2
Owner Tanjung Bin Energy Issuer Bhd. Client Mudajaya Corporation Berhad Chimney EPC Contractor Zelan BEC Consortium Lining System Pennguard Borosilicate Block Lining System Project Participants Challenges Significantly tapered external windshield design with off-centered single flue. Constructed on reclaimed land. Large 10.5m ID internal steel flue. Detail of work by BEC BEC was awarded the Design & Build package for the chimney, including pile cap, slipform, heavy lifting of roof, floors and flue, installation of internal rack and pinion hoist, AWLs, internal lighting, lightning conductor, earthing works and Pennguard borosilicate block protection lining system to the inside face of the flue. But the steel structural were fabricated by Zelan and installed by BEC. Tanjung Bin 4 Project Tanjung Bin Energy Issuer Berhad has a proposed 1 x 1000-megawatt (MW) coal-fired power plant for construction in Negeri Johor Darul Takzim, The new 1000 MW base load power facility will provide a reliable power source to the Malaysia community. . Tanjung Bin Energy Issuer Berhad was constructing a 1000-megawatt coal-fired power plant in Negeri Johor Darul Takzim , Malaysia. Mudajaya Corporation Berhad was the main EPC contractor for this project. TANJUNG BIN 4 PROJECT CASE STUDY TANJUNG BIN 4 PROJECT BEC Group of Companies c/o 18 Boon Lay Way #10-159/162 TradeHub 21 Singapore 609966 Tel: +65 6778 6858 Fax: +(65) 6690 9259 Website: www.be-con.com Email: [email protected]

CASE STUDY TANJUNG BIN 4 PROJECT BEC Case...BEC was awarded the Design & Build package for the chimn Owner Tanjung Bin Energy Issuer Bhd. Client Mudajaya Corporation Berhad Chimney

Embed Size (px)

Citation preview

Page 1: CASE STUDY TANJUNG BIN 4 PROJECT BEC Case...BEC was awarded the Design & Build package for the chimn Owner Tanjung Bin Energy Issuer Bhd. Client Mudajaya Corporation Berhad Chimney

Owner

Tanjung Bin Energy Issuer Bhd.

Client

Mudajaya Corporation Berhad

Chimney EPC Contractor

Zelan BEC Consortium

Lining System

Pennguard Borosilicate Block Lining System

Project

Participants

Challenges • Significantly tapered external windshield design with off-centered single flue. • Constructed on reclaimed land. • Large 10.5m ID internal steel flue.

Detail of work by BEC BEC was awarded the Design & Build package for the chimney, including pile cap, slipform, heavy lifting of roof, floors and flue, installation of internal rack and pinion hoist, AWLs, internal lighting, lightning conductor, earthing works and Pennguard borosilicate block protection lining system to the inside face of the flue. But the steel structural were fabricated by Zelan and installed by BEC.

Tanjung Bin 4 Project Tanjung Bin Energy Issuer Berhad has a proposed 1 x 1000-megawatt (MW) coal-fired power plant for construction in Negeri Johor Darul Takzim, The new 1000 MW base load power facility will provide a reliable power source to the Malaysia community.

.

Tanjung Bin Energy Issuer Berhad was constructing a 1000-megawatt coal-fired power plant in Negeri Johor Darul Takzim , Malaysia. Mudajaya Corporation Berhad was the main EPC contractor for this project.

TA

NJU

NG

BIN

4 P

RO

JE

CT

CASE STUDY TANJUNG BIN 4

PROJECT

BEC Group of Companies c/o 18 Boon Lay Way #10-159/162 TradeHub 21 Singapore 609966

Tel: +65 6778 6858 Fax: +(65) 6690 9259 Website: www.be-con.com Email: [email protected]

Page 2: CASE STUDY TANJUNG BIN 4 PROJECT BEC Case...BEC was awarded the Design & Build package for the chimn Owner Tanjung Bin Energy Issuer Bhd. Client Mudajaya Corporation Berhad Chimney

Chimney Data

Height 200m

No. of internal steel flue 1

No. of internal platforms 3

Diameter of internal flue 10.5m

External concrete diameter 24.2m

Piles 56 Nos. x 1200 dia

Pile Cap 33.0dia x 2.9m deep

Tanjung Bin 4 stack elevation

Slip forming in progress

Painting in progress

Installation of the 10.5m ID flue

Pennguard Borosilicate Block Protection Lining System