37
CAST-IN-PLACE REINFORCED CONCRETE BOX CULVERT (NO SKEW) INDEX ISSUE TITLE DETAIL DESCRIPTION DETAIL No. DATE GENERAL LEGEND 1.1.1 NOV, 2007 ABBREVIATIONS 1.1.2 NOV, 2007 COVER SHEET TYPICAL LAYOUT 1.2.1 OCT, 2019 DESIGN DATA 1.2.2 OCT, 2019 LEGEND 1.2.3 SEPT, 2019 SURVEY CONTROL 1.2.4 SEPT, 2019 GENERAL ELEVATION TYPICAL LAYOUT 1.3.1 APRIL, 2014 BORING LOG 1.3.2 APRIL, 2014 LONGITUDINAL SECTION 1.3.3 NOV, 2018 PLAN 1.3.4 NOV, 2007 CROSS SECTION 1.3.5 APRIL, 2014 NOTES, DETAIL “A” 1.3.6 APRIL, 2014 TITLE BOX 1.3.7 NOV, 2007 EROSION CONTROL SITE PLAN 1.4.1 SEPT, 2019 CONCRETE DETAILS TYPICAL LAYOUT 1.5.1 NOV, 2007 SIDE ELEVATION 1.5.2 NOV, 2007 END ELEVATION 1.5.3 APRIL, 2014 SECTION A-A 1.5.4 NOV, 2007 SECTION B-B & C-C 1.5.5 NOV, 2007 CROSS SECTION, DETAILS OF CONSTRUCTION JOINTS 1.5.6 APRIL, 2014 NOTES, POURING SCHEDULE 1.5.7 NOV, 2007 SLAB REINFORCING TYPICAL LAYOUT 1.6.1 NOV, 2007 DETAILS PLAN 1.6.2 NOV, 2007 PLAN 1.6.3 NOV, 2007 PLAN OF TIEBACK SLAB 1.6.4 SEPT, 2019 SECTION D-D 1.6.5 NOV, 2007 WALL REINFORCING TYPICAL LAYOUT 1.7.1 NOV, 2007 DETAILS ELEVATION 1.7.2 NOV, 2007 ELEVATION 1.7.3 NOV, 2007 ELEVATION 1.7.4 NOV, 2007 SECTION E-E & F-F 1.7.5 NOV, 2007 HEADWALL REINFORCING TYPICAL LAYOUT 1.8.1 NOV, 2007 DETAILS ELEVATION 1.8.2 NOV, 2007 ELEVATION 1.8.3 NOV, 2007 SECTION H-H 1.8.4 NOV, 2007 SECTION G-G 1.8.5 NOV, 2007 BILL OF REINFORCING STEEL 1.8.6 NOV, 2007

CAST-IN-PLACE REINFORCED CONCRETE BOX CULVERT ...CAST-IN-PLACE REINFORCED CONCRETE BOX CULVERT (NO SKEW) INDEX ISSUE TITLE DETAIL DESCRIPTION DETAIL No. DATE GENERAL LEGEND 1.1.1 NOV,

  • Upload
    others

  • View
    25

  • Download
    1

Embed Size (px)

Citation preview

  • CAST-IN-PLACE REINFORCED CONCRETE BOX CULVERT

    (NO SKEW)

    INDEX ISSUE

    TITLE DETAIL DESCRIPTION DETAIL No. DATE

    GENERAL LEGEND 1.1.1 NOV, 2007 ABBREVIATIONS 1.1.2 NOV, 2007

    COVER SHEET TYPICAL LAYOUT 1.2.1 OCT, 2019 DESIGN DATA 1.2.2 OCT, 2019 LEGEND 1.2.3 SEPT, 2019 SURVEY CONTROL 1.2.4 SEPT, 2019

    GENERAL ELEVATION TYPICAL LAYOUT 1.3.1 APRIL, 2014 BORING LOG 1.3.2 APRIL, 2014 LONGITUDINAL SECTION 1.3.3 NOV, 2018 PLAN 1.3.4 NOV, 2007 CROSS SECTION 1.3.5 APRIL, 2014 NOTES, DETAIL “A” 1.3.6 APRIL, 2014 TITLE BOX 1.3.7 NOV, 2007

    EROSION CONTROL SITE PLAN 1.4.1 SEPT, 2019

    CONCRETE DETAILS TYPICAL LAYOUT 1.5.1 NOV, 2007 SIDE ELEVATION 1.5.2 NOV, 2007 END ELEVATION 1.5.3 APRIL, 2014 SECTION A-A 1.5.4 NOV, 2007 SECTION B-B & C-C 1.5.5 NOV, 2007 CROSS SECTION, DETAILS OF CONSTRUCTION JOINTS 1.5.6 APRIL, 2014 NOTES, POURING SCHEDULE 1.5.7 NOV, 2007

    SLAB REINFORCING TYPICAL LAYOUT 1.6.1 NOV, 2007 DETAILS PLAN 1.6.2 NOV, 2007

    PLAN 1.6.3 NOV, 2007 PLAN OF TIEBACK SLAB 1.6.4 SEPT, 2019 SECTION D-D 1.6.5 NOV, 2007

    WALL REINFORCING TYPICAL LAYOUT 1.7.1 NOV, 2007 DETAILS ELEVATION 1.7.2 NOV, 2007

    ELEVATION 1.7.3 NOV, 2007 ELEVATION 1.7.4 NOV, 2007 SECTION E-E & F-F 1.7.5 NOV, 2007

    HEADWALL REINFORCING TYPICAL LAYOUT 1.8.1 NOV, 2007 DETAILS ELEVATION 1.8.2 NOV, 2007

    ELEVATION 1.8.3 NOV, 2007 SECTION H-H 1.8.4 NOV, 2007 SECTION G-G 1.8.5 NOV, 2007 BILL OF REINFORCING STEEL 1.8.6 NOV, 2007

  • SHEET LEGEND

    1.2.3

    LEGENDCOVER SHEET

    SIDE SLOPES

    ROADWAY WIDTH WITH SHOULDERS &

    R.M. OF

    BOX CULVERT

    REINFORCED CONCRETETriple

    Double or

    Single

    x

    OUT TO OUT OF HEADWALLS

    LOCATION

    ROADWAY WIDTH

    LENGTH

    TYPE

    ENVIRONMENTAL APPROVALS

    MANITOBA ENVIRONMENT ACT LICENCE

    FISHERIES AND OCEANS CANADA - AUTHORIZATION OR REVIEW

    TRANSPORT CANADA - NAVIGATION ACT

    ENVIRONMENTAL REVIEW COMPLETED

    FILE # :

    DATE :

    FILE # :

    DATE :

    FILE # :

    DATE :

    FILE # :

    DATE :

    COMPLETED BY :

    DATE :

    MANITOBA INFRASTRUCTURE ENVIRONMENTAL APPROVAL

    September 2019

    REINFORCING DETAILS

    HEADWALL REINFORCING DETAILS

    WALL REINFORCING DETAILS

    SLAB REINFORCING DETAILS

    CONCRETE DETAILS

    SITE AND EROSION CONTROL PLAN

    GENERAL ELEVATION

    COVER SHEET

    8.

    7.

    6.

    5.

    4.

    3.

    2.

    1.

    DETAIL DESCRIPTION

    LOCATION

    SITE No. DATE

    DETAIL No.

    Water Management and Structures

    Infrastructure

  • SURVEY CONTROL

    SITE CONTROL POINT DATA

    ______.___EASTING:

    _____.___

    _____.___

    ________DATE:

    ___.___ELEVATION:

    ______.___EASTING:

    ______.___NORTHING:CONTROL POINT #______

    ________DATE:

    ___.___ELEVATION:

    NORTHING:CONTROL POINT *______

    ________DATE:

    ___.___ELEVATION:

    ______.___EASTING:

    NORTHING:CONTROL POINT #______

    _._____SCALE FACTOR:

    ZONE ___UTM:

    ____________GEOID (HT2.0):

    GRS 1980ELLIPSOID:

    CGVD28VERTICAL DATUM:

    NAD83CSRSHORIZONTAL DATUM:

    September 2019 1.2.4

    SURVEY CONTROLCOVER SHEET

    in Universal Transverse Mercator (UTM) coordinates. See Policy/Standard No.CSS-100Primary survey control is established and administered by Construction Support Services (CSS)

    DETAIL DESCRIPTION

    LOCATION

    SITE No. DATE

    DETAIL No.

    Water Management and Structures

    Infrastructure

  • April 2014

    LOC:6.4mN. & 3.5mE.of CL of Ex.Conc.Culv

    N. of NE1/4 SEC.2, TWP.13, RGE.7E

    PTH 44, BACHMAN DRAIN, RM BROKENHEAD

    DRILL - 6" HOLLOW STEM POWER AUGER

    WATER LEVEL -

    BOREHOLE NO:

    PROJECT NO: 2251-01

    ELEVATION: 240.9 m

    BH-1

    COMPLETION DEPTH: 7.7 m

    COMPLETE: 07/20/76

    LOGGED BY: LP

    REVIEWED BY: JU & TS

    Fig. No: PAGE 175 Page 1 of 100/02/10 09:40AM (CIVIL10)

    240.0

    239.0

    238.0

    237.0

    236.0

    235.0

    234.0

    233.0

    232.0

    231.0

    ELE

    VATIO

    N(m

    )

    0.0

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    7.0

    8.0

    9.0

    10.0

    DEPT

    H(m

    )

    SOIL S

    YM

    BO

    L

    US

    C

    SA

    MPLE T

    YPE

    SA

    MPLE

    NO

    GW

    CI

    CI S-1

    P-2

    CH

    T-334

    S-3

    T-335

    T-336

    CI

    T-337

    ML

    S-4

    RD. FILL - GRAVEL, well graded with sand

    Elev.240.3m

    RD. FILL - CLAY, med. plastic, silty,

    brownish

    Elev.239.7m

    CLAY, med. plastic, silty, tr. organic

    fibres, tr. light brown CL lenses, tr.

    sulphates, firm, dk. brown

    1.8m - 2.4m, num. layers & lenses of sand

    & silt, pkt. oxidized sand, light brown

    Elev.238.5m

    CLAY, high plastic, silty, tr. sulphates

    2.4m - 2.7m, firm, greyish brown, tr.

    organic fibres, some lenses & layers white

    sand

    2.7m - 5.7m, firm, dk. brown

    3.0m - 3.5m, tr. mottled layers grayish

    white sand & silt

    3.6m - 4.1m, with CL pkts.

    4.5m - 5.0m, num. light brown silt pkts. &

    some sand pkts.

    Elev.235.2m

    TILL - CLAY, med. plastic, silty, some

    gravel, sandy, tr. sulphates, silt pkts.,

    firm, grey

    Elev.233.7m

    TILL - SILT, low plastic, some gravel,

    sandy, tr. sulphates, hard, grey

    Elev.233.2m

    END OF TESTHOLE AT D=7.7m

    Water entered Testhole at D=7.5m

    At D=7.5m, N>200

    SOIL

    DESCRIPTION20 40 60 80

    PLASTIC M.C. LIQUID

    100 200 300 400

    POCKET PENETROMETER, kPa

    SPT(N)

    5

    6

    200

    Qu,k

    Pa

    67

    114

    136

    56

    56

    93

    164

    134

    "in-situ" vane,k

    Pa

    54

    re

    moulded vane,k

    Pa

    18

    SAMPLE TYPE SHELBY TUBE DISTURBED SPT A-CASING NO RECOVERY CORE

    Surface

    LONGITUDINAL SECTION

    PLANDETAIL ’A’

    CROSS SECTION

    or WEST

    NORTH

    or EAST

    SOUTH

    BORING LOGS

    ( )( )

    ( )( )( )( )

    ( )

    ( )

    ( )

    ( ) ( )

    ( )( )

    ( )

    ( ) ( )

    ( )

    ( )( )( )( )

    ( )( )

    ( )

    ( )

    NOTES - re Boring Logs

    EDGE TREATMENT

    RIP RAP DETAILS

    FLOW

    OVERLAPPING DETAILS

    1.3.1

    TYPICAL LAYOUT

    GENERAL ELEVATION

    Infrastructure and TransportationManitoba

    Water Management & Structures

    4. Elevations on boring logs are at a vertical scale of 1 : 100.

    3. All stations, elevations, offsets and depths as shown are in metres.

    M.C. - Moisture Content

    USC - Unified Soil Classification

    SPT(N) - Number of blows per 300 mm - Standard Penetration Test

    Qu - Laboratory unconfined compressive strength in kPa

    2. The following abbreviations apply to bore hole information:

    Management and Structures Branch located at 6th. floor, 215 Garry Street, Winnipeg.

    the site. Contractors may peruse all available soil information in the Water

    information may not be representative of the soil conditions throughout

    1. The Department provides log boring information shown on the Plans. This

    DETAIL DESCRIPTION

    LOCATION

    SITE No. DATE

    DETAIL No.Infrastructure and Transportation

    Water Management and Structures

  • April 2014

    ML

    SC-SM

    CL

    B-68

    B-69

    437.3

    436.1

    434.6

    426.9

    ICE

    SILT, low plastic, clayey, very soft, grey

    SAND, silty, clayey, grey, stiff

    CLAY, low plastic, sandy, trace gravel,

    grey, hard

    END OF TESTHOLE AT D=10.7m

    105

    308

    63

    61

    63

    Sheet 1 of 1

    COMPLETION DEPTH: 10.7 m

    COMPLETE: 01/06/66

    LOGGED BY: JB

    REVIEWED BY: JU

    PAGE: 197

    20 40 60 80

    LIQUID

    SOIL S

    YM

    BO

    L

    Sta.475+41.6m & 7.6m N. of C.L. of P.T.H. 1

    IN SEC. 27, TWP. 10, RGE. 26W

    BOREHOLE NO: 01

    PROJECT NO: 2537

    ELEVATION: 437.6 (m)

    ELE

    VATIO

    N (m

    )

    "IN-SIT

    U"

    VA

    NE

    (kPa)

    QU

    (kPa)

    SPT(N)

    SA

    MPLE T

    YPE

    SAMPLE TYPE

    SA

    MPLE

    NO.

    NO RECOVERY SHELBY TUBE SPT

    RE

    MO

    UL

    DE

    D

    VA

    NE

    (kPa)SOIL

    DESCRIPTIONDEPT

    H (m

    )

    US

    C100 200 300 400

    PLASTIC M.C.

    POCKET PENETROMETER, kPa

    SCALLION CREEK

    DRILL - 6" Hollow Stem Power Auger

    WATER LEVEL -

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    437

    436

    435

    434

    433

    432

    431

    430

    429

    428

    427

    426

    BO

    RE

    HO

    LE L

    OG

    DXF 15 2537.G

    PJ

    MB_

    DH

    GS.G

    DT 11/09/00

    Reference to new

    structure | and

    new roadway |

    For R.C box culverts detail bore holes approx. 1.5 m below bottom of granular backfill.

    NOTES - re Boring Logs

    Surface

    Infrastructure and TransportationManitoba

    1.3.2

    BORING LOG

    GENERAL ELEVATION

    Water Management & Structures

    4. Elevations on boring logs are at a vertical scale of 1:100.

    3. All stations, elevations, offsets and depths as shown are in metres.

    M.C. - Moisture Content

    USC - Unified Soil Classification

    SPT(N) - Number of blows per 300 mm - Standard Penetration Test

    Qu - Laboratory unconfined compressive strength in kPa

    2. The following abbreviations apply to bore hole information:

    Management and Structures Branch located at 6th. floor, 215 Garry Street, Winnipeg.

    the site. Contractors may peruse all available soil information in the Water

    information may not be representative of the soil conditions throughout

    1. The Department provides log boring information shown on the Plans. This

    DETAIL DESCRIPTION

    LOCATION

    SITE No. DATE

    DETAIL No.Infrastructure and Transportation

    Water Management and Structures

  • April 2014

    Water Management and Structures

    Infrastructure

    RIP

    RAP

    DET

    AIL

    S

    500

    300

    45°

    NO

    TES :

    Geote

    xtile

    2.

    Geote

    xtile shall b

    e placed under all rip rap, overlapping 600

    mm in direction of flo

    w.

    fr

    om th

    e

    Manitoba Infrastr

    ucture's Approved Product

    List.

    1. All geote

    xtile shall b

    e

    Non-

    Woven Geote

    xtile,

    Class I (

    Heavy

    Duty)

    Class (3

    50) rip rap

    (450) thick

    ( )

    75 thick working base

    50 thick insulation

    300 thick granular backfill

    LO

    NGIT

    UDIN

    AL SE

    CTIO

    N

    Existing groundlin

    e as of (D

    ATE)

    or E

    AST

    S

    OUT

    H

    or

    WEST

    N

    ORT

    H

    by oth

    ers /

    Contractor.

    to be approved backfill

    material

    300 thick). R

    emainder (if req'd)

    be determined for each site (min.

    placed by Culvert

    Contractor to

    Upper limit of

    granular backfill

    ( )

    ( )

    ( )

    ( )

    ( )

    FL

    OW

    2%

    4%

    2%

    4%

    Road

    way

    Proposed

    of

    |

    ( ) m

    Invert

    Elev.

    ( ) m

    Invert

    Elev.

    FL

    OW

    600

    N.T.S.

    DET

    AIL 'A'

    :1

    :1

    oth

    erwise

    unless note

    d

    Typ.

    Elev. ( ) m

    Final pave

    ment

    OV

    ERL

    APPIN

    G

    DET

    AIL

    S

    ( )

    ( )

    Geote

    xtile

    Geote

    xtile

    ED

    GE T

    RE

    AT

    ME

    NT

    Culvert

    Contractor

    performed by oth

    er th

    an

    of rip-rap

    will b

    e

    Make a note if placing

    1.3.3LONGITUDINAL SECTION

    GENERAL ELEVATION

    (date)

    HW

    L ( ) m

    Class (3

    50) rip-rap

    (450) thick

    2018-11-20 N.J. Revised Note 1 as per MI's Approved Products for geotextile

    DETAIL DESCRIPTION DETAIL No.

    REVISIONS

    DescriptionByRevised Date

    DATE DRAWN:

  • April 2014

    1:11:1

    1:1

    with last 1 m vertical face.

    is reached and then 6:1 for 1 m in height

    slopes until 2 m in remaining vertical height

    - Vertical face for bottom 1 m with 1:1 side

    75 thick working base

    Granular backfill

    50 thick insulation

    Insulation Width

    Excavation Width

    ( ) ( )

    ( ) ( )

    ( )( )

    CROSS SECTION

    75 thick working base

    Granular backfill

    50 thick insulation

    ( ) ( )

    ( ) ( )

    ( )( )

    -Use in existing grade

    Excavation

    3 000

    300

    300

    -Use in new grade

    Limit of excavation

    Limit of excavation

    and rounded up to nearest increment of 2ft. (610) widths.

    - Insulation shall project a min. 450 each side of culvert (for frost protection)

    - Excavation width at the base shall be a min. 1 000 to 1 500 on each side of box culvert

    1.3.5

    GENERAL ELEVATION

    CROSS SECTION

    1 000

    1 000

    CROSS SECTION

    1:1

    6:1

    to MB Workplace Health and Safety requirements.

    - Excavation thru any existing grade (P.R. or P.T.H.) shall conform

    1:1

    of (DATE)

    groundline as

    Approx. existing

    1 000

    Culvert

    of

    |

    site (min. 300)

    to be determined for each

    Upper limit of granular backfill

    Culvert

    of

    |

    site (min. 300)

    to be determined for each

    Upper limit of granular backfill

    placed by Culvert Contractor.

    Granular backfill to be supplied and

    placed by Culvert Contractor.

    Granular backfill to be supplied and

    6:1

    1:1

    DETAIL DESCRIPTION

    LOCATION

    SITE No. DATE

    DETAIL No.Infrastructure and Transportation

    Water Management and Structures

  • April 2014

    granular backfill

    300 thick compacted

    50 thick insulation

    75 thick working base

    Scale 1 : 20

    DETAIL "A"

    NOTES:

    50 thick insulation

    75 thick working base

    Scale 1 : 20

    DETAIL "A"

    NOTES:

    1.3.6

    NOTES, DETAIL "A"

    GENERAL ELEVATION

    3. Working base shall be lean mix concrete 75 mm thick.

    all joints poly-vinyl taped.

    c) Insulation shall be completely enclosed in 6 mil. polyethylene with

    with staggered joints.

    b) Insulation shall be 50 mm thick extruded polystyrene placed

    in DETAIL "A"

    headwalls and shall extend vertically behind cut off wall as shown

    a) Insulation shall be placed under all working base concrete including

    2. Insulation shall be supplied and placed by Culvert Contractor as follows:

    1. Granular backfill shall be used within minimum limits as shown on "CROSS SECTION".

    DETAIL DESCRIPTION

    LOCATION

    SITE No. DATE

    DETAIL No.Infrastructure and Transportation

    Water Management and Structures

  • Proposed cofferdam

    Proposed sediment barrier

    & limits of construction and access area

    Limits of laydown, staging and access areas

    DETAIL DESCRIPTION

    LOCATION

    SITE No. DATE

    DETAIL No.Infrastructure and Transportation

    Water Management and Structures

    SITE PLAN

    SITE AND EROSION CONTROL DETAILS

    (as req’d)

    - show roadway centreline and width

    - show river/stream centreline

    - show right of way limits

    - show limits of construction area

    - show proposed silt barrier location

    - show extent of rip rap

    - overlay contour plan if available

    - proposed structure outline

    Place Plan of site and include the minimum of the following:

    Place any revelant notes as it pertains to

    the placement of silt barriers and or cofferdams

    for the Contractor to follow.

    May 2014 1.4.1

    SITE PLAN

    LEGEND

    NOTES

  • AA

    B BCC

    EN

    D ELE

    VATIO

    N

    ( )

    ( )

    ( )( )( )

    ( )

    ( )

    ( )

    ( )

    Head

    wall

    of

    |

    (see

    Details)

    Constr

    uction joints

    head

    wall

    front fa

    ce of

    to proje

    ct to

    back slab reinf.

    Must allo

    w tie

    100 cha

    mfer

    25 cha

    mfer

    Round corners

    : 1

    : 1

    ( )

    ( )

    ( )

    Class (3

    50) rip-rap

    (450) thick

    1.5.3

    END ELEVATION

    CONCRETE DETAILS

    500 belo

    w grade

    300 above grade

    800

    min.

    face of

    head

    wall only

    board on outside

    Use 19 x 50 form

    April 2014

    DETAIL DESCRIPTION

    LOCATION

    SITE No. DATE

    DETAIL No.Infrastructure and Transportation

    Water Management and Structures

  • Culvert

    of

    |

    constr. joints)

    (Betw

    een150 (Typical)

    CROSS SECTION

    150

    150

    90

    Construction joint

    Construction joints

    EXTERIOR WALLS

    JOINT AT TOP OF

    INTERIOR WALLS

    JOINT AT TOP OF

    EXTERIOR WALLS

    JOINT AT BOTTOM OF

    INTERIOR WALLS

    JOINT AT BOTTOM OF

    DETAILS OF CONSTRUCTION JOINTS

    ( )

    ( )

    ( )

    ( )

    ( )

    ( )

    ( )

    ( )

    ( )( )

    ( ) ( )

    ( )( ) ( )( )

    at tieback slabs

    6 layers of reinforcing steel

    300 thick min. to accept

    Top & bottom slabs must be

    (see Details)

    Construction joints

    Scale 1 : 2

    1.5.6

    CROSS SECTION, DETAILS OF CONSTRUCTION JOINTS

    CONCRETE DETAILS

    38 x 89 Key (typical)

    form board (tapered sides)

    Construction key, use 38 x 89

    ( )

    April 2014

    to accommodate concrete placement

    All walls to be 300 mm thick min.

    DETAIL DESCRIPTION

    LOCATION

    SITE No. DATE

    DETAIL No.Infrastructure and Transportation

    Water Management and Structures

  • ...\headwall reinforcing.dgn 2009-12-10 1:35:00 PM

  • rc box details 100 INDEX 2004 ISSUETITLE DETAIL DESCRIPTION DETAIL No. DATE GENERAL LEGEND 1.1.1 NOV, 2007ABBREVIATIONS 1.1.2 NOV, 2007COVER SHEET TYPICAL LAYOUT 1.2.1 NOV, 2007DESIGN DATA 1.2.2 NOV, 2007LEGEND 1.2.3 NOV, 2007GENERAL ELEVATION TYPICAL LAYOUT 1.3.1 NOV, 2007BORING LOG 1.3.2 NOV, 2007LONGITUDINAL SECTION 1.3.3 NOV, 2007PLAN 1.3.4 NOV, 2007CROSS SECTION 1.3.5 NOV, 2007NOTES, DETAIL “A” 1.3.6 NOV, 2007TITLE BOX 1.3.7 NOV, 2007EROSION CONTROL TYPICAL LAYOUT 1.4. NOV, 2007CONCRETE DETAILS TYPICAL LAYOUT 1.5.1 NOV, 2007SIDE ELEVATION 1.5.2 NOV, 2007END ELEVATION 1.5.3 NOV, 2007 SECTION A-A 1.5.4 NOV, 2007SECTION B-B & C-C 1.5.5 NOV, 2007CROSS SECTION, DETAILS OF CONSTRUCTION JOINTS 1.5.6 NOV, 2007NOTES, POURING SCHEDULE 1.5.7 NOV, 2007SLAB REINFORCING TYPICAL LAYOUT 1.6.1 NOV, 2007DETAILS PLAN 1.6.2 NOV, 2007PLAN 1.6.3 NOV, 2007PLAN OF TIEBACK SLAB 1.6.4 NOV, 2007SECTION D-D 1.6.5 NOV, 2007

    rc box details 111 Legendrc box details 112 Abbreviationsrc box details 121 Cover sheet layoutrc box details 122 Design datarc box details 123 Legendrc box details 124 survey controlrc box details 131 typical layoutrc box details 132 boring logrc box details 133 longitudinal sectionrc box details 134 planrc box details 135 cross section detailsrc box details 136 notes detailsrc box details 137 title boxrc box details 141_Site planrc box details 151 typical layoutrc box details 152 side elevationrc box details 153 end elevationrc box details 154 section aarc box details 155 section bb ccrc box details 156 cross section details construction jointsrc box details 157 notes pouring schedulerc box details 161 detailsrc box details 162 details planrc box details 163 planrc box details 164 detail plan of tieback slabrc box details 165 details section ddrc box details 171 reinforcing detailsrc box details 172 elevation detailsrc box details 174 elevation detailsrc box details 175 details section ee and ffrc box details 181 typical layoutrc box details 182 elevationrc box details 183 elevationrc box details 184 details section hhrc box details 185 details section ggrc box details 186 bill of reinforcing steel