maintenance of structures

•New buildings on piles. Maximum 20% more than existing volume of buildings, provided that risk mitigation works are implemented.

Zone 3SLow hazardWhat is allowed:•Routine and extraordinary maintenance of structures•New buildings on piles.

Page 25: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

The plan for Spinello’s landslide risk mitigation set rules that are mandatory for the Province of Forlì-Cesena and for the Municipality of Santa Sofia.

This mitigation risk plan is about a non-structural action and in this way we can mitigate the risk of Spinello over the time.

Page 26: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

A real case of CBA for flood risk

Now we will show you a case where CBA was used to address flood risk in Ravenna threatened by Montoneriver.

The main expertise involved was hydraulic engineering and economyFlood could hit this area with a return time of 300÷400 years (T300÷400)

Page 27: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Area potentially affected by the flood

Page 28: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Expected damage = benefit

deterministic analysis

Element at risk Damage

Hard – medium - light

built-up area area concerned Ha 300 medium

strategic buildings area concerned n. 4 medium

settlement of production

area concerned Ha 30 medium

employees n. 200 medium

significant risk sites area concerned Ha 0

Life lines (water pipes, electricity lines, etc.)

users served n. 80000 light

main ways of communication

People/day n. 20000 hard

Goods/day ton 2500 medium

cultural heritage presence yes

Estimated damage Euro 404.902.209,00

Page 29: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

COST

Design of the risk mitigation

Plan of the structural works

- Stretch of the river involved by work: about 4 km

-Screen waterproof

-Shift existing enbankment:

- Demolition and rebuilding

- Acquisition space for the river channel

Total cost = about Total cost = about 12.000.000 euros12.000.000 eurosMaintenance is evaluated Maintenance is evaluated in 100.000 euros/10 yearsin 100.000 euros/10 years

29

Page 30: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Stretch of river involved by the works of flood risk mitigation

Page 31: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

CBA

discount rate = 0,005

cost and benefit plan Discounting

Years Cost Benefit Cost Benefit net benefit

1 € 12.000.000,00 € 0,00 -€ 11.940.298,51 € 0,00 -€ 11.940.298,51

10 € 100.000,00 € 0,00 -€ 95.134,79 € 0,00 -€ 95.134,79

20 € 100.000,00 € 0,00 -€ 90.506,29 € 0,00 -€ 90.506,29

........ ........ ........ ........ ........ ........

........ ........ ........ ........ ........ ........270 € 100.000,00 € 0,00 -€ 26.011,38 € 0,00 -€ 26.011,38

280 € 100.000,00 € 0,00 -€ 24.745,87 € 0,00 -€ 24.745,87

290 € 100.000,00 € 0,00 -€ 23.541,93 € 0,00 -€ 23.541,93

300 € 100.000,00 € 405.000.000,00 -€ 22.396,57 € 90.706.100,39 € 90.683.703,82

total net benefit € 77.248.335,48

Page 32: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

What did the decision makers do with it?

The final report included the cost of the design and the analysis of the potential damage of the flood event.

It was sent to the Government in 2001 and it approved it for financing.Actually, the Government has been financing parts of the project giving the executive offices some money to make the work.

32

Page 33: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Some issuesProbabilistic estimation of risk

The macro-factors of risk are pervaded by significant uncertainty

Hazard

�Uncertainty on calculation models (e.g. magnitude-frequency relation)

�Uncertainty on runout

�Spatio-temporal variability

Vulnerability

�Spatio-temporal variability

�Uncertain indicators

�Uncertainty on calucalation models

Elements at risk

Uncertainty on calucalation models

�Subjectivity

�Spatio-temporal variability

33

All these uncertainties have a All these uncertainties have a significant influence on the CBAsignificant influence on the CBA

Page 34: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

Some issuesChoosing the right discount rateTo evaluate the benefit of the discount rate we can use the following formula: s= p+u*cwheres = the social time preference ratep = pure preference rate (that is the discount rate which is determined because you prefer present to future)c= rate of growth of real per capita consumptionu = measurement of the rate at which extra well being deriving from consumption decreases when consumption grows

34

What is the right choice of the What is the right choice of the parameters?parameters?

The question is much debated The question is much debated among experts.among experts.

Page 35: CBA Cost-benefit analysis Basin Authority of the … 10_CBA Forli.pdf · Cost-benefit analysis Basin Authority of the Romagna Rivers ... Synthetic Aperture Radar ... The final report

ThankThank youyou forfor youryour attentionattention