Project Specifics Installation Dates Trip 1 | June 11-18, 2019 Trip 2 | September 9-13, 2019 Environmental Conditions Trip 1 | Very hot/humid, weather. ~ +40deg.C each day. Trip 2 | No rain or precipitation. ~+25deg.C each day. Details Vessel Diameters: 74 Meters Storage Product: Crude Oil Vessel Construction: Out-of-Service, “Leak Detection” LD Ports, HDPE Liner or Equivalent, Sumps, Concrete Ring Wall Foundation Details: Bit-Sand Inhibitor Delivery System (IDS) Chime Ring Dry IDS with ER Probe Monitoring Zerust Product(s) Used Zerion® FVS-B15 Zerion® FVS-S15 Corrosion Inhibitor Sleeves Corrosion Problem? Contact us at [email protected] CASE STUDY Corrosion Protection of an Out-of-Service Crude Oil Aboveground Storage Tank on Bit-Sand Foundation by Chime Ring Dry IDS with ER Probes Project Specifics The client wanted corrosion protection for an aboveground stor- age tank holding crude oil on bit-sand foundation. Zerust Solution The engineers at Zerust® Oil & Gas developed a custom solution for this client using their Chime Ring Dry IDS. Zerion® FVS-S15 Cor- rosion Inhibitor Sleeves were installed around the tank along and ER Probes and Box were set up. Installation Process Trip 1 | June 11-18, 2019 The concrete substrate was in poor condition and required latex screed applied to allow for a smooth substrate for the application of Viscotaq Chime Seal, see right for images. Trip 2 | September 9-13, 2019 On the first trip the client was finishing the internal plate weld- ing so the team made a second trip to complete the installation of the sleeves and corrosion readings could not be completed at that time. For More Zerust Oil & Gas Case Studies Visit www.zerust-oilgas.com/casestudies COMPLETED PROJECT CONCRETE PRIOR TO REMEDIAL WORK ER PROBE TRENCHES REMEDIAL SCREED WORK COMPLETED ER PROBE TRENCHES CORE

CASE STUDY Corrosion Protection of an ... - Zerust Oil & Gas

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Project Specifics Installation DatesTrip 1 | June 11-18, 2019Trip 2 | September 9-13, 2019

Environmental ConditionsTrip 1 | Very hot/humid, weather. ~ +40deg.C each day.Trip 2 | No rain or precipitation. ~+25deg.C each day.

DetailsVessel Diameters: 74 MetersStorage Product: Crude OilVessel Construction: Out-of-Service, “Leak Detection” LD Ports, HDPE Liner or Equivalent, Sumps, Concrete Ring WallFoundation Details: Bit-SandInhibitor Delivery System (IDS)Chime Ring Dry IDS with ER Probe Monitoring

Zerust Product(s) UsedZerion® FVS-B15Zerion® FVS-S15 Corrosion Inhibitor Sleeves

Corrosion Problem? Contact us [email protected]

CASE STUDY Corrosion Protection of an Out-of-Service Crude OilAboveground Storage Tank on Bit-Sand Foundation by Chime Ring Dry IDS with ER Probes

Project Specifics The client wanted corrosion protection for an aboveground stor-age tank holding crude oil on bit-sand foundation.

Zerust SolutionThe engineers at Zerust® Oil & Gas developed a custom solution for this client using their Chime Ring Dry IDS. Zerion® FVS-S15 Cor-rosion Inhibitor Sleeves were installed around the tank along and ER Probes and Box were set up.

Installation Process Trip 1 | June 11-18, 2019The concrete substrate was in poor condition and required latex screed applied to allow for a smooth substrate for the application of Viscotaq Chime Seal, see right for images.

Trip 2 | September 9-13, 2019On the first trip the client was finishing the internal plate weld-ing so the team made a second trip to complete the installation of the sleeves and corrosion readings could not be completed at that time.

For More Zerust Oil & Gas Case Studies Visitwww.zerust-oilgas.com/casestudies

COMPLETED PROJECT

CONCRETE PRIOR TO REMEDIAL WORK

ER PROBETRENCHES

REMEDIAL SCREED WORK COMPLETED

ER PROBETRENCHES CORE

IMPLEMENTINGTHE PVC NETWORK

VISCOPASTE WITHADHESION TESTS

REMEDIAL SCREED WORK COMPLETED

VISCO BAND EZ

Corrosion Problem? Contact us [email protected]

CASE STUDY Corrosion Protection of an Out-of-Service Crude OilAboveground Storage Tank on Bit-Sand Foundation by Chime Ring Dry IDS with ER Probes

For More Zerust Oil & Gas Case Studies Visitwww.zerust-oilgas.com/casestudies

VISCO BAND TOP COAT

PRE-FABRICATION OF PVC ASSEMBLY

PRE-FABRICATION OF ER PROBE HOUSING