CAT - 244 Realignment and Reconstruction of
Rt. 28A
Town of OliveUlster County, New
YorkJanuary 2009
NEW
Y O R K C ITY D EPA RTM EN T OF
EN V IR O N M E N TA L PR O TE C TIO
N
2
NEW
Y O R K C ITY D EPA RTM EN T OF
EN V IR O N M E N TA L PR O TE C TIO
N
Project Introduction To improve public safety, approximately 2.5 miles of roadway
will be constructed. 0.4 miles of realigned roadway will be new construction to
eliminate the dangerous “S” curve on Rt. 28A. 2.1 miles of roadway improvements to existing Rt. 28A include
tree line cut-backs, pavement and shoulder widening, guide rails, directional signage, etc.
Two existing intersections will be reconstructed. The width of the lanes is being increased from 9 to 12 feet. A typical clear zone is 30 ft from the edge of travel lane
3
NEW
Y O R K C ITY D EPA RTM EN T OF
EN V IR O N M E N TA L PR O TE C TIO
N
Project Introduction Design speed of 45 mph and a posted speed limit of 40 mph
between Waste Channel Bridge and Rt. 214 intersection Design speed of 40 mph and a posted speed limit of 30 mph
between Waste Channel Bridge and Dividing Weir Bridge A parking lot located near the intersection of Route 213 is
added to facilitate public safety for people who visit the area for bird watching or utilize the dam’s walkway for exercising.
4
NEW
Y O R K C ITY D EPA RTM EN T OF
EN V IR O N M E N TA L PR O TE C TIO
N
Project IntroductionContractor: DA Collins Construction
Construction Manager:NYCDEP & Haider Engineering P.C.
Engineer:Greeley and Hansen LLC
5
NEW
Y O R K C ITY D EPA RTM EN T OF
EN V IR O N M E N TA L PR O TE C TIO
N
6
NEW
Y O R K C ITY D EPA RTM EN T OF
EN V IR O N M E N TA L PR O TE C TIO
N
Rt. 28A and 213 Intersection
Existing
New
7
NEW
Y O R K C ITY D EPA RTM EN T OF
EN V IR O N M E N TA L PR O TE C TIO
N
New Monument Road Parking Lot
8
NEW
Y O R K C ITY D EPA RTM EN T OF
EN V IR O N M E N TA L PR O TE C TIO
N
Monuments Rd and Rt. 28A Intersection
New
Existing
9
NEW
Y O R K C ITY D EPA RTM EN T OF
EN V IR O N M E N TA L PR O TE C TIO
N
Construction Schedule
Clearing/Grubbing: Jan-March, 2009 Waste Channel to existing “S” turn:
Spring/Summer 2009 Dividing weir to Waste Channel:
Summer/Fall 2009 Route 213 to “S” turn: Spring 2010
10
NEW
Y O R K C ITY D EPA RTM EN T OF
EN V IR O N M E N TA L PR O TE C TIO
N
Construction Schedule
11
NEW
Y O R K C ITY D EPA RTM EN T OF
EN V IR O N M E N TA L PR O TE C TIO
N
Construction Activities:
Working hours- 8:00 AM – 4:30 PM Flagmen/security services will be provided Maintenance and protection of traffic will be
required for at least one lane of traffic. Standard construction noises from both mobile
and stationary equipment will occur as well as from the limited rock blasting.
12
NEW
Y O R K C ITY D EPA RTM EN T OF
EN V IR O N M E N TA L PR O TE C TIO
N
Questions