Ref. No.: GC/SD/BR-728/12 Revision No.0 PROPOSED BUILDING No. 57 PROJECT IN KFUPM Kingdom of Saudi Arabia REPORT FOR RE-SCANNING SURVEY OF TREATED CAVITIES UNDER BUILDING No. 57 (Ref No.: GC/SD/BR-728/12) PREPARED FOR ISAM KABBANI & PARTNERS PREPARED BY GULF CONSULT SURVEY DIVISION JUNE 2012 0 Issued for Approval BRR GH SGM 19-06-2012 Rev. No. Description Prepared by Checked by Approved by Issue Date

Cavity Report Isam Kabbani #57 Re-scan

Embed Size (px)

Citation preview

Page 1: Cavity Report Isam Kabbani #57 Re-scan

Ref. No.: GC/SD/BR-728/12 Revision No.0

PROPOSED BUILDING No. 57 PROJECT IN KFUPM

Kingdom of Saudi Arabia

REPORT

FOR

RE-SCANNING SURVEY OF TREATED CAVITIES UNDER

BUILDING No. 57 (Ref No.: GC/SD/BR-728/12)

PREPARED FOR

ISAM KABBANI & PARTNERS

PREPARED BY

GULF CONSULT SURVEY DIVISION

JUNE 2012

0 Issued for Approval BRR GH SGM 19-06-2012

Rev. No. Description Prepared by Checked by Approved by Issue Date

Page 2: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/4322JO/11761-A2/11

Ref. No.: GC/SD/BR-728/12 Revision No.0

PROPOSED BUILDING No. 57

Project in KFUPM Report for Re-scanning Survey of Treated

Cavities Under Building No. 57 Kingdom of Saudi Arabia

TABLE OF CONTENTS

Page

TRANSMITTAL LETTER ii

I. INTRODUCTION 1

II. PURPOSE 1

III. METHODOLOGY 2

IV. GPR RE SCANNING PROCEDURE 7

V. STUDY AND CONCLUSION 10

VI. REFERENCES 10

VII. GPR PROFILE IMAGES 11

Page i

Page 3: Cavity Report Isam Kabbani #57 Re-scan

علي خضير الحربي/ م :لصاحبه License No. 408 ٤٠٨رخصه رقم

Geotechnical Division: E-Mail: [email protected] Website: www.gulfconsult.com Head Office: P.O. Box 684-Al Khobar 31952 Tel: +966 3 8944468 / 8955036 / 8949872 Fax: +966 3 8949015 Jubail Support Industry: P.O.Box 10113 – Jubail 31961 Tel: +966 3 3410018 Fax: +966 3 3410017

  ستشارات الهندسية إلمكتب الخليج لGULF CONSULT

ISAM KABBANI & PARTNERS FOR CONSTRUCTION & Date: 19th June 2012 MAINTENANCE CO. LTD. Ref. No.: GCL/SD/BR-728/12 P. O. Box 6897, Dammam 31452 Kingdom of Saudi Arabia Tel.: (03) 857 0034 x 3477 & Fax (03) 859 0289 Attention: ENG. MOHAMMED RIYADH Project Manager Subject: REPORT FOR RE-SCANNING SURVEY OF TREATED CAVITIES FOR THE

PROPOSED BUILDING No. 57 PROJECT IN KFUPM, KINGDOM OF SAUDI ARABIA.

Dear Sir:

We are pleased to submit herewith our report on GPR survey of treated cavities for the proposed Building no. 57 project in KFUPM which was re-scanned and executed on 6th of June 2012 in Dhahran, Kingdom of Saudi Arabia.

This report presents the field data survey with the methodology, collection of data, processing and interpretation.

Should there be any questions regarding the contents on this report, please call us at your most convenient time.

Very truly yours, For GULF CONSULT Prepared by: SAID G. MIKHAEL BERN R. RAMOS General Manager Project Manager Survey Division

Page ii

Page 4: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page 1 Revision No.0

I. INTRODUCTION GULF CONSULT was retained by ISAM KABBANI & PARTNERS (IKP) to perform and re-

scan the treated anomalies/weak spots/cavities for the proposed Classroom Building no. 57

project in King Fahd University of Petroleum & Minerals (KFUPM), Kingdom of Saudi Arabia.

It is situated at 6Km North West of City Center of Al-Khobar. Its geographic location is 26° 18'

51.02" North Latitude and 50° 08' 57.51" East Longitude. See Figure 1.

Figure 1: shows the project site.

II. PURPOSE The main objective of the re-scanning survey is to check the subsoil weak spots/fractures/cavities

that were treated to 12 locations of the same depth that were previously been detected and

analyzed. At the end of the survey, GULF CONSULT shall provide IKP the survey report showing

images of these treated cavities in comparison with the previous data submitted.

THIS SITE

Page 5: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page 2 Revision No.0

III. METHODOLOGY The Scope of Work of this study is to re scan the proposed construction of building no. 57 project

in KFUPM, KSA. The scope of work performed by us consisted of the following:

1. Set the limit of underground cavity detection survey.

2. Perform Line Scan on Points #1, #2, #3, #5, #7, #8, #9, #11 & #12 where small size suspected cavities were found.

3. Perform 3d Scan on Points #4, #6 & #10 where high anomalies were marked on these areas.

4. A maximum depth of 15m along parallel lines at 1m equal interval using 100 MHz & 400 MHz antennas Ground Penetrating Radar (GPR) to determine these anomalies are free from unwanted cavities and voids.

5. Field sketching will be prepared in conjunction with underground detection survey as reference for data acquisition and processing.

6. Upon completion of field works, the survey area shall be reinstated to its pre-survey condition and;

7. Prepare engineering report to include the methodology, collection of data, processing, interpretation, and conclusion.

Page 6: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 7

IV. GPR RE-SCANNING PROCEDURE GPR re-scanning was carried out in a cross-section direction for the detected low suspected

cavities. Shown in Figure 2 marked the direction for the low spot anomalies treated prior to re-

scanning.

N

W EEN

NW

SESW

S

Figure 2: Re-scanning Direction of Low Treated Anomalies

Page 7: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 8

Figures 3 & 4 show how the re-scanning direction went through for the marked highly treated

cavities.

N

W EEN

NW

SESW

S

Figure 3: Re-scanning Direction of High Treated Anomalies in X-Direction

Page 8: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 9

N

W EEN

NW

SESW

S

Figure 4: Re-scanning Direction of High Treated Anomalies in Y-Direction

Page 9: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 10

V. STUDY AND CONCLUSION

This study was executed on the request of IKP project team to be able to review the present

condition of the subsoil upon completion of the treatment of the weak spots, fractures & cavities.

GULF CONSULT was retained by IKP to re-scan the foundation area with series of parallel lines at

1m interval in one direction which prior to re-scanning, the foundation area was treated and filled

with grout for stability of the subsoil.

As a result, GULF CONSULT executes the non-destructive Ground Penetrating Radar (GPR)

survey to locate those high greater response and larger pattern and shows images of the treated

weak zones.

Figure 20, 21, 22, … up to figure 42 exhibit the “Before and After treatment of the weak zone” on

page 12 to 23.

Obviously, the rough images before the treatment show greater magnitude compare to the present

subsoil condition after the treatment process where the present image is smooth and dimmer than

previous image. Therefore, we conclude that the weak zone has been properly treated accordingly.

VI. REFERENCES

• Standard Guide for Using Surface Ground Penetrating Radar Method for Subsurface Investigation, ASTM D6432-99 (2005)

• Geophysical Survey Systems, Inc., User’s Manual for SIR system – 3000.

• Geotechnical Investigation for the Proposed Academic Building no. 57 in KFUPM, KSA with reference Job no. GC/4844JO/12281/11 dated 06th December 2011.

• GPR Report for the Proposed Extension of Engineering College Building no. 75 in KFUPM, KSA with reference Job no.: GC/5163JO/12600/12 dated 09th April 2012.

• GPR Report for the Proposed Academic Building no. 57 in KFUPM, KSA with reference Job no. GCL/SD/BR-723/12 dated 21st May 2012.

Page 10: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 11

PROPOSED BUILDING No. 57 Project in KFUPM

Survey Report for Underground Cavity Investigation By Non-Destructive Method

Kingdom of Saudi Arabia

GPR PROFILE IMAGES

Page 11: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 12

Figure 19: presents the GPR profile section of Line 1 (Before Cavity Treatment)

Figure 20: presents the GPR profile section of Line 1 (After Treatment)

1

Page 12: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 13

Figure 21: presents the GPR profile section of Line 2 (Before Cavity Treatment)

Figure 22: presents the GPR profile section of Line 2 (After Treatment)

2

Page 13: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 14

Figure 23: presents the GPR profile section of Line 3 (Before Cavity Treatment)

Figure 24: presents the GPR profile section of Line 3 (After Treatment)

3

Page 14: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 15

Figure 25: presents the GPR profile section of Line 4 (Before Cavity Treatment)

Figure 26: presents the GPR profile section of Line 4 (After Treatment)

4

Page 15: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 16

Figure 27: presents the GPR profile section of Line 5 (Before Cavity Treatment)

Figure 28: presents the GPR profile section of Line 5 (After Treatment)

5

Page 16: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 17

Figure 29: presents the GPR profile section of Line 6 (Before Cavity Treatment)

Figure 30: presents the GPR profile section of Line 6 (After Treatment)

6

Page 17: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 18

Figure 31: presents the GPR profile section of Line 7 (Before Cavity Treatment)

Figure 32: presents the GPR profile section of Line 7 (After Treatment)

7

Page 18: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 19

Figure 33: presents the GPR profile section of Line 8 (Before Cavity Treatment)

Figure 34: presents the GPR profile section of Line 8 (After Treatment)

8

Page 19: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 20

Figure 35: presents the GPR profile section of Line 9 (Before Cavity Treatment)

Figure 36: presents the GPR profile section of Line 9 (After Treatment)

9

Page 20: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 21

Figure 37: presents the GPR profile section of Line 10 (Before Cavity Treatment)

Figure 38: presents the GPR profile section of Line 10 (After Treatment)

10

Page 21: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 22

Figure 39: presents the GPR profile section of Line 11 (Before Cavity Treatment)

Figure 40: presents the GPR profile section of Line 11 (After Treatment)

11

Page 22: Cavity Report Isam Kabbani #57 Re-scan

مكتب الخليج لالستشارات الهندسية GULF CONSULT

Job No. GC/5163JO/12600-A1/12

Ref. No.: GC/SD/BR-728/12 Page Revision No.0 23

Figure 41: presents the GPR profile section of Line 12 (Before Cavity Treatment)

Figure 42: presents the GPR profile section of Line 12 (After Treatment)