CATAWBA COUNTY INSPECTION CHECKLIST REPORT BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER Building (C) BLDC PERMITTYPE PREFIX Air Barrier Behind Tub Other Inspector Comments Red Card Items Air Barriers Other Inspector Comments Red Card Items Brick Lintels make sure any lintel over 10 feet you have eng. D Other Inspector Comments Red Card Items Building Final 911 numbers flashing and counter-flashing installed handrails/guardrails installed Other Inspector Comments proper attic ventilation installed Red Card Items storm water diverted from structure Concrete Slab All vegetation and debris removed Note all thicken slab locations Note termite company Other Inspector Comments Red Card Items Reinforcing mesh installed Vapor retarder installed Concrete Wall installed per engineered design Other Inspector Comments Red Card Items size rebar and spacing Demolition Inspection Other Inspector Comments Drain/Damp Proofing installed approved alternate design installed per code minimum 2" stone below drain / 6" on top note location of termination point of pipe Other Inspector Comments Red Card Items waterproofing installed Electrical Rough electrical room secured per policy firestopping completed maximum box fill NM cable minimum 1-1/4" from edge of framing note any areas not looked at such as basement etc Other Inspector Comments receptacle spacing Red Card Items Fire Damper installed per manufacturers instructions match up UL designs with plans Other Inspector Comments Red Card Items Fire Wall Separation all designs must match with plans that were appro Other Inspector Comments Red Card Items Fixturing and Furniture Other Inspector Comments Red Card Items Floor System Only check for center third bearing for girders correct lumber sizes for spans joist blocked at ends Other Inspector Comments Red Card Items truss sheets on site Footing installed per manufacturers instructions Other Inspector Comments Property line strung Red Card Items Registered survey Set backs marked Verify location of pier footings with approved pl Verify with approved plans Footing, Light Pole Base Other Inspector Comments Red Card Items Found., Floor Sysm & Damp anchor bolts installed per code or approved desig check anchor bolts to insure wrench tight check any fireplace footings for proper projectio check for center third bearing for girders correct lumber sizes for spans engineered plans for retaining walls greater than foundation vents installed get elevation certificate if required installed approved alternate design installed per approved design installed per code joist blocked at ends minimum 2" stone below drain / 6" on top minimum access of 18" x 24" note location of termination point of pipe Other Inspector Comments Red Card Items sealed crawlspace truss sheets on site waterproofing installed rinspectionchecklists1 11/10/2016 11:06 Page 1 of 35

CATAWBA COUNTY INSPECTION CHECKLIST REPORT BY …catawbacountync.gov/building/_pdfs/inspectionchecklists201611.pdf · CATAWBA COUNTY INSPECTION CHECKLIST REPORT BY PERMIT TYPE

  • Upload
    buinhan

  • View
    230

  • Download
    1

Embed Size (px)

Citation preview

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Building (C)BLDC

PERMITTYPEPREFIX

Air Barrier Behind TubOther Inspector CommentsRed Card Items

Air BarriersOther Inspector CommentsRed Card Items

Brick Lintelsmake sure any lintel over 10 feet you have eng. DOther Inspector CommentsRed Card Items

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Concrete SlabAll vegetation and debris removedNote all thicken slab locationsNote termite companyOther Inspector CommentsRed Card ItemsReinforcing mesh installedVapor retarder installed

Concrete Wallinstalled per engineered designOther Inspector CommentsRed Card Itemssize rebar and spacing

Demolition InspectionOther Inspector Comments

Drain/Damp Proofinginstalled approved alternate designinstalled per codeminimum 2" stone below drain / 6" on topnote location of termination point of pipeOther Inspector CommentsRed Card Itemswaterproofing installed

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Fire Damperinstalled per manufacturers instructionsmatch up UL designs with plansOther Inspector CommentsRed Card Items

Fire Wall Separationall designs must match with plans that were approOther Inspector CommentsRed Card Items

Fixturing and FurnitureOther Inspector CommentsRed Card Items

Floor System Onlycheck for center third bearing for girderscorrect lumber sizes for spansjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Found., Floor Sysm & Dampanchor bolts installed per code or approved desigcheck anchor bolts to insure wrench tightcheck any fireplace footings for proper projectiocheck for center third bearing for girderscorrect lumber sizes for spansengineered plans for retaining walls greater thanfoundation vents installedget elevation certificate if requiredinstalled approved alternate designinstalled per approved designinstalled per codejoist blocked at endsminimum 2" stone below drain / 6" on topminimum access of 18" x 24"note location of termination point of pipeOther Inspector CommentsRed Card Itemssealed crawlspacetruss sheets on sitewaterproofing installed

rinspectionchecklists1 11/10/2016 11:06 Page 1 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Building (C)BLDC

PERMITTYPEPREFIX

Foundationanchor bolts installed per code or approved desigcheck any fireplace footings for proper projectioengineered plans for retaining walls greater thanfoundation vents installedinstalled per approved designminimum access of 18" x 24"Other Inspector CommentsRed Card Itemssealed crawlspace

Foundation & Drain Proofanchor bolts installed per code or approved desigcheck anchor bolts to insure wrench tightcheck any fireplace footings for proper projectiocheck for proper projection of footingsfoundation vents installedget elevation certificate if requiredOther Inspector CommentsRed Card ItemsVerify location of pier footings with approved pl

Foundation & Floor Systemcheck anchor bolts to insure wrench tightcheck for center third bearing for girderscorrect lumber sizes for spansget elevation certificate if requiredjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site

Framing Above Ceilingdraftstopping installedOther Inspector CommentsRed Card Itemstruss sheets on site

GPS Data CaptureDrawn in and sent to supervisorIf not captured for any reason note why and reschOther Inspector CommentsSend to GIS

Insulationminimum r-values installednote areas looked at so areas don't get missed atOther Inspector CommentsRed Card ItemsRes-check required

Marriage WallOther Inspector CommentsRed Card Itemsspacing and size of bolts used per mfg. setup man

Masonry Fireplace

check for proper projection of footingsminimum 1" clearance from combustibles at chimneyminimum 2" clearance from combustiblesOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Monolithic Concrete Pourminimum 6" above grade for wood sidingminimum width 12" for 3,000 psi soilnote all thicken areasOther Inspector Commentsrebar installed per engineered plansNote termite company

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Progress Check of Const.Other Inspector Commentsscheduled follow up inspection if needed

Roof Leaders/Drain TestOther Inspector Commentsverify size with approved engineered plans

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

rinspectionchecklists1 11/10/2016 11:06 Page 2 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Building (C)BLDC

PERMITTYPEPREFIX

Safety BuildingOther Inspector CommentsRed Card Items

Safety ElectricalOther Inspector CommentsRed Card Items

Safety MechanicalOther Inspector CommentsRed Card Items

Safety PlumbingOther Inspector CommentsRed Card Items

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Stocking and MerchandiseOther Inspector CommentsRed Card Items

Temp CO (Expired)Other Inspector CommentsRed Card Items

Temp Electrical RenewalOther Inspector CommentsRed Card Items

Temp Gas ConnectionOther Inspector CommentsRed Card Items

Temp Heat Agreement ExpiredOther Inspector Comments

Temp Heat on BuildingOther Inspector CommentsRed Card Items

Temp Power Add. Cir/PanelRed Card ItemsOther Inspector Comments

Temp Power Agreement ExpiredOther Inspector Comments

Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items

Temp Saw Pole Connectioncheck for in use coversOther Inspector CommentsRed Card Items

Temporary Mech. RenewalOther Inspector CommentsRed Card Items

Vertical Steel in FootingMinimum clearance from earth 3"

Other Inspector CommentsSize rebar and spacing per approved plans

Wall Reinforcementinstalled per engineered designminimum 3" from earth if poured in place concreteOther Inspector Commentssize rebar and spacing

Building (R)BLDR

PERMITTYPEPREFIX

Air Barrier Behind TubOther Inspector CommentsRed Card Items

Air BarriersOther Inspector CommentsRed Card Items

Brick Lintelsmake sure any lintel over 10 feet you have eng. DOther Inspector CommentsRed Card Items

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

ChimneyOther Inspector CommentsRed Card Items

Concrete SlabAll vegetation and debris removedNote all thicken slab locationsNote termite companyOther Inspector CommentsRed Card ItemsReinforcing mesh installedVapor retarder installed

Concrete Wallinstalled per engineered designOther Inspector CommentsRed Card Itemssize rebar and spacing

Demolition InspectionOther Inspector Comments

rinspectionchecklists1 11/10/2016 11:06 Page 3 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Building (R)BLDR

PERMITTYPEPREFIX

Drain/Damp Proofinginstalled approved alternate designinstalled per codeminimum 2" stone below drain / 6" on topnote location of termination point of pipeOther Inspector CommentsRed Card Itemswaterproofing installed

Elevation Certificate InspectionOther Inspector Comments

Fire Wall Separationall designs must match with plans that were approOther Inspector CommentsRed Card Items

Floor System Onlycheck for center third bearing for girderscorrect lumber sizes for spansjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Found., Floor Sysm & Dampanchor bolts installed per code or approved desigcheck anchor bolts to insure wrench tightcheck any fireplace footings for proper projectiocheck for center third bearing for girderscorrect lumber sizes for spansengineered plans for retaining walls greater thanfoundation vents installedget elevation certificate if requiredinstalled approved alternate designinstalled per approved designinstalled per codejoist blocked at endsminimum 2" stone below drain / 6" on topminimum access of 18" x 24"note location of termination point of pipeOther Inspector CommentsRed Card Itemssealed crawlspacetruss sheets on site

waterproofing installedFoundation

anchor bolts installed per code or approved desigcheck any fireplace footings for proper projectioengineered plans for retaining walls greater thanfoundation vents installedinstalled per approved designminimum access of 18" x 24"Other Inspector CommentsRed Card Itemssealed crawlspace

Foundation & Drain Proofanchor bolts installed per code or approved desigcheck anchor bolts to insure wrench tightcheck any fireplace footings for proper projectiocheck for proper projection of footingsfoundation vents installedget elevation certificate if requiredOther Inspector CommentsRed Card ItemsVerify location of pier footings with approved pl

Foundation & Floor Systemcheck anchor bolts to insure wrench tightcheck for center third bearing for girderscorrect lumber sizes for spansget elevation certificate if requiredjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site

Framing Above Ceilingdraftstopping installedOther Inspector CommentsRed Card Itemstruss sheets on site

GPS Data CaptureDrawn in and sent to supervisorIf not captured for any reason note why and reschOther Inspector CommentsSend to GIS

Insulationminimum r-values installednote areas looked at so areas don't get missed atOther Inspector CommentsRed Card ItemsRes-check required

Masonry Fireplacecheck for proper projection of footingsminimum 1" clearance from combustibles at chimneyminimum 2" clearance from combustiblesOther Inspector CommentsRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 4 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Building (R)BLDR

PERMITTYPEPREFIX

Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Modular Marriage WallOther Inspector CommentsRed Card Items

Monolithic Concrete Pourminimum 6" above grade for wood sidingminimum width 12" for 3,000 psi soilnote all thicken areasOther Inspector Commentsrebar installed per engineered plansNote termite company

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Perm. Power Main Servicemake note of any section not allowed to be turnedOther Inspector Commentspermanent plaques required for more than one servRed Card Items

Power Conn./Temp PoleOther Inspector CommentsRed Card Items

Prefab Fireplaceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Quality Control BuildingOther Inspector Comments

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

Site Code InspectionOther Inspector Comments

Stucco Material Installationmfg installation instructions must be on sitenon drainable systems not allowedOther Inspector CommentsRed Card Items

Temp CO (Expired)Other Inspector CommentsRed Card Items

Temp Electrical RenewalOther Inspector CommentsRed Card Items

Temp Heat Agreement ExpiredOther Inspector Comments

Temp Power Add. Cir/PanelRed Card ItemsOther Inspector Comments

Temp Power Agreement ExpiredOther Inspector Comments

Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items

Temp Saw Pole Connectioncheck for in use coversOther Inspector CommentsRed Card ItemsOther Inspector Comments

Temporary Mech. RenewalOther Inspector CommentsRed Card Items

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Wall Reinforcementinstalled per engineered designminimum 3" from earth if poured in place concreteOther Inspector Commentssize rebar and spacing

Building (Wireless Comm)WRLS

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

rinspectionchecklists1 11/10/2016 11:06 Page 5 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Building (Wireless Comm)WRLS

PERMITTYPEPREFIX

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far eno

Other Inspector CommentsSchool Inspection

Other Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Building Pool (C)SWMC

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Concrete SlabAll vegetation and debris removedNote all thicken slab locationsNote termite companyOther Inspector CommentsRed Card ItemsReinforcing mesh installedVapor retarder installed

Concrete Wallinstalled per engineered designOther Inspector CommentsRed Card Itemssize rebar and spacing

Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Monolithic Concrete Pourminimum 6" above grade for wood sidingminimum width 12" for 3,000 psi soilnote all thicken areasOther Inspector Commentsrebar installed per engineered plansNote termite company

Wall Reinforcementinstalled per engineered designminimum 3" from earth if poured in place concreteOther Inspector Commentssize rebar and spacing

Building Pool (R)SWMR

PERMITTYPEPREFIX

rinspectionchecklists1 11/10/2016 11:06 Page 6 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Building Pool (R)SWMR

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Concrete SlabAll vegetation and debris removedNote all thicken slab locationsNote termite companyOther Inspector CommentsRed Card ItemsReinforcing mesh installedVapor retarder installed

Concrete Wallinstalled per engineered designOther Inspector CommentsRed Card Itemssize rebar and spacing

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Monolithic Concrete Pourminimum 6" above grade for wood sidingminimum width 12" for 3,000 psi soilnote all thicken areasOther Inspector Commentsrebar installed per engineered plansNote termite company

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

Wall Reinforcementinstalled per engineered designminimum 3" from earth if poured in place concreteOther Inspector Commentssize rebar and spacing

Building Sign (C)SGNC

PERMITTYPEPREFIX

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Sign FinalOther Inspector CommentsRed Card Items

Building Sign (R)SGNR

PERMITTYPEPREFIX

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Sign FinalOther Inspector CommentsRed Card Items

Catawba Residential Zoning PermitCAZR

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

rinspectionchecklists1 11/10/2016 11:06 Page 7 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Catawba Residential Zoning PermitCAZR

PERMITTYPEPREFIX

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far eno

Other Inspector CommentsSchool Inspection

Other Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Claremont Residential Zoning PermitCLZR

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

rinspectionchecklists1 11/10/2016 11:06 Page 8 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Claremont Residential Zoning PermitCLZR

PERMITTYPEPREFIX

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

County Facility BuildingsCOFA

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footing

installed per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

County SchoolsSCH

PERMITTYPEPREFIX

rinspectionchecklists1 11/10/2016 11:06 Page 9 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

County SchoolsSCH

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor required

engineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Electrical (C)ELEC

PERMITTYPEPREFIX

Electric Under SlabOther Inspector Commentsraceways or cables meet minimum burial depthRed Card Items

Electrical Above Ceilingjunction box covers installedluminaries secured to ceiling gridOther Inspector Commentsraceways supported per code

Electrical Finalbond all available electrodesminimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector Commentspermanent labels on all disconnectsRed Card Items

Electrical Line UndergroundOther Inspector Commentsraceways or cables meet minimum burial depth

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Fixturing and FurnitureOther Inspector CommentsRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 10 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Electrical (C)ELEC

PERMITTYPEPREFIX

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Meeting w/ Elec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Pool Bonding3 foot bonding grid installednote items that were bonded (rwg)Other Inspector CommentsRed Card Items

Quality Control ElectricalOther Inspector Comments

Safety ElectricalOther Inspector CommentsRed Card Items

Service Changebond all available electrodesbond to water line(rwg)minimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector CommentsRed Card Items

Stocking and MerchandiseOther Inspector CommentsRed Card Items

Temp Electrical RenewalOther Inspector CommentsRed Card Items

Temp Gas ConnectionOther Inspector CommentsRed Card Items

Temp Heat Agreement ExpiredOther Inspector Comments

Temp Heat on BuildingOther Inspector CommentsRed Card Items

Temp Power Add. Cir/PanelRed Card ItemsOther Inspector Comments

Temp Power Agreement ExpiredOther Inspector Comments

Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items

Temp Saw Pole Connectioncheck for in use coversOther Inspector Comments

Red Card ItemsOther Inspector Comments

Temporary Mech. RenewalOther Inspector CommentsRed Card Items

Wire Mech UnitGFCI outlet within 25 feetOther Inspector CommentsRed Card Itemsworking clearance at disconnect

Electrical (R)ELER

PERMITTYPEPREFIX

Electric Under SlabOther Inspector Commentsraceways or cables meet minimum burial depthRed Card Items

Electrical Above Ceilingjunction box covers installedluminaries secured to ceiling gridOther Inspector Commentsraceways supported per code

Electrical Finalbond all available electrodesminimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector Commentspermanent labels on all disconnectsRed Card Items

Electrical Line UndergroundOther Inspector Commentsraceways or cables meet minimum burial depth

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Meeting w/ Elec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Pool Bonding3 foot bonding grid installednote items that were bonded (rwg)Other Inspector CommentsRed Card Items

Quality Control ElectricalOther Inspector Comments

rinspectionchecklists1 11/10/2016 11:06 Page 11 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Electrical (R)ELER

PERMITTYPEPREFIX

Relocate Existing Servicebond all available electrodesminimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector CommentsRed Card Items

Relocate Serv. for Const.bond all available electrodesbond between halvesminimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector CommentsRed Card Items

Safety ElectricalOther Inspector CommentsRed Card Items

Service Changebond all available electrodesbond to water line(rwg)minimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector CommentsRed Card Items

Temp Electrical RenewalOther Inspector CommentsRed Card Items

Temp Heat Agreement ExpiredOther Inspector Comments

Temp Heat on BuildingOther Inspector CommentsRed Card Items

Temp Power Add. Cir/PanelRed Card ItemsOther Inspector Comments

Temp Power Agreement ExpiredOther Inspector Comments

Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items

Temp Saw Pole Connectioncheck for in use coversOther Inspector CommentsRed Card ItemsOther Inspector Comments

Under Mobile Home Elec.Other Inspector Comments

Wire Mech UnitGFCI outlet within 25 feetOther Inspector Comments

Red Card Itemsworking clearance at disconnect

ExemptEXEM

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 12 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

ExemptEXEM

PERMITTYPEPREFIX

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Explosives PermitEXPL

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs marked

Verify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Fire ConstructionFCP

PERMITTYPEPREFIX

rinspectionchecklists1 11/10/2016 11:06 Page 13 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Fire ConstructionFCP

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor required

engineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Fire UseFIR

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 14 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Fire UseFIR

PERMITTYPEPREFIX

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Floodplain DevelopmentFLD

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Rough

electrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

rinspectionchecklists1 11/10/2016 11:06 Page 15 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Floodplain DevelopmentFLD

PERMITTYPEPREFIX

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Food & Lodging InstitutionsFLI

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Rough

firestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Hickory Fire ConstructionHFCP

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 16 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Hickory Fire ConstructionHFCP

PERMITTYPEPREFIX

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

ImprovementIMPV

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 17 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

ImprovementIMPV

PERMITTYPEPREFIX

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

LandfillLAN

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs marked

Verify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Long View Residential Zoning PermitLVZR

PERMITTYPEPREFIX

rinspectionchecklists1 11/10/2016 11:06 Page 18 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Long View Residential Zoning PermitLVZR

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor required

engineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Maiden Residential Zoning PermitMDZR

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 19 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Maiden Residential Zoning PermitMDZR

PERMITTYPEPREFIX

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Manufactured HomeMOH

PERMITTYPEPREFIX

Air Barrier Behind TubOther Inspector CommentsRed Card Items

Brick Lintelsmake sure any lintel over 10 feet you have eng. DOther Inspector CommentsRed Card Items

Building Final911 numbers

flashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

ChimneyOther Inspector CommentsRed Card Items

Concrete SlabAll vegetation and debris removedNote all thicken slab locationsNote termite companyOther Inspector CommentsRed Card ItemsReinforcing mesh installedVapor retarder installed

Concrete Wallinstalled per engineered designOther Inspector CommentsRed Card Itemssize rebar and spacing

Drain/Damp Proofinginstalled approved alternate designinstalled per codeminimum 2" stone below drain / 6" on topnote location of termination point of pipeOther Inspector CommentsRed Card Itemswaterproofing installed

Elevation Certificate InspectionOther Inspector Comments

Fire Wall Separationall designs must match with plans that were approOther Inspector CommentsRed Card Items

Floor System Onlycheck for center third bearing for girderscorrect lumber sizes for spansjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

rinspectionchecklists1 11/10/2016 11:06 Page 20 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Manufactured HomeMOH

PERMITTYPEPREFIX

Foundationanchor bolts installed per code or approved desigcheck any fireplace footings for proper projectioengineered plans for retaining walls greater thanfoundation vents installedinstalled per approved designminimum access of 18" x 24"Other Inspector CommentsRed Card Itemssealed crawlspace

Framing Above Ceilingdraftstopping installedOther Inspector CommentsRed Card Itemstruss sheets on site

GPS Data CaptureDrawn in and sent to supervisorIf not captured for any reason note why and reschOther Inspector CommentsSend to GIS

Insulationminimum r-values installednote areas looked at so areas don't get missed atOther Inspector CommentsRed Card ItemsRes-check required

Marriage WallOther Inspector CommentsRed Card Itemsspacing and size of bolts used per mfg. setup man

Masonry Fireplacecheck for proper projection of footingsminimum 1" clearance from combustibles at chimneyminimum 2" clearance from combustiblesOther Inspector CommentsRed Card Items

Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Monolithic Concrete Pourminimum 6" above grade for wood sidingminimum width 12" for 3,000 psi soilnote all thicken areasOther Inspector Commentsrebar installed per engineered plansNote termite company

Outside RoughFlashing is installed in all locations required bOther Inspector Comments

Red Card Itemsvapor retarder seams taped and installed per manu

Prefab Fireplaceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Quality Control BuildingOther Inspector Comments

Quality Control Mobile HomeOther Inspector Comments

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Site Code InspectionOther Inspector Comments

Stucco Material Installationmfg installation instructions must be on sitenon drainable systems not allowedOther Inspector CommentsRed Card Items

Temp Saw Pole Connectioncheck for in use coversOther Inspector CommentsRed Card Items

Under Mobile Home BldgOther Inspector Comments

Wall Reinforcementinstalled per engineered designminimum 3" from earth if poured in place concreteOther Inspector Commentssize rebar and spacing

Mechanical (C)MECC

PERMITTYPEPREFIX

Boiler/Hot Water Systeminstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Chilled Water Pipingbackflow preventer installedOther Inspector CommentsRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 21 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Mechanical (C)MECC

PERMITTYPEPREFIX

Duct Joint SealantOther Inspector CommentsRed Card Items

Duct Smoke Detector TestOther Inspector CommentsRed Card Items

Final Gas Connection App.Other Inspector CommentsRed Card Itemssticker and call in

Fixturing and FurnitureOther Inspector CommentsRed Card Items

Gas Applianceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Gas Line (In & Out)CSST bonded if usedif nonmetallic piping look for tracer wireOther Inspector CommentsRed Card Items

Gas Line (Inside)CSST bonded if usednote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items

Gas Line (Outside)CSST bonded if usedif nonmetallic piping look for tracer wirenote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items

Gas Logsinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Gas PACinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Grease Hood Duct Testclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Hoodclearance to combustibles

installed per manufacturers instructionsOther Inspector CommentsRed Card Items

Hood Exhaust Ductclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Hood System/Fire Suppress.Other Inspector CommentsRed Card Items

Hot Water/Steam Piping Sys.Other Inspector CommentsRed Card Items

Mechanical Above CeilingOther Inspector CommentsRed Card Items

Mechanical FinalOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Mechanical Under SlabOther Inspector CommentsRed Card Items

Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Meeting w/ Elec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Meeting w/ Mec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Meeting w/ Plbg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Prefab Fireplaceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Quality Control MechanicalOther Inspector Comments

Refrig. Lines/Press Testnote pressure test o.k.Other Inspector Comments

rinspectionchecklists1 11/10/2016 11:06 Page 22 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Mechanical (C)MECC

PERMITTYPEPREFIX

Safety MechanicalOther Inspector CommentsRed Card Items

Stocking and MerchandiseOther Inspector CommentsRed Card Items

Temp Heat Agreement ExpiredOther Inspector Comments

Temp Heat on BuildingOther Inspector CommentsRed Card Items

Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items

Temporary Mech. RenewalOther Inspector CommentsRed Card Items

Und. Crossover/Dryer VentOther Inspector Comments

Under Mobile Home Mech.Other Inspector Comments

Unit Heatersinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Mechanical (R)MECR

PERMITTYPEPREFIX

Air Barrier Behind TubOther Inspector CommentsRed Card Items

Air BarriersOther Inspector CommentsRed Card Items

Boiler/Hot Water Systeminstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Chilled Water Pipingbackflow preventer installedOther Inspector Comments

Red Card ItemsDuct Joint Sealant

Other Inspector CommentsRed Card Items

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Final Gas Connection App.Other Inspector CommentsRed Card Itemssticker and call in

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Gas Line (Inside)CSST bonded if usednote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items

Gas Line (Outside)CSST bonded if usedif nonmetallic piping look for tracer wirenote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items

Gas Logsinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Insulationminimum r-values installednote areas looked at so areas don't get missed atOther Inspector CommentsRed Card ItemsRes-check required

rinspectionchecklists1 11/10/2016 11:06 Page 23 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Mechanical (R)MECR

PERMITTYPEPREFIX

Mechanical Above CeilingOther Inspector CommentsRed Card Items

Mechanical FinalOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Mechanical Under SlabOther Inspector CommentsRed Card Items

Meeting w/ Mec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Perm. Gas ConnectionOther Inspector CommentsRed Card Items

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Prefab Fireplaceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Quality Control MechanicalOther Inspector Comments

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Piping

make sure of two main drains and that are far enoOther Inspector Comments

Safety MechanicalOther Inspector CommentsRed Card Items

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Temp Gas ConnectionOther Inspector CommentsRed Card Items

Temp Heat Agreement ExpiredOther Inspector Comments

Temp Heat on BuildingOther Inspector CommentsRed Card Items

Temporary Mech. RenewalOther Inspector CommentsRed Card Items

Und. Crossover/Dryer VentOther Inspector Comments

Under Mobile Home Mech.Other Inspector Comments

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Wire Mech UnitGFCI outlet within 25 feetOther Inspector CommentsRed Card Itemsworking clearance at disconnect

MiscellaneousMISC

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

rinspectionchecklists1 11/10/2016 11:06 Page 24 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

MiscellaneousMISC

PERMITTYPEPREFIX

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far eno

Other Inspector CommentsSchool Inspection

Other Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Mobile ClassroomsMBCL

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

rinspectionchecklists1 11/10/2016 11:06 Page 25 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Mobile ClassroomsMBCL

PERMITTYPEPREFIX

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Plumbing (C)PLMC

PERMITTYPEPREFIX

Final Gas Connection App.Other Inspector CommentsRed Card Itemssticker and call in

Fixturing and FurnitureOther Inspector CommentsRed Card Items

Gas Line (In & Out)CSST bonded if usedif nonmetallic piping look for tracer wireOther Inspector CommentsRed Card Items

Gas Line (Inside)CSST bonded if usednote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items

Gas Line (Outside)CSST bonded if usedif nonmetallic piping look for tracer wirenote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items

Gas Logsinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Grease Hood Duct Testclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Grease Trap Interceptorclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Meeting w/ Plbg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Plumbing Above Ceilingminimum 6.5 insulation on waterlinesnote any cleanout locationsOther Inspector Comments

Plumbing Finalescutcheon rings installedOther Inspector CommentsRed Card Itemstoilets & sinks caulked

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Plumbing Under SlabOther Inspector Comments

Quality Control PlumbingOther Inspector Comments

Roof Leaders/Drain TestOther Inspector Commentsverify size with approved engineered plans

Sewer Line InspectionOther Inspector CommentsRed Card Itemsverify if backwater valve is needed (rwg)

rinspectionchecklists1 11/10/2016 11:06 Page 26 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

Plumbing (C)PLMC

PERMITTYPEPREFIX

Shower PanOther Inspector CommentsRed Card Items

Stocking and MerchandiseOther Inspector CommentsRed Card Items

Water & Sewer LineOther Inspector CommentsRed Card Itemsseal foundation walls

Water LineOther Inspector CommentsRed Card Itemsseal foundation walls

Plumbing (R)PLMR

PERMITTYPEPREFIX

Final Gas Connection App.Other Inspector CommentsRed Card Itemssticker and call in

Gas Line (In & Out)CSST bonded if usedif nonmetallic piping look for tracer wireOther Inspector CommentsRed Card Items

Gas Line (Inside)CSST bonded if usednote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items

Gas Line (Outside)CSST bonded if usedif nonmetallic piping look for tracer wirenote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items

Gas Logsinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Meeting w/ Plbg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Plumbing Above Ceilingminimum 6.5 insulation on waterlinesnote any cleanout locations

Other Inspector CommentsPlumbing Final

escutcheon rings installedOther Inspector CommentsRed Card Itemstoilets & sinks caulked

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Plumbing Under SlabOther Inspector Comments

Quality Control PlumbingOther Inspector Comments

Roof Leaders/Drain TestOther Inspector Commentsverify size with approved engineered plans

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

Sewer Line InspectionOther Inspector CommentsRed Card Itemsverify if backwater valve is needed (rwg)

Shower PanOther Inspector CommentsRed Card Items

Stocking and MerchandiseOther Inspector CommentsRed Card Items

Under Mobile Home Plbg.main cleanoutOther Inspector Comments

Water & Sewer LineOther Inspector CommentsRed Card Itemsseal foundation walls

Water LineOther Inspector CommentsRed Card Itemsseal foundation walls

REHAB CODEREHA

PERMITTYPEPREFIX

Brick Lintelsmake sure any lintel over 10 feet you have eng. DOther Inspector CommentsRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 27 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

REHAB CODEREHA

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Concrete SlabAll vegetation and debris removedNote all thicken slab locationsNote termite companyOther Inspector CommentsRed Card ItemsReinforcing mesh installedVapor retarder installed

Concrete Wallinstalled per engineered designOther Inspector CommentsRed Card Itemssize rebar and spacing

Fire Wall Separationall designs must match with plans that were approOther Inspector CommentsRed Card Items

Fixturing and FurnitureOther Inspector CommentsRed Card Items

Floor System Onlycheck for center third bearing for girderscorrect lumber sizes for spansjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Found., Floor Sysm & Dampanchor bolts installed per code or approved desigcheck anchor bolts to insure wrench tightcheck any fireplace footings for proper projectiocheck for center third bearing for girderscorrect lumber sizes for spans

engineered plans for retaining walls greater thanfoundation vents installedget elevation certificate if requiredinstalled approved alternate designinstalled per approved designinstalled per codejoist blocked at endsminimum 2" stone below drain / 6" on topminimum access of 18" x 24"note location of termination point of pipeOther Inspector CommentsRed Card Itemssealed crawlspacetruss sheets on sitewaterproofing installed

Foundationanchor bolts installed per code or approved desigcheck any fireplace footings for proper projectioengineered plans for retaining walls greater thanfoundation vents installedinstalled per approved designminimum access of 18" x 24"Other Inspector CommentsRed Card Itemssealed crawlspace

Foundation & Floor Systemcheck anchor bolts to insure wrench tightcheck for center third bearing for girderscorrect lumber sizes for spansget elevation certificate if requiredjoist blocked at endsOther Inspector CommentsRed Card Itemstruss sheets on site

Framing Above Ceilingdraftstopping installedOther Inspector CommentsRed Card Itemstruss sheets on site

Insulationminimum r-values installednote areas looked at so areas don't get missed atOther Inspector CommentsRed Card ItemsRes-check required

Masonry Fireplacecheck for proper projection of footingsminimum 1" clearance from combustibles at chimneyminimum 2" clearance from combustiblesOther Inspector CommentsRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 28 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

REHAB CODEREHA

PERMITTYPEPREFIX

Meeting w/ Bldg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Monolithic Concrete Pourminimum 6" above grade for wood sidingminimum width 12" for 3,000 psi soilnote all thicken areasOther Inspector Commentsrebar installed per engineered plansNote termite company

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Stocking and MerchandiseOther Inspector CommentsRed Card Items

Temp Electrical RenewalOther Inspector CommentsRed Card Items

Temp Gas ConnectionOther Inspector CommentsRed Card Items

Temp Heat Agreement ExpiredOther Inspector Comments

Temp Heat on BuildingOther Inspector CommentsRed Card Items

Temp Power Add. Cir/PanelRed Card ItemsOther Inspector Comments

Temp Power Agreement ExpiredOther Inspector Comments

Temp Power Main Serv.electrical room secured per policyOther Inspector Comments

Red Card ItemsTemp Saw Pole Connection

check for in use coversOther Inspector CommentsRed Card Items

Temporary Mech. RenewalOther Inspector CommentsRed Card Items

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Wall Reinforcementinstalled per engineered designminimum 3" from earth if poured in place concreteOther Inspector Commentssize rebar and spacing

REHAB ElectricalRELE

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electric Under SlabOther Inspector Commentsraceways or cables meet minimum burial depthRed Card Items

Electrical Above Ceilingjunction box covers installedluminaries secured to ceiling gridOther Inspector Commentsraceways supported per code

Electrical Finalbond all available electrodesminimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector Commentspermanent labels on all disconnectsRed Card Items

Electrical Line UndergroundOther Inspector Commentsraceways or cables meet minimum burial depth

rinspectionchecklists1 11/10/2016 11:06 Page 29 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

REHAB ElectricalRELE

PERMITTYPEPREFIX

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Fixturing and FurnitureOther Inspector CommentsRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Meeting w/ Elec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Pool Bonding3 foot bonding grid installednote items that were bonded (rwg)Other Inspector CommentsRed Card Items

Quality Control ElectricalOther Inspector Comments

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

Safety ElectricalOther Inspector CommentsRed Card Items

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Service Changebond all available electrodesbond to water line(rwg)minimum 12 foot clearance @ service mastminimum two driven rods installedOther Inspector CommentsRed Card Items

Stocking and MerchandiseOther Inspector CommentsRed Card Items

Temp Electrical RenewalOther Inspector CommentsRed Card Items

Temp Gas ConnectionOther Inspector CommentsRed Card Items

Temp Heat Agreement ExpiredOther Inspector Comments

Temp Heat on BuildingOther Inspector CommentsRed Card Items

Temp Power Add. Cir/PanelRed Card ItemsOther Inspector Comments

Temp Power Agreement ExpiredOther Inspector Comments

Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 30 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

REHAB ElectricalRELE

PERMITTYPEPREFIX

Temp Saw Pole Connectioncheck for in use coversOther Inspector CommentsRed Card ItemsOther Inspector Comments

Temporary Mech. RenewalOther Inspector CommentsRed Card Items

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Wire Mech UnitGFCI outlet within 25 feetOther Inspector CommentsRed Card Itemsworking clearance at disconnect

REHAB MechanicalRMEC

PERMITTYPEPREFIX

Boiler/Hot Water Systeminstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Chilled Water Pipingbackflow preventer installedOther Inspector CommentsRed Card Items

Duct Joint SealantOther Inspector CommentsRed Card Items

Duct Smoke Detector TestOther Inspector CommentsRed Card Items

Final Gas Connection App.Other Inspector CommentsRed Card Itemssticker and call in

Fixturing and FurnitureOther Inspector CommentsRed Card Items

Gas Applianceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Gas Line (Inside)CSST bonded if usednote pressure test o.k.Other Inspector Commentsprotected from physical damage

Red Card ItemsGas Line (Outside)

CSST bonded if usedif nonmetallic piping look for tracer wirenote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items

Gas Logsinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Grease Hood Duct Testclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Hoodclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Hood Exhaust Ductclearance to combustiblesinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Hood System/Fire Suppress.Other Inspector CommentsRed Card Items

Hot Water/Steam Piping Sys.Other Inspector CommentsRed Card Items

Mechanical Above CeilingOther Inspector CommentsRed Card Items

Mechanical FinalOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Mechanical Under SlabOther Inspector CommentsRed Card Items

Meeting w/ Mec ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 31 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

REHAB MechanicalRMEC

PERMITTYPEPREFIX

Prefab Fireplaceinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Quality Control MechanicalOther Inspector Comments

Safety MechanicalOther Inspector CommentsRed Card Items

Stocking and MerchandiseOther Inspector CommentsRed Card Items

Temp Heat Agreement ExpiredOther Inspector Comments

Temp Heat on BuildingOther Inspector CommentsRed Card Items

Temp Power Main Serv.electrical room secured per policyOther Inspector CommentsRed Card Items

Temporary Mech. RenewalOther Inspector CommentsRed Card Items

Und. Crossover/Dryer VentOther Inspector Comments

Unit Heatersinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

REHAB PlumbingRPLM

PERMITTYPEPREFIX

Final Gas Connection App.Other Inspector CommentsRed Card Itemssticker and call in

Fixturing and FurnitureOther Inspector CommentsRed Card Items

Gas Line (In & Out)CSST bonded if usedif nonmetallic piping look for tracer wireOther Inspector CommentsRed Card Items

Gas Line (Inside)CSST bonded if usednote pressure test o.k.Other Inspector Commentsprotected from physical damage

Red Card ItemsGas Line (Outside)

CSST bonded if usedif nonmetallic piping look for tracer wirenote pressure test o.k.Other Inspector Commentsprotected from physical damageRed Card Items

Gas Logsinstalled per manufacturers instructionsOther Inspector CommentsRed Card Items

Meeting w/ Plbg ContractorMake notes on all items discussedOther Inspector CommentsRed Card Items

Plumbing Above Ceilingminimum 6.5 insulation on waterlinesnote any cleanout locationsOther Inspector Comments

Plumbing Finalescutcheon rings installedOther Inspector CommentsRed Card Itemstoilets & sinks caulked

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Plumbing Under SlabOther Inspector Comments

Quality Control PlumbingOther Inspector Comments

Roof Leaders/Drain TestOther Inspector Commentsverify size with approved engineered plans

Sewer Line InspectionOther Inspector CommentsRed Card Itemsverify if backwater valve is needed (rwg)

Shower PanOther Inspector CommentsRed Card Items

Stocking and MerchandiseOther Inspector CommentsRed Card Items

Water & Sewer LineOther Inspector CommentsRed Card Itemsseal foundation walls

rinspectionchecklists1 11/10/2016 11:06 Page 32 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

REHAB PlumbingRPLM

PERMITTYPEPREFIX

Water LineOther Inspector CommentsRed Card Itemsseal foundation walls

SafetySAFE

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Safety BuildingOther Inspector CommentsRed Card Items

Safety ElectricalOther Inspector CommentsRed Card Items

Safety MechanicalOther Inspector CommentsRed Card Items

Safety PlumbingOther Inspector CommentsRed Card Items

Septic Pumper TruckSPT

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector Comments

Property line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

ShorelineSHR

PERMITTYPEPREFIX

rinspectionchecklists1 11/10/2016 11:06 Page 33 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

ShorelineSHR

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor required

engineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

SubdivisionSUB

PERMITTYPEPREFIX

Building Final911 numbersflashing and counter-flashing installedhandrails/guardrails installedOther Inspector Commentsproper attic ventilation installedRed Card Itemsstorm water diverted from structure

Electrical Roughelectrical room secured per policyfirestopping completedmaximum box fillNM cable minimum 1-1/4" from edge of framingnote any areas not looked at such as basement etcOther Inspector Commentsreceptacle spacingRed Card Items

Footinginstalled per manufacturers instructionsOther Inspector CommentsProperty line strungRed Card ItemsRegistered surveySet backs markedVerify location of pier footings with approved plVerify with approved plans

Footing, Light Pole BaseOther Inspector CommentsRed Card Items

rinspectionchecklists1 11/10/2016 11:06 Page 34 of 35

CATAWBA COUNTYINSPECTION CHECKLIST REPORT

BY PERMIT TYPE BY INSPECTION TYPE BY CHECKLIST SORT ORDER

SubdivisionSUB

PERMITTYPEPREFIX

Mechanical Roughnote any areas not inspected at this timeOther Inspector CommentsRed Card Items

Outside RoughFlashing is installed in all locations required bOther Inspector CommentsRed Card Itemsvapor retarder seams taped and installed per manu

Plumbing Roughfirestopping completedminimum 6.5 insulation on waterlinesnail guards installedOther Inspector CommentsRed Card Items

Rough Buildingbraced wall panels installedcheck all stairs for head room and note any thatcorrect lumber sizes for spansdraftstopping of attic requireddraftstopping of floor requiredengineered point loads properly supportedfirestopping completedgrade marked lumber usedOther Inspector CommentsRed Card Itemstruss sheets on site

Rough-In Circulation Pipingmake sure of two main drains and that are far enoOther Inspector Comments

School InspectionOther Inspector CommentsRooms have Power cords connected in in tandem.Dropcords can not be used for Permanent wiring.

Vertical Steel in FootingMinimum clearance from earth 3"Other Inspector CommentsSize rebar and spacing per approved plans

Third Party InspectionTPI

PERMITTYPEPREFIX

TPI-Final CaseOther Inspector Comments

TPI-Final Concrete Construction ReporOther Inspector Comments

TPI-Final EIFS System ReportOther Inspector Comments

TPI-Final Fabricators ReportOther Inspector Comments

TPI-Final Masonry Report

Other Inspector CommentsTPI-Final Pier Foundation Report

Other Inspector CommentsTPI-Final Pile Foundation Report

Other Inspector CommentsTPI-Final Seismic Resis Report

Other Inspector CommentsTPI-Final Smoke Control Report

Other Inspector CommentsTPI-Final Soil Eval Report

Other Inspector CommentsTPI-Final Special Case Report

Other Inspector CommentsTPI-Final Sprayed Fire Resistance

Other Inspector CommentsTPI-Final Steel Construction Steel Rep

Other Inspector CommentsTPI-Final Structural Observation

Other Inspector CommentsTPI-Final Wall Panel-Ven Report

Other Inspector CommentsTPI-Final Wood Construction Report

Other Inspector CommentsTPI-Interim Inspection Report

Other Inspector Comments

Zoning Authorization (NR)ZONC

PERMITTYPEPREFIX

Site Code InspectionOther Inspector Comments

Zoning Authorization (R)ZONR

PERMITTYPEPREFIX

Site Code InspectionOther Inspector Comments

rinspectionchecklists1 11/10/2016 11:06 Page 35 of 35