VARADERO TOWHEAD MANIFOLD 6 X PRODUCTION WELLS 3 X WATER INJECTION
VARADERO DRILLING TEMPLATE 13 X PRODUCTION WELLS1 X WATER INJECTION WELLS
VARADERO DRILLING TEMPLATE 21 X PRODUCTION WELL2 X WATER INJECTION WELL
BURGMAN DRILLING TEMPLATE 22 X PRODUCTION WELLS2 X WATER INJECTION WELLS
BURGMAN DRILLING TEMPLATE 13 X PRODUCTION WELLS1 X WATER INJECTION WELL
BURGMAN TOWHEAD MANIFOLD6 X PRODUCTION SLOTS3 X WATER INJECTION SLOTS
BURGMAN BUNDLE 3.37km BURGMAN RISER BASE TOWHEAD
CATCHER RISER BASE TOWHEAD
CATCHER BUNDLE 3.21km
CATCHER TOWHEAD MANIFOLD6 X PRODUCTION SLOTS3 X WATER INJECTION SLOTS
VARADERO BUNDLE 3.64km
CATCHER DRILLING TEMPLATE 23 X PRODUCTION WELLS
CATCHER DRILLING TEMPLATE 12 X PRODUCTION WELLS2 X WATER INJECTION WELLS
CATCHER GAS EXPORT PLEM
CURLEWDEEP GAS DIVERTER
LANGELED 44”
GAS PIPELINE
CATS EVEREST TO
TEESIDE 36” GAS PIPELINE
FULMAR TO ST.FERGUS
20” GAS PIPELINEGANNET TO FULMAR
16” OIL PIPELINE
TYPICAL ROCKDUMP PROTECTION
10” GAS EXPORT / IMPORTTO ST. FERGUS VIA FULMARGAS LINE62.11KM APPROX LENGTH( TRENCHED AND BACKFILLED )
CATCHER FPSO (BW OFFSHORE)
ROCKDUMPS
VARDERO RISER BASE TOWHEAD
Catcher Area Development
Key Gas ExportGas LiftProductionWater InjectionE.H.C. Umbilical
TYPICALMIDWATER ARCH