Page 1: Case for Cambodia

Team 6

Case for Cambodia

Eric Immerfall

Elizabeth Smit

Jordan Johnston

Lisa Andela

Aaron Goodman

Page 2: Case for Cambodia

Review of ProjectDesign NormsPreliminary Solutions

RequirementsAlternativesFeasibilityObstacles

ResourcesQuestions

Presentation Outline

Page 3: Case for Cambodia

Genesis Community of Transformation

Eden School of Agriculture

Master Plan ComponentsWater Distribution

SystemSanitary FacilitiesCommon BuildingBridge DesignRenewable Energy

Source

Review of Project

Problem Review of Project Design Norms Preliminary Solutions Resources

Page 4: Case for Cambodia

Cultural Appropriateness: Through the design, materials, and

construction methods of the common Cambodian.

Transparency: Communication about the simplicity and

reliability of the design.Integrity:

Design will facilitate relationships between people and their land.

Design Norms

Problem Review of Project Design Norms Preliminary Solutions Resources

Page 5: Case for Cambodia

Sanitary FacilityRequirements

2 Sinks, 2 Toilets, and 2 Showers

Gravity Fed Water SystemWaste Removal Alternatives

Latrine PitsStabilization PondsSeptic Tank

FeasibilitySanitation is necessary and

achievable anywhere

Problem Review of Project Design Norms Preliminary Solutions Resources

http://www.rdic.org

Page 6: Case for Cambodia

Water DistributionRequirements:

Water to supply sanitary facility and irrigation

Filters for clean waterFeasibility:

Existing 140 ft wellDry season irrigation

Detention pond, runoff collection

Water from the well to supplement

Safe Drinking Water

http://www.rdic.org

Problem Review of Project Design Norms Preliminary Solutions Resources

Page 7: Case for Cambodia

Common BuildingRequirements:

• 2 stories• 6m x 12m (about 20’ x

40’)• 10-12 dorm rooms • Use local style and

materialsFeasibility:

• Large groups purposes• Keep costs low• Long life in wet

conditions• Size to fit in requests

Problem Review of Project Design Norms Preliminary Solutions Resources

Obstacles:Finding informationCultural Differences

Page 9: Case for Cambodia

Renewable Energy Source

• Preliminary Design:• 6-10 x 175 W solar panels

• Charge controller• 10-14 maintenance free

batteries• Inverter

Problem Review of Project Design Norms Preliminary Solutions Resources

Requirements: Provide Energy to the

Common Building and house Must turn a variable supply

into a dependant AC source Feasibility:

Solar is feasible Hydro is questionable Wind is no longer an option

Page 10: Case for Cambodia

Bridge Design• Requirements:

• Required to span the distance including the added depth of the wet season

• Needs to be able to support the load of a small vehicle or tractor

Alternatives:• Three types of designs that are

feasible at this point are slab bridges, truss bridges, and culvert with land bridge

• Feasibility:• The biggest obstacle at this

point is not having enough data to properly model each design

Problem Review of Project Design Norms Preliminary Solutions Resources

Page 11: Case for Cambodia

DistanceSite specificsCommunicationClimate/Weather

Cultural DifferencesStandard building practicesAccess to materials and site

Obstacles in Design

Problem Review of Project Design Norms Preliminary Solutions Resources

Page 12: Case for Cambodia

Roger Lamer – Industrial ConsultantProfessor De Rooy – Team AdvisorProfessor Dornbos – Biology ProfessorNavy Chann-Chhay and Li Chhay – Owners of

ESAJon Cooper – Formerly lived at the siteRDI – Resource Development InternationalArjen Luxwolda – Managing Director of

Kamworks

Resources

Problem Review of Project Design Norms Preliminary Solutions Resources

Page 13: Case for Cambodia

Further questions…email us at: [email protected]

Questions?