48
SPO91539 Best Practice: Hamm-Reno Group with SAP HANA on IBM Power Systems with SUSE® Linux Exterprise Server Carsten Dieterle IBM Germany [email protected]

CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Embed Size (px)

Citation preview

Page 1: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

SPO91539

Best Practice: Hamm-Reno Group with

SAP HANA on IBM Power Systems with

SUSE® Linux Exterprise Server

Carsten Dieterle

IBM Germany

[email protected]

Page 2: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Agenda

- SAP HANA on Power History

- Introduction to HR Group

- SAP HANA History at HR Group

- SAP HANA RampUp with HoP

- Migration Project and Going Live

- Lessons Learned and next steps

- Summary

2 2

Page 3: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

History - Development activities

August 2013

SAP initiates Product Development Program for HANA on IBM

Power technology

December 2013

HANA code optimized compiled/linked (HANA SPS08,

SLES11SP2)

February 2014

All HANA Servers running, IBM code checked in, full function

testing commencing, Power 8 optimization agreed

June 2014

SaphireNow/Bernd Leukert announces “Test and Evaluation

Program” for selected customers in 3Q 2014

October 2014

SAP TechEd && d-code/Bjoern Goerke announces HANA on

POWER SAP Ramp-Up Program” beginning 1Q2015

November, 2014

BW 7.31+ TEA code ships to customers

March, 2015:

SAP Ramp-up opened for customer applications

July 2015:

SAP Ramp-up successfully closed 3

SAP HANA on IBM Power – From Start till To-Date

August, 2015:

GA SAP HANA on IBM POWER

December, 2015

Support for SAP Suite on HANA and

HANA Platform Edition SPS 11

Page 4: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Countries with HR-Group presence 20

Points of sale (POS) 2,000

Employees 5,000

Units sold per year

(shoes, textiles and accessories)

40m pairs / units

Revenue per year 600m€

Hamm-Reno Group - Company Key Data (rounded)

4

Page 5: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Internationalization

Reno retail onlySystems trade Retail and systems tradeReno general franchise

5

Page 6: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Largest footware system wholesaler in Europe

More than 750 chain stores in 20 countries

Owner managed, franchise & general franchise

Exclusive shoe brands e.g. Bama,

Sansibar, Young Spirit and Mercedes

Large portfolio of lifestyle brands

Attractive prices

Proven quality

Patent for „3E-Children Shoe System“

RENO: Footwear Retailer in the HR-Group

6

Page 7: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Brands

7

Page 8: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

8

Page 9: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

9

Page 10: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Mülheim Kärlich

10

Page 11: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

SAP HANA on IBM Power Systems – Current Status as of May 2015

November 2014 - February 2015

March 2015 August 21st, 2015

Ramp-Up periodGeneral availability

(GA)

Customer Test and

Evaluation phase (TEA)

March 2015 - July 2015

HR-Group was one of 20 customers that qualified for Ramp-Up Program and live with a productive system as #4 worldwide

11

Page 12: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

SAP HANA at HR-Group

Start with BW on SAP HANA

in December 2012

2 system landscape each with

20-Core Intel / 256 GB memory

Assortment and module planning

POS Data Management and Loss Prevention Analytics

Data sources: POS-DM, ETL from ERP-System, SLT

BO Analysis for Office, Design-Studio applications

Real-time reporting for Point of Sale (POS) and logistics

At present about 300 GB of data

Source: IBM

12

Page 13: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Hardware Life Cycle with HR-Group

Replacement of leased IBM POWER7 Systems

with Power8 beginning of 2015

3 x S824 (each 16 Cores, 768 GB Memory)

1 x S822L (10 Cores, 384 GB as Linux test system)

2 x Storwize V5000, each 3,2 TB SSD, 82 TB HDD, EasyTier

Almost doubling the number of SAPS leaves room for new developments

End of leasing of existing HANA-Appliances in December 2015

Source: IBM

Page 14: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

SAP HANA is strategic for SAP

Since 2011 available with SAP Business Warehouse

Since 2013 with SAP Business Suite (“Suite on SAP HANA“)

Base of the „Simple…“ roadmap / S/4 HANA

that redesigns central modules

Future SAP solutions will probably

only be available with SAP HANA

Source: SAP

14

Page 15: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

From the Appliance to the Cloud

Started as High Performance ANalytic Appliance

S/4 HANA is also available as

Cloud Edition

Cloud environments

require virtualization

IBM PowerVM

Source: SAP

15

Page 16: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Availability “on Premise“

HR-Group prefers IBM PowerVM

as platform for virtualization

Intel-Appliance is “foreign object“

IBM Proof-of-Concept on IBM POWER in 2012 was successful

Customer demanded permission for “on Premise“ in 2012

SAP started Development Program on August 1st, 2013

Test- and Evaluation Program since November 1st, 2014

Ramp-Up started on April 1st, 2015

General Availability (GA) since August 21st, 2015

SLES 11.3 (LINUX_PPC64), POWER8, ≤ 3TB Memory, BW 7.31.12ff

Source: IBM

16

Page 17: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

All IBM POWER8 Servers are certified by SAP

IBM Solution Edition are a fast-start option, using sample configurations based on industry best-practices used to quickly configure and order an attractively priced infrastructure solution

Rapid deployment of SAP HANA on IBM Power Systems

Power E870 / E880

Up to 16 sockets Up to 12 cores/socket Up to 32 TB of Memory

The most scalable in-memory analytics

platform in the industry

Power E850

4 sockets Up to 12 cores/socket Up to 4 TB of Memory

1 or 2 sockets Up to 12 cores/socket Up to 2 TB of Memory

Power S814 / S824

Power S812 / S822

HR-Group

17

Page 18: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

New World Record set by IBM Power E870 on SAP BW Enhanced

Mixed Load Standard Application Benchmark with 2 Billion records

SAP BW Enhanced Mixed Load (BW-EML) Standard Application Benchmark Results, 2 billion initial record load on SAP Hana 1.0: Ad-hoc navigation step per hour/per core

Source SAP: http://www.sap.com//benchmark

“IBM set a world record in the industry leading SAP BW-EML Standard Application Benchmark at 2 billion records ... twice the performance per core over previous benchmarks.” >>

Kyle GarmanSVP & Managing Director, Global

Strategic Partners, SAP

(1) IBM Power Enterprise System E870 on the SAP BW Extended mixed load standard application benchmark running SAP Netweaver 7.31 application; 4 processors / 40 cores / 320 threads, POWER8; 4.19GHz, 1024 GB memory, 192.750 adhoc navigation steps per hours on SuSE Linux Enterprise Server 11 and SAP Hana 1.0, Certification #: 2015024 Result valid as of June 1, 2015. Source: http://www.sap.com/benchmark.(2) Dell PowerEdge R930, on the SAP BW Extended mixed load standard application benchmark running SAP Netweaver 7.31 application; 4 processors / 72 cores / 144 threads, , Intel Xeon Processor E-7 8890 v3 ,2.5 GHz; 1536 GB memory, 172.450 adhoc navigation steps per hours on SuSE Linux Enterprise Server 11 and SAP Hana 1.0, Certification #: 2015014 (3) Dell PowerEdge R920, on the SAP BW Extended mixed load standard application benchmark running SAP Netweaver 7.31 application; 4 processors / 60 cores / 120 threads, , Intel Xeon Processor E-7 4890 v2 ,2.8 GHz; 1024 GB memory, 137,010 adhoc navigation steps per hours on SuSE Linux Enterprise Server 11 and SAP Hana 1.0, Certification #: 2014044 (4) HP DL580 Gen8, on the SAP BW Extended mixed load standard application benchmark running SAP Netweaver 7.30 application; 4 processors / 60 cores / 120 threads, , Intel Xeon Processor E-7 4880 v2 ,2.5 GHz; 1024 GB memory, 126,980 adhoc navigation steps per hours on SuSE Linux Enterprise Server 11 and SAP Hana 1.0, Certification #: 2014009

SAP and all SAP logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries. All other product and service names mentioned are the trademarks of their respective companies.

2Xmore per core

IBM E870

POWER8 4p/40c/320t

DellPowerEdge R930

E7-8890 v34p/72c/144t

HPDL580 Gen8E7-4880 v24p/60c/120t

DellPowerEdge R920

E7-4890 v2,4p/60c/120t

18

Page 19: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Reflections

SAP HANA is strategic component from SAP

Virtualization on IBM Power Systems

has proved to work very well for HR-Group

Suitable point of time in the

HR-Group hardware life cycle

Ramp-Up Program started by SAP

High interest from IBM and Hardware partner FUM

Great opportunity and timing to migrate

to SAP HANA on IBM Power Systems

We wanted to change as little as possible on NetWeaver

HR-Group

19

Page 20: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Architecture Overview Diagram of the SAP Infrastructure including SAP HANA on Power

© Copyright IBM Corporation 2015

V5000V5000

S824_1

16 (24)-Core, 768GB RAM

LP

AR

Ethernet

Fibrechannel

VIO

2

HMC_2HMC_1

DC1 DC2

VIO

1

Ethernet

Fibrechannel

Live Partition Mobility

S824_2

16 (24)-Core, 768GB RAM

VIO

2

VIO

1

LVM Mirror

SAN

Fabric 1SAN

Fabric 1SAN

Fabric 2

SAN

Fabric 2

LTO Library LTO Library

4 4 44

S824_3

16 (24)-Core, 768GB RAM

VIO

2

VIO

1

LP

AR

LP

AR

LP

AR

LP

AR

LP

AR

LP

AR

HA

NA

De

v

LP

AR

LP

AR

LP

AR

LP

AR

S822L

20-Core, 384GB RAM

VIO

2

VIO

1

HA

NA

Pro

d

20

Page 21: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Architectural Concept for the SAP InfrastructureAbstract:

This architecture assumes that the existing workload is distributed over three identical Power8 S824

systems. If in the future more compute power and memory is required, this can be done via PowerVM and

AIX license increase of the available CoD resources.

Characteristics:

Distribution of LPAR’s on three symmetrically equipped Power 824 systems across the two data center

(load-balancing and high availability)

On each physical server will be 2 VIOS server installed for redundancy

All DB and application server instances are mapped to these systems in micro-partitions and "fully

virtualized". Virtualization refers to all components: CPU, memory and I/O adapters

I/O adapters are hot pluggable

The integrated virtualization PowerVM Enterprise enables a non-disruptive migration of LPARs between

systems (Partition Mobility) *

Data mirroring over both storage subsystems with AIX standard tools (LVM Mirror)

SAN connection via 8Gb FC

LAN connection via 10 Gbit / 1Gbit copper RJ45

Use of VSCSI- or NPIV technology for the operating system and data LUN’s

The management of the hardware and LPARs takes place on the HMC

* Requires appropriate support of this technology through the application vendor

© Copyright IBM Corporation 2015

21

Page 22: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

SAP Note 2133369

Only for SAP Business Warehouse (BW)

BO reports directly onto SAP HANA views is not supported

SAP Migration Check Service was under development

No support for SAP LT for HoP (!!!!)

HANA-Revision ≥ 94 +

new SAP kernel required

32 GB memory per core

SLES11 SP3 + patch

No show-stoppers for HR !

Scope of the SAP HANA on Power RampUp Program

© Copyright IBM Corporation 2015

22

Page 23: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

SAP HANA on Power Scope Description SAP Note 2133369 Version 1.0 from 18th of June 2015

© Copyright IBM Corporation 2015

223

Page 24: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

SAP Landscape Transformation Replication Server

© Copyright IBM Corporation 2015

24

Page 25: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

HANA on Power workshop conducted from IBM in April

2015

Support agreed by IBM and Fritz & Macziol (FuM) in

05/2015

Successful applied as RampUp customer end of May 2015

Project started mid of June 2015

Sandbox migration done in CW 27/28 (July 2015)

Development system migrated in CW 30 (Aug 5th)

SAP HANA on IBM POWER Systems

General Availability (GA) Aug. 21st

SAP Support agreement for SAP LT on Sep. 3d

TSM 7.1.3 GA on Sep. 11th

Production system migrated on Sep 11th+12th

Project schedule

© Copyright IBM Corporation 2015

25

Page 26: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

SAP HANA Sizing report for the productive SAP BW system

© Copyright IBM Corporation 2015

26

Page 27: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

SAN 1 SAN 2LAN

V5000 V5000

HMC1

HMC2

Architecture Overview for HANA on Power Production System

© Copyright IBM Corporation 2015

27

Page 28: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Architecture Overview for HANA on Power LPAR of the

Production System (Details)

© Copyright IBM Corporation 2015

28

Page 29: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

OS-DB-Migration

IBM POWER uses big-endian,Intel uses little-endian

OS-DB-migration was necessary

Significant CPU-load on app (!) servers for export / import in platformindependent format, about 15 GB/Core/hour

Parallelization / partitioning of large tables

Test of migration on sandbox system

DB objects created with HANA-Studio or SLT had to be migrated manually (!!!!)

Source: Wikipedia

29

Page 30: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

TSM Beta Programm

“TSM ERP SAP HANA on Power“ available with 7.1.3

Direct API call from HANA instead of temporary dump

Participation in BETA-Program

One error found – quickly resolved (stability)

Great cooperation with IBM specialists

Subsequent tests passed without any problems

TSM is now called

30

Page 31: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

SAP HANA Backup with TSM (Spectrum Protect) @ HR Group

Hamm Reno (large retailer in Europe) decided for SAP HANA on POWER

Gained better performance compared to SAP HANA on INTEL hardware

Hamm Reno was the first customer that is in production with Spectrum Protect for ERP for

SAP HANA on POWER

Scenario

Full database backup of production system to tape

Redo logs and development system to disk, later migration to tape

Customer feedback:

"HammReno is using Spectrum Protect for many year to protect their SAP databases. During the HANA

RampUp on IBMs POWER platform we evaluated Spectrum Protect for ERP using early code. It worked

very stable and robust with great performance characteristics, which made us using the product in our

production environment starting with the first day of General Availability on the POWER platform."

31

Page 32: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

HANA & Spectrum Protect Environment at HR Group

SAP Application Server

BW 7.3.1

AIX 7.1

ABAP

PROD Site

SAP Application Server

BW 7.3.1

AIX 7.1

ABAP

DEV Site

SAN

Storwize Storwize

HANA DB Server

HANA Rev. 96

SLES 11 SP4

320 GB Memory

HANA DB Server

HANA Rev. 96

SLES 11 SP4

180 GB Memory

TSM B/A

Client

TSM B/A

Client

TSM Agent for

HANA

TSM B/A

ClientTSM Agent for

HANA

• POS-DM

• Visualization with SAP Business Objects

• SAP LT Replication from Retail

• Integrated planning

Recovery Scenarios:

• Storage failure: Mirror on other Storwize

• IBM Power S824L failure: Live Partition Mobility

• Logical database failure: Restore from DB Backup

• Disaster Recovery with offsite tapes

Spectrum Protect

Server

TSM B/A

Client

Inhouse vault Remote vault

Planned in 2016:

Node Replication over Ethernet Connect to

other headquarter in Osnabrück

32

Page 33: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Assessment / Impact of Risks

OS-DB migration had to be completed within given timeframe. This was feasible

TSM 7.1.3 was available (GA) on time for go-live

Support for SLT was agreed 10 days prior to go-live

SAP OS/DB migration check service became available on time

HANA-Rev. 94: Error in test system: “Integrated Planning“

SAP Note: 2100049 / 2094791 (or BW SP13)

IBM activated some additional cores (already built in)

No show-stoppers

Timing and project plan were fully in scope

Production migration was flawless33

Page 34: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Tips & Lessons Learned

Check and use DNS aliases

Validate unified names of schemes

Test migration using sandbox system

Evaluate BW patchlevel update before migration

Plan for manual migration of “other“ HANA objects

Perform „Integrity Test“ before export

Configure 10+ cores on App servers

IBM and FUM always reacted fast and with high competency

Also with SAP it‘s a great help to have a personal contact

34

Page 35: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

SAP HANA on POWER – Current Status as of September 2015

November 2014 – February 2015

Release to Customer

Ramp-Up Start

April 2015

Public announcement

at SAPPHIRE, May 2015

Ramp-Up period

BWoH

Customer Test and Evaluation

phase

T&EA period

SoH selected use

cases

GA date

SoH

tbd

General Availability

SAP for BW

August 2015

Ramp-Up period

BWoHClosed 07/15

© Copyright IBM Corporation 2015

HR-Group was one of 20 customers that qualified for Ramp-Up Programand went live with a HoP productive system as #4 worldwide

35

Page 36: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Performance - Observations Pure Database observations, not SAPS

Evaluation of replicated table konp with about 9m data sets

Sum: select sum(kbetr) from konp

Integer: select sum(kbetr*2) from konp

Float: select sum(kbetr/17) from konp

Evaluation of likp/lips with 19 vkorg in about 7.5m joins

Join: select sum(lfimg), vkorg from likp, lips where lips.mandt=likp.mandt and lips.vbeln=likp.vbeln group by vkorg

0%

50%

100%

150%

200%

250%

Sum Integer Float Join

Intel 20-Core(100%)

Power 6-Core

Power 10-Core

36

Page 37: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

37

CPU Usage Few peaks during overnight processing

Real-time processing during daytime hardly visible

Significantly more than 32 GB per core load-dependent is realistic, e.g.

with entitlement (guaranteed cycles) in a shared processor pool

Page 38: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Watch the Hamm Reno reference online @ http://ibm.co/1WwiS9z

© Copyright IBM Corporation 2015

38

Page 39: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP
Page 40: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP
Page 41: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP
Page 42: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Summary

Since 2000 HR-Group is satisfied IBM Power customer

When starting with SAP HANA – it was only available as an Intel Appliance - a “foreign object” in our Data Center

SAP HANA on IBM Power is a real Enterprise Solution: Not an Appliance but implemented as a Tailored Data Center Integration (TDI)

The time was right to join the SAP on Power ramp-up program

All IBM POWER8 server configurations are certified by SAP

Smooth Migration to SAP HANA on IBM Power Systems!

42

Page 43: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Next steps

Upgrade from SLES11 SP3 to SLES4SAP (SLES11 SP4) with support from SUSE (done in Jan/Feb 2016)

Full virtualization of Power8 servers with PowerVM

Integration of application stack in SAP HANA LPAR (back to 2tier)

Planned integration of SLES HAE for reducing unplanned downtime

Further SAP HANA projects with SLES and IBM Power Systems

43

Page 44: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Thank you for your attention !

[email protected]

Page 45: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Time for questions …

Page 46: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP
Page 47: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP

Carsten Dieterle

Leading SOLAR(SAP Infrastructure SOLution ARchitect)

Member of the IBM

Technical Expert Council (TEC) DACH

IBM Deutschland GmbH

IBM-Allee 171139 EhningenGermany

Phone/Mobile +49 7034 274 1917

[email protected]

Page 48: CAS91539: 'Best Practice: Hamm-Reno Group with SAP · PDF fileProgram” for selected customers in 3Q 2014 October 2014 SAP TechEd && d-code/Bjoern Goerke announces HANA on POWER SAP