23

Case Studies 2016Tciarc

Embed Size (px)

Citation preview

FF&E Specialists for temporary accommodation within the Construction Sector

With TCI (GB) Ltd we offer a comprehensive project managed service designed to simplify complex FF&E projects for temporary accommodation within the construction industry. With over 45 years combined experience our project teams work in partnership with you to achieve significant savings, improve efficiency, source products and manage your installation to completion. We are the leading FF&E specialists within the construction sector that deliver everything from innovative design, space planning and full project management. Our unrivalled experience sets us apart, delivering beyond the brief on the most complex of projects. We hold all the necessary accreditations to install on high security sites across the country. We make it our job to make your job easier.

... The complete solution

London’s South Bank is set to be transformed by a unique mixed-use development with the famous Shell Centre Tower at its heart. TCi (GB) Ltd were approached to supply and install our Mesh Basket System within the arched welfare areas and locker room benching for 300 site operatives and trade contractors. This element of works was the initial phase of ongoing services provided by TCi (GB) Ltd on the project.

Southbank Place, London SE1 – Project Hub

Hanging Basket system

TCi (GB) Ltd were appointed to provide a sustainable solution for the project office furniture requirements. We supplied & Installed our revolutionary 100% sustainable cardboard engineered workstations to provide a solution. This project further cements the working relationship between Mace Group and TCi (GB) Ltd.

Elephant & Castle, London SE1

MACE Group Project Office – Elephant & Castle, London SE1

Battersea Power Station Redevelopment

Carillion is one of the UK’s leading integrated support services companies, with a substantial portfolio of Public Private Partnership projects, extensive construction capabilities. We approached Carillion with regards to the Battersea Redevelopment Scheme. We worked closely with one of Carillion’s senior buyers to ascertain their needs to provide an adequate facility for their onsite employees. Subsequently a presentation was delivered and accepted. An order followed for Office Desks, Office Chairs, Canteen Units, Lockers and all other ancillary items. This project further cements the working relationship between Carillion PLC and TCi (GB) Ltd.

Interserve, the international support services and construction group, has been selected to build the new £200 million Defence establishment at the Defence and National Rehabilitation Centre (DNRC) at Stanford Hall, near Loughborough. TCi (GB) Ltd procured and project managed the installation of Office furniture & Welfare Equipment to accommodate the project team and 200 operatives.

DNRC - Loughborough

Balfour Beatty were awarded an £80m contract to construct the National Automotive Innovation Centre (NAIC) for the University of Warwick. Through competitive tender TCI (GB) Ltd were awarded the contract to fit out the modular buildings for the construction phase. TCi (GB) Ltd procured and project managed the installation of Office furniture & Welfare Equipment to accommodate the project team and 250 + operatives.

University of Warwick NAIC

AstraZeneca, New Global R&D Centre

In March 2013, plans were announced to establish a new Global R&D Centre and Corporate Headquarters in Cambridge on the Cambridge Biomedical Campus, the future home to approximately 2,000 employees. Skanska Construction were awarded the contract to build the £300m scheme and in June 2015 works commenced site. TCi (GB) Ltd through competitive tender achieved contract award for the FF&E Installation for the modular temporary accommodation units. Over 300 workstations for the Project Team and Welfare Solutions for up to 1000 operatives was successfully delivered.

Brookfield Multiplex secured the conversion of London’s landmark Centre Point office tower into 82 luxury apartments. Works will complete in the second quarter of 2017, and create a pedestrian square that links the building to Oxford Street and Covent Garden. TCi (GB) Ltd procured and project managed the installation of Office furniture for the project team and designed a solution for the welfare areas to accommodate over 300 operatives. This project further cements the working relationship between Brookfield Multiplex Construction Europe and TCi (GB) Ltd.

Centre Point - London

A stunning new riverside development offering a selection of luxurious one, two and three bedroom apartments and penthouses boasting magnificent views of some of London's most iconic landmarks. TCi (GB) Ltd were approached to supply and install Welfare furniture within the temporary accommodation for site operatives and trade contractors. This element of works was the initial phase in ongoing services provided by TCi (GB) Ltd

22-26 Albert Embankment, London SE1

Lend Lease secured the contract to design and build the new £250m super prison in Wrexham. TCi (GB) Ltd procured and project managed the installation of all the Office furniture for the project team comprising of 96 workstations and associated storage. Our personnel hold all the necessary certifications to successfully complete a project of this nature and TCI (GB) Ltd holds all relevant industry accreditations. This project further cements the working relationship between Lend Lease and TCi (GB) Ltd.

Wrexham Prison

The 50:50 joint venture, called Hercules, was awarded the contract by the Defence Infrastructure Organisation (DIO).Hercules will deliver new single-living accommodation for military training and purpose-built enhanced training facilities. TCi GB were asked to provide a solution to the accommodation requirements on the Hercules project undertaken by Kier Balfour Joint Venture. A proposal was submitted based on their specifications and a successful negotiation provided TCi GB Ltd with an order for the works. We successfully supplied and installed office desks and chairs, screens and canteen units. TCi GB Ltd were able to carry out the afore mentioned works as we hold all current and necessary industry accreditations.

Pill Media, Manchester

Large 3-storey welfare & offices In November 2007 we completed the site offices and welfare accommodation for the development of Media City in Manchester. Media City was a huge project which encompasses the new BBC Head Office, Sky and other key media players.

TCi (GB) Ltd have provided 3 storey's of office and welfare furniture into 15,000 sq ft of buildings, which was supplied, installed and ready for occupation within the tight schedule.

Queens Building

Heathrow -T2a TCi were asked by Hetco to provide Office and Welfare furniture on the high security site of Heathrow. It required furniture on 4 storey’s with 2 levels of welfare incorporating Lockers, benches and canteen seating. All work would have to take place within a strict timeframe and it would be pivotal all deliveries and installation were run like clockwork.

Ground Floor Plan

First Floor Plan Second Floor Plan Third Floor Plan

AWE Project Mensa

Changing room and Basket room

TCi were approached by Wilson James to create a new welfare area within their existing office and welfare building on the AWE site. Understanding the high security of the site and the requirement to keep to the strict programme for work was paramount. The project would incorporate a hanging basket system in a secure room to provide a safe storage of operatives belongings and a changing area. This would ensure space would be maximised for the circulation of the personnel.

Programme of works

Programme of Works

Proposed Plan

Hanging Basket system

Cloakroom Bench with hat and coat hooks

Personal effects lockers

Qty

860

Supply and installation of 860no. Wire mesh baskets to newly erected space with associated frames, drip trays along mid level and basket identification numbers.

50 Supply and installation of 16 tier lockers for personal effects (mobile phones) 305mm x 460mm x 1780mmH with key lock

10 2000mmL Double sided wooden slatted bench with hat and coat hooks over

18 2000mmL Single sided wooden slatted bench with hat and coat hooks over

Partition

1

Supply and fit 25 Linear metres of full height partition incorporating 70mm Stud, 1 layer of 12.5mm Moisture board each side, tape and jointed. Finish with 100mm laminate grey skirting. Allow for creation of 2no. Hatch openings for service.

1 Finish partition by decoration with Dulux trade emulsion paint

1 Supply and fit 1no. FD30 Door into new partition with Ash Veneer finish with associated ironmongery. Assume card access is required (Supplied by Client).

2

Create 2no. openings into existing shower room wall. Supply and fit 2no. FD30 doors with associated ironmongery.

Description of Works

The Olympic Park, London

The 180 acre Stratford City site is located on former railways land bordered by Stratford Regional Station, Leyton Road and Carpenters Road. It is divided into two halves by the new Stratford International Station, with the northern site housing the Athletes Village and to the south Westfield's city centre development.

During its creation TCI won the builds contract with WACO to supply and install all floor coverings. In total TCI's flooring contractors installed 5,000m2 of vinyl and 2,500m2 carpet tiles. Our skilled joinery team installed over 200 toilet cubicles and 120 vanity units, complete with mirrors and soap dispensers.

In order to achieve this state of the art site, Westfield Ltd contracted Waco Premier Interlink to install a modular construction office. The modular construction office comprises of 80,000 ft2 / 7,500 m2 to accommodate 250 office staff and 2,500 site operatives.

We are passionate about our work; Passion drives our commitment to continuous improvement and excellence in delivery, which generates happy customers and continued business. We are committed to the creation of long lasting relationships. One year on and TCI still fulfill the needs and requirements of Westfield Ltd and Waco Premier Interlink.

The project took a record breaking seven weeks to complete, with TCI working around the clock to ensure the project was bought in on time and budget, whilst encouraging and actively promoting Health and Safety innovation, best practices and initiatives through our staff, sub contractors and systems.

Whilst the main build had been completed, TCI won it’s second large contract, this time working directly for the end client Westfield's Shopping Ltd. TCI's scope of works included the supply and install of 250 work stations and conference room facilities.

Head Office 18-20 Daddon Court Business Park Bideford EX39 3HN United Kingdom Tel: 01237 470 288

Distribution Catfoss Lane Brandesburton East Yorkshire YO25 8EJ United Kingdom

Tele: 01237 470 288 Fax: 05600 754 057 E-mail: [email protected] [email protected]

Contact us

Cornwall Kaigan House 5 Oakleigh Terrace Newquay TR7 1RN Tel: 01637 420 462

Somerset Unit 6 Washford Watchet Somerset TA24 0JY Tel: 01984 678051

London Westminster Ind Est Woolwich London SE18 5PH Tel: 020 7060 5242