Case Study - DeGrussa Solar Hybrid Project Energy and Mines World Congress 22-11-2016 Peter Drager juwi Renewable Energy Pty Ltd

Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

Case Study - DeGrussa Solar Hybrid ProjectEnergy and Mines World Congress

22-11-2016 – Peter Drager

juwi Renewable Energy Pty Ltd

Page 2: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

juwi at a Glance

Wind Energy

1,800 MW of installed capacity;

100 wind parks (840 turbines);

Solar Energy

1,700 MW of installed capacity;

1,500 PV Installations;

Company

1,000 employees worldwide;

$7 billion investment volume;

Top 3 largest solar EPC.

juwi Renewable Energy Pty Ltd

Page 3: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

Consulting &

AcquisitionPlanning Development

Financing &

SalesConstruction

Operations &

Service

Our Renewable Energy Activities

juwi Renewable Energy Pty Ltd

Page 4: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

Global leader in Off-Grid Projects

Off-grid Projects: Rwanda, Chile, Namibia, Egypt, Germany

juwi Renewable Energy Pty Ltd

Page 5: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

DeGrussa Project: Mine Site Background

Degrussa Mine:

Mining: Gold and copper

Location: Doolgunna Region, WA

900 km North of Perth

Owner/Operator: Sandfire Resources NL

Power Supply:

Diesel Generators: 19MW

Operator: KPS

Avg. load: ~ 11MW

Avg. consumption: ~ 100GWh p.a.

Diesel Power Supply Constraints:

• High price (and likely to increase);

• Fluctuating prices;

• Supply unreliable (trucked to site).

juwi Renewable Energy Pty Ltd

Page 6: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

DeGrussa Project: The Solution

Hybrid Power Plant:

PV-Modules: 10.6 MWp

Tracking: East-West tracking

PV-Inverter: 10 MW

Storage: 4 MW / 1,8 MWh (6 MW peak)

Primary Purpose: To reduce diesel consumption of the mine

Builder / Operator: juwi Australia

juwi Renewable Energy Pty Ltd

Page 7: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

DeGrussa Project: The Solution

Low Penetration High Penetration

• Low Penetration

• Simple control mechanism

• No Control System required

• No BESS necessary

• Low Capex

• High Capex

• Complex control system

• Storage Necessary

• Diesel off-mode possible

• Solar Smoothing

• High Penetration

CAPEX

Grid

support

Solar

Penetration

Fuel

Savings

high

>50%

high

Up to 100%

CAPEX

Grid

support

Fuel

Savings

low

<7

%

low

15

%

Power ratio PPV/PGen

Solar

FractionUp to 100%Solar

Fraction

<7

%

Solar

Penetration

Medium Penetration

• Low Capex

• Fuel Save Controller

• No Solar Smoothing

• No Storage Necessary

• Diesel off-mode possible

• Medium Penetration

CAPEX

Grid

support

Solar

Penetration

Fuel

Savings

low

>25%

Up to

50%

low

Solar

Fraction

Up to

25%

Page 8: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

DeGrussa Project: System Components

“Standard” Solar PV System

• 34,080 polycrystalline modules;

• Distributed DC Combiner boxes;

• 5 x 2MW containerized inverter stations with Tx station;

Proven Battery/Battery Inverter technology

• 2 x 2MW (3MW peak) Grid forming battery inverters;

• 2 x 900kWh (3.6mw Peak) LI-ion battery containers.

Solar/Hybrid Controller:

• Distributed controllers;

• Remote monitoring and control;

• Functionalities include spinning reserve control, solar

smoothing (ramp rate control), frequency control, reactive

power control and priority dispatch of solar PV energy.

juwi Renewable Energy Pty Ltd

Page 9: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

DeGrussa Project: Control System Design

Night Time Operation

• 100% reliant on Diesel Power Station

• Battery Station provides Frequency and Reactive

Power Support

• Option for Battery Station to provide additional spinning

reserve.

juwi Renewable Energy Pty Ltd

Page 10: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

DeGrussa Project: Control System Design

Daytime Operation

• Mine operations reliant primarily on the Diesel Power

Station;

• Solar PV generation maximized through optimum

function of the integration philosophy;

• Key constraints that determine the PV production

include the mine load, minimum diesel loading,

minimum number of generators online and the

required spinning reserve.

• Spinning reserve requirement of 100% coverage of

solar PV output + buffer outlined by Sandfire;

• Ramp rate determined by Diesel Power Station

constraints (limited by storage/spinning reserve

capacity);

• “Diesel off mode” possible.

juwi Renewable Energy Pty Ltd

Page 11: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

DeGrussa Project: The Corp Development Structure

Project SPV

ARENA

Equity

Diesel Genset IPP

Debt

EPC Contractor

Offtaker O&M contractor

juwi Renewable Energy Pty Ltd

Page 12: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

DeGrussa Project: Development Timeline

juwi Renewable Energy Pty Ltd

2014 2015 2016 2021

MO

U s

ign

ed

Gra

nt fu

nd

ing

ag

reem

ent sig

ned

PP

A s

ign

ed

EP

C C

ontr

act sig

ned

and

co

nstr

uction

sta

rt

Co

nstr

uction

co

mp

letion

and

ene

rgis

ation

Pra

ctical C

om

ple

tion

Co

mp

letion

of In

itia

l T

erm

Page 13: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

The Result – Site View

juwi Renewable Energy Pty Ltd

Page 14: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

The Result – Solar Facility

juwi Renewable Energy Pty Ltd

Page 15: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

The Result – Battery Station

juwi Renewable Energy Pty Ltd

Page 16: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

Challenges – Brownfield Projects on Minesites

Cost savings are not material compared with business turnover;

Mine life restricting PPA length;

Non-core business drain on time and money;

Little technical understanding of renewable energy;

Additional construction/operational requirements compared with standard solar PV projects.

juwi Renewable Energy Pty Ltd

Page 17: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

Challenges – Hybrid Project Commercials

Financing

• Higher risk (potential for a stranded asset);

• Limited Hybrid Renewable energy experience;

• Guarantee requirements become complex;

• Complex Due diligence requirements;

• Complex legal negotiations.

System Cost

• Engineering - Substantial design process;

• Additional equipment (battery, inverters etc.);

• Installation costs (labor, transport etc.);

• Logistics - Remote operation and maintenance;

juwi Renewable Energy Pty Ltd

Page 18: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

Challenges - Solar PV Production

Soiling losses in dusty region with heavy equipment;

Solar curtailment due to constrained grid;

Longevity of equipment in harsh conditions;

(vegetation management not an issue)

juwi Renewable Energy Pty Ltd

Page 19: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

Project Benefits

Reduction in power costs:

Cheaper than diesel generation (subject to diesel price

and PPA term);

PPA price is fixed for the contract term;

Auxiliary benefits not quantified in financial model

(reactive power control, frequency control)

Reduced exposure to power price rises:

Fossil fuel market prices;

Transport;

Exchange rate;

Current & future cost of CO2.

juwi Renewable Energy Pty Ltd

Page 20: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

Project Benefits (cont’d)

Technical Benefits

Energy security;

Improved power quality and power system reliability;

Better monitoring analysis;

Employee energy consciousness;

Supplier/ experience for future projects.

Social License

Sustainability image (“the solar mine”);

Local employment;

Increased marketing/recognition.

juwi Renewable Energy Pty Ltd

Page 21: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

Additional Resources

juwi Renewable Energy Pty Ltd

Project Overview YouTube video

https://www.youtube.com/watch?v=9ljiQ86L78Y&feature=youtu.be

juwi Press Release

http://www.juwi.ae/articledetail/largest-off-grid-solar-project-complete-3/

Sandfire Solar Project Info Page

http://www.sandfire.com.au/operations/degrussa/solar-power-project.html

Page 22: Case Study - DeGrussa Solar Hybrid Project - Energy And Minesworldcongress.energyandmines.com/files/Energy-and-Mines...Case Study - DeGrussa Solar Hybrid Project Energy and Mines World

Thank You!

Peter Drager

Business Development Manager - Australia-South Pacific

juwi Renewable Energies Pty Ltd

Level 8, 110 George St.

Brisbane Qld 4000

Tel. +61 7 3107 0908

Mob. +61 432 068 155

[email protected]

www.juwi.com

juwi Renewable Energy Pty Ltd