This presentation includes certain statements that may be deemed "forward-looking statements.” All statements in this presentation, other than statements of historical facts, that address exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. Although the Company believes the expectations expressed in its forward-looking statements are based on reasonable assumptions, such statements should not be in any way construed as guarantees of the ultimate size, quality or commercial feasibility of the Pebble Project or of the Company's future performance. Assumptions used by the Company to develop forward-looking statements include the following: the Pebble Project will obtain all required environmental and other permits and all land use and other licenses, studies and development of the Pebble Project will continue to be positive, and no geological or technical problems will occur. The likelihood of future mining at the Pebble Project is subject to a large number of risks and will require achievement of a number of technical, economic and legal objectives, including obtaining necessary mining and construction permits, approvals, licenses and title on a timely basis, delays due to third party opposition, changes in government policies regarding mining and natural resource exploration and exploitation, the final outcome of any litigation, completion of pre-feasibility and final feasibility studies, preparation of all necessary engineering for surface or underground mining and processing facilities as well as receipt of significant additional financing to fund these objectives as well as funding mine construction. Such funding may not be available to the Company on acceptable terms or on any terms at all. There is no known ore at the Pebble Project and there is no assurance that the mineralization at the Pebble Project will ever be classified as ore. The need for compliance with extensive environmental and socio- economic rules and practices and the requirement for the Company to obtain government permitting can cause a delay or even abandonment of a mineral project. The Company is also subject to the specific risks inherent in the mining business as well as general economic and business conditions. For more information on the Company, Investors should review the Company's filings with the United States Securities and Exchange Commission and its home jurisdiction filings that are available at www.sedar.com. CAUTIONARY AND FORWARD LOOKING STATEMENTS

CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

T h i s p r e s e n t a t i o n i n c l u d e s c e r t a i n s t a t e m e n t s t h a t m a y b e d e e m e d " f o r w a r d - l o o k i n g s t a t e m e n t s . ” A l l s t a t e m e n t s i n t h i s p r e s e n t a t i o n , o t h e r t h a n s t a t e m e n t s o f h i s t o r i c a l f a c t s , t h a t a d d r e s s e x p l o r a t i o n

d r i l l i n g , e x p l o i t a t i o n a c t i v i t i e s a n d e v e n t s o r d e v e l o p m e n t s t h a t t h e C o m p a n y e x p e c t s a r e f o r w a r d - l o o k i n g s t a t e m e n t s .

A l t h o u g h t h e C o m p a n y b e l i e v e s t h e e x p e c t a t i o n s e x p r e s s e d i n i t s f o r w a r d - l o o k i n g s t a t e m e n t s a r e b a s e d o n r e a s o n a b l e a s s u m p t i o n s , s u c h s t a t e m e n t s s h o u l d n o t b e i n a n y w a y c o n s t r u e d a s g u a r a n t e e s o f t h e

u l t i m a t e s i ze , q u a l i t y o r c o m m e r c i a l f e a s i b i l i t y o f t h e P e b b l e P r o j e c t o r o f t h e C o m p a n y ' s f u t u r e p e r f o r m a n c e . A s s u m p t i o n s u s e d b y t h e C o m p a n y t o d e v e l o p f o r w a r d - l o o k i n g s t a t e m e n t s i n c l u d e t h e

f o l l o w i n g : t h e P e b b l e P r o j e c t w i l l o b t a i n a l l r e q u i r e d e n v i r o n m e n t a l a n d o t h e r p e r m i t s a n d a l l l a n d u s e a n d o t h e r l i c e n s e s , s t u d i e s a n d d e v e l o p m e n t o f t h e P e b b l e P r o j e c t w i l l c o n t i n u e t o b e p o s i t i v e , a n d n o

g e o l o g i c a l o r t e c h n i c a l p r o b l e m s w i l l o c c u r .

T h e l i k e l i h o o d o f f u t u r e m i n i n g a t t h e P e b b l e P r o j e c t i s s u b j e c t t o a l a r g e n u m b e r o f r i s k s a n d w i l l r e q u i r e a c h i e v e m e n t o f a n u m b e r o f t e c h n i c a l , e c o n o m i c a n d l e g a l o b j e c t i v e s , i n c l u d i n g o b t a i n i n g n e c e s s a r y

m i n i n g a n d c o n s t r u c t i o n p e r m i t s , a p p r o v a l s , l i c e n s e s a n d t i t l e o n a t i m e l y b a s i s , d e l a y s d u e t o t h i r d p a r t y o p p o s i t i o n , c h a n g e s i n g o v e r n m e n t p o l i c i e s r e g a r d i n g m i n i n g a n d n a t u r a l r e s o u r c e e x p l o r a t i o n a n d

e x p l o i t a t i o n , t h e f i n a l o u t c o m e o f a n y l i t i g a t i o n , c o m p l e t i o n o f p r e - f e a s i b i l i t y a n d f i n a l f e a s i b i l i t y s t u d i e s , p r e p a r a t i o n o f a l l n e c e s s a r y e n g i n e e r i n g f o r s u r f a c e o r u n d e r g r o u n d m i n i n g a n d p r o c e s s i n g f a c i l i t i e s a s

w e l l a s r e c e i p t o f s i g n i f i c a n t a d d i t i o n a l f i n a n c i n g t o f u n d t h e s e o b j e c t i v e s a s w e l l a s f u n d i n g m i n e c o n s t r u c t i o n .

S u c h f u n d i n g m a y n o t b e a v a i l a b l e t o t h e C o m p a n y o n a c c e p t a b l e t e r m s o r o n a n y t e r m s a t a l l . T h e r e i s n o k n o w n o r e a t t h e P e b b l e P r o j e c t a n d t h e r e i s n o a s s u r a n c e t h a t t h e m i n e r a l i za t i o n a t t h e P e b b l e

P r o j e c t w i l l e v e r b e c l a s s i f i e d a s o r e . T h e n e e d f o r c o m p l i a n c e w i t h e x t e n s i v e e n v i r o n m e n t a l a n d s o c i o -e c o n o m i c r u l e s a n d p r a c t i c e s a n d t h e r e q u i r e m e n t f o r t h e C o m p a n y t o o b t a i n g o v e r n m e n t p e r m i t t i n g c a n

c a u s e a d e l a y o r e v e n a b a n d o n m e n t o f a m i n e r a l p r o j e c t .

T h e C o m p a n y i s a l s o s u b j e c t t o t h e s p e c i f i c r i s k s i n h e r e n t i n t h e m i n i n g b u s i n e s s a s w e l l a s g e n e r a l e c o n o m i c a n d b u s i n e s s c o n d i t i o n s . F o r m o r e i n f o r m a t i o n o n t h e C o m p a n y , I n v e s t o r s s h o u l d r e v i e w t h e

C o m p a n y ' s f i l i n g s w i t h t h e U n i t e d S t a t e s S e c u r i t i e s a n d E x c h a n g e C o m m i s s i o n a n d i t s h o m e j u r i s d i c t i o n f i l i n g s t h a t a r e a v a i l a b l e a t w w w . s e d a r . c o m .

C A U T I O N A R Y A N D F O R W A R D L O O K I N G S T A T E M E N T S

Page 2: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

A CLEAR PATH FORWARD

Page 3: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

PEBBLE FACTS1

Page 4: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Pebble is a copper mine.

Page 5: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

The Pebble Deposit is on landowned by the state of Alaska.

Page 6: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

THIS IS THE PEBBLE DEPOSIT

Page 7: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

S O U R C E : N G E O G R A P H I C

7

FROM OPPOSITION PR

Page 8: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

S O U R C E : R O B T K E T C H U M

8

Page 9: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

S O U R C E : R O B T K E T C H U M

9

Page 10: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

… w h i c h a r e n o w h e r e n e a r

t h e a c t u a l l o c a t i o n .

10

Page 11: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

C H I K A M I N U K L A K E

1 2 0 M I L E S F R O M P E B B L E

S O U R C E : N A T I O N A L G E O G R A P H I C

11

Page 12: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

W O O D T I K C H I K S T A T E P A R K

1 3 4 M I L E S F R O M P E B B L E

S O U R C E : R O B E R T K E T C H U M

12

Page 13: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

8 5 M I L E S F R O M P E B B L E

S O U R C E : R O B E R T K E T C H U M

T W I N L A K E S

13

Page 14: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

THIS IS OUR PLAN

Responsive with a smaller footprint20-year operationCompact footprint – out of Upper Talarik/KvichakNo cyanideNo waste rock pilesEnhanced environmental safeguards

Page 15: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Pebble 2019EPA 6.5

Footprint

Separate Tailings

Lined Pyritic TSF(temporary)

No Waste Rock Dumps

No Major UTC Facilities

NO CYANIDE

Page 16: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Pebble 2019

Footprint

Separate Tailings

Lined Pyritic TSF(temporary)

No Waste Rock Dumps

No Major UTC Facilities

NO CYANIDE

Page 17: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

THE DRAFT EIS2

Page 18: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Part of NEPA, the Draft EIS was produced by the U.S. Army Corps of Engineers.

Page 19: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

T h e “ D r a f t E n v i r o n m e n t a l I m p a c t

S t a t e m e n t ” p r o v i d e s a n e x p e r t ,

i n d e p e n d e n t , o b j e c t i v e r e v i e w a n d

s c i e n t i f i c e v a l u a t i o n o f P e b b l e .

Page 20: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

“NEPA protects our health, our homes, and our environment… NEPA is

democratic to the core.”

Page 21: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Nondalton Tribal Council

Whose EIS?

Page 22: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Government to Government

• Newhalen Tribal Council• Aleknagik Traditional Council• Chignik Bay Tribal Council• Chignik Lagoon Village Council• Chignik Lake Traditional Council• Clarks Point Village Council• Cook Inlet Tribal Council• Curyung Tribal Council• Egegik Village Council• Ekuk Village Council• Ekwok Village Council• Igiugig Village Council• Iliamna Village Council• Ivanof Bay Tribal Council• King Salmon Tribal Council• Levelock Village Council• Manokotak Village Council

• Kokhanok Village Council• Naknek Village Council• Nanwalek IRA Council• Native Tribe of Kanatak• New Koliganek Village Council• New Stuyahok Traditional Council• Ninilchik Traditional Council• Nondalton Tribal Council• Pedro Bay Village Council• Pilot Point Tribal Council• Port Graham Tribal Council• Port Heiden Village Council• Portage Creek Village Council• Seldovia Village Council• Traditional Council of Togiak• Twin Hills Village Council• Ugashik Traditional Council• United Tribes of Bristol Bay

35 Bristol Bay & Cook Inlet Tribal Governments

Page 23: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

EIS Schedule

Application

Scoping Period

Draft EIS

PUBLIC REVIEW

Final EIS

Record of Decision (ROD)

Dec. 2017

April – June 2018

February 2019

March 1 – July 1 2019

Est. Early 2020

Est. Mid 2020

Page 24: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Examples of large mining and other development projects that received major federal permits within about three years: Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill gold mine on State of Alaska-owned land in the Goodpaster River Valley. EPA, in close consultation with the USACE, published a Draft EIS in March 2003, then a Final EIS in Sept. 2003 – three years and a month after the application. Kensington Mine: In 2001, Coeur Mining redefined the scope for its development of an underground gold mine within the Tongass National Forest outside of Juneau. This necessitated a new NEPA review, which was completed three years later in December 2004.Red Dog Mine: EPA prepared the EIS for the expansion of the Red Dog Mine into the Aqqaluk deposit in northwest Alaska. The permitting process started in mid-2007 and the EIS was finished during Fall 2009, taking just over two years. USACE was a cooperating agency.Point Thomson: The USACE was the lead agency for the EIS for the development of ExxonMobil’s Point Thomson oil facility on the North Slope of Alaska. The EIS process began in late 2009 and the Final EIS was issued mid-2012, taking approximately two and a half years.ConocoPhillips GMT-1 Project: In 2013, ConocoPhillips moved forward with permitting of its proposed Greater Moose’s Tooth-1 oil and gas project in the National Petroleum Reserve-Alaska. BLM was the lead agency, and the USACE was a cooperating agency. The EIS process began in August 2013 and concluded by November 2014, taking just over a year.ConocoPhillips GMT-2 Project: ConocoPhillips began permitting the Greater Mooses-2 project in 2016. Like GMT-1, the GMT-2 project is located in the National Petroleum Reserve-Alaska, and the EIS was overseen by BLM with the USACE as a cooperating agency. The EIS process began during July 2016 and concluded just over two years later in September 2018.Hilcorp Liberty Project: Hilcorp is the operator of the Liberty oil and gas leases in the federal OCS off the North Slope of Alaska. The leases are overseen by BOEM. Hilcorp began permitting the Liberty project in 2015. BOEM started the EIS process in September 2015 and completed it three years later in August 2018.

Page 25: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Project Name Lead Agency DEIS Comment Period

Extension of Comment

Period

Length of DEIS (Excluding

Appendices)

Notes

ANWR Coastal Plain Oil and Gas Leasing

BLM 12/2018 45 days Yes30 days

392 pages NOA: 83 Fed. Reg. 67337 (Dec. 28, 2018)Extension: News Release Extension of Comment

Period (extended to March 13, 2018)

Tongass Timber Sale on POW Island

Forest Service 4/2018 45 days No 408 pages NOA: 83 Fed. Reg. 19758 (May 4, 2018)

ConocoPhillips GMT 2 BLM 3/2018 45 days Yes10 days

631 pages(SEIS)

NOA: 83 Fed. Reg. 13508 (March 29, 2018)Extension: News Release of Extension of Comment

Period (extended to May 17, 2018)

Oil Search Nanushuk Project Corps 9/2017 45 days Yes30 days

1,191 pages NOA: 82 Fed. Reg. 41621 (Sept. 1, 2017)Extension: Public Notice of Application for Permit

(extended to Nov. 14, 2017)

Hilcorp Liberty Project BOEM 7/2017 90 days Yes22 days

784 pages NOA: 82 Fed. Reg. 39453 (Aug. 18, 2017). Extension: News Release of Extension Comment

Period (extended to Dec. 8, 2017)

Alaska Stand Alone Pipeline Project

Corps 6/2017 45 days Yes15 days

1,822 pages(SEIS)

NOA: 82 Fed. Reg. 29859 (June 30, 2017)Extension: 82 Fed. Reg. 39424 (extended to Aug. 29,

2017)

Donlin Gold Corps & BLM 11/2015 155 days Yes31 days

3,144 pages NOA: 80 Fed. Reg. 74104 (Nov. 27, 2015) Extension: 81 Fed. Reg. 27442 (extended to May 31,

2016)

Chukchi Sea OCS Oil and Gas Lease Sale 193

BOEM 11/2014 45 days No 694 pages(2nd SEIS)

NOA: 79 Fed. Reg. 66401 (Nov. 7, 2014)

Bristol Bay Watershed Assessment

EPA 4/2013 32 days Yes6 days

618 pages(Revised version)

NOA: 78 Fed. Reg. 25266 (April 30, 2013)Extension: 78 Fed. Reg. 34093 (extended to June 6,

2013)

ConocoPhillips GMT1 BLM 2/2014 60 days No 480 pages NOA: 79 Fed. Reg. 9920 (Feb. 21, 2014) Exxon Mobile Corporation -

Point Thomson Corps 11/2011 45 days Yes

15 days1,506 pages NOA: 76 Fed. Reg. 70979 (Nov. 16, 2011)

Extension: Noted in 77 Fed. Reg. 44222

Point Mackenzie Railroad Expansion

Surface Transportation

Board

3/2010 56 days No 603 pages NOA: 75 Fed. Reg. 12594 (March 16, 2010)

Red Dog Aqqaluk Expansion EPA 12/2008 60 days No 464 pages NOA: 73 Fed. Reg. 74170 (Dec. 5, 2008)

Page 26: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

PROTECTING WATER3

Page 27: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Released water will not just betreated. It will be strategically adjusted

to optimal conditions for fish life.

Page 28: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill
Page 29: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

A sophisticated management plan will discharge water into all three nearby

streams to benefit fish habitat.(2.31)

According to the Draft EIS

Page 30: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

There will be no downstream impacts from the pit in post closure.

(ES 41)

According to the Draft EIS

Page 31: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

TAILINGS SAFETY4

Page 32: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

The Tailings Storage Facility has been designed for maximum safety.

Page 33: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

F e a t u r e s i n c l u d e a f l o w - t h r o u g h d e s i g n

t o p r e v e n t w a t e r b u i l d u p , a g r a d u a t e d

s l o p e a n d l o n g b e a c h a r e a , p l u s a n e w

b u t t r e s s f o r i m p r o v e d s a f e t y .

Page 34: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill
Page 35: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

D e s i g n , c o n s t r u c t i o n , o p e r a t i o n s a n d

c l o s u r e w i l l b e o v e r s e e n a n d c e r t i f i e d

b y

t h e A l a s k a D a m S a f e t y P r o g r a m .

Page 36: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Pyritic tailings storagewill be fully lined.

Page 37: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill
Page 38: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

The pyritic TSF will be completelyeliminated at closure.

Page 39: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill
Page 40: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Catastrophic failure isextremely unlikely.

(4.27.6)

According to the Draft EIS

Page 41: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

There are no population level impactsfor fish from the tailings release

scenarios evaluated.(ES 71)

According to the Draft EIS

Page 42: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

SUPPORTING SALMON5

Page 43: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

W e ’ v e a l w a y s s a i d t h a t w e w o n ’ t

c o m p r o m i s e w h e n i t c o m e s t o

s u p p o r t i n g a n d p r o t e c t i n g s a l m o n .

Page 44: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

We’ve done more than a decade of intensive environmental studies & invested more than $150 million.

Page 45: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Mine area escapement is low.

Page 46: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

SOCKEYE ESCAPEMENT

UTC DrainageSFK DrainageNFK DrainageTOTAL

0.39%0.06%0.02%0.08%

Page 47: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Alaska’s mining operations have a solid environmental track record

Page 48: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

C H I K A M I N U K L A K E

S O U R C E : A L A S K A S T O C K

FORT KNOX

Page 49: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

C H I K A M I N U K L A K E

S O U R C E : A L A S K A S T O C K

GREENS CREEK

Page 50: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

C H I K A M I N U K L A K E

S O U R C E : W I K I M E D I A

KENSINGTON

Page 51: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

C H I K A M I N U K L A K E

S O U R C E : W I K I M E D I A

POGO MINE

Page 52: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

C H I K A M I N U K L A K E

S O U R C E : A L A S K A S T O C K

RED DOG

Page 53: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

The DEIS shows Pebble will not harm the Bristol Bay fishery.

Page 54: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Project will not reduce returning adult salmon to the Nushagak or

Kvichak River systems.(ES 54)

According to the Draft EIS

Page 55: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Impacts to fish and wildlife would not be expected to impact harvest levels

because there would be no decrease in resource and abundance.

(ES 31)

According to the Draft EIS

Page 56: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

There will be no long term changeto the health of the Bristol Bay

and Cook Inlet fisheries.(ES 54)

According to the Draft EIS

Page 57: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Other salmon fisheries in Alaska co-exist with other

extraction industries.(ES 53)

According to the Draft EIS

Page 58: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

WHO BENEFITS6

Page 59: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

The benefits to the local people,and their economy and culture,

are substantial.

Page 60: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

POTENTIAL REVENUE TO THELAKE & PENINSULA BOROUGH

$19M - $21M ANNUAL $377M - $420M OVER 20 YRS

L P B F Y 1 6 O p e r a t i n g B u d g e t = $ 6 . 4 M

Page 61: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Pebble is an asset and offerseconomic opportunity statewide.

Page 62: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

$49M - $66M ANNUAL

$970M - $1.32B OVER 20 YRS

I n c l u d e s e s t i m a t e s o f m i n e r a l l i c e n s i n gt a x , c o r p o r a t e t a x , a n d s t a t e r o y a l t i e s .

POTENTIAL STATE REVENUE

Page 63: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Pebble means jobs.

Page 64: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

~ 2 0 0 0 J O B S

A V E R A G E M I N I N G W A G E = $ 1 0 0 K +

JOBS FORALASKANS

Page 65: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Project benefits will be mostapparent in small, rural communities

closest to the mine site.(4.10-8)

According to the Draft EIS

Page 66: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Population level effects to fish and wildlife (for subsistence) would not be expected.

(4.9-4)

According to the Draft EIS

Page 67: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

The overall economic and health benefits will be substantial.

(4.10-8)

According to the Draft EIS

Page 68: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

A CLEAR PATH7

Page 69: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Alaska’s resource projectsalready co-exist with fishing.

(ES 53)

According to the Draft EIS

Page 70: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Pebble’s approach willuse industry best practices.

(ES 5)

According to the Draft EIS

Page 71: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

Project benefits include increased revenue, employment, and education.

(4.10-8)

According to the Draft EIS

Page 72: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

There will be no downstreamimpacts from the pit in post closure.

(ES 53)

According to the Draft EIS

Page 73: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

There will be no long-term changeto the health of the Bristol Bay

and Cook Inlet fisheries.(ES 53)

According to the Draft EIS

Page 74: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

A l a s k a k n o w s h o w t o d e v e l o p

r e s o u r c e s r e s p o n s i b l y .

Page 75: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill
Page 76: CAUTIONARY AND FORWARD LOOKING … › site › assets › files › ...Pogo Mine: In August 2000, Teck-Pogo Inc. applied for a Section 404 permit for a proposed underground cut-and-fill

The right mine. The right time.