6
The lateral tooth, #22 has a very short root, high mobility, which means no pain . Treatment option: a screw retained restoration over an implant. Treatment sequence: tooth was extracted and immediate implant placement was performed using MGUIDE, MIS V3 3,90 x 11,50mm implant, filling the depression on the buccal side of #22 with a Connective Tissue Graft taken from the upper palatal area and delayed loading. Provisional restoration is a Maryland bridge between 21 and 23. After 4 months of osseointegration, a screw retained crown was placed for #22 as well as a composite filling on # 23. Brief description Guided immediate placement in the esthetic zone Case study Credentials: Galip Gürel (Turkey) Dr. Galip Gürel

Case study - MIS Implants Technologies Ltd....Treatment option: a screw retained restoration over an implant. Treatment sequence: tooth was extracted and immediate implant placement

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Case study - MIS Implants Technologies Ltd....Treatment option: a screw retained restoration over an implant. Treatment sequence: tooth was extracted and immediate implant placement

The lateral tooth, #22 has a very short root, high mobility, which means no pain . Treatment option: a screw retained restoration over an implant. Treatment sequence: tooth was extracted and immediate implant placement was performed using MGUIDE, MIS V3 3,90 x 11,50mm implant, filling the depression on the buccal side of #22 with a Connective Tissue Graft taken from the upper palatal area and delayed loading. Provisional restoration is a Maryland bridge between 21 and 23. After 4 months of osseointegration, a screw retained crown was placed for #22 as well as a composite filling on # 23.

Brief description

Brief description

Guided immediate placement in the esthetic zone

Case study

Credentials:Galip Gürel (Turkey)

Dr. Galip Gürel

Page 2: Case study - MIS Implants Technologies Ltd....Treatment option: a screw retained restoration over an implant. Treatment sequence: tooth was extracted and immediate implant placement

1. 2. 3.

Page 3: Case study - MIS Implants Technologies Ltd....Treatment option: a screw retained restoration over an implant. Treatment sequence: tooth was extracted and immediate implant placement

4. 5. 6.

Page 4: Case study - MIS Implants Technologies Ltd....Treatment option: a screw retained restoration over an implant. Treatment sequence: tooth was extracted and immediate implant placement

8. 9. 7.

Page 5: Case study - MIS Implants Technologies Ltd....Treatment option: a screw retained restoration over an implant. Treatment sequence: tooth was extracted and immediate implant placement

10. 11. 12.

Page 6: Case study - MIS Implants Technologies Ltd....Treatment option: a screw retained restoration over an implant. Treatment sequence: tooth was extracted and immediate implant placement

X-ray

16.