Rapid prototyping is our unique approach for developing many different ideas very early in the process and using those alternative ideas to inform the design. In conjunction with other brainstorming techniques, we use this process with the project stakeholders, who become active participants in the design, rather than passive observers of its results.

Citation preview

Rapid Prototyping for a Research and

Development Facility

Case Study:Collaborative Design Using Digital Modeling

Collaborative Design Using

Digital Modeling

Model the program brief space requirements

Rapid PrototypingRapid prototyping is our unique approach for developing many different ideas very early in the process and using those alternative ideas to inform the design. In conjunction with other brainstorming techniques, we use this process with the project stakeholders, who become active participants in the design, rather than passive observers of its results.

Organize by critical adjacencies

Define larger space groupings

We use 3D computer modeling and traditional hand sketching as the primary tools for facilitating this process because they allow us to quickly generate variations and evaluate alternatives from different perspectives. These services can be provided in a cost-effective manner and generally save significant dollars during construction.

Because new ideas tend to flow from old ones, we look at variations by quickly developing each idea in a simplified 3D model. These sessions are very effective at engaging the users, and work that requires weeks in traditional design can often be accomplished in a two or three hour session.

Since the users are engaged, the solutions that come out of the process have immediate buy in, and consensus among a diverse group of stakeholders is usually achieved early, making the entire design process more efficient.

Examine and Refine Multiple Conceptual Designs

Options for overall building organization

Start with concept client used to get board approval for the project

Atrium as hub to link labs, offices and pilot plant

Lab/office building organized as a long linear slab

Rotate facility to open views from existing building

Closer adjacency with administration facility

Stack labs and offices over the pilot plant

Labs and offices sandwiched between manufacturing and pilot plant

“L” shaped office/lab wing

Rotate office/lab wing

Approved scheme combines best features of multiple schemes

“T” shaped lab/office wing

Combine “L” shape with rotation and incorporate atrium as circulation hub

Interactive planning of individual lab groups

Plan for the Space at Hand

Use planning module, casework and equipment ‘kit of parts’

Synergies between spaces led to efficiency and area reduction Stacking options: combine detail lab layouts with office plans

Study building envelope: branding, blending with existing

Examine the Envelope

Make the Most of Daylight and Views

Maximize daylight & views while controlling heat gain & solar glare

Combine best features into three preferred options

Determine the Best Options

Finalize the Design

Approved exterior concept

Concept for interior atrium

Final design concept

Final concept design: 3 weeks of interactive meetings over a 5-week period

About IDC ArchitectsIDC Architects is an integrated, multidisciplinary planning and design firm focused on science and technology, with a global presence and a singular vision: to discover better ways for people, technology, buildings, and the environment to work together. Our integrated method of architectural and engineering design produces sound master plans, functional and flexible spaces, reliable building systems, and sustainable solutions, achieved through a highly collaborative process that fully engages all project stakeholders.

As a CH2M HILL company, IDC Architects has access to the resources of a global leader in full-service consulting, design, design-build, operations, and program management for public and private clients. With US$6.4 billion in revenue and nearly 30,000 employees worldwide, CH2M HILL delivers innovative, practical, sustainable solutions—helping clients develop and manage infrastructure and facilities that improve efficiency, safety, and quality of life. The firm has long been recognized as a most-admired company and leading employer. CH2M HILL is an industry-leading program management, construction management, and design firm as ranked by Engineering News-Record (2011).

©2012 CH2M HILLIAT041312202212PGH

West Coast Design Headquarters2020 SW Fourth Ave.Third FloorPortland, OR 97201USATel: +1 503.736.4250

East Coast Design HeadquartersFive Penn Center West, Suite 300Pittsburgh, PA 15276USATel: +1.412.848.2275

www.idcarchitects.com