CASE STUDY ELIMINATING 3RD PARTY DAMAGE DURING LARGE SCALE ALDYL-A REPLACEMENT PROGRAM EXECUTIVE SUMMARY Originally installed in the 1970s, Aldyl-A plasc pipe was the choice of many installers but has since become problemac because of its vulnerability to premature cracking. Addionally, the PE pipe is challenging to locate due to broken and missing tracer wires. To reduce the risk of 3rd party damages, Orange and Rockland partnered with ULC Robocs to roll-out a highly accurate locang and mark out program to tackle the unlocatable plasc in the field prior to replacement. CHALLENGES Tradional methods of locang and marking out Aldyl-A and plasc gas mains are challenging due to: Tracer wire is either broken or was never installed making it difficult to locate. • Mapping is either outdated or does not include gas main features such as stubs and services, which may lead to 3rd party damages. Excessive test holes must be dug driving up the cost of pavement restoraon. INSPECTION & RESULTS INDUSTRY: Natural Gas Networks BUSINESS AREAS ADDRESSED: • Damage Prevenon • Gas Construcon SOLUTION IMPROVED: • Worker Safety • Project Efficiency RESULTS: • Eliminated 3rd Party Damages • Enhanced Efficiency of Field Workflow and Operaons • Reducon in Project Time, Cost and 3rd Party Damage “Before we excavate for replacement of Aldyl-A pipe, we always call ULC to help us avoid third party damages in the field. We won’t dig until ULC marks the main using their long range cameras. Their markers are spot-on, which means fewer holes in the street for our community.” Clint W. - Chief Construction Inspector, Orange & Rockland Utilities

CASE STUDY ELIMINATING 3RD PARTY DAMAGE DURING LARGE …

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CASE STUDY ELIMINATING 3RD PARTY DAMAGE DURING LARGE …

CASE STUDY

ELIMINATING 3RD PARTY DAMAGE DURING LARGE SCALE ALDYL-A REPLACEMENT PROGRAM

EXECUTIVE SUMMARY

Originally installed in the 1970s, Aldyl-A plastic pipe was the choice of many installers but has since become problematic because of its vulnerability to premature cracking. Additionally, the PE pipe is challenging to locate due to broken and missing tracer wires. To reduce the risk of 3rd party damages, Orange and Rockland partnered with ULC Robotics to roll-out a highly accurate locating and mark out program to tackle the unlocatable plastic in the field prior to replacement.

CHALLENGES

Traditional methods of locating and marking out Aldyl-A and plastic gas mains are challenging due to:

• Tracer wire is either broken or was never installed making it difficult to locate.

• Mapping is either outdated or does not include gas main features such as stubs and services, which may lead to 3rd party damages.

• Excessive test holes must be dug driving up the cost of pavement restoration.

INSPECTION & RESULTS

INDUSTRY: Natural Gas Networks

BUSINESS AREAS ADDRESSED:

• Damage Prevention

• Gas Construction

SOLUTION IMPROVED:

• Worker Safety

• Project Efficiency

RESULTS:

• Eliminated 3rd Party Damages

• Enhanced Efficiency of Field Workflow and Operations

• Reduction in Project Time, Cost and 3rd Party Damage

“Before we excavate for replacement of Aldyl-A pipe, we always call ULC to help us avoid third party damages in the field. We won’t dig until ULC marks the main using their long range cameras. Their markers are spot-on, which means fewer holes in the street for our community.” Clint W. - Chief Construction Inspector, Orange & Rockland Utilities

Page 2: CASE STUDY ELIMINATING 3RD PARTY DAMAGE DURING LARGE …

ULC Robotics’ crews deploy proprietary live gas main camera systems to visually identify all features in the pipe and mark out the location of the pipe and its features on the street surface. The highly accurate and complete mark out provides a roadmap for construction to avoid accidental damage to gas mains and features such as stubs.

• ULC eliminated 3rd party damages by working ahead of replacement contractors to mark out projects and ensuring the contractor crews understood the marks prior to breaking ground.

• Ensured test holes were dug directly over taps and other features to avoid unnecessary excavations and improve efficiency.

• Provide engineers reliable mapping so that new main work can be efficiently carried out ahead of schedule with confidence and accurate coordinates.

• ULC fast-tracked services with operator qualified technicians to perform fusions and tappings on entry fittings.

“Contractors and inspectors face human error, which makes it difficult to properly identify the gas main. Working with ULC, we all come together to accurately identify and mark out the main, services, and tees. ULC Robotics is always on the money, they provide us all the information directly onsite to improve the safety of our work.” Joell P. - Foreman, Riggs Distler

ULC LIVE GAS MAIN INSPECTION & IN-PIPE LOCATING SERVICES

With dedicated field crews and an array of cameras and crawlers, our staff is ready to deploy the right inspection tool for your team. From steel, plastic and cast iron, our robust systems provide reliable data that gives utility contractors 100% confidence to carryout work for years to come by looking directly inside the pipes.

Contact us to learn more about our Live Gas Main Inspection Services: 1-631-667-9200 / www.ulcrobotics.com

FEATURES MARKED OUT: Stub Connection Service Connections Offsets Couplings Valves Branches

DIAMETER RANGE: 2”+ Aldyl-A, PE, Steel & Cast Iron

MAX PRESSURE: 99 psi Live Gas Conditions

DISTANCE RANGE: Up to 800’ per entry point