33-35 SANDY LANE, SKELMERSDALE, LANCS, WN8 8LA T 0844 800 7791 E [email protected] W www.hawkinsconstruction.co.uk Roof valley repair The roof valleys had failed on the store roof and a solution was required that did not involve the major disruption and cost associated with re-roofing. We surveyed the condition of the roof and designed and specified an appropriate solution with a selected product supplier, SIKA. Key issues on this project also related to safe working on the roof and the ongoing security of the store during the works to the roof. We specified specially designed scaffolding to ensure full edge protection with access towers removed out of working hours. The valleys were reformed in timber and a SIKA waterproofing system, Decothane was applied in four layers. In addition to our quality control systems, the SIKA technical representative made weekly inspections and the completed repair is now covered by a 15 year guarantee. Case Study - Aldi Store in Netherton, Liverpool Client Aldi Requirement Repair of failed roof valleys Value £24,000 Programme 4 weeks Certificate Number 2754/01

Case Study - Aldi Store in Netherton, Liverpool · 33-35 SANDY LANE, SKELMERSDALE, LANCS, WN8 8LA T 0844 800 7791 E [email protected] W Roof valley repair

  • Upload
    lengoc

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

33-35 SANDY LANE, SKELMERSDALE, LANCS, WN8 8LAT 0844 800 7791 E [email protected] W www.hawkinsconstruction.co.uk

Roof valley repair The roof valleys had failed on the store roof and a solution was required that did not involve the major disruption and cost associated with re-roofing. We surveyed the condition of the roof and designed and specified an appropriate solution with a selected product supplier, SIKA.

Key issues on this project also related to safe working on the roof and the ongoing security of the store during the works to the roof. We specified specially designed scaffolding to ensure full edge protection with access towers removed out of working hours. The valleys were reformed in timber and a SIKA waterproofing system, Decothane was applied in four layers.

In addition to our quality control systems, the SIKA technical representative made weekly inspections and the completed repair is now covered by a 15 year guarantee.

Case Study - Aldi Store in Netherton, Liverpool

ClientAldi

RequirementRepair of failed roof valleys

Value£24,000

Programme4 weeks

Certificate Number 2754/01