Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Cartier Resources OverviewAugust 31st – September 2nd, 2021 – Mines & Money
Philippe Cloutier, President & CEO
CAUTIONARY STATEMENT
FORWARD-LOOKING STATEMENTS
This document may contain forward-looking statements that reflect management’s current expectations withregards to future events. Such forward-looking statements are subject to certain factors and involve a number ofrisks and uncertainties. Actual results may differ from expected results. Factors that could cause our results, ouroperations or future events to change materially compared to expectations expressed or implied by the forward-looking statements include, but are not limited to, volatility in the price of gold, risks inherent to the miningindustry, uncertainty regarding mineral resource estimations, and additional funding requirements or theCompany’s ability to obtain such funding.
QUALIFIED PERSONS
The scientific and/or technical information presented in this presentation has been prepared and reviewed byMM. Gaétan Lavallière, P. Geo., Ph. D., Vice President for Cartier Resources and Ronan Déroff, P. Geo., M. Sc.,Senior Geologist, Project Manager and Geomatician, qualified persons as defined by National Instrument 43-101.Mr. Lavallière approved the information contained in this document.
2
CAPITAL STRUCTURE
COMMON SHARES - ISSUED AND OUTSTANDING 218 145 393
STOCK OPTIONS 17 400 000
WARRANTS (EXPIRE AUGUST 11TH 2021) 0
FULLY-DILUTED, AUGUST 2020 235 545 393
SHARE DISTRIBUTIONSHARE STRUCTURE
3STRONG CASH POSITION 8.5 MILLION CAN $
SHAREHOLDER %
CORPORATE & INSTITUTIONAL 45%
• AGNICO EAGLE • 16.4
• QUEBEC FUNDS • 12.0
• JUPITER ASSET MNGT • 9.8
• RUFFER • 3.9
• SSI • 3.3
MANAGEMENT & BOARD 4.0%
LONG TERM RETAIL 33.0%
• GROUP BMO• GROUP VAL-D’OR
• 23.0• 10.0
OTHER RETAIL 18.0%
ECR PROJECTS VS ADVANCED PROJECTS AND MILLS
4
BENOISTIND. 134,400 OZ AU
INF. 107,000 OZ AURECENT - NI 43-101 RESOURCES
DECEMBER 17, 2020
DDH IN PROGRESS
NELLIGAN
CHEVRIER
MONSTER LAKE
WINDFALL LAKE
GLADIATOR
BARRY
COMTOIS
DOUAY
FENELONMARTINIERE
PERRON
DUPARQUET
HORNE 5
ECR PROJECT
ADVANCED PROJECT
FENTON64,000 OZ AUHISTORICAL ESTIMATION –
NON NI 43-101
COMPILATION IN PROGRESS
WILSON43,000 OZ AU
HISTORICAL ESTIMATION – NON NI 43-101
28 DDH / 5000M
IN PROGRESS
CHIMO MINEIND. 684,000 OZ AU
INF. 1,358,000 OZ AU
NI 43-101 RESOURCES
MARCH 23, 2021
5
CHIMO MINE PROJECT HIGHLIGHTS
Mineral Resource Estimate
➢ Indicated resources of 6,616,000 tonnes at an average grade of 3.21 g/t Au for a total of 684,000 ounces of gold, and
➢ Inferred resources of 15,240,000 tonnes at an average grade of 2.77 g/t Au for a total of 1,358,000 ounces of gold.
Industrial sorting test work on mineralized material
➢Tests produced a concentrate representing by mass +50 % of the original mass of the material with a percentage increase of 170 % of the gold content compared to the feed of the sorter;
Internal engineering studies
➢ Internal engineering study on optimal development and mining scenarios is nearly complete. The designs aim to minimize costs while recovering as many ounces as possible from the property's three gold corridors
➢ In parallel, preliminary and internal technical-economic scenarios are being used to analyze the impact of results on the existing mining infrastructure of various potential partners
6
CHIMO MINE : PAST PRODUCTION
7
INTERNAL ENGINEERNG STUDIES: CONSTANT PROGRESS
-1000m -1000m
Past Production at Chimo Mine Ongoing Internal Engineering Designs
REPEAT PROCESS
Three more projects with similar characteristics: ➢ 100% owned by Cartier;
➢ Gold deposit with well defined geometry / rapid growth potential;
➢ Characteristics present to produce large tonnage at constant grade;
➢ Situated near infrastructure and qualified workforce;
BENOIST: DRILLING WILSON: UNDER OPTIONFENTON: RECENT 100% ACQUISITION
8
9
➢ Best intersections from historic drilling
▪ 5.3 g/t Au / 56.1 m incl. 10.5 g/t Au / 7.8 m
▪ 5.6 g/t Au / 53.6 m
▪ incl. 11.6 g/t Au / 9.3 m
▪ 6.5 g/t Au / 37.0 m incl. 12.9 g/t Au / 15.5 m
➢ Best intersections from Cartier Drilling
(2012-2014)
▪ 2.4 g/t Au / 53.0 m incl. 10.3 g/t Au / 5.0 m
▪ 1.7 g/t Au / 65.0 m
▪ incl. 24.5 g/t Au / 3.0 m
▪ 1.1 g/t Au / 27.0 m incl. 12.3 g/t Au / 1.0 m
ADVANCED PROJECT
WITH DEPOSIT – BENOIST
-600m
BENOIST PROJECT HIGHLIGHTS
MAIDEN RESOURCE ESTIMATE: DECEMBER 17TH 2020
10
11
BENOIST 2021 DDH PROGRAM – IN PROGRESS
12
FENTON: RECENT 100% ACQUIRED
13
WILSON OPTION: 28 HOLE , 5030-M PROGRAM
THANK YOU !FOR MORE INFORMATION:PHILIPPE [email protected]
TOLL FREE: 1-877-874-1331DIRECT: 819-874-1331
Chimo Mine Visible Gold Sample from Zone 5B, Level 17, 108.4 g/t Au over 2.0 mCourtesy of Mr. Tony Brisson, Mine Geologist, 1995
14