Case for Cambodia. Team 6. Aaron Goodman. Lisa Andela. Eric Immerfall. Elizabeth Smit. Jordan Johnston. Presentation Outline. Review of Project Design Norms Preliminary Solutions Requirements Alternatives Feasibility Obstacles Resources Questions. Review of Project. - PowerPoint PPT Presentation
Citation preview
Team 6
Case for Cambodia
Eric Immerfall
Elizabeth Smit
Jordan Johnston
Lisa Andela
Aaron Goodman
Review of ProjectDesign NormsPreliminary Solutions
RequirementsAlternativesFeasibilityObstacles
ResourcesQuestions
Presentation Outline
Genesis Community of Transformation
Eden School of Agriculture
Master Plan ComponentsWater Distribution
SystemSanitary FacilitiesCommon BuildingBridge DesignRenewable Energy
Source
Review of Project
Problem Review of Project Design Norms Preliminary Solutions Resources
Cultural Appropriateness: Through the design, materials, and
construction methods of the common Cambodian.
Transparency: Communication about the simplicity and
reliability of the design.Integrity:
Design will facilitate relationships between people and their land.
Design Norms
Problem Review of Project Design Norms Preliminary Solutions Resources
Sanitary FacilityRequirements
2 Sinks, 2 Toilets, and 2 Showers
Gravity Fed Water SystemWaste Removal Alternatives
Latrine PitsStabilization PondsSeptic Tank
FeasibilitySanitation is necessary and
achievable anywhere
Problem Review of Project Design Norms Preliminary Solutions Resources
http://www.rdic.org
Water DistributionRequirements:
Water to supply sanitary facility and irrigation
Filters for clean waterFeasibility:
Existing 140 ft wellDry season irrigation
Detention pond, runoff collection
Water from the well to supplement
Safe Drinking Water
http://www.rdic.org
Problem Review of Project Design Norms Preliminary Solutions Resources
Common BuildingRequirements:
• 2 stories• 6m x 12m (about 20’ x
40’)• 10-12 dorm rooms • Use local style and
materialsFeasibility:
• Large groups purposes• Keep costs low• Long life in wet
conditions• Size to fit in requests
Problem Review of Project Design Norms Preliminary Solutions Resources
Obstacles:Finding informationCultural Differences
FIRST FLOOR SECOND FLOOR
Common Building Roofing Alternatives
Problem Review of Project Design Norms Preliminary Solutions Resources
Renewable Energy Source
• Preliminary Design:• 6-10 x 175 W solar panels
• Charge controller• 10-14 maintenance free
batteries• Inverter
Problem Review of Project Design Norms Preliminary Solutions Resources
Requirements: Provide Energy to the
Common Building and house Must turn a variable supply
into a dependant AC source Feasibility:
Solar is feasible Hydro is questionable Wind is no longer an option
Bridge Design• Requirements:
• Required to span the distance including the added depth of the wet season
• Needs to be able to support the load of a small vehicle or tractor
Alternatives:• Three types of designs that are
feasible at this point are slab bridges, truss bridges, and culvert with land bridge
• Feasibility:• The biggest obstacle at this
point is not having enough data to properly model each design
Problem Review of Project Design Norms Preliminary Solutions Resources
DistanceSite specificsCommunicationClimate/Weather
Cultural DifferencesStandard building practicesAccess to materials and site
Obstacles in Design
Problem Review of Project Design Norms Preliminary Solutions Resources
Roger Lamer – Industrial ConsultantProfessor De Rooy – Team AdvisorProfessor Dornbos – Biology ProfessorNavy Chann-Chhay and Li Chhay – Owners of
ESAJon Cooper – Formerly lived at the siteRDI – Resource Development InternationalArjen Luxwolda – Managing Director of
Kamworks
Resources
Problem Review of Project Design Norms Preliminary Solutions Resources