CE511- Construction Planning & Control
1
Cash Flow AnalysisPart 2
King Saud University
CE511- Construction Planning & Control
2King Saud University
• Payment schedule• Materials• Mobilization• Monthly payments• Final Payment
Contract Provision that Impact Cash Flow
CE511- Construction Planning & Control
3King Saud University
Contractor Cash Disbursements
• Labor• Equipment• Materials• Subcontractors• Other
– Insurance,– Permit and mobilization– Overhead items
CE511- Construction Planning & Control
4King Saud University
Factors That Minimize Contractor's Negative Cash Flow
1. Front end rate loading: – earlier items in bill of quantities carry a higher mark-
up than later items early stages.– This reduces negative cash flows in contract early
stages.
2. Reduction of delays in receiving revenue.
3. Adjustment of work schedule to late start timing.
4. Coinciding the timing of delivery of large materials orders with the submittal of the contractor's monthly pay estimate.
CE511- Construction Planning & Control
5King Saud University
Factors That Minimize Contractor's Negative Cash Flow
5. Delay in paying labour, plant hirers, materials suppliers, and subcontractors.– This would reduce negative cash flows but undermine
commercial confidence in the company.
6. Increasing the mark-up and reducing the retentions.
7. Increasing mobilization and advance payment.8. Achievement of maximum production in the
field.9. Quick settlement or claims.
CE511- Construction Planning & Control
6King Saud University
The Cash Flow Analysis
CE511- Construction Planning & Control
7King Saud University
The Cash Flow Analysis
CE511- Construction Planning & Control
8King Saud University
Example 4.1
• The mark-up is 10% of tender value and is assumed to be uniformly distributed over the contract.
• The contractor will receive an advanced payment of 10% of tender value. – This will be deducted from each monthly revenue.
Retention is 5% and is paid on contract completion.• Labour cost is assumed to be 30% of total
contract cost and is paid after one week's delay.• The delay for other submitting is one month.• Revenue is received after 4 weeks from
submitting invoices.
CE511- Construction Planning & Control
9King Saud University
Example 4.1
• Assuming all the activities are scheduled on their early start timings, it is required to derive:– revenue and income curves, – cost and expense curves and– contract cash flow curves.
• Compare contract net cash flows for revenue received after 4 and 6 weeks from submitting invoices.
• Determine the effect on contract cash flow of scheduling the activities on their late start timings while the revenue is received with 4 week’s delay.
CE511- Construction Planning & Control
10King Saud University
Table 4.3 Date for example 4.1
Activity Duration (weeks)
Preceding activity
Overlap Value (LE)
A 5 30000 B 4 A 20000 C 5 A -1 15000 D 5 A 15000 E 5 B 2 25000 F 4 B,C 16000 G 6 D 18000 H 4 E 1 8000 I 3 F,G 2 with G 9000 J 2 H.I 4000
CE511- Construction Planning & Control
11King Saud University
CE511- Construction Planning & Control
12King Saud University
CE511- Construction Planning & Control
13King Saud University
CE511- Construction Planning & Control
14King Saud University
CE511- Construction Planning & Control
15King Saud University
CE511- Construction Planning & Control
16King Saud University
CE511- Construction Planning & Control
17King Saud University
CE511- Construction Planning & Control
18King Saud University
CE511- Construction Planning & Control
19King Saud University
CE511- Construction Planning & Control
20King Saud University
Algorithm Calculations1) calculate the net operating cash flow at the end of
period t for t ≥ 0 is given by:
At = Pt Et
– At is positive for a surplus and negative for a shortfall– Et = the contractor's expenses in period t, and – Pt = owner's payments in period t, for t = 0,1,2,...,n.
2) calculate The cumulative operating cash flow at the end of period t just before receiving payment Pt (for t ≥ 1) is:
Ft = Nt-1 Et
– Nt-1 is the cumulative net cash flows from period 0 to period (t-1).
CE511- Construction Planning & Control
21King Saud University
3) calculate the cumulative net operating cash flow after receiving payment Pt at the end of period t (for t ≥1) is:
Nt = Ft + Pt = Nt-1 + At
4) The gross operating profit G for a n-period project is defined as net operating cash flow at t=n and is given by:
Algorithm Calculations
CE511- Construction Planning & Control
22King Saud University
Example 1: Contractor's gross profit from a project
The contractor's expenses and owner's payments for a multi-year construction project are given in Columns 2 and 3, respectively, of Table 1. Each time period is represented by one year, and the annual interest rate i is for borrowing 11%. The computation has been carried out in Table 1, and the contractor's gross profit G is found to be N5 = $8.025 million in the last column of the table.
TABLE 1 Example of Contractor's Expenses and Owner's Payments ($ Million)
Period t
Contractor's Expenses
Et
Owner's Payments
Pt
Net Cash Flow
At
Cumulative Cash Before Payments
Ft
Cumulative Net Cash
Nt
0 1 2 3 4 5
Total
$3.782 7.458
10.425 14.736 11.420
5.679 $53.500
$0 6.473 9.334
13.348 16.832
15.538 $61.525
-$3.782 -0.985 -1.091 -1.388 +5.412
+9.859 +$8.025
-$3.782 -11.240 -15.192 -20.594 -18.666 -7.513
-$3.782 -4.767 -5.858 -7.246 -1.834 +8.025
CE511- Construction Planning & Control
23King Saud University
CE511- Construction Planning & Control
24King Saud University
Considering the time value of money
1) Compute the interest per period
- If is negative and i is the borrowing rate for the shortfall,
- If is positive and h is the investment rate for the surplus,
CE511- Construction Planning & Control
25King Saud University
2) calculate the interest accrued in period t, the cumulative cash flow at the end of period t just before receiving payment Pt (for t ≥1) is:
Considering the time value of money
3) calculate the cumulative net cash flow after receiving payment Pt at the end of period t (for t ≥1) is:
CE511- Construction Planning & Control
26King Saud University
4) calculate the gross operating profit at the end of a n-period project including interest charges is:
Considering the time value of money
where is the cumulative net cash flow for t = n.
CE511- Construction Planning & Control
27King Saud University
Example 2: Effects of Construction Financing
The computation of the cumulative cash flows including interest charges at i = 11% for Example 1 is shown in Table 2 with gross profit = = $1.384 million. The results of computation are also shown in Figure 2.
TABLE 2 Example Cumulative Cash Flows Including Interests for a Contractor ($ Million)
Period (year)
t
Construction Expenses
Et
Owner's Payments
Pt
Annual Interest
Cumulative Before Payments
Cumulative Net Cash Flow
0 1 2 3 4 5
$3.782 7.458 10.425 14.736 11.420 5.679
0 $6.473 9.334 13.348 16.832 15.538
0 -$0.826 -1.188 -1.676 -1.831 -1.121
-$3.782 -12.066 -17.206 -24.284 -24.187 -14.154
-$3.782 -5.593 -7.872
-10.936 -7.354 +1.384
Example 2
CE511- Construction Planning & Control
28King Saud University
Example 2
CE511- Construction Planning & Control
29King Saud University
Example 2
CE511- Construction Planning & Control
30King Saud University
Example 3: Effects of Inflation Suppose that both expenses and receipts for the construction project in the Example 1 are now expressed in then-current dollars (with annual inflation rate of 4%) in Table 3. The market interest rate reflecting this inflation is now 15%. In considering these expenses and receipts in then-current dollars and using an interest rate of 15% including inflation, we can recompute the cumulative net cash flow (with interest). Thus, the gross profit less financing costs becomes = = $0.4 million. There will be a loss rather than a profit after deducting financing costs and adjusting for the effects of inflation with this project.
TABLE 3 Example of Overdraft Financing Based on Inflated Dollars ($ Million)
Period (year)
t
Construction Expenses
Et
Owner's Payments
Pt
Annual Interest
Cumulative Before
Payments
Cumulative Net Cash
Flow
0 1 2 3 4 5
$3.782 7.756 11.276 16.576 13.360 6.909
0 $6.732 10.096 15.015 16.691 18.904
0 -$1.149 -1.739 -2.574 -2.953 -1.964
-$3.782 -12.687 -18.970 -28.024 -29.322 -18.504
-$3.782 -5.955 -8.874 -13.009 -9.631 +0.400
CE511- Construction Planning & Control
31King Saud University
Example 4: Effects of Work Stoppage at Periods of Inflation
TABLE 4 Example of the Effects of Work Stoppage and Inflation on a Contractor ($ Million)
Period (year)
t
Construction Expenses
Et
Owner's Payments
Pt
Annual Interest
Cumulative Before
Payments
Cumulative Net Cash
Flow
0 1 2 3 4 5 6
$3.782 7.756 11.276
0 17.239 13.894 7.185
0 $6.732 10.096
0 15.015 16.691 18.904
0 -$1.149 -1.739 -1.331 -2.824 -3.330 -2.457
-$3.782 -12.687 -18.970 -10.205 -30.268 -32.477 22.428
-$3.782 -5.955 -8.874 -10.205 -15.253 -12.786 -3.524
CE511- Construction Planning & Control
32King Saud University
Example 4: Effects of Work Stoppage at Periods of Inflation
CE511- Construction Planning & Control
33King Saud University
Example 4: Effects of Work Stoppage at Periods of Inflation